DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi 390,000
- PC Gresik @ 50 Kg 5.00 Zak 78,000 390,000
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 4,673,250
- Triplek 6 mm (120 cm x 240 cm x 6 mm) 6.00 Lbr 85,000 510,000
- Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 19.00 Btg 56,555 1,074,545
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
SYAIFULLAH,ST BULKIAH
4,088,923
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
panggung
TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
9 No Jenis Bahan Bangunan
(Satuan) (Rp)
7
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg 5 Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
10.67 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
5.33 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
7200 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
18.00 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
List - Triplek 6 mm (120 cm x 240 cm x 6 mm) 6 Lbr 85,000
89.44 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 19 Btg 56,555
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Toko/ Penyedia
UD TIG
SYAIFULLAH,ST BULKIAH
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
1 Pasir - m3 316,667
2 Batu Belah 15/20 - m3 250,000
3 Bata merah - Bh 950
4 Batu Pecah 2/3 - m3 300,000
HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
390,000 3 Pasangan Pondasi
390,000 - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
4,673,250 4 Papan
510,000 - Triplek 6 mm (120 cm x 240 cm x 6 mm) - Lbr
1,074,545 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) - Btg
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
a Bahan Bangunan
GA DARA
No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
Tenaga Fasilitator Lapangan
SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
a
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
- 1 Pasir - m3
- 2 Batu Belah 15/20 - m3
- 3 Bata merah - Bh
- 4 Batu Pecah 2/3 - m3
- HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
85,000 -
56,555 -
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
48,619 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
BULKIAH
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
316,667 -
250,000 -
950 -
300,000 -
-
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi -
- PC Gresik @ 50 Kg Zak 78,000 -
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 4,957,180
- Triplek 6 mm (120 cm x 240 cm x 6 mm) 10.00 Lbr 85,000 850,000
- Kayu usuk lokal/rimba 4/6 (4 cm x 6 cm x 4 m) - Btg 35,751 -
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
4,851,459
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
panggung TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
5 No Jenis Bahan Bangunan
(Satuan) (Rp)
9
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg - Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
9.33 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.67 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
6300 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
15.75 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
List - Triplek 6 mm (120 cm x 240 cm x 6 mm) 10 Lbr 85,000
72.78 - Kayu usuk lokal/rimba 4/6 (4 cm x 6 cm x 4 m) - Btg 35,751
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
1 Pasir - m3 316,667
2 Batu Belah 15/20 - m3 250,000
3 Bata merah - Bh 950
4 Batu Pecah 2/3 - m3 300,000
HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
- 3 Pasangan Pondasi
- - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
4,957,180 4 Papan
850,000 - Triplek 6 mm (120 cm x 240 cm x 6 mm) - Lbr
- - Kayu usuk lokal/rimba 4/6 (4 cm x 6 cm x 4 m) - Btg
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
a Bahan Bangunan
GA DARA
No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
Tenaga Fasilitator Lapangan
O SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
a
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
- 1 Pasir - m3
- 2 Batu Belah 15/20 - m3
- 3 Bata merah - Bh
- 4 Batu Pecah 2/3 - m3
- HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
85,000 -
35,751 -
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
48,619 -
25,000 -
25,000 -
25,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
HERIANTO ABIDANO
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
25,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
316,667 -
250,000 -
950 -
300,000 -
-
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi 390,000
- PC Gresik @ 50 Kg 5.00 Zak 78,000 390,000
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu 777,777
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) 7.00 Btg 111,111 777,777
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 6,147,723
- Triplek 6 mm (120 cm x 240 cm x 6 mm) 10.00 Lbr 85,000 850,000
- Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 50.00 Btg 56,555 2,827,750
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
5,939,239
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP I
pgung DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
7 No Jenis Bahan Bangunan
(Satuan) (Rp)
11
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg 5 Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
12.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
6.00 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) 7 Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
8100 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
20.25 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
List - Triplek 6 mm (120 cm x 240 cm x 6 mm) 10 Lbr 85,000
89.44 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 50 Btg 56,555
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
1 Pasir - m3 316,667
2 Batu Belah 15/20 - m3 250,000
3 Bata merah - Bh 950
4 Batu Pecah 2/3 - m3 300,000
HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
390,000 3 Pasangan Pondasi
390,000 - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
777,777 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
777,777 - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
6,147,723 4 Papan
850,000 - Triplek 6 mm (120 cm x 240 cm x 6 mm) - Lbr
2,827,750 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) - Btg
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
a Bahan Bangunan
GA DARA
No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
Tenaga Fasilitator Lapangan
N SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
a
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
- 1 Pasir - m3
- 2 Batu Belah 15/20 - m3
- 3 Bata merah - Bh
- 4 Batu Pecah 2/3 - m3
- HARGA TOTAL PEMEBELIAN
TERBILANG : Nihil Rupiah
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
85,000 -
56,555 -
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
48,619 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
ISKANDAR SAMIUN
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
316,667 -
250,000 -
950 -
300,000 -
-
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi -
- PC Gresik @ 50 Kg Zak 78,000 -
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan -
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : UD. GILANG MAS
Alamat Toko/ Penyedian Bahan Bangunan : UD. CAHAYA SINERGI
Nomor Rekening Bank Toko/ Penyedia BB : 0200201506273
SYAIFULLAH,ST JUSAIYAH
6,852,416
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Panggung
TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
5 No Jenis Bahan Bangunan
(Satuan) (Rp)
8.5
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg - Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
9.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.50 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
6075 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
15.19 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
p
List - Listplank beton (8 mm x 20 cm x 4 m) motif - Lbr 62,000
71.39 - Kayu usuk lokal/rimba 4/6 (4 cm x 6 cm x 4 m) - Btg 35,751
Jumlah - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
Listplank - Paku 7 cm - Kg 25,000
46.25 - Paku 5 cm - Kg 25,000
- Dry wall screw 4 cm - Pack 185,000
5 Pengecatan
- Cat Tembok Mutu Menengah - Kg
- Cat Kayu Mutu Menengeah - Kg 45,000
VI PEKERJAAN PINTU DAN JENDELA
a Kusen dan Daun Pintu (200 cm x 80 cm)
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
- Engsel pintu - Set 30,000
- Kunci pintu - Set 275,000
b Kusen dan Daun Jendela 2 Lubang (150 cm x 120 cm)
JMLH KUSEN - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
MIN - Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
4 JENDELA - Engsel jendela - Set 25,000
VII RING BALOK
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton
9.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.50 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
VIII PEKERJAAN ATAP
Kuda-kuda dan rangka atap :
- Canal C polos (0,75 mm x 100mm x 6m) - Btg 115,000
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
- Kayu gording lokal/rimba 6/12 (6 cm x 12 cm x 4 m) - Btg 85,714
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 12 cm - Kg 25,000
IX Pekerjaan Penutup atap :
JMLH ATAP 1 Penutup Atap
(70 - GVLM) - Seng gavalum (0,30 mm x 80 cm x 3 m1) @ Rp51.500,-/m1 - Lbr 154,500
20.0 - Seng gavalum (0,30 mm x 80 cm x 3,5 m1) @ Rp51.500,-/m1 - Lbr 180,250
- Seng gavalum (0,30 mm x 80 cm x 4 m1) @ Rp51.500,-/m1 46 Lbr 206,000
- Seng gavalum (0,30 mm x 80 cm x 4,5 m1) @ Rp51.500-/m1 - Lbr 231,750
- Seng gavalum (0,30 mm x 80 cm x 5 m1) @ Rp51.500,-/m1 - Lbr 257,500
Panjang Gvlm - Seng gavalum (0,30 mm x 80 cm x 6 m1) @ Rp51.500,-/m1 - Lbr 309,000
5.42 - Paku seng polos 4 Kg 35,000
2 Bubungan seng gavalum (0,35 mm x 3 m1) @ Rp37.000,-/m1 3 Lbr 111,000
3 Listplank beton (8 mm x 20 cm x 4 m) motif Jati 9 Lbr 62,000
X PEKERJAAN LANTAI
1 Lantai Rabat Beton 1 PC : 3 PS : 5 KR
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
- Pasir - m3 316,667
0.00 2 Lantai Papan
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) 82 Lbr 72,428
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) 20 Btg 45,666
- Paku 7 cm - Kg 25,000
- Paku 5 cm 5.62 Kg 25,000
XI Pekerjaan MCK
1 Tangki septick + Peresapan
- Buis Beton ɸ 80 cm - Bh 120,000
- Tutup Buis - Unit 120,000
2 Toilet
- Closet Jongkok - unit 125,000
- Pipa Air Bersih Ukuran 3/4" - Btg 34,000
- Pipa Air Kotor Ukuran 2" - Btg 47,500
- Pipa Air Kotor Ukuran 4" - Btg 105,000
- Floor Drain - Bh 10,000
- Kran - Bh 20,000
- Pintu Kamar Mandi - set 185,000
#VALUE! TOTAL HARGA PEMBELIAN (A)
Terbilang : Tujuh Belas Juta Lima Ratus Ribu Rupiah Rupiah
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
SYAIFULLAH,ST JUSAIYAH
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangun
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
- 3 Pasangan Pondasi
- - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
- 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
) No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
n Tenaga Fasilitator Lapangan
SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
wa
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
nan ( Tahap II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
62,000 -
35,751 -
48,619 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
JUSAIYAH
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi -
- PC Gresik @ 50 Kg Zak 78,000 -
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 3,792,282
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : UD. GILANG MAS
Alamat Toko/ Penyedian Bahan Bangunan : UD. CAHAYA SINERGI
Nomor Rekening Bank Toko/ Penyedia BB : 0200201506273
SYAIFULLAH,ST NASRUDDIN
3,792,282
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
rmh siku
TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
6 No Jenis Bahan Bangunan
(Satuan) (Rp)
9
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg - Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
10.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
5.00 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
6750 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
16.88 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
p
List - Listplank beton (8 mm x 20 cm x 4 m) motif - Lbr 62,000
78.33 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) - Btg 56,555
Jumlah - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) 78 Lbr 48,619
Listplank - Paku 7 cm - Kg 25,000
52.50 - Paku 5 cm - Kg 25,000
- Dry wall screw 4 cm - Pack 185,000
5 Pengecatan
- Cat Tembok Mutu Menengah - Kg
- Cat Kayu Mutu Menengeah - Kg 45,000
VI PEKERJAAN PINTU DAN JENDELA
a Kusen dan Daun Pintu (200 cm x 80 cm)
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
- Engsel pintu - Set 30,000
- Kunci pintu - Set 275,000
b Kusen dan Daun Jendela 2 Lubang (150 cm x 120 cm)
JMLH KUSEN - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
MIN - Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
4 JENDELA - Engsel jendela - Set 25,000
VII RING BALOK
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton
10.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
5.00 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
VIII PEKERJAAN ATAP
Kuda-kuda dan rangka atap :
- Canal C polos (0,75 mm x 100mm x 6m) - Btg 115,000
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
- Kayu gording lokal/rimba 6/12 (6 cm x 12 cm x 4 m) - Btg 85,714
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 12 cm - Kg 25,000
IX Pekerjaan Penutup atap :
JMLH ATAP 1 Penutup Atap
(70 - GVLM) - Seng gavalum (0,30 mm x 80 cm x 3 m1) @ Rp51.500,-/m1 - Lbr 154,500
22.9 - Seng gavalum (0,30 mm x 80 cm x 3,5 m1) @ Rp51.500,-/m1 20 Lbr 180,250
- Seng gavalum (0,30 mm x 80 cm x 4 m1) @ Rp51.500,-/m1 - Lbr 206,000
- Seng gavalum (0,30 mm x 80 cm x 4,5 m1) @ Rp51.500-/m1 - Lbr 231,750
- Seng gavalum (0,30 mm x 80 cm x 5 m1) @ Rp51.500,-/m1 26 Lbr 257,500
Panjang Gvlm - Seng gavalum (0,30 mm x 80 cm x 6 m1) @ Rp51.500,-/m1 - Lbr 309,000
5.65 - Paku seng polos 4 Kg 35,000
2 Bubungan seng gavalum (0,35 mm x 3 m1) @ Rp37.000,-/m1 5 Lbr 111,000
3 Listplank beton (8 mm x 20 cm x 4 m) motif Jati 15 Lbr 62,000
X PEKERJAAN LANTAI
1 Lantai Rabat Beton 1 PC : 3 PS : 5 KR
- PC Gresik @ 50 Kg 10 Zak 78,000
Total Pasir
- Pasir - m3 316,667
0.00 2 Lantai Papan
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 7 cm - Kg 25,000
- Paku 5 cm - Kg 25,000
XI Pekerjaan MCK
1 Tangki septick + Peresapan
- Buis Beton ɸ 80 cm 2 Bh 120,000
- Tutup Buis 2 Unit 120,000
2 Toilet
- Closet Jongkok 1 unit 125,000
- Pipa Air Bersih Ukuran 3/4" 1 Btg 34,000
- Pipa Air Kotor Ukuran 2" 1 Btg 47,500
- Pipa Air Kotor Ukuran 4" 1 Btg 105,000
- Floor Drain 1 Bh 10,000
- Kran 1 Bh 20,000
- Pintu Kamar Mandi 1 set 185,000
#VALUE! TOTAL HARGA PEMBELIAN (A)
Terbilang : Tujuh Belas Juta Lima Ratus Ribu Rupiah Rupiah
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
SYAIFULLAH,ST NASRUDDIN
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangun
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
- 3 Pasangan Pondasi
- - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
3,792,282 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
) No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
n Tenaga Fasilitator Lapangan
SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
wa
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
nan ( Tahap II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
62,000 -
56,555 -
48,619 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
NASRUDDIN
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi 1,096,667
- PC Gresik @ 50 Kg 10.00 Zak 78,000 780,000
- Pasir 1.00 m3 316,667 316,667
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 5,328,000
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : UD. GILANG MAS
Alamat Toko/ Penyedian Bahan Bangunan : UD. CAHAYA SINERGI
Nomor Rekening Bank Toko/ Penyedia BB : 0200201506273
SYAIFULLAH,ST SABRAM A
316,667
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
panggung
TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
5 No Jenis Bahan Bangunan
(Satuan) (Rp)
9.6
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg 10 Zak 78,000
…… JUTA - Pasir 1.00 m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
9.73 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.87 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
6570 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
16.43 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
1.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
p
List - Listplank beton (8 mm x 20 cm x 4 m) motif 74 Lbr 62,000
74.44 - Kayu usuk lokal/rimba 4/6 (4 cm x 6 cm x 4 m) - Btg 35,751
Jumlah - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
Listplank - Paku 7 cm - Kg 25,000
49.00 - Paku 5 cm - Kg 25,000
- Dry wall screw 4 cm 4 Pack 185,000
5 Pengecatan
- Cat Tembok Mutu Menengah - Kg
- Cat Kayu Mutu Menengeah - Kg 45,000
VI PEKERJAAN PINTU DAN JENDELA
a Kusen dan Daun Pintu (200 cm x 80 cm)
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
- Engsel pintu - Set 30,000
- Kunci pintu - Set 275,000
b Kusen dan Daun Jendela 2 Lubang (150 cm x 120 cm)
JMLH KUSEN - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
MIN - Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
4 JENDELA - Engsel jendela - Set 25,000
VII RING BALOK
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton
9.73 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.87 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
VIII PEKERJAAN ATAP
Kuda-kuda dan rangka atap :
- Canal C polos (0,75 mm x 100mm x 6m) - Btg 115,000
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
- Kayu gording lokal/rimba 6/12 (6 cm x 12 cm x 4 m) - Btg 85,714
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 12 cm - Kg 25,000
IX Pekerjaan Penutup atap :
JMLH ATAP 1 Penutup Atap
(70 - GVLM) - Seng gavalum (0,30 mm x 80 cm x 3 m1) @ Rp51.500,-/m1 20 Lbr 154,500
20.0 - Seng gavalum (0,30 mm x 80 cm x 3,5 m1) @ Rp51.500,-/m1 - Lbr 180,250
- Seng gavalum (0,30 mm x 80 cm x 4 m1) @ Rp51.500,-/m1 36 Lbr 206,000
- Seng gavalum (0,30 mm x 80 cm x 4,5 m1) @ Rp51.500-/m1 - Lbr 231,750
- Seng gavalum (0,30 mm x 80 cm x 5 m1) @ Rp51.500,-/m1 - Lbr 257,500
Panjang Gvlm - Seng gavalum (0,30 mm x 80 cm x 6 m1) @ Rp51.500,-/m1 - Lbr 309,000
5.93 - Paku seng polos 4 Kg 35,000
2 Bubungan seng gavalum (0,35 mm x 3 m1) @ Rp37.000,-/m1 - Lbr 111,000
3 Listplank beton (8 mm x 20 cm x 4 m) motif Jati 7 Lbr 62,000
X PEKERJAAN LANTAI
1 Lantai Rabat Beton 1 PC : 3 PS : 5 KR
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
- Pasir - m3 316,667
1.00 2 Lantai Papan
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 7 cm - Kg 25,000
- Paku 5 cm - Kg 25,000
XI Pekerjaan MCK
1 Tangki septick + Peresapan
- Buis Beton ɸ 80 cm - Bh 120,000
- Tutup Buis - Unit 120,000
2 Toilet
- Closet Jongkok - unit 125,000
- Pipa Air Bersih Ukuran 3/4" - Btg 34,000
- Pipa Air Kotor Ukuran 2" - Btg 47,500
- Pipa Air Kotor Ukuran 4" - Btg 105,000
- Floor Drain - Bh 10,000
- Kran - Bh 20,000
- Pintu Kamar Mandi - set 185,000
#VALUE! TOTAL HARGA PEMBELIAN (A)
Terbilang : Tujuh Belas Juta Lima Ratus Ribu Rupiah Rupiah
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
SYAIFULLAH,ST SABRAM A
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangun
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
1,096,667 3 Pasangan Pondasi
780,000 - PC Gresik @ 50 Kg - Zak
316,667 - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 1.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
5,328,000 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
) No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
n Tenaga Fasilitator Lapangan
SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
wa
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
nan ( Tahap II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
62,000 -
35,751 -
48,619 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
SABRAM A
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi -
- PC Gresik @ 50 Kg Zak 78,000 -
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm 613,000
- Besi beton polos ɸ 10 mm SNI 6.00 Ljr 98,000 588,000
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat 1.00 kg 25,000 25,000
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu -
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769 -
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111 -
V DINDING PERMANEN
1 Tembok 1,014,000
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg 13.00 Zak 78,000 1,014,000
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen #VALUE!
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak #VALUE!
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 8,263,000
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : UD. GILANG MAS
Alamat Toko/ Penyedian Bahan Bangunan : UD. CAHAYA SINERGI
Nomor Rekening Bank Toko/ Penyedia BB : 0200201506273
4,759,647
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
59 No Jenis Bahan Bangunan
(Satuan) (Rp)
6
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg - Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
43.33 - Besi beton polos ɸ 10 mm SNI 6 Ljr 98,000
21.67 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat 1.00 kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
29250 - PC Gresik @ 50 Kg 13 Zak 78,000
SEMEN - Bata merah - Bh 950
73.13 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
p
List - Triplek 6 mm (120 cm x 240 cm x 6 mm) 3 Lbr 85,000
364.44 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 30 Btg 56,555
Jumlah - Papan kayu rimas (3 cm x 20 cm x 4 m) 63 Lbr 96,238
Listplank - Paku 7 cm 2.00 Kg 25,000
310.00 - Paku 5 cm 4.00 Kg 25,000
- Paku 10 cm 4 Pack 25,000
5 Pengecatan
- Cat Tembok Mutu Menengah - Kg
- Cat Kayu Mutu Menengeah - Kg 45,000
VI PEKERJAAN PINTU DAN JENDELA
a Kusen dan Daun Pintu (200 cm x 80 cm)
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
- Engsel pintu - Set 30,000
- Kunci pintu - Set 275,000
b Kusen dan Daun Jendela 2 Lubang (150 cm x 120 cm)
JMLH KUSEN - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
MIN - Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
4 JENDELA - Engsel jendela - Set 25,000
VII RING BALOK
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton
43.33 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
21.67 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
VIII PEKERJAAN ATAP
Kuda-kuda dan rangka atap :
- Canal C polos (0,75 mm x 100mm x 6m) - Btg 115,000
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
- Kayu gording lokal/rimba 6/12 (6 cm x 12 cm x 4 m) - Btg 85,714
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 12 cm - Kg 25,000
IX Pekerjaan Penutup atap :
JMLH ATAP 1 Penutup Atap
(70 - GVLM) - Seng gavalum (0,30 mm x 80 cm x 3 m1) @ Rp51.500,-/m1 - Lbr 154,500
174.3 - Seng gavalum (0,30 mm x 80 cm x 3,5 m1) @ Rp51.500,-/m1 - Lbr 180,250
- Seng gavalum (0,30 mm x 80 cm x 4 m1) @ Rp51.500,-/m1 30 Lbr 206,000
- Seng gavalum (0,30 mm x 80 cm x 4,5 m1) @ Rp51.500-/m1 - Lbr 231,750
- Seng gavalum (0,30 mm x 80 cm x 5 m1) @ Rp51.500,-/m1 - Lbr 257,500
Panjang Gvlm - Seng gavalum (0,30 mm x 80 cm x 6 m1) @ Rp51.500,-/m1 - Lbr 309,000
4.30 - Paku seng polos 3 Kg 35,000
2 Bubungan seng gavalum (0,35 mm x 3 m1) @ Rp37.000,-/m1 3 Lbr 111,000
3 Listplank beton (8 mm x 20 cm x 4 m) motif Jati 16 Lbr 62,000
X PEKERJAAN LANTAI
1 Lantai Rabat Beton 1 PC : 3 PS : 5 KR
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
- Pasir - m3 316,667
0.00 2 Lantai Papan
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 7 cm - Kg 25,000
- Paku 5 cm - Kg 25,000
XI Pekerjaan MCK
1 Tangki septick + Peresapan
- Buis Beton ɸ 80 cm - Bh 120,000
- Tutup Buis - Unit 120,000
2 Toilet
- Closet Jongkok - unit 125,000
- Pipa Air Bersih Ukuran 3/4" - Btg 34,000
- Pipa Air Kotor Ukuran 2" - Btg 47,500
- Pipa Air Kotor Ukuran 4" - Btg 105,000
- Floor Drain - Bh 10,000
- Kran - Bh 20,000
- Pintu Kamar Mandi - set 185,000
#VALUE! TOTAL HARGA PEMBELIAN (A)
Terbilang : #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangun
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
- 3 Pasangan Pondasi
- - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
613,000 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
588,000 - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
25,000 - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
- 3 Tiang Kayu
- - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
- - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
1,014,000 1 Tembok
- - Pasir - m3
1,014,000 - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
#VALUE! 3 Ferosemen
- - Pasir - m3
#VALUE! - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
8,263,000 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
) No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
n Tenaga Fasilitator Lapangan
GA SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
wa
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
nan ( Tahap II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
#VALUE!
316,667 -
#VALUE!
35,000 -
30,000 -
25,000 -
40,000 -
-
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
85,000 -
56,555 -
96,238 -
25,000 -
25,000 -
25,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
SARAPUDDIN MENGGA
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
25,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
DANA TOTAL
DAFTAR RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I/II *)
I PEKERJAAN PERSIAPAN
- Bongkar Rumah Lama - ls 300,000 -
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi - m3 52,100 -
2 Urugan Pasir - m3 180,000 -
3 Pasangan Pondasi -
- PC Gresik @ 50 Kg Zak 78,000 -
- Pasir m3 316,667 -
- Batu Belah 15/20 m3 250,000 -
4 Urugan Kembali - m3 100,000 -
III PEKERJAAN SLOOF
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
IV PEKERJAAN KOLOM
1 Bagisting -
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619 -
- Paku 7 cm - kg 25,000 -
2 Cor Beton Kolom -
- Besi beton polos ɸ 10 mm SNI Ljr 98,000 -
- Besi beton polos ɸ 8 mm SNI Ljr 65,000 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Kawat bendrat kg 25,000 -
- Pasir m3 316,667 -
- Batu Pecah 2/3 m3 300,000 -
3 Tiang Kayu 1,149,298
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) 4.00 Btg 231,769 927,076
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) 2.00 Btg 111,111 222,222
V DINDING PERMANEN
1 Tembok -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
- Bata merah Bh 950 -
2 Plesteran -
- Pasir m3 316,667 -
- PC Gresik @ 50 Kg Zak 78,000 -
3 Ferosemen -
- Pasir - m3 316,667 -
- PC Gresik @ 50 Kg - Zak 78,000 -
- Paku seng polos - kg 35,000 -
- Paku Beton - Pack 30,000 -
- Kawat bendrat - kg 25,000 -
- Kawat Anyam - m 40,000 -
4 Papan 9,394,917
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : UD. GILANG MAS
Alamat Toko/ Penyedian Bahan Bangunan : UD. CAHAYA SINERGI
Nomor Rekening Bank Toko/ Penyedia BB : 0200201506273
SYAIFULLAH,ST FAISAL
5,993,929
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
panggung TAHAP I
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS TAHAP I
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangunan ( Tahap I )
UK RUMAH
Volume Harga Satuan
6 No Jenis Bahan Bangunan
(Satuan) (Rp)
12
I PEKERJAAN PERSIAPAN
SWADAYA - Bongkar Rumah Lama - ls 300,000
- II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3 52,100
2 Urugan Pasir - m3 180,000
- 3 Pasangan Pondasi
DANA TUNAI - PC Gresik @ 50 Kg - Zak 78,000
…… JUTA - Pasir - m3 316,667
(TERMASUK - Batu Belah 15/20 - m3 250,000
ONGKOS 4 Urugan Kembali - m3 100,000
TUKANG) III PEKERJAAN SLOOF
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
12.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
6.00 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
Asumsi IV PEKERJAAN KOLOM
Jumlah Kolom 1 Bagisting
min- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
9 - Paku 7 cm - kg 25,000
2 Cor Beton Kolom
9.75 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
4.88 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
- Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
3 Tiang Kayu
- Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) 4 Btg 231,769
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) 2 Btg 111,111
V DINDING PERMANEN
1 Tembok
BATA - Pasir - m3 316,667
8100 - PC Gresik @ 50 Kg - Zak 78,000
SEMEN - Bata merah - Bh 950
20.25 2 Plesteran
- Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
3 Ferosemen
0.00 - Pasir - m3 316,667
- PC Gresik @ 50 Kg - Zak 78,000
- Paku seng polos - kg 35,000
- Paku Beton - pack 30,000
- Kawat bendrat - kg 25,000
- Kawat Anyam - m 40,000
Jmlah Papan + 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
p
List - Triplek 6 mm (120 cm x 240 cm x 6 mm) 15 Lbr 85,000
86.67 - Kayu usuk rimas 5/7 (5 cm x 7 cm x 4 m) 35 Btg 56,555
Jumlah - Papan kayu rimas (3 cm x 20 cm x 4 m) 63 Lbr 96,238
Listplank - Paku 7 cm 1.10 Kg 25,000
60.00 - Paku 5 cm 2.00 Kg 25,000
- Dry wall screw 4 cm - Pack 185,000
5 Pengecatan
- Cat Tembok Mutu Menengah - Kg
- Cat Kayu Mutu Menengeah - Kg 45,000
VI PEKERJAAN PINTU DAN JENDELA
a Kusen dan Daun Pintu (200 cm x 80 cm)
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
- Engsel pintu - Set 30,000
- Kunci pintu - Set 275,000
b Kusen dan Daun Jendela 2 Lubang (150 cm x 120 cm)
JMLH KUSEN - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
MIN - Kayu lokal/rimba 7/14 (7 cm x 14 cm x 4 m) - Btg 115,384
4 JENDELA - Engsel jendela - Set 25,000
VII RING BALOK
1 Bagisting
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr 48,619
- Paku 7 cm - kg 25,000
2 Cor Beton
12.00 - Besi beton polos ɸ 10 mm SNI - Ljr 98,000
6.00 - Besi beton polos ɸ 8 mm SNI - Ljr 65,000
- PC Gresik @ 50 Kg - Zak 78,000
Kawat bendrat - kg 25,000
- Pasir - m3 316,667
- Batu Pecah 2/3 - m3 300,000
VIII PEKERJAAN ATAP
Kuda-kuda dan rangka atap :
- Canal C polos (0,75 mm x 100mm x 6m) - Btg 115,000
- Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg 111,111
- Kayu gording lokal/rimba 6/12 (6 cm x 12 cm x 4 m) - Btg 85,714
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 12 cm - Kg 25,000
IX Pekerjaan Penutup atap :
JMLH ATAP 1 Penutup Atap
(70 - GVLM) - Seng gavalum (0,30 mm x 80 cm x 3 m1) @ Rp51.500,-/m1 - Lbr 154,500
22.9 - Seng gavalum (0,30 mm x 80 cm x 3,5 m1) @ Rp51.500,-/m1 - Lbr 180,250
- Seng gavalum (0,30 mm x 80 cm x 4 m1) @ Rp51.500,-/m1 - Lbr 206,000
- Seng gavalum (0,30 mm x 80 cm x 4,5 m1) @ Rp51.500-/m1 - Lbr 231,750
- Seng gavalum (0,30 mm x 80 cm x 5 m1) @ Rp51.500,-/m1 20 Lbr 257,500
Panjang Gvlm - Seng gavalum (0,30 mm x 80 cm x 6 m1) @ Rp51.500,-/m1 - Lbr 309,000
7.06 - Paku seng ulir 2 Kg 35,000
2 Bubungan seng gavalum (0,35 mm x 3 m1) @ Rp37.000,-/m1 - Lbr 111,000
3 Listplank beton (8 mm x 20 cm x 4 m) motif Jati - Lbr 62,000
X PEKERJAAN LANTAI
1 Lantai Rabat Beton 1 PC : 3 PS : 5 KR
- PC Gresik @ 50 Kg - Zak 78,000
Total Pasir
- Pasir - m3 316,667
0.00 2 Lantai Papan
- Papan kayu lokal/rimba (3 cm x 20 cm x 4 m) - Lbr 72,428
- Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) 15 Lbr 48,619
- Kayu gording lokal/rimba 5/10 (5 cm x 10 cm x 4 m) - Btg 60,000
- Kayu usuk lokal/rimba 5/7 (5 cm x 7 cm x 4 m) - Btg 45,666
- Paku 7 cm - Kg 25,000
- Paku 5 cm - Kg 25,000
XI Pekerjaan MCK
1 Tangki septick + Peresapan
- Buis Beton ɸ 80 cm 2 Bh 120,000
- Tutup Buis 2 Unit 120,000
2 Toilet
- Closet Jongkok 1 unit 125,000
- Pipa Air Bersih Ukuran 3/4" 1 Btg 34,000
- Pipa Air Kotor Ukuran 2" 1 Btg 47,500
- Pipa Air Kotor Ukuran 4" 1 Btg 105,000
- Floor Drain 1 Bh 10,000
- Kran 1 Bh 20,000
- Pintu Kamar Mandi 1 set 185,000
#VALUE! TOTAL HARGA PEMBELIAN (A)
Terbilang : Tujuh Belas Juta Lima Ratus Ribu Rupiah Rupiah
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
SYAIFULLAH,ST FAISAL
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
Toko/ Penyedia
UD TIG
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
TAHAP II
DAFTRA RENCANA PEMANFAATAN BANTUAN (DRPB) BSPS
A. Jumlah Dana yang ditransfer ke Toko/ Penyedia Bahan Bangunan untuk pembelian bahan bangun
I PEKERJAAN PERSIAPAN
- - Bongkar Rumah Lama - ls
II PEKERJAAN PONDASI
- 1 Galian Tanah Pondasi - m3
- 2 Urugan Pasir - m3
- 3 Pasangan Pondasi
- - PC Gresik @ 50 Kg - Zak
- - Pasir - m3
- - Batu Belah 15/20 - m3
- 4 Urugan Kembali - m3
III PEKERJAAN SLOOF
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Sloof, Ukuran 15 cm x 20 cm
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
IV PEKERJAAN KOLOM
- 1 Bagisting
- - Papan kayu lokal/rimba (2 cm x 20 cm x 4 m) - Lbr
- - Paku 7 cm - kg
- 2 Cor Beton Kolom
- - Besi beton polos ɸ 10 mm SNI - Ljr
- - Besi beton polos ɸ 8 mm SNI - Ljr
- - PC Gresik @ 50 Kg - Zak
- - Kawat bendrat - kg
- - Pasir - m3
- - Batu Pecah 2/3 - m3
1,149,298 3 Tiang Kayu
927,076 - Kayu lokal/rimba 14/14 (14 cm x 14 cm x 4 m) - Btg
222,222 - Kayu lokal/rimba 8/12 (8 cm x 12 cm x 4 m) - Btg
V DINDING PERMANEN
- 1 Tembok
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Bata merah - Bh
- 2 Plesteran
- total jmlah pasir - Pasir - m3
- 0.00 - PC Gresik @ 50 Kg - Zak
- 3 Ferosemen
- - Pasir - m3
- - PC Gresik @ 50 Kg - Zak
- - Paku seng polos - kg
- - Paku Beton - pack
- - Kawat bendrat - kg
- - Kawat Anyam - m
9,394,917 4 Papan
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
) No Uraian
1,250,000 1 Upah Kerja PKRS
1,250,000 TOTAL TARIK TUNAI (B)
Terbilang : Satu Juta Dua Ratus Lima Puluh Ribu Rupiah Rupiah
Didampingi Oleh,
n Tenaga Fasilitator Lapangan
SYAIFULLAH,ST
Diverifikasi Oleh
Konsultan provinsi
wa
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
Disanggupi Oleh :
Nama Toko/ Penyedian Bahan Bangunan : Dua Puluh Juta Rupiah
Alamat Toko/ Penyedian Bahan Bangunan : UD TIGA DARA
Nomor Rekening Bank Toko/ Penyedia BB :
a Bahan Bangunan
GA DARA
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
S TAHAP II
nan ( Tahap II )
300,000 -
52,100 -
180,000 -
-
78,000 -
316,667 -
250,000 -
100,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
231,769 -
111,111 -
-
316,667 -
78,000 -
950 -
-
316,667 -
78,000 -
-
316,667 -
78,000 -
35,000 -
30,000 -
25,000 -
40,000 -
-
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
85,000 -
56,555 -
96,238 -
25,000 -
25,000 -
185,000 -
#VALUE!
#VALUE!
45,000 -
-
72,428 -
115,384 -
30,000 -
275,000 -
-
48,619 -
115,384 -
25,000 -
-
48,619 -
25,000 -
-
98,000 -
65,000 -
78,000 -
25,000 -
316,667 -
300,000 -
-
115,000 -
111,111 -
85,714 -
60,000 -
45,666 -
25,000 -
-
154,500 -
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
35,000 -
111,000 -
62,000 -
-
78,000 -
316,667 -
-
72,428 -
48,619 -
60,000 -
45,666 -
25,000 -
25,000 -
-
120,000 -
120,000 -
-
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE! #VALUE!
Format C-5
Daftar Rencana Pemanfaatan Bantuan (DRPB)
#VALUE!
Diajukan Oleh,
Penerima Bantuan
FAISAL
Diperiksa Oleh,
Koordinator
Kabupaten Sumbawa
FATHURRAHMAN, ST
AHAP II
180,250 -
206,000 -
231,750 -
257,500 -
309,000 -
111,000 -
115,000 -
25,000 -
25,000 -
25,000 -
35,000 -
35,000 -
30,000 -
185,000 -
40,000 -
120,000 -
120,000 -
125,000 -
34,000 -
47,500 -
105,000 -
10,000 -
20,000 -
185,000 -
#VALUE!
#VALUE!
SELISIH
#VALUE!
AHAP II
TAHAP I
9 78,750,000 #REF!
SELISIH #REF!
TAHAP II
Volume Harga Satuan
No Jenis Bahan Bangunan
(Satuan) (Rp)
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
12 #REF! #REF! #REF!
13 #REF! #REF! #REF!
14 #REF! #REF! #REF!
15 #REF! #REF! #REF!
16 #REF! #REF! #REF!
17 #REF! #REF! #REF!
18 #REF! #REF! #REF!
19 #REF! #REF! #REF!
20 #REF! #REF! #REF!
21 #REF! #REF! #REF!
22 #REF! #REF! #REF!
23 #REF! #REF! #REF!
24 #REF! #REF! #REF!
25 #REF! #REF! #REF!
26 #REF! #REF! #REF!
27 #REF! #REF! #REF!
28 #REF! #REF! #REF!
29 #REF! #REF! #REF!
30 #REF! #REF! #REF!
31 #REF! #REF! #REF!
32 #REF! #REF! #REF!
33 #REF! #REF! #REF!
34 #REF! #REF! #REF!
35 #REF! #REF! #REF!
HARGA TOTAL PEMEBELIAN
TERBILANG : #NAME?
9 78,750,000
SELISIH
Total Harga
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total Harga
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total Harga
(Rp)
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!