Pekerjaan Konstruksi Paket 1 Di Kabupaten Klaten (SMAN 1 Karangdowo dan SMAN 1 Cawas) Dana Alokasi Khusus (DAK) Fisik SMA (26731042)
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)
I BAHAN DASAR
1 BATU KALI
Batu Bulat Utuh m3 190,000.00
Batu Bulat Belah m3 200,000.00
2 KERIKIL
Batu Split Pecah Mesin (2-3 cm) m3 210,000.00
Batu Split Pecah Mesin (2-3 cm) / Berat Jenis = 1450 kg 103.45
3 BATU BATA
Batu Bata 5 x 11 x 22 (20) bh 650.00
4 PASIR
Pasir Urug m3 160,000.00
Pasir Pasang m3 190,000.00
Pasir Beton / Berat Jenis = 1400 kg 135.71
Pasir Batu (Sirtu) m3 190,000.00
7 PORTLAND CEMENT
Portland Cement (PC) 50 kg kg 1,200.00
Semen warna (40 kg) zak 48,000.00
Semen warna kg 1,100.00
II BAHAN PENUTUP ATAP
5 ASBES GELOMBANG
Asbes Gelombang Kecil
Atap bitumen type Onduvilla: 40cm x 106 cm x 0,3mm Lbr 45,000.00
Nok / Ridge Onduline Lbr 35,000.00
III. BAHAN KAYU
7 DOLKEN
Sedang 8 x 10 x 400 cm bt 10,000.00
Bambu btg 5,000.00
9 LOKAL
Papan m3 1,800,000.00
Balok/pesagen m3 2,000,000.00
Kayu Lokal 5/7 m3 2,000,000.00
IV . BAHAN PENUTUP DINDING/LANTAI
5 KERAMIK
Keramik 25/40, warna (bisa untuk dinding) buah 5,500.00
Keramik 25/25, (anti slip) buah 3,500.00
Keramik Lantai Uk. 40cm x 40cm Polished/Unpolished buah 10,000.00
Keramik Dinding Uk. 40cm x 40cm buah 12,500.00
Plint Granit 10 x 60 cm buah 7,500.00
Stepnosing 10x 60 cm buah 7,500.00
VI . BAHAN BESI
1 BESI BETON
Besi beton polos kg 10,000.00
Besi beton ulir kg 10,000.00
3 BESI PROFIL
Besi Profil kg 13,043.48
Besi Baja IWF kg 13,043.48
c HOLLOW GALVANIS LIPAT -
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm panj : 4 m btg 21,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm m' 5,250.00
6 KAWAT
- Ikat beton/bendrat kg -
7 BAHAN ALUMINIUM
Kusen aluminium uk. 4" Brown (ALEXINDO) ALEXINDO m' 95,000.00
Profil Daun Pintu Aluminium Uk. 2,5" silver ALEXINDO m' 110,000.00
Profil Daun Pintu Aluminium Uk. 2,5" Brown ALEXINDO m' 115,000.00
Allumunium Strip m' 55,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)
Dibuat oleh :
KONTRAKTOR PELAKSANA
PT. / CV. ………………………………………….
……………………………………………
Direktur / Direktris
DAFTAR HARGA SATUAN PERALATAN
BIAYA SEWA
No. URAIAN KODE HP KAP. ALAT/JAM di luar
PPN (Rp.)
Dibuat oleh :
KONTRAKTOR PELAKSANA
PT. / CV. ………………………………………….
……………………………………………
Direktur / Direktris
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 74,545,454.55
BIAYA UMUM 2% 1,490,909.09
KEUNTUNGAN 8% 5,963,636.36
TOTAL 82,000,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
BP ( Biaya penyambungan ) VA 66,000.000 969.00 63,954,000.00
UJL ( Uang Jaminan Langanan ) ls 1.000 5,046,000.00 5,046,000.00
Biaya Instalatir Include -
Concuil Include -
Pemasangan dan material yang dibutuhkan, seperti Include -
( kabel, tiang, pondasi, galian & urugan kembali, dll ) -
III PERALATAN
JUMLAH 69,000,000.00
BIAYA UMUM 2% 1,380,000.00
KEUNTUNGAN 8% 5,520,000.00
TOTAL 75,900,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH 20,000,000.00
BIAYA UMUM 2% 400,000.00
KEUNTUNGAN 8% 1,600,000.00
TOTAL 22,000,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
DAUN PINTU JALUSI KREPYAK/SPANDREL m2 1.000 1,200,000.00 1,200,000.00
III PERALATAN
Alat Bantu Pasang Ls 1.000 27,272.73 27,272.73
JUMLAH 1,227,272.73
BIAYA UMUM 2% 24,545.45
KEUNTUNGAN 8% 98,181.82
TOTAL 1,350,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
DAUN PINTU ENGINEERING DOOR HONEYCOMB m2 1.000 1,250,000.00 1,250,000.00
III PERALATAN
Alat Bantu Pasang Ls 1.000 27,272.73 27,272.73
JUMLAH 1,277,272.73
BIAYA UMUM 2% 25,545.45
KEUNTUNGAN 8% 102,181.82
TOTAL 1,405,000.00
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m' #REF! #REF! #REF!
Pemasangan Rangka Jendela Allumunium m' #REF! #REF! #REF!
#REF! bh #REF! #REF! #REF!
#REF! bh #REF! #REF! #REF!
#REF! m' #REF! #REF! #REF!
#REF! m' #REF! #REF! #REF!
#REF! m' #REF! #REF! #REF!
KACA 5MM JENDELA m2 #REF! #REF! #REF!
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 187,478.88 187,478.88
JUMLAH #REF!
BIAYA UMUM 0% #REF!
KEUNTUNGAN 0% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m' 5.930 #REF! #REF!
#REF! #REF! 2.091 1,405,000.00 2,937,855.00
#REF! #REF! 11.860 #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! 5.930 #REF! #REF!
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 256,747.00 256,747.00
JUMLAH #REF!
BIAYA UMUM 0% #REF!
KEUNTUNGAN 0% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m' 6.700 #REF! #REF!
Pemasangan Rangka Jendela Allumunium (BV Kaca) m' 2.460 #REF! #REF!
#REF! #REF! 1.700 1,405,000.00 2,388,500.00
#REF! #REF! 11.860 #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! 7.550 #REF! #REF!
CASEMENT bh 2.000 #REF! #REF!
RAMBUNCIS bh 1.000 #REF! #REF!
KACA 5MM JENDELA m2 0.219 #REF! #REF!
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 250,763.82 250,763.82
JUMLAH #REF!
BIAYA UMUM 0% #REF!
KEUNTUNGAN 0% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m' 6.400 #REF! #REF!
Pemasangan Rangka Jendela Allumunium (BV Kaca) m' 2.000 #REF! #REF!
#REF! #REF! 1.400 1,405,000.00 1,967,000.00
#REF! #REF! 11.400 #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
CASEMENT bh 2.000 #REF! #REF!
RAMBUNCIS bh 1.000 #REF! #REF!
KACA 5MM JENDELA m2 0.174 #REF! #REF!
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 208,817.04 208,817.04
JUMLAH #REF!
BIAYA UMUM 0% #REF!
KEUNTUNGAN 0% #REF!
TOTAL #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m' 3.520 #REF! #REF!
#REF! #REF! 0.603 1,350,000.00 814,320.00
#REF! SET 1.000 #REF! #REF!
ENGSEL PSG 2.000 #REF! #REF!
#REF! m' 3.520 #REF! #REF!
III PERALATAN
Instalasi (5% - 8%) Ls 1.000 124,681.06 124,681.06
JUMLAH #REF!
BIAYA UMUM 0% #REF!
KEUNTUNGAN 0% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
Alat Bantu Cor ls 1.000 #REF! #REF!
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
Alat Bantu Cor ls 1.000 #REF! #REF!
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH 0.075 200,000.00 15,000.00
#REF! OH 0.075 150,000.00 11,250.00
#REF! OH 0.075 #REF! #REF!
II BAHAN
III PERALATAN
Sewa Alat Bore Pile Machine jam 0.600 376,818.18 226,090.91
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak
SATUAN MATA PEMBAYARAN : Titik AHSP BIDANG CIPTA KARYA
VOLUME : A.6.2.1.1 PAGE. 1209
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! % 100.000 #REF! #REF!
#REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JENIS PEKERJAAN : Pek. Pasang Homogenous Tile Polish lantai Unit Hunian, R. Serbaguna, Koridor, Tangga Utama dan Tangg
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.3.13. PAGE. 1114
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Penutup Atap Transparant , UPVC , Skylight semi transparant (20% tembus cahaya)
SATUAN MATA PEMBAYARAN : m2 AHSP PERMEN PUPR NO. 28 2016
VOLUME : A.4.5.2.41
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul m2
untuk Plafon Gypsum
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
SUB TOTAL (A) (50%x Rangka) #REF!
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul m2
untuk Plafon Gypsum
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! % 10.000 142,083.33 14,208.33
#REF!
II BAHAN
Kabel Tray W200 x H100 x 2400mm UCP btg 0.417 227,000.00 94,583.33
Jointing pcs 1.000 12,500.00 12,500.00
Bracket (Rod drat, Siku, dll) ls 1.000 35,000.00 35,000.00
III PERALATAN
Alat bantu Pasang ls 1.000 48,253.79 48,253.79
JUMLAH 204,545.45
BIAYA UMUM 2% 4,090.91
KEUNTUNGAN 8% 16,363.64
TOTAL 225,000.00
JENIS PEKERJAAN : Pekerjaan Rollag Bata, Pas, 1bt (dibawah dinding bata)
SATUAN MATA PEMBAYARAN : Err:509 AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.1.4. PAGE. 1096
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JENIS PEKERJAAN : Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 5%
SATUAN MATA PEMBAYARAN : Err:509 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 1.7.2.e PAGE. 185
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
Alat bantu pemadatan Vibro
ls 1.000 15,000.00 15,000.00
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
Sub Bas Borong m2 1.000 36,000.00 36,000.00
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
Alat bantu ls 1.000 2,482.77 2,482.77
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tangga
SATUAN MATA PEMBAYARAN : Err:509 AHSP BIDANG CIPTA KARYA
VOLUME : A. 4.4.1.26. PAGE. 1105
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu
SATUAN MATA PEMBAYARAN : Titik AHSP BIDANG CIPTA KARYA
VOLUME : A.6.2.1.1 PAGE. 1209
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! % 100.000 #REF! #REF!
#REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
A #REF! m2
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Keramik 20x25 Dinding KM/WC, R. Cuci + Dinding Dapur
SATUAN MATA PEMBAYARAN : Err:509 AHSP BIDANG CIPTA KARYA
VOLUME : A.4.4.3.14. PAGE. 1115
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH 0.600 #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
Balok Kayu bekisting Sewa (Suri - Suri) #REF! #REF! 800,000.00 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! 0.426 #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. Bag. Dalam
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.2.2.2.5. 3.2.2.2.35.(a)
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
II BAHAN
#REF! m2 1.000 #REF! #REF!
#REF! m2 1.000 #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH 0.100 #REF! #REF!
#REF! OH 0.100 #REF! #REF!
#REF! OH 0.010 #REF! #REF!
#REF! OH 0.010 #REF! #REF!
II BAHAN
Semen Portland kg 6.816 #REF! #REF!
Pasir Pasang m3 0.013 #REF! #REF!
III PERALATAN ls 1.000 6,940.73 6,940.73
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Cat Dinding dan Dak Bag. Luar (exterior)
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.3.10.(c) PAGE. 323
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior)
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.3.10.(c) PAGE. 323
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Besi beton Untuk pembesian kolom, balok, ring balk dan sloof (Ulir)
SATUAN MATA PEMBAYARAN : kg AHSP BIDANG PEK. UMUM (PU)
VOLUME : 2.2.6.1.(a) PAGE. 279
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
JENIS PEKERJAAN : Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela
SATUAN MATA PEMBAYARAN : m2 AHSP BIDANG PEK. UMUM (PU)
VOLUME : 3.2.2.2.35.(a) PAGE. 318
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
#REF! OH #REF! #REF! #REF!
II BAHAN
#REF! #REF! #REF! #REF! #REF!
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
#REF! OH 0.010 #REF! #REF!
#REF! OH 0.400 #REF! #REF!
#REF! OH 0.040 #REF! #REF!
#REF! OH 0.005 #REF! #REF!
II BAHAN
Diameter 20mm (Ball Valve & Gate Valve) bh 1.000 67,010.00 67,010.00
Sealtape bh 0.145 5,000.00 726.36
III PERALATAN
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
No Uraian Satuan
Penawaran Klarifikasi Penawaran Klarifikasi Penawaran Klarifikasi
I UPAH
PEMBANGUNAN RUANG RAWAT INAP UNTUK PARU, JANTUNG DAN PENYAKIT AKIBAT DAMPAK ASAP ROKOK (TAHAP 5)
JUMLAH #REF!
BIAYA UMUM 2% #REF!
KEUNTUNGAN 8% #REF!
TOTAL #REF!
Page 24
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
C WATER PROOFING
1. Plat atap dan area rooftank Water Proof Coating Penetron, Fosroc
2. Kanopi Water Proof Coating Penetron, Fosroc
3. Toilet dan tempat wudhu Water Proof Coating Penetron, Fosroc
4. Lantai balkon Water Proof Coating Penetron, Fosroc
D PASANGAN BATA
1. Dinding Pasang bata merah tebal ½ bata 1PC : 5PP Lokal
2. Plesteran Plesteran tebal 15mm 1PC : 5PP dan acian Pasir Lokal
3. Rolag bata Bata merah Lokal
E PELAPIS LANTAI
a. Ruang umum Lantai Ukuran 40 x 40 cm polos putih ( R. Pendopo ) Mulia, Asia
b. Lantai Toilet Ukuran 25 x 25 cm motif (Toilet Lantai 2) Asia Tile Mulia, Asia
c. Dinding Toilet dinding ukuran 25 x 40 cm Motif warna Asia Tile Mulia, Asia
e. Dinding Homogenous tile uk. ( 60 x 60 ) cm Granito, Indogress
F AKSESORIES
a.Listplank GRC motif kayu
- Ukuran 2x2/20cm GRC Board
b.Logo PU stainless steel ukuran sesuai gambar
2.Daun Pintu semua ruang Wood plastic composit, finishing melamin DUMA
Aluminium warna Natural / Silver Alumunium ALEXINDO
3.Lubang Angin Plat ram Expanda dengan Rangka Holo 4cm x 4cm Lokal
Finishing cat
H KACA
1.Kaca jendela/pintu Kaca bening t=5mm & 8mm Mulia
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN
(LANJUTAN)
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
KELOMPOK KERJA (POKJA) : PEMBANGUNAN GEDUNG KANTOR KECAMATAN (LANJUTAN)
: JL. Mataram No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
K PENGECATAN
1.Cat dinding
a.Dinding bagian luar Cat dinding Weather Shield Catylac
b.Dindin bagian dalam Cat dinding interior acrilic emulsion Catylac
2.Cat plafond
a.Seluruh Ruangan cat plafond Catylac
putih standart,doff
L SANITARY
1.Kloset duduk Pipa buangan belakang(dinding) INA
2.kran air SanEi, Onda
3.Jet Washer TP SanEi, Onda
4.Tempat sabun polos, ukuran 10x20cm SanEi, Onda
5.Kran cuci solid SanEi, Onda
6.Kran sink solid SanEi, Onda
7.Sink ukuran 50x50 (1lubang) Royal
8.Washtafel ukuran panjang 40-50cm,lebar 30-45cm INA
9.Kran Washtafel solid SanEi, Onda
NUR HIDAYAT, SE
DIREKTUR
MASTER SCHEDULE
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
: Kecamatan Pekalongan Timur Jl. Tondano No.19
LOKASI : (POKJA) PEMBANGUNAN GEDUNG KANTOR
Pekalongan
KELOMPOK KERJA (POKJA) :KECAMATAN
JL. Mataram(LANJUTAN)
No 1 Kota Pekalongan Jawa Tengah
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
NO BOBOT 04/08/22
URAIAN PEKERJAAN BIAYA M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19
. (%)
29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22
4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22
99.054
97.040
95.910
90.900
85.890
74.190
63.170
53.150
43.130
32.120
27.110
0.133
20.100 0.363
13.090
0.238
7.010 0.212
0
BOBOT RENCANA
0.946
KOMULATIF BOBOT RENCANA
100.000
Page 28
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pek. Lampu Panel LED Downlight (18 watt
putih),Panasonic bh 2.00 175,000.00 11.00 38,500.00 388,500.00
Pek. Pasangan saklar Tunggal bh 2.00 26,620.00 11.00 5,856.40 59,096.40
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 11.00 62,320.05 628,866.01
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 11.00 195,539.03 1,973,166.53
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 658,817.50 11.00 72,469.93 731,287.43
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 185,130.00 11.00 40,728.60 410,988.60
Pek. Pasangan floor drain bh 2.00 150,562.50 11.00 33,123.75 334,248.75
Pek. Pasangan pipa PVC AW dia.4 m 15.00 112,913.63 11.00 186,307.48 1,880,011.86
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 21,301.50 11.00 35,147.48 354,669.98
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 1,895,052.50 11.00 833,823.10 8,414,033.10
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pengecatan tembok lantai 1 (Exsisting) m2 240.89 25,863.75 11.00 685,335.06 6,915,653.80
Pekerjaan Pengecatan tembok Toilet m2 54.28 23,060.68 11.00 137,690.68 1,389,424.12
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN LAIN 0.00 0.00 0.00 0.00 0.00
Tulisan KECAMATAN PEKALONGAN TIMUR KOTA unit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
PEKALONGAN Stainless steel + Logo Kota
Pemasangan Partisi Rangka Metal stud untuk Ruang Front m2 11.47 114,251.50 11.00 144,151.12 1,454,615.82
Office
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 m2 11.47 195,000.00 11.00 246,031.50 2,482,681.50
Lapis HPL
Pemasangan Partisi Rangka Metal stud untuk Ruang Rapat m2 13.86 114,251.50 11.00 174,187.84 1,757,713.63
Staf
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 m2 13.86 195,000.00 11.00 297,297.00 2,999,997.00
Lapis HPL
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL A 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PEMBANGUNAN LANTAI 2 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI 2 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1 6 m2 553.82 110,512.60 11.00 6,732,449.69 67,936,537.83
Pek. Plesteran 1 6 m2 1,107.63 62,456.13 11.00 7,609,611.16 76,787,894.43
Pek. Acian m2 1,107.63 26,592.50 11.00 3,240,011.59 32,694,662.36
Pek. Sponengan m 167.20 12,500.00 11.00 229,900.00 2,319,900.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN KUSEN DAN DAUN 0.00 0.00 0.00 0.00 0.00
JENDELA UPVC
Pek. Pintu Panel Type P1.a Unit 2.00 2,436,000.00 11.00 535,920.00 5,407,920.00
Pek. Pintu Kupu Tarung Type P2.b Unit 4.00 6,409,000.00 11.00 2,819,960.00 28,455,960.00
Pek. Pintu Kupu Tarung Type P2.c Unit 4.00 5,278,000.00 11.00 2,322,320.00 23,434,320.00
Pek. Jendela Type J3 Unit 16.00 7,653,100.00 11.00 13,469,456.00 135,919,056.00
Pek. Bouven Type BV1 Unit 4.00 580,000.00 11.00 255,200.00 2,575,200.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00
Pek. Beton Bertulang Kolom Praktis 15 x 15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 7.56 133,328.25 11.00 110,875.77 1,118,837.34
Pembesian kg 136.39 13,011.38 11.00 195,208.40 1,969,830.17
Beton Cor (Mutu beton K-175) m3 0.81 991,411.40 11.00 88,334.76 891,377.99
Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,3 m 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 143.36 133,328.25 11.00 2,102,533.17 21,216,471.09
Pembesian kg 2,430.36 13,011.38 11.00 3,478,456.46 35,100,787.88
Beton Cor (Mutu beton K-225) m3 20.48 1,040,738.55 11.00 2,344,575.80 23,658,901.26
Pek. Beton Bertulang Kolom Teras 40 x 30 T = 4,1 m 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 28.49 133,328.25 11.00 417,837.40 4,216,359.25
Page 30
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pembesian kg 672.04 13,011.38 11.00 961,858.27 9,706,024.41
Beton Cor (Mutu beton K-225) m3 4.44 1,040,738.55 11.00 508,296.71 5,129,175.86
Pek. Beton Bertulang Balok 25\/40 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 68.04 142,375.75 11.00 1,065,597.06 10,752,843.09
Pembesian kg 1,793.10 13,011.38 11.00 2,566,377.11 25,897,078.10
Beton Cor (Mutu beton K-225) m3 12.15 1,040,738.55 11.00 1,390,947.07 14,035,920.42
Pek. Beton Bertulang Balok 20\/30 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 62.72 142,375.75 11.00 982,278.77 9,912,085.81
Pembesian kg 1,641.10 13,011.38 11.00 2,348,826.88 23,701,798.49
Beton Cor (Mutu beton K-225) m3 6.72 1,040,738.55 11.00 769,313.93 7,763,076.97
Pek. Beton Bertulang Ring Balok 12\/18 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 2.02 142,375.75 11.00 31,635.89 319,234.91
Pembesian kg 39.79 13,011.38 11.00 56,949.50 574,672.21
Beton Cor (Mutu beton K-175) m3 0.17 991,411.40 11.00 18,539.39 187,079.33
Pek. Beton Bertulang Balok Latiu 12\/15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 29.02 142,375.75 11.00 454,491.87 4,586,236.13
Pembesian kg 389.54 13,011.38 11.00 557,529.72 5,625,981.71
Beton Cor (Mutu beton K-175) m3 1.78 991,411.40 11.00 194,118.35 1,958,830.65
Pek. Beton Bertulang Balok Balustred 15\/15 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 7.22 142,375.75 11.00 113,074.82 1,141,027.74
Pembesian kg 133.95 13,011.38 11.00 191,716.14 1,934,590.16
Beton Cor (Mutu beton K-175) m3 0.77 991,411.40 11.00 83,972.55 847,359.33
Balok Konsul Aula Lantai 2 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.80 142,375.75 11.00 75,174.40 758,578.00
Pembesian kg 101.45 13,011.38 11.00 145,200.47 1,465,204.71
Beton Cor (Mutu beton K-225) m3 0.69 991,411.40 11.00 75,248.13 759,321.99
Plat Topi - Topi tbl. 10 cm Selasar 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 15.43 141,028.25 11.00 239,367.25 2,415,433.15
Pembesian kg 336.60 13,011.38 11.00 481,759.26 4,861,388.93
Beton Cor (Mutu beton K-175) m3 2.77 991,411.40 11.00 302,083.06 3,048,292.65
Plat Topi - Topi tbl. 10 cm Jendela Bouven 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 10.68 141,028.25 11.00 165,679.99 1,671,861.70
Pembesian kg 232.97 13,011.38 11.00 333,438.67 3,364,699.28
Beton Cor (Mutu beton K-175) m3 1.92 991,411.40 11.00 209,386.09 2,112,895.99
Pek. Bertulang Plat beton Tebal 12 cm 0.00 0.00 0.00 0.00 0.00
Bondex 0,75 m2 127.05 141,028.25 11.00 1,970,940.31 19,888,579.47
Pembesian kg 1,197.92 13,011.38 11.00 1,714,524.83 17,301,114.16
Beton Cor (Mutu beton K-225) m3 17.23 991,411.40 11.00 1,879,022.04 18,961,040.54
Pek. Plat beton selasar lantai 2 Tebal 12 cm (Dudukan 0.00 0.00 0.00 0.00 0.00
water tank)
Bekisting 2x pakai m2 3.68 141,028.25 11.00 57,088.24 576,072.20
Pembesian kg 77.25 13,011.38 11.00 110,564.18 1,115,693.09
Beton Cor (Mutu beton K-225) m3 0.75 991,411.40 11.00 81,791.44 825,349.99
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LANTAI KERAMIK 0.00 0.00 0.00 0.00 0.00
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE
(Toilet) m2 11.84 139,647.75 11.00 181,877.23 1,835,306.59
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 154,662.75 11.00 232,736.51 2,348,522.93
(Toilet) Tinggi 1.20 m
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN RANGKA ATAP DAN PENUTUP
ATAP 0.00 0.00 0.00 0.00 0.00
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 24,530.00 11.00 1,915,793.00 19,332,093.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 24,530.00 11.00 12,421,219.31 125,341,394.81
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 24,530.00 11.00 3,979,398.87 40,155,752.27
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai Luar) kg 1,150.84 24,530.00 11.00 3,105,311.57 31,335,416.77
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Plat Buhul 8 mm kg 204.00 24,530.00 11.00 550,453.20 5,554,573.20
Pasang kait angin 12 mm kg 144.74 13,011.38 11.00 207,159.35 2,090,426.13
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 2,500.00 11.00 178,200.00 1,798,200.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 2,500.00 11.00 514,800.00 5,194,800.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 13,011.38 11.00 187,794.51 1,895,017.35
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 250.00 11.00 111,375.00 1,123,875.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 96,525.00 11.00 7,042,753.58 71,067,786.08
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 100,650.00 11.00 7,343,725.95 74,104,870.95
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 93,051.75 11.00 696,027.09 7,023,546.09
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 50,000.00 11.00 780,450.00 7,875,450.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 25,000.00 11.00 277,750.00 2,802,750.00
(8x20x400)
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN INSTALASI LISTRIK 0.00 0.00 0.00 0.00 0.00
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 1,500,000.00 11.00 330,000.00 3,330,000.00
assesories)
Pek. Stop Kontak bh 17.00 26,620.00 11.00 49,779.40 502,319.40
Pek. Stop Kontak AC bh 11.00 85,000.00 11.00 102,850.00 1,037,850.00
Pek. Saklar Tunggal bh 4.00 26,620.00 11.00 11,712.80 118,192.80
Pek. Saklar Ganda bh 7.00 26,620.00 11.00 20,497.40 206,837.40
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 175,000.00 11.00 539,000.00 5,439,000.00
putih),Panasonic
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 225,000.00 11.00 495,000.00 4,995,000.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 226,600.00 11.00 1,620,190.00 16,349,190.00
pipa conduit
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 0.00 0.00 0.00 0.00
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 65,000.00 11.00 42,900.00 432,900.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 65,000.00 11.00 71,500.00 721,500.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 11.00 43,450.00 438,450.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SDP 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 65,000.00 11.00 14,300.00 144,300.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 395,000.00 11.00 86,900.00 876,900.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 395,000.00 11.00 86,900.00 876,900.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PANEL AC LANTAI 2 0.00 0.00 0.00 0.00 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 11.00 0.00 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 65,000.00 11.00 78,650.00 793,650.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 11.00 43,450.00 438,450.00
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 11.00 45,919.50 463,369.50
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 11.00 9,350.00 94,350.00
Pekerjaan Intaslasi AC bh 11.00 350,000.00 11.00 423,500.00 4,273,500.00
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 11.00 82,500.00 832,500.00
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Page 32
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 11.00 62,320.05 628,866.01
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 11.00 195,539.03 1,973,166.53
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 185,130.00 11.00 81,457.20 821,977.20
Pek. Pasangan floor drain stainlesstell bh 2.00 150,562.50 11.00 33,123.75 334,248.75
Pek. Pasangan pipa PVC AW dia.4 m 20.00 112,913.63 11.00 248,409.98 2,506,682.48
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 21,301.50 11.00 58,579.13 591,116.63
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 1,895,052.50 11.00 416,911.55 4,207,016.55
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pengecatan tembok interior ex.catylac m2 1,014.80 23,060.68 11.00 2,574,217.03 25,976,190.02
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.00
Pemasangan Partisi Rangka Metal stud m2 34.65 114,251.50 11.00 435,469.59 4,394,284.07
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 58,681.43 11.00 447,328.50 4,513,951.26
Uk.120x240 cm
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL B 0.00 0.00 0.00 0.00 0.00
PEKERJAAN GEDUNG PENDOPO 0.00 0.00 0.00 0.00 0.00
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 0.00 0.00 0.00 0.00
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00
Pek. Galian tanah biasa sedalam 1 m m3 1.66 75,075.00 11.00 13,708.70 138,333.20
Pek. Pengurugan tanah kembali bekas galian m3 0.42 25,025.00 11.00 1,156.16 11,666.66
Pek. Pengurugan Sirtu padat kelas A m3 17.64 238,150.00 11.00 462,106.26 4,663,072.26
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 320,430.00 11.00 487,117.69 4,915,460.29
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PONDASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 466,661.25 11.00 64,679.25 652,672.42
Pek. Pasangan pondasi batu kali 16 m3 1.00 725,925.75 11.00 79,851.83 805,777.58
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BETON 0.00 0.00 0.00 0.00 0.00
Pek. Sloof 15\/20 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 3.60 101,216.50 11.00 40,081.73 404,461.13
Pembesian kg 36.47 13,011.38 11.00 52,197.74 526,722.68
Beton K.175 m3 0.27 991,411.40 11.00 29,444.92 297,126.00
Pek. Kolom 30\/30 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 60.48 133,328.25 11.00 887,006.18 8,950,698.74
Pembesian kg 254.32 13,011.38 11.00 363,995.89 3,673,049.41
Beton K.225 m3 6.48 1,040,738.55 11.00 741,838.44 7,485,824.23
Pek. Kolom Praktis 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 5.29 133,328.25 11.00 77,583.71 782,890.15
Pembesian kg 95.47 13,011.38 11.00 136,641.58 1,378,837.79
Beton K.175 m3 0.57 991,411.40 11.00 62,161.50 627,266.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 12.74 142,375.75 11.00 199,525.38 2,013,392.43
Pembesian kg 305.06 13,011.38 11.00 436,617.59 4,405,868.41
Beton K.225 m3 2.73 1,040,738.55 11.00 312,533.79 3,153,750.02
Pek. Balok Aula 20\/25 (B1) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 31.36 142,375.75 11.00 491,139.39 4,956,042.91
Pembesian kg 412.25 13,011.38 11.00 590,033.44 5,953,973.82
Beton K.225 m3 3.20 1,040,738.55 11.00 366,339.97 3,696,703.32
Pek. Balok Gapura 15\/20 (B3) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.89 142,375.75 11.00 76,583.92 772,801.33
Pembesian kg 67.55 13,011.38 11.00 96,681.04 975,599.59
Beton K.175 m3 0.32 991,411.40 11.00 34,897.68 352,149.33
Pek. Balok Teki-teki 15\/20 (B3) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 11.95 142,375.75 11.00 187,152.92 1,888,543.14
Pembesian kg 235.77 13,011.38 11.00 337,446.17 3,405,138.65
Beton K.175 m3 1.02 991,411.40 11.00 111,236.36 1,122,475.99
Pek. Balok Aula 20\/35 (B2) 0.00 0.00 0.00 0.00 0.00
Page 33
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Bekisting 2x pakai m2 13.23 142,375.75 11.00 207,199.43 2,090,830.60
Pembesian kg 418.04 13,011.38 11.00 598,320.39 6,037,596.64
Beton K.225 m3 1.47 1,040,738.55 11.00 168,287.42 1,698,173.09
Pek. Balok Konsul Pendopo Bawah Talang 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.50 142,375.75 11.00 70,476.00 711,166.87
Pembesian kg 169.58 13,011.38 11.00 242,711.63 2,449,181.03
Beton K.175 m3 0.46 991,411.40 11.00 50,165.42 506,214.66
Pek. Balok Konsul Topi-Topi 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.12 142,375.75 11.00 64,524.69 651,112.78
Pembesian kg 52.04 13,011.38 11.00 74,482.33 751,594.41
Beton K.175 m3 0.59 991,411.40 11.00 64,342.60 649,275.33
Pek. Plat beton talang aula tebal 12 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 23.80 141,028.25 11.00 369,211.96 3,725,684.31
Pembesian kg 1,430.69 13,011.38 11.00 2,047,677.24 20,662,924.92
Beton K.225 m3 3.62 1,040,738.55 11.00 414,422.09 4,181,895.63
Pek. Plat beton topi-topi tebal 10 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 29.24 141,028.25 11.00 453,603.26 4,577,269.29
Pembesian kg 448.41 13,011.38 11.00 641,787.50 6,476,219.28
Beton K.175 m3 3.63 991,411.40 11.00 395,870.57 3,994,693.97
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 47.60 142,375.75 11.00 745,479.43 7,522,565.13
Pembesian kg 1,088.91 13,011.38 11.00 1,558,504.10 15,726,723.17
Beton K.225 m3 7.07 1,040,738.55 11.00 809,382.37 8,167,403.90
Pek. Balok Konsul Topi-topi 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 4.50 142,375.75 11.00 70,476.00 711,166.87
Pembesian kg 169.58 13,011.38 11.00 242,711.63 2,449,181.03
Beton K.175 m3 0.46 991,411.40 11.00 50,165.42 506,214.66
Pek. Plat deker Gapura Pendopo 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 6.00 141,028.25 11.00 93,078.65 939,248.15
Pembesian kg 107.41 13,011.38 11.00 153,730.73 1,551,282.78
Beton K.225 m3 0.48 1,040,738.55 11.00 54,951.00 554,505.50
Pek. Plat Talang Gapuro tebal 8 cm 0.00 0.00 0.00 0.00 0.00
Bekisting 2x pakai m2 5.97 141,028.25 11.00 92,613.25 934,551.90
Pembesian kg 56.81 13,011.38 11.00 81,309.40 820,485.75
Beton K.225 m3 0.48 1,040,738.55 11.00 54,951.00 554,505.50
Lantai Beton Rabat Keliling Pendopo fc=7,4 Mpa m3 1.95 905,121.64 11.00 194,148.59 1,959,135.80
Lantai Beton Rabat Bawah Lantai Pendopo fc=7,4 Mpa m3 12.78 905,121.64 11.00 1,272,420.01 12,839,874.60
Pek. Waterproofing dak Talang m2 68.00 50,000.00 11.00 374,000.00 3,774,000.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PASANGAN 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 472.00 110,512.60 11.00 5,737,814.19 57,899,761.39
Pek. Plesteran tbl. 15 mm, 16 m2 944.00 62,456.13 11.00 6,485,444.54 65,444,031.26
Pek. Sekoningan Sudut m 37.50 12,500.00 11.00 51,562.50 520,312.50
Pek. Acian m2 944.00 26,592.50 11.00 2,761,365.20 27,864,685.20
Pek. Ornamen List beton profil 10 cm Pendopo (Teki-teki) m 92.00 24,983.75 11.00 252,835.55 2,551,340.55
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENUTUP LANTAI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Lantai Keramik 40x40 cm, motif warna m2 270.75 139,647.75 11.00 4,159,059.11 41,968,687.43
Pek. Pasangan Granit Tile 60x60 cm, (untuk dinding) m2 36.15 238,115.78 11.00 946,867.39 9,554,752.76
Pek. Pasangan Dinding Batu paras candi (10x20) cm m2 33.11 185,000.00 11.00 673,788.50 6,799,138.50
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LANGIT- LANGIT 0.00 0.00 0.00 0.00 0.00
Pek. Plafond PVC drop ceilling Lengkap List Plafond + m2 347.57 146,619.00 11.00 5,605,640.24 56,566,006.07
Lampu Hias
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN ATAP 0.00 0.00 0.00 0.00 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 & m2 237.50 96,525.00 11.00 2,521,715.63 25,446,403.13
Z95.075 dan Reng B 32 (Tebal 0,45 mm)
Pek. Pasangan Genteng metal lapis pasir m2 237.50 100,650.00 11.00 2,629,481.25 26,533,856.25
Page 34
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pek. Pasangan Nok genteng metal lapis pasir m 34.10 93,051.75 11.00 349,037.11 3,522,101.79
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan Pipa PVC tipe AW 3 m 84.00 77,273.63 11.00 714,008.30 7,204,992.80
Pek. Pasangan Saluran beton U-20 cm m 27.00 35,000.00 11.00 103,950.00 1,048,950.00
Pek. Pasangan Gorong-gorong beton 20 cm m 7.50 45,000.00 11.00 37,125.00 374,625.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.00
Pek. Pengecatan tembok baru m2 944.00 23,060.68 11.00 2,394,620.49 24,163,897.69
Pek. Pengecatan topi-topi , Konsul Beton m2 71.11 23,060.68 11.00 180,382.91 1,820,227.51
Pek. Pengecatan Water proofing untuk Talang Beton m2 53.70 50,000.00 11.00 295,350.00 2,980,350.00
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LISTRIK 0.00 0.00 0.00 0.00 0.00
Pek. Instalasi titik lampu NYA 2x2,5mm+pipa conduit titik 23.00 226,600.00 11.00 573,298.00 5,785,098.00
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 65,000.00 11.00 7,150.00 72,150.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 225,000.00 11.00 371,250.00 3,746,250.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 175,000.00 11.00 154,000.00 1,554,000.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 26,620.00 11.00 20,497.40 206,837.40
Pek. Stop kontak (Broco) bh 3.00 26,620.00 11.00 8,784.60 88,644.60
Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.00
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,500,000.00 11.00 275,000.00 2,775,000.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 114,251.50 11.00 245,823.53 2,480,582.87
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 58,681.43 11.00 252,517.91 2,548,135.25
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 185,000.00 11.00 71,632.00 722,832.00
Steel (Jalur Difable)
Total 0.00 0.00 0.00 0.00 0.00
TOTAL ( C ) 0.00 0.00 0.00 0.00 0.00
PEKERJAAN HALAMAN 0.00 0.00 0.00 0.00 0.00
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.00
Pek . Urugan Sirtu Kelas A m3 86.68 238,150.00 11.00 2,270,712.62 22,913,554.62
Sub Total 0.00 0.00 0.00 0.00 0.00
PEKERJAAN PAVING 0.00 0.00 0.00 0.00 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 110,512.60 11.00 173,228.50 1,748,033.05
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 62,456.13 11.00 195,799.97 1,975,799.67
Pek. Acian m2 28.50 26,592.50 11.00 83,367.49 841,253.74
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 208,696.40 11.00 2,850,521.52 28,764,353.51
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 0.00 0.00 0.00 0.00
TOTAL D 0.00 0.00 0.00 0.00 0.00
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 0.00 0.00 0.00 0.00
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Asuransi dan perijinan ls 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
Personil Keselamatan Konstruksi ls 1.00 1,526,238.77 11.00 167,886.26 1,694,125.04
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL PEKERJAAN 1,925,000,000.00
PAJAK PERTAMBAHAN NILAI (PPN 11%) 190,765,765.77
DPP PEKERJAAN 1,734,234,234.23
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
PEJABAT PEMBUAT KOMITMEN CV. ARFAHMAULANA CIPTA RAYA
Penyedia Jasa / Kontraktor
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 62,320.05 628,866.01 0.031
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 195,539.03 1,973,166.53 0.098
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 658,817.50 72,469.93 731,287.43 0.036
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,500,000.00 165,000.00 1,665,000.00 0.083
Pek. Pasangan kran air dia.3\/4 bh 2.00 185,130.00 40,728.60 410,988.60 0.020
Pek. Pasangan floor drain bh 2.00 150,562.50 33,123.75 334,248.75 0.017
Pek. Pasangan pipa PVC AW dia.4 m 15.00 112,913.63 186,307.48 1,880,011.86 0.093
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 21,301.50 35,147.48 354,669.98 0.018
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 1,895,052.50 833,823.10 8,414,033.10 0.418
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.000
Pekerjaan Pengecatan tembok lantai 1 (Exsisting) m2 240.89 25,863.75 685,335.06 6,915,653.80 0.343
Pekerjaan Pengecatan tembok Toilet m2 54.28 23,060.68 137,690.68 1,389,424.12 0.069
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN LAIN LAIN 0.00 0.00 0.00 0.00 0.000
Tulisan KECAMATAN PEKALONGAN TIMUR KOTA unit 1.00 1,500,000.00 165,000.00 1,665,000.00 0.083
PEKALONGAN Stainless steel + Logo Kota
Pemasangan Partisi Rangka Metal stud untuk Ruang Front Office m2 11.47 114,251.50 144,151.12 1,454,615.82 0.072
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 Lapis m2 11.47 195,000.00 246,031.50 2,482,681.50 0.123
HPL
Pemasangan Partisi Rangka Metal stud untuk Ruang Rapat Staf m2 13.86 114,251.50 174,187.84 1,757,713.63 0.087
Pemasangan Partisi Plywood tebal 9 mm Uk.120x240 Lapis m2 13.86 195,000.00 297,297.00 2,999,997.00 0.149
HPL
Sub Total 0.00 0.00 0.00 0.00 0.000
TOTAL A 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PEMBANGUNAN LANTAI 2 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 2 0.00 0.00 0.00 0.00 0.000
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Pek. Beton Bertulang Balok 20\/30 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 62.72 142,375.75 982,278.77 9,912,085.81 0.492
Pembesian kg 1,723.16 13,011.38 2,466,268.22 24,886,888.42 1.236
Beton Cor (Mutu beton K-225) m3 6.72 1,040,738.55 769,313.93 7,763,076.97 0.385
Pek. Beton Bertulang Ring Balok 12\/18 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 2.02 142,375.75 31,635.89 319,234.91 0.016
Pembesian kg 41.78 13,011.38 59,796.97 603,405.82 0.030
Beton Cor (Mutu beton K-175) m3 0.17 991,411.40 18,539.39 187,079.33 0.009
Pek. Beton Bertulang Balok Latiu 12\/15 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 29.02 142,375.75 454,491.87 4,586,236.13 0.228
Pembesian kg 409.02 13,011.38 585,406.21 5,907,280.80 0.293
Beton Cor (Mutu beton K-175) m3 1.78 991,411.40 194,118.35 1,958,830.65 0.097
Pek. Beton Bertulang Balok Balustred 15\/15 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 7.22 142,375.75 113,074.82 1,141,027.74 0.057
Pembesian kg 140.65 13,011.38 201,301.95 2,031,319.67 0.101
Beton Cor (Mutu beton K-175) m3 0.77 991,411.40 83,972.55 847,359.33 0.042
Balok Konsul Aula Lantai 2 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 4.80 142,375.75 75,174.40 758,578.00 0.038
Pembesian kg 106.52 13,011.38 152,460.49 1,538,464.95 0.076
Beton Cor (Mutu beton K-225) m3 0.69 991,411.40 75,248.13 759,321.99 0.038
Plat Topi - Topi tbl. 10 cm Selasar 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 15.43 141,028.25 239,367.25 2,415,433.15 0.120
Pembesian kg 353.43 13,011.38 505,847.23 5,104,458.38 0.253
Beton Cor (Mutu beton K-175) m3 2.77 991,411.40 302,083.06 3,048,292.65 0.151
Plat Topi - Topi tbl. 10 cm Jendela Bouven 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 10.68 141,028.25 165,679.99 1,671,861.70 0.083
Pembesian kg 244.62 13,011.38 350,110.60 3,532,934.25 0.175
Beton Cor (Mutu beton K-175) m3 1.92 991,411.40 209,386.09 2,112,895.99 0.105
Pek. Bertulang Plat beton Tebal 12 cm 0.00 0.00 0.00 0.00 0.000
Bondex 0,75 m2 127.05 141,028.25 1,970,940.31 19,888,579.47 0.988
Pembesian kg 1,257.82 13,011.38 1,800,251.07 18,166,169.87 0.902
Beton Cor (Mutu beton K-225) m3 17.23 991,411.40 1,879,022.04 18,961,040.54 0.942
Pek. Plat beton selasar lantai 2 Tebal 12 cm (Dudukan water 0.00 0.00 0.00 0.00 0.000
tank)
Bekisting 2x pakai m2 3.68 141,028.25 57,088.24 576,072.20 0.029
Pembesian kg 77.25 13,011.38 110,564.18 1,115,693.09 0.055
Beton Cor (Mutu beton K-225) m3 0.75 991,411.40 81,791.44 825,349.99 0.041
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN LANTAI KERAMIK 0.00 0.00 0.00 0.00 0.000
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE (Toilet) m2 11.84 139,647.75 181,877.23 1,835,306.59 0.091
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE (Toilet) m2 13.68 154,662.75 232,736.51 2,348,522.93 0.117
Tinggi 1.20 m
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.00 0.00 0.00 0.00 0.000
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 24,530.00 1,915,793.00 19,332,093.00 0.960
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 5,922.39 24,530.00 15,980,387.53 161,256,637.78 8.008
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,578.09 24,530.00 4,258,152.69 42,968,631.71 2.134
Rangka Gording Besi CNP 75.45.2,3 kg 390.00 24,530.00 1,052,337.00 10,619,037.00 0.527
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai Luar) kg 2,269.81 24,530.00 6,124,619.90 61,802,982.67 3.069
Besi C 75 Tebal 1.00 mm double m1 674.60 42,500.00 3,153,755.00 31,824,255.00 1.580
Plat Landas\u00A0(base plate) 10 mm kg 131.06 24,530.00 353,639.20 3,568,541.00 0.177
Plat Buhul 8 mm kg 204.00 24,530.00 550,453.20 5,554,573.20 0.276
Pasang kait angin 12 mm kg 144.74 13,011.38 207,159.35 2,090,426.13 0.104
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 2,500.00 178,200.00 1,798,200.00 0.089
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 2,500.00 514,800.00 5,194,800.00 0.258
Angkur diameter 19 mm panjang 40 cm kg 131.21 13,011.38 187,794.51 1,895,017.35 0.094
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 250.00 111,375.00 1,123,875.00 0.056
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan Reng B m2 663.30 96,525.00 7,042,753.58 71,067,786.08 3.529
32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 100,650.00 7,343,725.95 74,104,870.95 3.680
Page 39
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 93,051.75 696,027.09 7,023,546.09 0.349
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 50,000.00 780,450.00 7,875,450.00 0.391
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 25,000.00 277,750.00 2,802,750.00 0.139
(8x20x400)
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN INSTALASI LISTRIK 0.00 0.00 0.00 0.00 0.000
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 1,500,000.00 330,000.00 3,330,000.00 0.165
assesories)
Pek. Stop Kontak bh 17.00 26,620.00 49,779.40 502,319.40 0.025
Pek. Stop Kontak AC bh 11.00 85,000.00 102,850.00 1,037,850.00 0.052
Pek. Saklar Tunggal bh 4.00 26,620.00 11,712.80 118,192.80 0.006
Pek. Saklar Ganda bh 7.00 26,620.00 20,497.40 206,837.40 0.010
Pek. Lampu Panel LED Downlight (18 watt putih),Panasonic bh 28.00 175,000.00 539,000.00 5,439,000.00 0.270
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 225,000.00 495,000.00 4,995,000.00 0.248
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + pipa ttk 65.00 226,600.00 1,620,190.00 16,349,190.00 0.812
conduit
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 0.00 0.00 0.00 0.000
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel Kontrol + unit 1.00 1,500,000.00 165,000.00 1,665,000.00 0.083
Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 65,000.00 42,900.00 432,900.00 0.021
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 65,000.00 71,500.00 721,500.00 0.036
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 43,450.00 438,450.00 0.022
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 45,919.50 463,369.50 0.023
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 9,350.00 94,350.00 0.005
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 82,500.00 832,500.00 0.041
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN SDP 0.00 0.00 0.00 0.00 0.000
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + unit 1.00 1,000,000.00 110,000.00 1,110,000.00 0.055
Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 65,000.00 14,300.00 144,300.00 0.007
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 395,000.00 86,900.00 876,900.00 0.044
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 395,000.00 86,900.00 876,900.00 0.044
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 45,919.50 463,369.50 0.023
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 9,350.00 94,350.00 0.005
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 82,500.00 832,500.00 0.041
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PANEL AC LANTAI 2 0.00 0.00 0.00 0.00 0.000
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol + unit 1.00 0.00 0.00 0.00 0.000
Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 65,000.00 78,650.00 793,650.00 0.039
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 395,000.00 43,450.00 438,450.00 0.022
Pekerjaan Pasang Pilot Lamp bh 3.00 139,150.00 45,919.50 463,369.50 0.023
Pekerjaan Pasang Volt Meter bh 1.00 85,000.00 9,350.00 94,350.00 0.005
Pekerjaan Intaslasi AC bh 11.00 350,000.00 423,500.00 4,273,500.00 0.212
Pekerjaan Pasang Petanahan bh 1.00 750,000.00 82,500.00 832,500.00 0.041
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.000
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 62,320.05 628,866.01 0.031
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 195,539.03 1,973,166.53 0.098
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 185,130.00 81,457.20 821,977.20 0.041
Pek. Pasangan floor drain stainlesstell bh 2.00 150,562.50 33,123.75 334,248.75 0.017
Pek. Pasangan pipa PVC AW dia.4 m 20.00 112,913.63 248,409.98 2,506,682.48 0.124
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 21,301.50 58,579.13 591,116.63 0.029
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 1,895,052.50 416,911.55 4,207,016.55 0.209
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.000
Pengecatan tembok interior ex.catylac m2 1,014.80 23,060.68 2,574,217.03 25,976,190.02 1.290
Sub Total 0.00 0.00 0.00 0.00 0.000
Page 40
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.000
Pemasangan Partisi Rangka Metal stud m2 34.65 114,251.50 435,469.59 4,394,284.07 0.218
Pemasangan Partisi Gypsum Board tebal 9 mm Uk.120x240 cm m2 69.30 58,681.43 447,328.50 4,513,951.26 0.224
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Bekisting 2x pakai m2 23.80 141,028.25 369,211.96 3,725,684.31 0.185
Pembesian kg 1,502.22 13,011.38 2,150,061.11 21,696,071.17 1.077
Beton K.225 m3 3.62 1,040,738.55 414,422.09 4,181,895.63 0.208
Pek. Plat beton topi-topi tebal 10 cm 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 29.24 141,028.25 453,603.26 4,577,269.29 0.227
Pembesian kg 448.41 13,011.38 641,787.50 6,476,219.28 0.322
Beton K.175 m3 3.63 991,411.40 395,870.57 3,994,693.97 0.198
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 47.60 142,375.75 745,479.43 7,522,565.13 0.374
Pembesian kg 1,143.36 13,011.38 1,636,429.30 16,513,059.33 0.820
Beton K.225 m3 7.07 1,040,738.55 809,382.37 8,167,403.90 0.406
Pek. Balok Konsul Topi-topi 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 4.50 142,375.75 70,476.00 711,166.87 0.035
Pembesian kg 169.58 13,011.38 242,711.63 2,449,181.03 0.122
Beton K.175 m3 0.46 991,411.40 50,165.42 506,214.66 0.025
Pek. Plat deker Gapura Pendopo 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 6.00 141,028.25 93,078.65 939,248.15 0.047
Pembesian kg 107.41 13,011.38 153,730.73 1,551,282.78 0.077
Beton K.225 m3 0.48 1,040,738.55 54,951.00 554,505.50 0.028
Pek. Plat Talang Gapuro tebal 8 cm 0.00 0.00 0.00 0.00 0.000
Bekisting 2x pakai m2 5.97 141,028.25 92,613.25 934,551.90 0.046
Pembesian kg 56.81 13,011.38 81,309.40 820,485.75 0.041
Beton K.225 m3 0.48 1,040,738.55 54,951.00 554,505.50 0.028
Lantai Beton Rabat Keliling Pendopo fc=7,4 Mpa m3 1.95 905,121.64 194,148.59 1,959,135.80 0.097
Lantai Beton Rabat Bawah Lantai Pendopo fc=7,4 Mpa m3 12.78 905,121.64 1,272,420.01 12,839,874.60 0.638
Pek. Waterproofing dak Talang m2 68.00 50,000.00 374,000.00 3,774,000.00 0.187
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PASANGAN 0.00 0.00 0.00 0.00 0.000
Pek. Pasangan batu bata 1\/2 bata, 16 m2 472.00 110,512.60 5,737,814.19 57,899,761.39 2.875
Pek. Plesteran tbl. 15 mm, 16 m2 944.00 62,456.13 6,485,444.54 65,444,031.26 3.250
Pek. Sekoningan Sudut m 37.50 12,500.00 51,562.50 520,312.50 0.026
Pek. Acian m2 944.00 26,592.50 2,761,365.20 27,864,685.20 1.384
Pek. Ornamen List beton profil 10 cm Pendopo (Teki-teki) m 92.00 24,983.75 252,835.55 2,551,340.55 0.127
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PENUTUP LANTAI 0.00 0.00 0.00 0.00 0.000
Pek. Pasangan Lantai Keramik 40x40 cm, motif warna m2 270.75 139,647.75 4,159,059.11 41,968,687.43 2.084
Pek. Pasangan Granit Tile 60x60 cm, (untuk dinding) m2 36.15 238,115.78 946,867.39 9,554,752.76 0.474
Pek. Pasangan Dinding Batu paras candi (10x20) cm m2 33.11 185,000.00 673,788.50 6,799,138.50 0.338
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN LANGIT- LANGIT 0.00 0.00 0.00 0.00 0.000
Pek. Plafond PVC drop ceilling Lengkap List Plafond + Lampu m2 347.57 146,619.00 5,605,640.24 56,566,006.07 2.809
Hias
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN ATAP 0.00 0.00 0.00 0.00 0.000
Pek. Pasang rangka atap baja ringan Usuk C.75.075 & Z95.075 m2 237.50 96,525.00 2,521,715.63 25,446,403.13 1.264
dan Reng B 32 (Tebal 0,45 mm)
Pek. Pasangan Genteng metal lapis pasir m2 237.50 100,650.00 2,629,481.25 26,533,856.25 1.318
Pek. Pasangan Nok genteng metal lapis pasir m 34.10 93,051.75 349,037.11 3,522,101.79 0.175
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN SANITASI 0.00 0.00 0.00 0.00 0.000
Pek. Pasangan Pipa PVC tipe AW 3 m 84.00 77,273.63 714,008.30 7,204,992.80 0.358
Pek. Pasangan Saluran beton U-20 cm m 27.00 35,000.00 103,950.00 1,048,950.00 0.052
Pek. Pasangan Gorong-gorong beton 20 cm m 7.50 45,000.00 37,125.00 374,625.00 0.019
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PENGECATAN 0.00 0.00 0.00 0.00 0.000
Pek. Pengecatan tembok baru m2 944.00 23,060.68 2,394,620.49 24,163,897.69 1.200
Pek. Pengecatan topi-topi , Konsul Beton m2 71.11 23,060.68 180,382.91 1,820,227.51 0.090
Pek. Pengecatan Water proofing untuk Talang Beton m2 53.70 50,000.00 295,350.00 2,980,350.00 0.148
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN LISTRIK 0.00 0.00 0.00 0.00 0.000
Page 42
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
Pek. Instalasi titik lampu NYA 2x2,5mm+pipa conduit titik 23.00 226,600.00 573,298.00 5,785,098.00 0.287
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 65,000.00 7,150.00 72,150.00 0.004
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 225,000.00 371,250.00 3,746,250.00 0.186
Pek. Lampu LED Downlight 18 Watt setara Phillips + fitting bh 8.00 175,000.00 154,000.00 1,554,000.00 0.077
Pek. Sakelar Ganda (Broco) bh 7.00 26,620.00 20,497.40 206,837.40 0.010
Pek. Stop kontak (Broco) bh 3.00 26,620.00 8,784.60 88,644.60 0.004
Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN LAIN-LAIN 0.00 0.00 0.00 0.00 0.000
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,500,000.00 165,000.00 1,665,000.00 0.083
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,500,000.00 275,000.00 2,775,000.00 0.138
Pemasangan Partisi Rangka Metal stud untuk Ruang Laktasi m2 19.56 114,251.50 245,823.53 2,480,582.87 0.123
Pemasangan Partisi Gypsum Board tebal 9 mm Uk.120x240 cm m2 39.12 58,681.43 252,517.91 2,548,135.25 0.127
Pekerjaan Hand Railling Tangga Besi Hollow Stainless Steel m2 3.52 185,000.00 71,632.00 722,832.00 0.036
(Jalur Difable)
Total 0.00 0.00 0.00 0.00 0.000
TOTAL ( C ) 0.00 0.00 0.00 0.00 0.000
PEKERJAAN HALAMAN 0.00 0.00 0.00 0.00 0.000
PEKERJAAN TANAH 0.00 0.00 0.00 0.00 0.000
Pek . Urugan Sirtu Kelas A m3 86.68 238,150.00 2,270,712.62 22,913,554.62 1.138
Sub Total 0.00 0.00 0.00 0.00 0.000
PEKERJAAN PAVING 0.00 0.00 0.00 0.00 0.000
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 110,512.60 173,228.50 1,748,033.05 0.087
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 62,456.13 195,799.97 1,975,799.67 0.098
Pek. Acian m2 28.50 26,592.50 83,367.49 841,253.74 0.042
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa Spesi m2 124.17 208,696.40 2,850,521.52 28,764,353.51 1.428
(Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 0.00 0.00 0.00 0.000
TOTAL D 0.00 0.00 0.00 0.00 0.000
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 0.00 0.00 0.00 0.000
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 500,000.00 55,000.00 555,000.00 0.028
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 500,000.00 55,000.00 555,000.00 0.028
Asuransi dan perijinan ls 1.00 1,000,000.00 110,000.00 1,110,000.00 0.055
Personil Keselamatan Konstruksi ls 1.00 1,526,238.77 167,886.26 1,694,125.04 0.084
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,000,000.00 110,000.00 1,110,000.00 0.055
Protokol Kesehatan Penanganan COVID 19 )
TOTAL PEKERJAAN 2,013,812,519.29
PAJAK PERTAMBAHAN NILAI (PPN 11%) 199,567,006.42 100.000
DPP PEKERJAAN 1,814,245,512.88
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (Rp.) Total (Rp.) Bobot (%)
E GORDING
VERTICAL 3.25 3.00 28.00
HOR 3.25 3.00 12.00
TOTAL TOTAL
PANJANG BERAT
(m) (Kg)
19.38 286.02
15.73 232.17
0.58 8.56
2.58 27.97
0.88 12.99
2.40 26.02
1.36 20.07
3.48 37.72
1.96 28.93
3.10 33.60
3.20 47.23
5.14 55.72
2.24 32.99
2L 70.70 4,013.80
2L 60.60 1,086.17
5,099.97
9.69 143.01
7.83 115.57
0.29 4.28
1.29 13.98
0.44 6.49
1.20 13.01
0.68 10.04
1.74 18.86
0.98 14.46
1.55 16.80
1.60 23.62
2.57 27.86
2.24 32.99
2L 70.70 700.92
2L 60.60 181.03
881.95
10.96 161.77
10.96 161.77
0.29 4.28
1.25 13.55
0.63 9.30
1.20 13.01
0.93 13.73
1.20 13.01
1.23 18.15
1.92 20.81
1.70 25.02
1.92 20.81
1.99 29.33
2.57 27.86
2.38 35.06
2L 70.70 1,833.61
2L 60.60 436.20
2,269.81
7.89 116.38
7.75 114.32
0.29 4.28
1.25 13.55
0.44 6.49
1.20 13.01
0.68 10.04
1.74 18.86
1.19 17.56
1.54 16.64
1.04 15.28
1.45 15.66
1.19 17.56
2L 70.70 1,207.66
2L 60.60 310.89
1,518.55
325.72 9,770.29
84.00 273.00
36.00 117.00
390.00
NAMA
Bekisting 119.39 m2
Beton 11.37 m3
Bekisting 37.91 m2
Beton 3.61 m3
Bekisting 76.00 m2
Beton 5.70 m3
BALOK LATIU (BL) 12/15 Tul. Pokok : 4Ø10 270.11 kg
Panjang 109.5 m Tul. SK : Ø8-15cm 114.96 kg
Pengurang 10.4 m (bh) 662
99.1 m
Stek Besi @40cm 52 bh 51.31 kg
26kolom x 2sisi Total 436.39 kg
Bekisting 41.62 m2
Beton 1.78 m3
Bekisting 43.40 m2
Beton 3.10 m3
Bekisting 18.63 m2
Beton 1.45 m3
BALOK B3 15/20 +4.20 Tul. Pokok : 5Ø12 46.18 kg
Panjang 10.4 m Tul. SK : Ø8-15cm 16.34 kg
Pengurang 0.3 m (bh) 69
10.1 m
Stek Besi @40cm 4 bh 3.79 kg
4kolom x 1sisi Total 66.31 kg
Bekisting 5.56 m2
Beton 0.30 m3
Bekisting 5.56 m2
Beton 0.30 m3
Bekisting 26.21 m2
Beton 2.50 m3
Bekisting 73.02 m2
Beton 6.78 m3
Bekisting 47.04 m2
Beton 5.64 m3
PEKERJAAN BETON
Pek. Beton Bertulang Kolom Praktis 15 x 15
Bekisting 2x pakai m2 7.56 133,328.25 1,007,961.57 0.058 - - - - 100.00 7.56 1,007,961.57 0.058
Pembesian kg 136.39 13,011.38 1,774,621.78 0.102 - - - - 100.00 136.39 1,774,621.78 0.102
Beton Cor (Mutu beton K-175) m3 0.81 991,411.40 803,043.24 0.046 - - - - 100.00 0.81 803,043.24 0.046
Pek. Beton Bertulang Kolom Struktur 40 x 40 T = 4,3 m 1,6*4,4*32
Bekisting 2x pakai m2 143.36 133,328.25 19,113,937.92 1.102 15.30 2,040,549.40 - - 110.68 158.66 21,154,487.32 1.220
Pembesian kg 2,430.36 13,011.38 31,622,331.42 1.823 - - - - 100.00 2,430.36 31,622,331.42 1.823
Beton Cor (Mutu beton K-225) m3 20.48 1,040,738.55 21,314,325.46 1.229 - - - - 100.00 20.48 21,314,325.46 1.229
Pek. Beton Bertulang Kolom Teras 40 x 30 T = 4,1 m 1,1*3,5*10
Bekisting 2x pakai m2 28.49 133,328.25 3,798,521.84 0.219 4.24 564,645.14 - - 114.86 32.73 4,363,166.98 0.252
Pembesian kg 672.04 13,011.38 8,744,166.14 0.504 - - - - 100.00 672.04 8,744,166.14 0.504
Beton Cor (Mutu beton K-225) m3 4.44 1,040,738.55 4,620,879.15 0.266 - - - - 100.00 4.44 4,620,879.15 0.266
Pek. Beton Bertulang Balok 25\/40 31+31+15,5+15,5+14+7+7,5
Bekisting 2x pakai m2 68.04 142,375.75 9,687,246.03 0.559 46.21 6,579,183.41 - - 167.92 114.25 16,266,429.44 0.938
Pembesian kg 1,793.10 13,011.38 23,330,701.00 1.345 65.58 853,242.82 - - 103.66 1,858.68 24,183,943.82 1.395
Beton Cor (Mutu beton K-225) m3 12.15 1,040,738.55 12,644,973.35 0.729 1.75 1,821,292.46 - - 114.40 13.90 14,466,265.81 0.834
Pek. Beton Bertulang Balok 20\/30 31+31+(3,5*10)+15,5
Bekisting 2x pakai m2 62.72 142,375.75 8,929,807.04 0.515 33.33 4,745,383.75 - - 153.14 96.05 13,675,190.79 0.789
Pembesian kg 1,641.10 13,011.38 21,352,971.62 1.231 - - - - 100.00 1,641.10 21,352,971.62 1.231
Beton Cor (Mutu beton K-225) m3 6.72 1,040,738.55 6,993,763.04 0.403 0.36 374,665.88 - - 105.36 7.08 7,368,428.92 0.425
Pek. Beton Bertulang Ring Balok 12\/18
Bekisting 2x pakai m2 2.02 142,375.75 287,599.02 0.017 - - - - 100.00 2.02 287,599.02 0.017
Pembesian kg 39.79 13,011.38 517,722.71 0.030 1.99 25,886.14 - - 105.00 41.78 543,608.85 0.031
Beton Cor (Mutu beton K-175) m3 0.17 991,411.40 168,539.94 0.010 - - - - 100.00 0.17 168,539.94 0.010
Pek. Beton Bertulang Balok Latiu 12\/15
Bekisting 2x pakai m2 29.02 142,375.75 4,131,744.27 0.238 12.60 1,794,219.20 - - 143.43 41.62 5,925,963.47 0.342
Pembesian kg 389.54 13,011.38 5,068,451.99 0.292 46.85 609,566.91 - - 112.03 436.39 5,678,018.90 0.327
Beton Cor (Mutu beton K-175) m3 1.78 991,411.40 1,764,712.30 0.102 0.00 3,767.36 - - 100.21 1.78 1,768,479.66 0.102
Pek. Beton Bertulang Balok Balustred 15\/15
Bekisting 2x pakai m2 7.22 142,375.75 1,027,952.92 0.059 - - - - 100.00 7.22 1,027,952.92 0.059
Pembesian kg 133.95 13,011.38 1,742,874.02 0.100 - - - - 100.00 133.95 1,742,874.02 0.100
Beton Cor (Mutu beton K-175) m3 0.77 991,411.40 763,386.78 0.044 - - - - 100.00 0.77 763,386.78 0.044
Balok Konsul Aula Lantai 2
Bekisting 2x pakai m2 4.80 142,375.75 683,403.60 0.039 - - - - 100.00 4.80 683,403.60 0.039
Pembesian kg 101.45 13,011.38 1,320,004.25 0.076 - - - - 100.00 101.45 1,320,004.25 0.076
Beton Cor (Mutu beton K-225) m3 0.69 991,411.40 684,073.87 0.039 - - - - 100.00 0.69 684,073.87 0.039
Plat Topi - Topi tbl. 10 cm Selasar
Bekisting 2x pakai m2 15.43 141,028.25 2,176,065.90 0.125 - - - - 100.00 15.43 2,176,065.90 0.125
Pembesian kg 336.60 13,011.38 4,379,629.67 0.253 - - - - 100.00 336.60 4,379,629.67 0.253
Beton Cor (Mutu beton K-175) m3 2.77 991,411.40 2,746,209.59 0.158 - - - - 100.00 2.77 2,746,209.59 0.158
Page 64
PEKERJAAN SANITASI
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 566,545.95 566,545.95
0.033 - - - - 100.00 1.00 566,545.95 0.033
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,777,627.50 1,777,627.50
0.103 - - - - 100.00 1.00 1,777,627.50 0.103
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 185,130.00 740,520.00
0.043 - - - - 100.00 4.00 740,520.00 0.043
Pek. Pasangan floor drain stainlesstell bh 2.00 150,562.50 301,125.00
0.017 - - - - 100.00 2.00 301,125.00 0.017
Pek. Pasangan pipa PVC AW dia.4 m 20.00 112,913.63 2,258,272.50
0.130 - - - - 100.00 20.00 2,258,272.50 0.130
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 21,301.50 532,537.50
0.031 - - - - 100.00 25.00 532,537.50 0.031
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 1,895,052.50 3,790,105.00
0.219 - - - - 100.00 2.00 3,790,105.00 0.219
Sub Total 56.250
PEKERJAAN PENGECATAN 372.000
Pengecatan tembok interior ex.catylac m2 1,014.80 23,060.68 23,401,972.99 1.349 - - 1,014.80 23,401,972.99 0.00 - - 0.000
PEKERJAAN LAIN-LAIN
Pemasangan Partisi Rangka Metal stud m2 34.65 114,251.50 3,958,814.48 0.228 - - 34.65 3,958,814.48 0.00 - - 0.000
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 58,681.43 4,066,622.75 0.234 - - 69.30 4,066,622.75 0.00 - - 0.000
Uk.120x240 cm
PEKERJAAN GEDUNG PENDOPO
PEKERJAAN GEDUNG PENDOPO (LANJUTAN)
PEKERJAAN TANAH
Pek. Galian tanah biasa sedalam 1 m m3 1.66 75,075.00 124,624.50 0.007 - - - - 100.00 1.66 124,624.50 0.007
Pek. Pengurugan tanah kembali bekas galian m3 0.42 25,025.00 10,510.50 0.001 - - - - 100.00 0.42 10,510.50 0.001
Pek. Pengurugan Sirtu padat kelas A m3 17.64 238,150.00 4,200,966.00 0.242 - - - - 100.00 17.64 4,200,966.00 0.242
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 320,430.00 4,428,342.60 0.255 - - - - 100.00 13.82 4,428,342.60 0.255
PEKERJAAN PONDASI
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 466,661.25 587,993.18 0.034 - - - - 100.00 1.26 587,993.18 0.034
Pek. Pasangan pondasi batu kali 16 m3 1.00 725,925.75 725,925.75 0.042 - - - - 100.00 1.00 725,925.75 0.042
PEKERJAAN BETON
Pek. Sloof 15\/20
Bekisting 2x pakai m2 3.60 101,216.50 364,379.40 0.021 - - - - 100.00 3.60 364,379.40 0.021
Pembesian kg 36.47 13,011.38 474,524.94 0.027 - - - - 100.00 36.47 474,524.94 0.027
Beton K.175 m3 0.27 991,411.40 267,681.08 0.015 - - - - 100.00 0.27 267,681.08 0.015
Pek. Kolom 30\/30
Bekisting 2x pakai m2 60.48 133,328.25 8,063,692.56 0.465 3.89 518,380.24 - - 106.43 64.37 8,582,072.80 0.495
Pembesian kg 254.32 13,011.38 3,309,053.53 0.191 - - - - 100.00 254.32 3,309,053.53 0.191
Beton K.225 m3 6.48 1,040,738.55 6,743,985.79 0.389 - - 1.65 1,719,716.38 74.50 4.83 5,024,269.41 0.290
Pek. Kolom Praktis
Bekisting 2x pakai m2 5.29 133,328.25 705,306.44 0.041 - - - - 100.00 5.29 705,306.44 0.041
Pembesian kg 95.47 13,011.38 1,242,196.21 0.072 - - - - 100.00 95.47 1,242,196.21 0.072
Beton K.175 m3 0.57 991,411.40 565,104.50 0.033 - - - - 100.00 0.57 565,104.50 0.033
Pek. Balok DudukanTalang 20\/30 (B4)
Bekisting 2x pakai m2 12.74 142,375.75 1,813,867.06 0.105 13.47 1,917,516.60 - - 205.71 26.21 3,731,383.66 0.215
Pembesian kg 305.06 13,011.38 3,969,250.82 0.229 51.49 669,972.38 - - 116.88 356.55 4,639,223.20 0.268
Beton K.225 m3 2.73 1,040,738.55 2,841,216.24 0.164 - - 0.23 243,532.82 91.43 2.50 2,597,683.41 0.150
Page 67
Pek. Pasang rangka atap baja ringan Usuk C.75.075 & m2 237.50 96,525.00 22,924,687.50 1.322 - - - - 100.00 237.50 22,924,687.50 1.322
Z95.075 dan Reng B 32 (Tebal 0,45 mm)
Pek. Pasang Rangka Kuda2 baja ringan C.75.075 m2 0.00 175,000.00 0.00 0.000 - - - - 0.00 - - 0.000
dan Reng B 32 (Tebal 0,45 mm)
Pek. Pasangan Genteng metal lapis pasir m2 237.50 100,650.00 23,904,375.00 1.378 - - - - 100.00 237.50 23,904,375.00 1.378
Pek. Pasangan Nok genteng metal lapis pasir m 34.10 93,051.75 3,173,064.68 0.183 - - - - 100.00 34.10 3,173,064.68 0.183
PEKERJAAN SANITASI
Pek. Pasangan Pipa PVC tipe AW 3 m 84.00 77,273.63 6,490,984.50 0.374 - - - - 100.00 84.00 6,490,984.50 0.374
Pek. Pasangan Saluran beton U-20 cm m 27.00 35,000.00 945,000.00 0.054 - - - - 100.00 27.00 945,000.00 0.054
Pek. Pasangan Gorong-gorong beton 20 cm m 7.50 45,000.00 337,500.00 0.019 - - - - 100.00 7.50 337,500.00 0.019
PEKERJAAN PENGECATAN
Pek. Pengecatan tembok baru m2 944.00 23,060.68 21,769,277.20 1.255 - - - - 100.00 944.00 21,769,277.20 1.255
Pek. Pengecatan topi-topi , Konsul Beton m2 71.11 23,060.68 1,639,844.60 0.095 - - - - 100.00 71.11 1,639,844.60 0.095
Pek. Pengecatan Water proofing untuk Talang Beton m2 53.70 50,000.00 2,685,000.00 0.155 - - - - 100.00 53.70 2,685,000.00 0.155
PEKERJAAN LISTRIK
Pek. Instalasi titik lampu NYA 2x2,5mm+pipa conduit titik 23.00 226,600.00 5,211,800.00 0.301 - - - - 100.00 23.00 5,211,800.00 0.301
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 65,000.00 65,000.00 0.004 - - - - 100.00 1.00 65,000.00 0.004
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 225,000.00 3,375,000.00 0.195 - - - - 100.00 15.00 3,375,000.00 0.195
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 175,000.00 1,400,000.00 0.081 - - - - 100.00 8.00 1,400,000.00 0.081
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 26,620.00 186,340.00 0.011 - - - - 100.00 7.00 186,340.00 0.011
Pek. Stop kontak (Broco) bh 3.00 26,620.00 79,860.00 0.005 - - - - 100.00 3.00 79,860.00 0.005
PEKERJAAN LAIN-LAIN
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,500,000.00 1,500,000.00 0.086 - - - - 100.00 1.00 1,500,000.00 0.086
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,500,000.00 2,500,000.00 0.144 - - 1.00 2,500,000.00 0.00 - - 0.000
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 114,251.50 2,234,759.34 0.129 - - 19.56 2,234,759.34 0.00 - - 0.000
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 58,681.43 2,295,617.35 0.132 - - 39.12 2,295,617.35 0.00 - - 0.000
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow m2 3.52 185,000.00 651,200.00 0.038 - - 3.52 651,200.00 0.00 - - 0.000
Stainless Steel (Jalur Difable)
TOTAL ( C )
PEKERJAAN HALAMAN
PEKERJAAN TANAH
Pek . Urugan Sirtu Kelas A m3 86.68 238,150.00 20,642,842.00 1.190 - - 86.68 20,642,842.00 0.00 - - 0.000
Sub Total
PEKERJAAN PAVING
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 110,512.60 1,574,804.55 0.091 - - 14.25 1,574,804.55 0.00 - - 0.000
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 62,456.13 1,779,999.71 0.103 - - 28.50 1,779,999.71 0.00 - - 0.000
Pek. Acian m2 28.50 26,592.50 757,886.25 0.044 - - 28.50 757,886.25 0.00 - - 0.000
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm m2 124.17 208,696.40 25,913,831.99 1.494 - - 124.17 25,913,831.99 0.00 - - 0.000
Tanpa Spesi (Tanpa Pemadatan) Halaman Pendopo
Page 70
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.00 - 0.000 2.87 100.00 0.017 0.00 - 0.000 2.87 - - 0.00
Pembesian kg 56.70 818,897.07 0.043 0.00 - 0.000 56.70 100.00 0.043 0.00 - 0.000 56.70 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Plat beton toilet tebal 10 cm 0.00
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.00 - 0.000 5.04 100.00 0.039 0.00 - 0.000 5.04 - - 0.00
Pembesian kg 24.48 353,555.56 0.018 0.00 - 0.000 24.48 100.00 0.018 0.00 - 0.000 24.48 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 0.00 - 0.000 4.93 100.00 0.257 0.00 - 0.000 4.93 - - 0.00
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 0.00 - 0.000 3.90 100.00 0.204 0.00 - 0.000 3.90 - - 0.00
Sub Total 0.00
PEKERJAAN KERAMIK 0.00
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00
PEKERJAAN INSTALASI LISTRIK 0.00
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00
PEKERJAAN SANITASI 0.00
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00
Page 74
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00
PEKERJAAN LANTAI KERAMIK 0.00
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00
PEKERJAAN INSTALASI LISTRIK 0.00
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 77
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00
PEKERJAAN SDP 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00
PEKERJAAN PANEL AC LANTAI 2 0.00
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00
PEKERJAAN SANITASI 0.00
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 78
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00
PEKERJAAN PENGECATAN 0.00
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00
PEKERJAAN LAIN-LAIN 0.00
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00
TOTAL B 0.00
PEKERJAAN GEDUNG PENDOPO 0.00
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00
PEKERJAAN TANAH 0.00
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00
PEKERJAAN PONDASI 0.00
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00
PEKERJAAN BETON 0.00
Pek. Sloof 15\/20 0.00
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 0.00 - 0.000 60.48 100.00 0.465 0.00 - 0.000 60.48 - - 0.00
Pembesian kg 254.32 3,673,049.41 0.191 0.00 - 0.000 254.32 100.00 0.191 0.00 - 0.000 254.32 - - 0.00
Beton K.225 m3 6.48 7,485,824.23 0.389 0.00 - 0.000 6.48 100.00 0.389 0.00 - 0.000 6.48 - - 0.00
Pek. Kolom Praktis 0.00
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 0.00 - 0.000 12.74 100.00 0.105 0.00 - 0.000 12.74 - - 0.00
Pembesian kg 305.06 4,405,868.41 0.229 0.00 - 0.000 305.06 100.00 0.229 0.00 - 0.000 305.06 - - 0.00
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 79
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.00 - 0.000 13.23 100.00 0.109 0.00 - 0.000 13.23 - - 0.00
Pembesian kg 418.04 6,037,596.64 0.314 0.00 - 0.000 418.04 100.00 0.314 0.00 - 0.000 418.04 - - 0.00
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.00 - 0.000 23.80 100.00 0.194 0.00 - 0.000 23.80 - - 0.00
Pembesian kg 1,430.69 20,662,924.92 1.073 0.00 - 0.000 1,430.69 100.00 1.073 0.00 - 0.000 1,430.69 - - 0.00
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 80
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00
PEKERJAAN LAIN-LAIN 0.00
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00
TOTAL ( C ) 0.00
PEKERJAAN HALAMAN 0.00
PEKERJAAN TANAH 0.00
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00
PEKERJAAN PAVING 0.00 0.00 0.000 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00
TOTAL D 0.00
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 - 0.50 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 - 0.55 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 - 0.90 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 - 0.10 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 84
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 85
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 86
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 87
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 88
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 89
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 90
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 91
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 92
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.00 - 0.000 2.87 100.00 0.017 0.00 - 0.000 2.87 - - 0.00
Pembesian kg 56.70 818,897.07 0.043 0.00 - 0.000 56.70 100.00 0.043 0.00 - 0.000 56.70 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.00 - 0.000 5.04 100.00 0.039 0.00 - 0.000 5.04 - - 0.00
Pembesian kg 24.48 353,555.56 0.018 0.00 - 0.000 24.48 100.00 0.018 0.00 - 0.000 24.48 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 0.00 - 0.000 4.93 100.00 0.257 0.00 - 0.000 4.93 - - 0.00
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 0.00 - 0.000 3.90 100.00 0.204 0.00 - 0.000 3.90 - - 0.00
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - 0.00
(Toilet) -
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - 0.00
(Toilet) -
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - 0.00
2X2,5mm pipa counduit -
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - 0.00
putih),Panasonic -
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 96
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - 0.00
(Toilet) -
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - 0.00
(Toilet) Tinggi 1.20 m -
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00
ATAP -
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - 0.00
Luar) -
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - 0.00
Reng B 32 (tebal 0.45) -
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - 0.00
(8x20x400) -
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - 0.00
assesories) -
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - 0.00
putih),Panasonic -
Page 99
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - 0.00
pipa conduit -
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00
KONTROL, ASESORIS -
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - 0.00
Kontrol + Asesoris -
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - 0.00
+ Asesoris -
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - 0.00
+ Asesoris -
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 100
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - 0.00
Uk.120x240 cm -
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 0.00 - 0.000 60.48 100.00 0.465 0.00 - 0.000 60.48 - - 0.00
Pembesian kg 254.32 3,673,049.41 0.191 50.86 20.00 0.038 254.32 100.00 0.191 50.86 20.00 0.038 254.32 - 50.86 50.86
Beton K.225 m3 6.48 7,485,824.23 0.389 0.00 - 0.000 6.48 100.00 0.389 0.00 - 0.000 6.48 - - 0.00
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 0.00 - 0.000 12.74 100.00 0.105 0.00 - 0.000 12.74 - - 0.00
Pembesian kg 305.06 4,405,868.41 0.229 0.00 - 0.000 305.06 100.00 0.229 0.00 - 0.000 305.06 - - 0.00
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 101
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.00 - 0.000 13.23 100.00 0.109 0.00 - 0.000 13.23 - - 0.00
Pembesian kg 418.04 6,037,596.64 0.314 0.00 - 0.000 418.04 100.00 0.314 0.00 - 0.000 418.04 - - 0.00
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.00 - 0.000 23.80 100.00 0.194 0.00 - 0.000 23.80 - - 0.00
Pembesian kg 1,430.69 20,662,924.92 1.073 0.00 - 0.000 1,430.69 100.00 1.073 0.00 - 0.000 1,430.69 - - 0.00
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 102
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - 0.00
fitting -
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - 0.00
lengkap) -
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - 0.00
Laktasi -
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - 0.00
Uk.120x240 cm -
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - 0.00
Steel (Jalur Difable) -
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo -
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00
MANAJEMEN KESELAMATAN KONSTRUKSI -
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - 0.00
Protokol Kesehatan Penanganan COVID 19 ) -
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 106
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 107
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 108
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 109
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 110
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 111
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 112
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 113
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 114
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.00 - 0.000 2.87 100.00 0.017 0.00 - 0.000 2.87 - - 0.00
Pembesian kg 56.70 818,897.07 0.043 0.00 - 0.000 56.70 100.00 0.043 0.00 - 0.000 56.70 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.00 - 0.000 5.04 100.00 0.039 0.00 - 0.000 5.04 - - 0.00
Pembesian kg 24.48 353,555.56 0.018 0.00 - 0.000 24.48 100.00 0.018 0.00 - 0.000 24.48 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 0.00 - 0.000 4.93 100.00 0.257 0.00 - 0.000 4.93 - - 0.00
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 0.00 - 0.000 3.90 100.00 0.204 0.00 - 0.000 3.90 - - 0.00
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 118
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 121
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 122
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 12.10 20.00 0.093 60.48 100.00 0.465 12.10 20.00 0.093 60.48 - 12.10 12.10
Pembesian kg 254.32 3,673,049.41 0.191 101.73 40.00 0.076 254.32 100.00 0.191 101.73 40.00 0.076 254.32 50.86 50.86 101.73
Beton K.225 m3 6.48 7,485,824.23 0.389 1.30 20.00 0.078 6.48 100.00 0.389 1.30 20.00 0.078 6.48 - 1.30 1.30
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 0.00 - 0.000 12.74 100.00 0.105 0.00 - 0.000 12.74 - - 0.00
Pembesian kg 305.06 4,405,868.41 0.229 0.00 - 0.000 305.06 100.00 0.229 0.00 - 0.000 305.06 - - 0.00
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 123
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.00 - 0.000 13.23 100.00 0.109 0.00 - 0.000 13.23 - - 0.00
Pembesian kg 418.04 6,037,596.64 0.314 0.00 - 0.000 418.04 100.00 0.314 0.00 - 0.000 418.04 - - 0.00
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.00 - 0.000 23.80 100.00 0.194 0.00 - 0.000 23.80 - - 0.00
Pembesian kg 1,430.69 20,662,924.92 1.073 0.00 - 0.000 1,430.69 100.00 1.073 0.00 - 0.000 1,430.69 - - 0.00
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 124
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 128
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 129
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 130
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 131
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 132
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 133
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 134
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 135
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 136
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.00 - 0.000 2.87 100.00 0.017 0.00 - 0.000 2.87 - - 0.00
Pembesian kg 56.70 818,897.07 0.043 0.00 - 0.000 56.70 100.00 0.043 0.00 - 0.000 56.70 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.00 - 0.000 5.04 100.00 0.039 0.00 - 0.000 5.04 - - 0.00
Pembesian kg 24.48 353,555.56 0.018 0.00 - 0.000 24.48 100.00 0.018 0.00 - 0.000 24.48 - - 0.00
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 0.00 - 0.000 4.93 100.00 0.257 0.00 - 0.000 4.93 - - 0.00
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 0.00 - 0.000 3.90 100.00 0.204 0.00 - 0.000 3.90 - - 0.00
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 140
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 143
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 144
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 12.10 20.00 0.093 60.48 100.00 0.465 12.10 20.00 0.093 60.48 12.10 - 12.10
Pembesian kg 254.32 3,673,049.41 0.191 101.73 40.00 0.076 254.32 100.00 0.191 101.73 40.00 0.076 254.32 101.73 - 101.73
Beton K.225 m3 6.48 7,485,824.23 0.389 1.30 20.00 0.078 6.48 100.00 0.389 1.30 20.00 0.078 6.48 1.30 - 1.30
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 0.00 - 0.000 12.74 100.00 0.105 0.00 - 0.000 12.74 - - 0.00
Pembesian kg 305.06 4,405,868.41 0.229 0.00 - 0.000 305.06 100.00 0.229 0.00 - 0.000 305.06 - - 0.00
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 145
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.00 - 0.000 13.23 100.00 0.109 0.00 - 0.000 13.23 - - 0.00
Pembesian kg 418.04 6,037,596.64 0.314 0.00 - 0.000 418.04 100.00 0.314 0.00 - 0.000 418.04 - - 0.00
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.00 - 0.000 23.80 100.00 0.194 0.00 - 0.000 23.80 - - 0.00
Pembesian kg 1,430.69 20,662,924.92 1.073 0.00 - 0.000 1,430.69 100.00 1.073 0.00 - 0.000 1,430.69 - - 0.00
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 146
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 150
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 151
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 152
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 153
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 154
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 155
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 156
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 157
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 158
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 1.44 50.00 0.008 2.87 100.00 0.017 1.44 50.00 0.008 2.87 - 1.44 1.44
Pembesian kg 56.70 818,897.07 0.043 28.35 50.00 0.021 56.70 100.00 0.043 28.35 50.00 0.021 56.70 - 28.35 28.35
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.13 50.00 0.007 0.25 100.00 0.014 0.13 50.00 0.007 0.25 - 0.13 0.13
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 2.52 50.00 0.019 5.04 100.00 0.039 2.52 50.00 0.019 5.04 - 2.52 2.52
Pembesian kg 24.48 353,555.56 0.018 12.24 50.00 0.009 24.48 100.00 0.018 12.24 50.00 0.009 24.48 - 12.24 12.24
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.14 50.00 0.008 0.27 100.00 0.015 0.14 50.00 0.008 0.27 - 0.14 0.14
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 2.47 50.00 0.129 4.93 100.00 0.257 2.47 50.00 0.129 4.93 - 2.47 2.47
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 1.95 50.00 0.102 3.90 100.00 0.204 1.95 50.00 0.102 3.90 - 1.95 1.95
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 162
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 165
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 166
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 48.38 80.00 0.372 60.48 100.00 0.465 48.38 80.00 0.372 60.48 12.10 36.29 48.38
Pembesian kg 254.32 3,673,049.41 0.191 241.60 95.00 0.181 254.32 100.00 0.191 241.60 95.00 0.181 254.32 101.73 139.88 241.60
Beton K.225 m3 6.48 7,485,824.23 0.389 5.18 80.00 0.311 6.48 100.00 0.389 5.18 80.00 0.311 6.48 1.30 3.89 5.18
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 6.37 50.00 0.052 12.74 100.00 0.105 6.37 50.00 0.052 12.74 - 6.37 6.37
Pembesian kg 305.06 4,405,868.41 0.229 122.02 40.00 0.092 305.06 100.00 0.229 122.02 40.00 0.092 305.06 - 122.02 122.02
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 167
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 5.98 50.00 0.049 11.95 100.00 0.098 5.98 50.00 0.049 11.95 - 5.98 5.98
Pembesian kg 235.77 3,405,138.65 0.177 94.31 40.00 0.071 235.77 100.00 0.177 94.31 40.00 0.071 235.77 - 94.31 94.31
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 6.62 50.00 0.054 13.23 100.00 0.109 6.62 50.00 0.054 13.23 - 6.62 6.62
Pembesian kg 418.04 6,037,596.64 0.314 167.22 40.00 0.125 418.04 100.00 0.314 167.22 40.00 0.125 418.04 - 167.22 167.22
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.00 - 0.000 23.80 100.00 0.194 0.00 - 0.000 23.80 - - 0.00
Pembesian kg 1,430.69 20,662,924.92 1.073 0.00 - 0.000 1,430.69 100.00 1.073 0.00 - 0.000 1,430.69 - - 0.00
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 168
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 172
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 173
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 174
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 175
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 176
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 177
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 178
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 179
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 180
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 1.44 0.86 2.30
Pembesian kg 56.70 818,897.07 0.043 45.36 80.00 0.034 56.70 100.00 0.043 45.36 80.00 0.034 56.70 28.35 17.01 45.36
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.13 0.08 0.20
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 2.52 1.51 4.03
Pembesian kg 24.48 353,555.56 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 12.24 7.34 19.58
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.14 0.08 0.22
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 3.94 80.00 0.206 4.93 100.00 0.257 3.94 80.00 0.206 4.93 2.47 1.48 3.94
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 3.12 80.00 0.163 3.90 100.00 0.204 3.12 80.00 0.163 3.90 1.95 1.17 3.12
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 184
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 187
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 188
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 36.29 60.00 0.279 60.48 100.00 0.465 36.29 60.00 0.279 60.48 48.38 -12.10 36.29
Pembesian kg 254.32 3,673,049.41 0.191 203.46 80.00 0.153 254.32 100.00 0.191 203.46 80.00 0.153 254.32 241.60 -38.15 203.46
Beton K.225 m3 6.48 7,485,824.23 0.389 3.89 60.00 0.233 6.48 100.00 0.389 3.89 60.00 0.233 6.48 5.18 -1.30 3.89
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 0.00 - 0.000 5.29 100.00 0.041 0.00 - 0.000 5.29 - - 0.00
Pembesian kg 95.47 1,378,837.79 0.072 0.00 - 0.000 95.47 100.00 0.072 0.00 - 0.000 95.47 - - 0.00
Beton K.175 m3 0.57 627,266.00 0.033 0.00 - 0.000 0.57 100.00 0.033 0.00 - 0.000 0.57 - - 0.00
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 5.10 40.00 0.042 12.74 100.00 0.105 5.10 40.00 0.042 12.74 6.37 -1.27 5.10
Pembesian kg 305.06 4,405,868.41 0.229 61.01 20.00 0.046 305.06 100.00 0.229 61.01 20.00 0.046 305.06 122.02 -61.01 61.01
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 189
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 5.98 -5.98 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 94.31 -94.31 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 5.29 40.00 0.043 13.23 100.00 0.109 5.29 40.00 0.043 13.23 6.62 -1.32 5.29
Pembesian kg 418.04 6,037,596.64 0.314 83.61 20.00 0.063 418.04 100.00 0.314 83.61 20.00 0.063 418.04 167.22 -83.61 83.61
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 9.52 40.00 0.077 23.80 100.00 0.194 9.52 40.00 0.077 23.80 - 9.52 9.52
Pembesian kg 1,430.69 20,662,924.92 1.073 286.14 20.00 0.215 1,430.69 100.00 1.073 286.14 20.00 0.215 1,430.69 - 286.14 286.14
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.00 - 0.000 47.60 100.00 0.391 0.00 - 0.000 47.60 - - 0.00
Pembesian kg 1,088.91 15,726,723.17 0.817 0.00 - 0.000 1,088.91 100.00 0.817 0.00 - 0.000 1,088.91 - - 0.00
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 190
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 194
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 195
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 196
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 197
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 198
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 199
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 200
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 201
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 202
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30
Pembesian kg 56.70 818,897.07 0.043 45.36 80.00 0.034 56.70 100.00 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03
Pembesian kg 24.48 353,555.56 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 3.94 80.00 0.206 4.93 100.00 0.257 3.94 80.00 0.206 4.93 3.94 - 3.94
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 3.12 80.00 0.163 3.90 100.00 0.204 3.12 80.00 0.163 3.90 3.12 - 3.12
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 206
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 0.00 - 0.000 710.00 100.00 1.004 0.00 - 0.000 710.00 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 0.00 - 0.000 4,603.35 100.00 6.511 0.00 - 0.000 4,603.35 - - 0.00
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 0.00 - 0.000 1,474.78 100.00 2.086 0.00 - 0.000 1,474.78 - - 0.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 0.00 - 0.000 1,150.84 100.00 1.628 0.00 - 0.000 1,150.84 - - 0.00
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.00 - 0.000 131.06 100.00 0.185 0.00 - 0.000 131.06 - - 0.00
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.00 - 0.000 204.00 100.00 0.289 0.00 - 0.000 204.00 - - 0.00
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 209
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 210
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 42.34 70.00 0.325 60.48 100.00 0.465 42.34 70.00 0.325 60.48 36.29 6.05 42.34
Pembesian kg 254.32 3,673,049.41 0.191 241.60 95.00 0.181 254.32 100.00 0.191 241.60 95.00 0.181 254.32 203.46 38.15 241.60
Beton K.225 m3 6.48 7,485,824.23 0.389 4.54 70.00 0.272 6.48 100.00 0.389 4.54 70.00 0.272 6.48 3.89 0.65 4.54
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 2.12 40.00 0.016 5.29 100.00 0.041 2.12 40.00 0.016 5.29 - 2.12 2.12
Pembesian kg 95.47 1,378,837.79 0.072 38.19 40.00 0.029 95.47 100.00 0.072 38.19 40.00 0.029 95.47 - 38.19 38.19
Beton K.175 m3 0.57 627,266.00 0.033 0.23 40.00 0.013 0.57 100.00 0.033 0.23 40.00 0.013 0.57 - 0.23 0.23
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 10.19 80.00 0.084 12.74 100.00 0.105 10.19 80.00 0.084 12.74 5.10 5.10 10.19
Pembesian kg 305.06 4,405,868.41 0.229 183.04 60.00 0.137 305.06 100.00 0.229 183.04 60.00 0.137 305.06 61.01 122.02 183.04
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 211
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 0.00 - 0.000 4.89 100.00 0.040 0.00 - 0.000 4.89 - - 0.00
Pembesian kg 67.55 975,599.59 0.051 0.00 - 0.000 67.55 100.00 0.051 0.00 - 0.000 67.55 - - 0.00
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 10.58 80.00 0.087 13.23 100.00 0.109 10.58 80.00 0.087 13.23 5.29 5.29 10.58
Pembesian kg 418.04 6,037,596.64 0.314 250.82 60.00 0.188 418.04 100.00 0.314 250.82 60.00 0.188 418.04 83.61 167.22 250.82
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 3.60 80.00 0.030 4.50 100.00 0.037 3.60 80.00 0.030 4.50 - 3.60 3.60
Pembesian kg 169.58 2,449,181.03 0.127 101.75 60.00 0.076 169.58 100.00 0.127 101.75 60.00 0.076 169.58 - 101.75 101.75
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 19.04 80.00 0.155 23.80 100.00 0.194 19.04 80.00 0.155 23.80 9.52 9.52 19.04
Pembesian kg 1,430.69 20,662,924.92 1.073 858.41 60.00 0.644 1,430.69 100.00 1.073 858.41 60.00 0.644 1,430.69 286.14 572.28 858.41
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 38.08 80.00 0.313 47.60 100.00 0.391 38.08 80.00 0.313 47.60 - 38.08 38.08
Pembesian kg 1,088.91 15,726,723.17 0.817 653.35 60.00 0.490 1,088.91 100.00 0.817 653.35 60.00 0.490 1,088.91 - 653.35 653.35
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 212
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 216
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 217
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 218
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 219
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 220
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 221
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 222
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 223
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 224
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30
Pembesian kg 56.70 818,897.07 0.043 45.36 80.00 0.034 56.70 100.00 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03
Pembesian kg 24.48 353,555.56 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 4.44 90.00 0.232 4.93 100.00 0.257 4.44 90.00 0.232 4.93 3.94 0.49 4.44
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 3.51 90.00 0.183 3.90 100.00 0.204 3.51 90.00 0.183 3.90 3.12 0.39 3.51
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 228
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 71.00 10.00 0.100 710.00 100.00 1.004 71.00 10.00 0.100 710.00 - 71.00 71.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 460.34 10.00 0.651 4,603.35 100.00 6.511 460.34 10.00 0.651 4,603.35 - 460.34 460.34
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 147.48 10.00 0.209 1,474.78 100.00 2.086 147.48 10.00 0.209 1,474.78 - 147.48 147.48
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 115.08 10.00 0.163 1,150.84 100.00 1.628 115.08 10.00 0.163 1,150.84 - 115.08 115.08
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 13.11 10.00 0.019 131.06 100.00 0.185 13.11 10.00 0.019 131.06 - 13.11 13.11
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 20.40 10.00 0.029 204.00 100.00 0.289 20.40 10.00 0.029 204.00 - 20.40 20.40
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.00 - 0.000 131.21 100.00 0.098 0.00 - 0.000 131.21 - - 0.00
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 231
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 232
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 42.34 18.14 60.48
Pembesian kg 254.32 3,673,049.41 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 241.60 12.72 254.32
Beton K.225 m3 6.48 7,485,824.23 0.389 4.54 70.00 0.272 6.48 100.00 0.389 4.54 70.00 0.272 6.48 4.54 - 4.54
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 2.12 40.00 0.016 5.29 100.00 0.041 2.12 40.00 0.016 5.29 2.12 - 2.12
Pembesian kg 95.47 1,378,837.79 0.072 38.19 40.00 0.029 95.47 100.00 0.072 38.19 40.00 0.029 95.47 38.19 - 38.19
Beton K.175 m3 0.57 627,266.00 0.033 0.23 40.00 0.013 0.57 100.00 0.033 0.23 40.00 0.013 0.57 0.23 - 0.23
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 12.10 95.00 0.099 12.74 100.00 0.105 12.10 95.00 0.099 12.74 10.19 1.91 12.10
Pembesian kg 305.06 4,405,868.41 0.229 289.81 95.00 0.217 305.06 100.00 0.229 289.81 95.00 0.217 305.06 183.04 106.77 289.81
Beton K.225 m3 2.73 3,153,750.02 0.164 0.00 - 0.000 2.73 100.00 0.164 0.00 - 0.000 2.73 - - 0.00
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 233
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 4.65 95.00 0.038 4.89 100.00 0.040 4.65 95.00 0.038 4.89 - 4.65 4.65
Pembesian kg 67.55 975,599.59 0.051 64.17 95.00 0.048 67.55 100.00 0.051 64.17 95.00 0.048 67.55 - 64.17 64.17
Beton K.175 m3 0.32 352,149.33 0.018 0.00 - 0.000 0.32 100.00 0.018 0.00 - 0.000 0.32 - - 0.00
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 12.57 95.00 0.103 13.23 100.00 0.109 12.57 95.00 0.103 13.23 10.58 1.98 12.57
Pembesian kg 418.04 6,037,596.64 0.314 292.63 70.00 0.220 418.04 100.00 0.314 292.63 70.00 0.220 418.04 250.82 41.80 292.63
Beton K.225 m3 1.47 1,698,173.09 0.088 0.00 - 0.000 1.47 100.00 0.088 0.00 - 0.000 1.47 - - 0.00
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 4.28 95.00 0.035 4.50 100.00 0.037 4.28 95.00 0.035 4.50 3.60 0.68 4.28
Pembesian kg 169.58 2,449,181.03 0.127 161.10 95.00 0.121 169.58 100.00 0.127 161.10 95.00 0.121 169.58 101.75 59.35 161.10
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 22.61 95.00 0.184 23.80 100.00 0.194 22.61 95.00 0.184 23.80 19.04 3.57 22.61
Pembesian kg 1,430.69 20,662,924.92 1.073 1,359.16 95.00 1.020 1,430.69 100.00 1.073 1,359.16 95.00 1.020 1,430.69 858.41 500.74 1,359.16
Beton K.225 m3 3.62 4,181,895.63 0.217 0.00 - 0.000 3.62 100.00 0.217 0.00 - 0.000 3.62 - - 0.00
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 45.22 95.00 0.371 47.60 100.00 0.391 45.22 95.00 0.371 47.60 38.08 7.14 45.22
Pembesian kg 1,088.91 15,726,723.17 0.817 1,034.46 95.00 0.776 1,088.91 100.00 0.817 1,034.46 95.00 0.776 1,088.91 653.35 381.12 1,034.46
Beton K.225 m3 7.07 8,167,403.90 0.424 0.00 - 0.000 7.07 100.00 0.424 0.00 - 0.000 7.07 - - 0.00
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 234
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 238
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 239
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 240
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 241
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 242
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 243
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 244
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 245
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 246
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30
Pembesian kg 56.70 818,897.07 0.043 45.36 80.00 0.034 56.70 100.00 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03
Pembesian kg 24.48 353,555.56 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 4.44 90.00 0.232 4.93 100.00 0.257 4.44 90.00 0.232 4.93 4.44 - 4.44
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 3.51 90.00 0.183 3.90 100.00 0.204 3.51 90.00 0.183 3.90 3.51 - 3.51
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 250
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 213.00 30.00 0.301 710.00 100.00 1.004 213.00 30.00 0.301 710.00 71.00 142.00 213.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 1,381.01 30.00 1.953 4,603.35 100.00 6.511 1,381.01 30.00 1.953 4,603.35 460.34 920.67 1,381.01
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 442.43 30.00 0.626 1,474.78 100.00 2.086 442.43 30.00 0.626 1,474.78 147.48 294.96 442.43
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 345.25 30.00 0.488 1,150.84 100.00 1.628 345.25 30.00 0.488 1,150.84 115.08 230.17 345.25
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 39.32 30.00 0.056 131.06 100.00 0.185 39.32 30.00 0.056 131.06 13.11 26.21 39.32
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 61.20 30.00 0.087 204.00 100.00 0.289 61.20 30.00 0.087 204.00 20.40 40.80 61.20
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 39.36 30.00 0.030 131.21 100.00 0.098 39.36 30.00 0.030 131.21 - 39.36 39.36
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 253
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 254
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 60.48 - 60.48
Pembesian kg 254.32 3,673,049.41 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 254.32 - 254.32
Beton K.225 m3 6.48 7,485,824.23 0.389 4.54 70.00 0.272 6.48 100.00 0.389 4.54 70.00 0.272 6.48 4.54 - 4.54
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 2.12 40.00 0.016 5.29 100.00 0.041 2.12 40.00 0.016 5.29 2.12 - 2.12
Pembesian kg 95.47 1,378,837.79 0.072 38.19 40.00 0.029 95.47 100.00 0.072 38.19 40.00 0.029 95.47 38.19 - 38.19
Beton K.175 m3 0.57 627,266.00 0.033 0.23 40.00 0.013 0.57 100.00 0.033 0.23 40.00 0.013 0.57 0.23 - 0.23
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 12.74 100.00 0.105 12.74 100.00 0.105 12.74 100.00 0.105 12.74 12.10 0.64 12.74
Pembesian kg 305.06 4,405,868.41 0.229 305.06 100.00 0.229 305.06 100.00 0.229 305.06 100.00 0.229 305.06 289.81 15.25 305.06
Beton K.225 m3 2.73 3,153,750.02 0.164 2.46 90.00 0.147 2.73 100.00 0.164 2.46 90.00 0.147 2.73 - 2.46 2.46
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 255
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 4.89 100.00 0.040 4.89 100.00 0.040 4.89 100.00 0.040 4.89 4.65 0.24 4.89
Pembesian kg 67.55 975,599.59 0.051 67.55 100.00 0.051 67.55 100.00 0.051 67.55 100.00 0.051 67.55 64.17 3.38 67.55
Beton K.175 m3 0.32 352,149.33 0.018 0.32 100.00 0.018 0.32 100.00 0.018 0.32 100.00 0.018 0.32 - 0.32 0.32
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 13.23 100.00 0.109 13.23 100.00 0.109 13.23 100.00 0.109 13.23 12.57 0.66 13.23
Pembesian kg 418.04 6,037,596.64 0.314 292.63 70.00 0.220 418.04 100.00 0.314 292.63 70.00 0.220 418.04 292.63 - 292.63
Beton K.225 m3 1.47 1,698,173.09 0.088 1.32 90.00 0.079 1.47 100.00 0.088 1.32 90.00 0.079 1.47 - 1.32 1.32
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 4.28 0.23 4.50
Pembesian kg 169.58 2,449,181.03 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 161.10 8.48 169.58
Beton K.175 m3 0.46 506,214.66 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 - 0.46 0.46
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 23.80 100.00 0.194 23.80 100.00 0.194 23.80 100.00 0.194 23.80 22.61 1.19 23.80
Pembesian kg 1,430.69 20,662,924.92 1.073 1,359.16 95.00 1.020 1,430.69 100.00 1.073 1,359.16 95.00 1.020 1,430.69 1,359.16 - 1,359.16
Beton K.225 m3 3.62 4,181,895.63 0.217 3.62 100.00 0.217 3.62 100.00 0.217 3.62 100.00 0.217 3.62 - 3.62 3.62
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 47.60 100.00 0.391 47.60 100.00 0.391 47.60 100.00 0.391 47.60 45.22 2.38 47.60
Pembesian kg 1,088.91 15,726,723.17 0.817 1,088.91 100.00 0.817 1,088.91 100.00 0.817 1,088.91 100.00 0.817 1,088.91 1,034.46 54.45 1,088.91
Beton K.225 m3 7.07 8,167,403.90 0.424 6.36 90.00 0.382 7.07 100.00 0.424 6.36 90.00 0.382 7.07 - 6.36 6.36
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 256
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 260
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 261
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 262
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 263
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 264
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 265
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 266
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 267
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 268
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (MC 0%) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00
Pek. Beton Bertulang Sloof 12\/18 0.00 -
Bekisting 2x pakai m2 2.87 322,445.40 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30
Pembesian kg 56.70 818,897.07 0.043 45.36 80.00 0.034 56.70 100.00 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20
Plat beton toilet tebal 10 cm 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00
Pembesian kg 142.39 2,056,485.95 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00
Kolom 15\/15 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03
Pembesian kg 24.48 353,555.56 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22
Lantai Beton Rabat bawah lantai toilet fc=7,4 Mpa m3 4.46 4,480,895.21 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 cm m3 4.93 4,953,097.17 0.257 4.44 90.00 0.232 4.93 100.00 0.257 4.44 90.00 0.232 4.93 4.44 - 4.44
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 cm m3 3.90 3,918,271.59 0.204 3.51 90.00 0.183 3.90 100.00 0.204 3.51 90.00 0.183 3.90 3.51 - 3.51
Sub Total 0.00 -
PEKERJAAN KERAMIK 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif ex.platinum m2 106.78 16,551,861.29 0.860 0.00 - 0.000 106.78 100.00 0.860 0.00 - 0.000 106.78 - - 0.00
Pek. Dinding keramik motif warna 25x40 ASIA TILE m2 12.82 2,200,881.87 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00
(Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA TILE m2 6.86 1,063,361.76 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00
(Toilet)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel NYM titik 4.00 1,006,104.00 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00
2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Kran dapur (leher angsa) Stainless steel bh 1.00 731,287.43 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00
Pek. Pasang Meja Dapur Portable + Bak cuci Stainles stell unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00
Sub Total 0.00 -
Page 272
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.00 - 0.000 3.68 100.00 0.030 0.00 - 0.000 3.68 - - 0.00
Pembesian kg 77.25 1,115,693.09 0.058 0.00 - 0.000 77.25 100.00 0.058 0.00 - 0.000 77.25 - - 0.00
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.00 - 0.000 0.75 100.00 0.043 0.00 - 0.000 0.75 - - 0.00
Sub Total 0.00 -
PEKERJAAN LANTAI KERAMIK 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 ASIA TILE m2 11.84 1,835,306.59 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00
(Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 ASIA TILE m2 13.68 2,348,522.93 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00
(Toilet) Tinggi 1.20 m
Sub Total 0.00 -
PEKERJAAN RANGKA ATAP DAN PENUTUP 0.00 -
ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie Besi) kg 710.00 19,332,093.00 1.004 213.00 30.00 0.301 710.00 100.00 1.004 213.00 30.00 0.301 710.00 213.00 - 213.00
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 1,381.01 30.00 1.953 4,603.35 100.00 6.511 1,381.01 30.00 1.953 4,603.35 1,381.01 - 1,381.01
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 442.43 30.00 0.626 1,474.78 100.00 2.086 442.43 30.00 0.626 1,474.78 442.43 - 442.43
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m (Jurai kg 1,150.84 31,335,416.77 1.628 345.25 30.00 0.488 1,150.84 100.00 1.628 345.25 30.00 0.488 1,150.84 345.25 - 345.25
Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 0.00 - 0.000 674.60 100.00 1.653 0.00 - 0.000 674.60 - - 0.00
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 39.32 30.00 0.056 131.06 100.00 0.185 39.32 30.00 0.056 131.06 39.32 - 39.32
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 61.20 30.00 0.087 204.00 100.00 0.289 61.20 30.00 0.087 204.00 61.20 - 61.20
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.00 - 0.000 648.00 100.00 0.093 0.00 - 0.000 648.00 - - 0.00
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70.7 mm) buah 1,872.00 5,194,800.00 0.270 0.00 - 0.000 1,872.00 100.00 0.270 0.00 - 0.000 1,872.00 - - 0.00
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 39.36 30.00 0.030 131.21 100.00 0.098 39.36 30.00 0.030 131.21 39.36 - 39.36
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00
Pek. Pasang rangka atap baja ringan Usuk C.75.075 dan m2 663.30 71,067,786.08 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00
Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.00 - 0.000 141.90 100.00 0.409 0.00 - 0.000 141.90 - - 0.00
Pek. Memasang Lisplank WOODPLANK elephant.ukuran m 101.00 2,802,750.00 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00
(8x20x400)
Sub Total 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.00 -
Pek. Penangkal petir konvensional (split, arde BC dan unit 2.00 3,330,000.00 0.173 0.00 - 0.000 2.00 100.00 0.173 0.00 - 0.000 2.00 - - 0.00
assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00
putih),Panasonic
Page 275
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00
Pek. Instalasi listrik lampu dan stop kontak NYM Eterna + ttk 65.00 16,349,190.00 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00
pipa conduit
Sub Total 0.00 -
PEKERJAAN PENERANGAN - BUSBAR, KABEL 0.00 -
KONTROL, ASESORIS
Pekerjaan Pasang Box Busbar 50x70x100 cm Kabel unit 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
Kontrol + Asesoris
Pekerjaan Pasang MCB 6A\/5KA bh 6.00 432,900.00 0.022 0.00 - 0.000 6.00 100.00 0.022 0.00 - 0.000 6.00 - - 0.00
Pekerjaan Pasang MCB 10A\/5KA bh 10.00 721,500.00 0.037 0.00 - 0.000 10.00 100.00 0.037 0.00 - 0.000 10.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SDP 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/5KA bh 2.00 144,300.00 0.007 0.00 - 0.000 2.00 100.00 0.007 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 20A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 2.00 876,900.00 0.046 0.00 - 0.000 2.00 100.00 0.046 0.00 - 0.000 2.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PANEL AC LANTAI 2 0.00 -
Pekerjaan Pasang Box Busbar 60x40x20 cm Kabel Kontrol unit 1.00 0.00 0.000 0.00 - 0.000 1.00 100.00 0.000 0.00 - 0.000 1.00 - - 0.00
+ Asesoris
Pekerjaan Pasang MCB 20A\/10KA bh 11.00 793,650.00 0.041 0.00 - 0.000 11.00 100.00 0.041 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang MCCB 80A\/10KA 3Phase bh 1.00 438,450.00 0.023 0.00 - 0.000 1.00 100.00 0.023 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Pasang Pilot Lamp bh 3.00 463,369.50 0.024 0.00 - 0.000 3.00 100.00 0.024 0.00 - 0.000 3.00 - - 0.00
Pekerjaan Pasang Volt Meter bh 1.00 94,350.00 0.005 0.00 - 0.000 1.00 100.00 0.005 0.00 - 0.000 1.00 - - 0.00
Pekerjaan Intaslasi AC bh 11.00 4,273,500.00 0.222 0.00 - 0.000 11.00 100.00 0.222 0.00 - 0.000 11.00 - - 0.00
Pekerjaan Pasang Petanahan bh 1.00 832,500.00 0.043 0.00 - 0.000 1.00 100.00 0.043 0.00 - 0.000 1.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN SANITASI 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara INA) bh 1.00 628,866.01 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan Kloset duduk Porselen (setara INA) bh 1.00 1,973,166.53 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00
Pek. Pasangan kran air besi dia.3\/4 bh 4.00 821,977.20 0.043 0.00 - 0.000 4.00 100.00 0.043 0.00 - 0.000 4.00 - - 0.00
Pek. Pasangan floor drain stainlesstell bh 2.00 334,248.75 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00
Pek. Pasangan pipa PVC AW dia.4 m 20.00 2,506,682.48 0.130 0.00 - 0.000 20.00 100.00 0.130 0.00 - 0.000 20.00 - - 0.00
Pek. Pasangan pipa pvc tipe aw dia.3\/4 m 25.00 591,116.63 0.031 0.00 - 0.000 25.00 100.00 0.031 0.00 - 0.000 25.00 - - 0.00
Page 276
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang Wastafel Sekualitas TOTO bh 2.00 4,207,016.55 0.219 0.00 - 0.000 2.00 100.00 0.219 0.00 - 0.000 2.00 - - 0.00
Sub Total 0.00 -
PEKERJAAN PENGECATAN 0.00 -
Pengecatan tembok interior ex.catylac m2 1,014.80 25,976,190.02 1.349 0.00 - 0.000 1,014.80 100.00 1.349 0.00 - 0.000 1,014.80 - - 0.00
Sub Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pemasangan Partisi Rangka Metal stud m2 34.65 4,394,284.07 0.228 0.00 - 0.000 34.65 100.00 0.228 0.00 - 0.000 34.65 - - 0.00
Pemasangan Partisi Gypsum Board tebal 9 mm m2 69.30 4,513,951.26 0.234 0.00 - 0.000 69.30 100.00 0.234 0.00 - 0.000 69.30 - - 0.00
Uk.120x240 cm
Sub Total 0.00 -
TOTAL B 0.00 -
PEKERJAAN GEDUNG PENDOPO 0.00 -
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 0.00 -
PEKERJAAN TANAH 0.00 -
Pek. Galian tanah biasa sedalam 1 m m3 1.66 138,333.20 0.007 0.00 - 0.000 1.66 100.00 0.007 0.00 - 0.000 1.66 - - 0.00
Pek. Pengurugan tanah kembali bekas galian m3 0.42 11,666.66 0.001 0.00 - 0.000 0.42 100.00 0.001 0.00 - 0.000 0.42 - - 0.00
Pek. Pengurugan Sirtu padat kelas A m3 17.64 4,663,072.26 0.242 0.00 - 0.000 17.64 100.00 0.242 0.00 - 0.000 17.64 - - 0.00
Pek. Urugan pasir bawah lantai dan teras keliling m3 13.82 4,915,460.29 0.255 0.00 - 0.000 13.82 100.00 0.255 0.00 - 0.000 13.82 - - 0.00
Total 0.00 -
PEKERJAAN PONDASI 0.00 -
Pek. Pasangan pondasi batu kosong\/ Aanstamping m3 1.26 652,672.42 0.034 0.00 - 0.000 1.26 100.00 0.034 0.00 - 0.000 1.26 - - 0.00
Pek. Pasangan pondasi batu kali 16 m3 1.00 805,777.58 0.042 0.00 - 0.000 1.00 100.00 0.042 0.00 - 0.000 1.00 - - 0.00
Total 0.00 -
PEKERJAAN BETON 0.00 -
Pek. Sloof 15\/20 0.00 -
Bekisting 2x pakai m2 3.60 404,461.13 0.021 0.00 - 0.000 3.60 100.00 0.021 0.00 - 0.000 3.60 - - 0.00
Pembesian kg 36.47 526,722.68 0.027 0.00 - 0.000 36.47 100.00 0.027 0.00 - 0.000 36.47 - - 0.00
Beton K.175 m3 0.27 297,126.00 0.015 0.00 - 0.000 0.27 100.00 0.015 0.00 - 0.000 0.27 - - 0.00
Pek. Kolom 30\/30 0.00 -
Bekisting 2x pakai m2 60.48 8,950,698.74 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 100.00 0.465 60.48 60.48 - 60.48
Pembesian kg 254.32 3,673,049.41 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 100.00 0.191 254.32 254.32 - 254.32
Beton K.225 m3 6.48 7,485,824.23 0.389 4.54 70.00 0.272 6.48 100.00 0.389 4.54 70.00 0.272 6.48 4.54 - 4.54
Pek. Kolom Praktis 0.00 -
Bekisting 2x pakai m2 5.29 782,890.15 0.041 2.12 40.00 0.016 5.29 100.00 0.041 2.12 40.00 0.016 5.29 2.12 - 2.12
Pembesian kg 95.47 1,378,837.79 0.072 38.19 40.00 0.029 95.47 100.00 0.072 38.19 40.00 0.029 95.47 38.19 - 38.19
Beton K.175 m3 0.57 627,266.00 0.033 0.23 40.00 0.013 0.57 100.00 0.033 0.23 40.00 0.013 0.57 0.23 - 0.23
Pek. Balok DudukanTalang 20\/30 (B4) 0.00 -
Bekisting 2x pakai m2 12.74 2,013,392.43 0.105 12.74 100.00 0.105 12.74 100.00 0.105 12.74 100.00 0.105 12.74 12.74 - 12.74
Pembesian kg 305.06 4,405,868.41 0.229 305.06 100.00 0.229 305.06 100.00 0.229 305.06 100.00 0.229 305.06 305.06 - 305.06
Beton K.225 m3 2.73 3,153,750.02 0.164 2.46 90.00 0.147 2.73 100.00 0.164 2.46 90.00 0.147 2.73 2.46 - 2.46
Pek. Balok Aula 20\/25 (B1) 0.00 -
Bekisting 2x pakai m2 31.36 4,956,042.91 0.257 0.00 - 0.000 31.36 100.00 0.257 0.00 - 0.000 31.36 - - 0.00
Page 277
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pembesian kg 412.25 5,953,973.82 0.309 0.00 - 0.000 412.25 100.00 0.309 0.00 - 0.000 412.25 - - 0.00
Beton K.225 m3 3.20 3,696,703.32 0.192 0.00 - 0.000 3.20 100.00 0.192 0.00 - 0.000 3.20 - - 0.00
Pek. Balok Gapura 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 4.89 772,801.33 0.040 4.89 100.00 0.040 4.89 100.00 0.040 4.89 100.00 0.040 4.89 4.89 - 4.89
Pembesian kg 67.55 975,599.59 0.051 67.55 100.00 0.051 67.55 100.00 0.051 67.55 100.00 0.051 67.55 67.55 - 67.55
Beton K.175 m3 0.32 352,149.33 0.018 0.32 100.00 0.018 0.32 100.00 0.018 0.32 100.00 0.018 0.32 0.32 - 0.32
Pek. Balok Teki-teki 15\/20 (B3) 0.00 -
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00
Pembesian kg 235.77 3,405,138.65 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00
Beton K.175 m3 1.02 1,122,475.99 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00
Pek. Balok Aula 20\/35 (B2) 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 13.23 100.00 0.109 13.23 100.00 0.109 13.23 100.00 0.109 13.23 13.23 - 13.23
Pembesian kg 418.04 6,037,596.64 0.314 292.63 70.00 0.220 418.04 100.00 0.314 292.63 70.00 0.220 418.04 292.63 - 292.63
Beton K.225 m3 1.47 1,698,173.09 0.088 1.32 90.00 0.079 1.47 100.00 0.088 1.32 90.00 0.079 1.47 1.32 - 1.32
Pek. Balok Konsul Pendopo Bawah Talang 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 4.50 - 4.50
Pembesian kg 169.58 2,449,181.03 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 169.58 - 169.58
Beton K.175 m3 0.46 506,214.66 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 0.46 - 0.46
Pek. Balok Konsul Topi-Topi 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00
Pembesian kg 52.04 751,594.41 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00
Beton K.175 m3 0.59 649,275.33 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00
Pek. Plat beton talang aula tebal 12 cm 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 23.80 100.00 0.194 23.80 100.00 0.194 23.80 100.00 0.194 23.80 23.80 - 23.80
Pembesian kg 1,430.69 20,662,924.92 1.073 1,359.16 95.00 1.020 1,430.69 100.00 1.073 1,359.16 95.00 1.020 1,430.69 1,359.16 - 1,359.16
Beton K.225 m3 3.62 4,181,895.63 0.217 3.62 100.00 0.217 3.62 100.00 0.217 3.62 100.00 0.217 3.62 3.62 - 3.62
Pek. Plat beton topi-topi tebal 10 cm 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00
Pembesian kg 448.41 6,476,219.28 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00
Beton K.175 m3 3.63 3,994,693.97 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 47.60 100.00 0.391 47.60 100.00 0.391 47.60 100.00 0.391 47.60 47.60 - 47.60
Pembesian kg 1,088.91 15,726,723.17 0.817 1,088.91 100.00 0.817 1,088.91 100.00 0.817 1,088.91 100.00 0.817 1,088.91 1,088.91 - 1,088.91
Beton K.225 m3 7.07 8,167,403.90 0.424 6.36 90.00 0.382 7.07 100.00 0.424 6.36 90.00 0.382 7.07 6.36 - 6.36
Pek. Balok Konsul Topi-topi 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00
Pembesian kg 169.58 2,449,181.03 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00
Beton K.175 m3 0.46 506,214.66 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00
Pek. Plat deker Gapura Pendopo 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00
Pembesian kg 107.41 1,551,282.78 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00
Beton K.225 m3 0.48 554,505.50 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00
Page 278
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
Pek. Pasang MCB 6A 1 Phase + Box + Gruonding unit 1.00 72,150.00 0.004 0.00 - 0.000 1.00 100.00 0.004 0.00 - 0.000 1.00 - - 0.00
Pek. Lampu RMI (2 x Lampu 18 watt) setara Philips bh 15.00 3,746,250.00 0.195 0.00 - 0.000 15.00 100.00 0.195 0.00 - 0.000 15.00 - - 0.00
Pek. Lampu LED Downlight 18 Watt setara Phillips + bh 8.00 1,554,000.00 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00
fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00
Total 0.00 -
PEKERJAAN LAIN-LAIN 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo Kota + lampu ls 1.00 1,665,000.00 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00
lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.00 - 0.000 1.00 100.00 0.144 0.00 - 0.000 1.00 - - 0.00
Pemasangan Partisi Rangka Metal stud untuk Ruang m2 19.56 2,480,582.87 0.129 0.00 - 0.000 19.56 100.00 0.129 0.00 - 0.000 19.56 - - 0.00
Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.00 - 0.000 39.12 100.00 0.132 0.00 - 0.000 39.12 - - 0.00
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow Stainless m2 3.52 722,832.00 0.038 0.00 - 0.000 3.52 100.00 0.038 0.00 - 0.000 3.52 - - 0.00
Steel (Jalur Difable)
Total 0.00 -
TOTAL ( C ) 0.00 -
PEKERJAAN HALAMAN 0.00 -
PEKERJAAN TANAH 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.00 - 0.000 86.68 100.00 1.190 0.00 - 0.000 86.68 - - 0.00
Sub Total 0.00 0.00 0.000 0.00 -
PEKERJAAN PAVING 0.00 0.00 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.00 - 0.000 14.25 100.00 0.091 0.00 - 0.000 14.25 - - 0.00
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.00 - 0.000 28.50 100.00 0.103 0.00 - 0.000 28.50 - - 0.00
Pek. Acian m2 28.50 841,253.74 0.044 0.00 - 0.000 28.50 100.00 0.044 0.00 - 0.000 28.50 - - 0.00
Pek. Pasang Paving Hexagonal warna Tb. 6 Cm Tanpa m2 124.17 28,764,353.51 1.494 0.00 - 0.000 124.17 100.00 1.494 0.00 - 0.000 124.17 - - 0.00
Spesi (Tanpa Pemadatan) Halaman Pendopo
Sub Total 0.00 -
TOTAL D 0.00 -
PEKERJAAN BIAYA PENERAPAN SISTEM 0.00 -
MANAJEMEN KESELAMATAN KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.90 90.00 0.052 1.00 100.00 0.058 0.90 90.00 0.052 1.00 0.90 - 0.90
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.10 10.00 0.009 1.00 100.00 0.088 0.10 10.00 0.009 1.00 0.10 - 0.10
Fasilitas sarana, Prasarana dan Alat kesehatan ( Termasuk ls 1.00 1,110,000.00 0.058 0.00 - 0.000 1.00 100.00 0.058 0.00 - 0.000 1.00 - - 0.00
Protokol Kesehatan Penanganan COVID 19 )
TOTAL E
BACK UP BREAKDOWN
TOTAL BOBOT MONITORING PROGRESS PEKERJAAN VOL.
QTY TERPASANG
URAIAN PEKERJAAN SAT MC PROGRESS MC 0% BOBOT CCO PROGRESS CCO CCO PROGRESS VOLUME
MC 0%
(Rp.) 0(%) VOL % BOBOT VOL % BOBOT VOL % BOBOT (REAL) LALU INI TOTAL
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 282
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 283
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 284
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 285
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 286
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 287
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 288
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 289
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Page 290
BACK UP BREAKDOWN
TERPASANG
PROGRESS VOLUME
(%)
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
REKAPITULASI PROGRESS PEKERJAAN PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
PEKERJAAN : PEMBANGUNAN PEMBANGUNAN GEDUNG KANTOR KECAMATAN LANJUTAN
LOKASI : Kecamatan Pekalongan Timur Jl. Tondano No.19 Pekalongan
: (POKJA) PEMBANGUNAN GEDUNG KANTOR KECAMATAN
KELOMPOK KERJA (POKJA) : JL. Mataram No 1 Kota Pekalongan Jawa Tengah
(LANJUTAN)
ALAMAT POKJA
SUMBER DANA : APBD TA. 2022
WAKTU PELAKSANAAN : 140 HARI KALENDER
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (CCO -1) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) CCO 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
A PEKERJAAN PENYEMPURNAAN LANTAI 1 5.018 MUTUAL CEK 0% (MC -%) CONTRACT CHANGE ORDER -1
PEKERJAAN PERSIAPAN 0.040 0.040 0.000 0.040 0.008 0.008 0.008 0.008 0.008
PEKERJAAN TANAH 0.142 0.142 0.000 0.142 0.071 0.071
PEKERJAAN PONDASI 0.158 0.158 0.000 0.158 0.079 0.079 95.218
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1 0.477 0.162 0.000 0.162 0.119 0.119 0.119 0.119
PEKERJAAN PINTU TOILET 0.098 0.000 0.000 0.000 0.049 0.049
PEKERJAAN BETON 1.177 0.532 0.000 0.532 0.300 0.200 0.100 0.289 0.289
85.591
PEKERJAAN KERAMIK 1.029 0.000 #DIV/0! #DIV/0! 0.257 0.257 0.257 0.257
PEKERJAAN INSTALASI LISTRIK 0.076 0.000 0.000 0.000 0.019 0.019 0.019 0.019
PEKERJAAN SANITASI 0.852 0.000 0.000 0.000 0.213 0.213 0.213 0.213
PEKERJAAN PENGECATAN 0.431 0.000 0.000 0.000 0.108 0.108
76.446 0.108 0.108
PEKERJAAN LAIN LAIN 0.538 0.000 #DIV/0! #DIV/0! 0.135 0.135 0.135 0.135
B PEKERJAAN PEMBANGUNAN LANTAI 2 62.184
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 2 9.337 0.000 0.000 0.000 1.167 1.167 1.167 1.167 0.500 0.500 0.734 0.734 0.734 0.734 0.734
PEK. PASANGAN KUSEN DAN DAUN JENDELA UPVC 10.171 0.000 0.000 0.000 65.640 3.390 3.390 3.390
PEKERJAAN BETON 15.136 11.485 1.476 12.961 2.699 2.702 2.702 2.702 2.702 1.629
PEKERJAAN LANTAI KERAMIK 0.217 0.000 0.000 0.000 0.109 0.109
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 22.446 3.541 #DIV/0! #DIV/0! 1.803 2.398 2.398 1.373 1.000 1.000 2.495 2.495 2.495 2.495 2.495
PEKERJAAN INSTALASI LISTRIK 1.661 0.000 0.000 0.000 55.843
0.332 0.332 0.332 0.332 0.332
PEK. PENERANGAN - BUSBAR, KABEL KONTROL, ACC 0.241 0.000 0.000 0.000 0.048 0.048 0.048 0.048 0.048
PEKERJAAN SDP 0.228 0.000 0.000 0.000 0.046 0.046 0.046 0.046 0.046
PEKERJAAN PANEL AC LANTAI 2 0.358 0.000 0.000 0.000 48.208 0.072 0.072 0.072 0.072 0.072
PEKERJAAN SANITASI 0.575 0.000 0.000 0.000 0.115 0.115 0.115 0.115 0.115
PEKERJAAN PENGECATAN 1.349 0.000 #DIV/0! #DIV/0! 23.570 0.270 0.270 0.270 0.270 0.270
22.576 41.298
PEKERJAAN LAIN-LAIN 0.463 0.000 #DIV/0! #DIV/0! 0.154 0.154 0.154
C PEKERJAAN GEDUNG PENDOPO 29.615 36.793
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 34.293
PEKERJAAN TANAH 0.505 0.000 0.000 0.000 17.269 0.168
32.120 0.168 0.168
PEKERJAAN PONDASI 0.076 0.000 0.000 0.000 0.025 0.025 0.025
PEKERJAAN BETON 9.091 5.314 #DIV/0! #DIV/0! 13.248 27.110 1.000 1.000 1.773 1.773 1.773 1.773
PEKERJAAN PASANGAN 8.015 2.105 0.000 2.105 1.336 1.336 1.336 1.336 1.336 1.336
PEKERJAAN PENUTUP LANTAI 3.030 0.000 0.000 0.000 0.757 0.757 0.757 0.757
PEKERJAAN LANGIT- LANGIT 2.938 0.000 0.000 0.000 9.428 20.100 0.735 0.735 0.735 0.735
PEKERJAAN ATAP 2.883 0.000 #DIV/0! #DIV/0! 7.602 0.577 0.577 0.577 0.577 0.577
PEKERJAAN SANITASI 0.448 0.000 0.000 0.000 0.149 0.149 0.149
13.090
PEKERJAAN PENGECATAN 1.505 0.000 0.000 0.000 0.376 0.376 0.000 0.752
3.659
PEKERJAAN LISTRIK 0.595 0.000 0.000 0.000 0.149 0.149 0.149 0.149
2.206 7.010
PEKERJAAN LAIN-LAIN 0.529 0.000 #DIV/0! #DIV/0! 0.176 0.176 0.176
0.635
D PEKERJAAN HALAMAN 2.922 0.000 #DIV/0! #DIV/0! 3.900 0.730 0.730 0.730 0.730
E PEK. BIAYA PENERAPAN SMKK 0.261 0.091 0.070 0.161 0.102 0.052 0.680
0.052 1.090
0.052 0.003
0.110 0.170
PEKERJAAN PENYEMPURNAAN
LANTAI 1
PEKERJAAN PERSIAPAN
Pek. Uitzet Dan Pengukuran ls 1.00 555,000.00 0.029 0.029 1.00 100.00 0.029 1.00 100.00 0.029 1.00 100.00 0.029 1.00 1.00 - 1.00 100.00%
Pek. Papan Nama Proyek ls 1.00 222,000.00 0.012 0.012 1.00 100.00 0.012 1.00 100.00 0.012 1.00 100.00 0.012 1.00 1.00 - 1.00 100.00%
Sub Total 0.000 0.00
PEKERJAAN TANAH 0.000 0.00
Pek. Galian tanah biasa 1 m m3 2.74 228,333.11 0.012 0.012 2.74 100.00 0.012 2.74 100.00 0.012 2.74 100.00 0.012 2.74 2.74 - 2.74 100.00%
Pek. Urugan tanah kembali bekas galian m3 0.68 18,888.87 0.001 0.001 0.68 100.00 0.001 0.68 100.00 0.001 0.68 100.00 0.001 0.68 0.68 - 0.68 100.00%
Pek. Pasir bawah pondasi m3 0.40 142,270.92 0.007 0.007 0.40 100.00 0.007 0.40 100.00 0.007 0.40 100.00 0.007 0.40 0.40 - 0.40 100.00%
Pek. Pasir bawah lantai m3 4.24 1,508,071.75 0.078 0.078 4.24 100.00 0.078 4.24 100.00 0.078 4.24 100.00 0.078 4.24 4.24 - 4.24 100.00%
Pek. Urugan tanah baru padat m3 3.16 835,334.94 0.043 0.043 3.16 100.00 0.043 3.16 100.00 0.043 3.16 100.00 0.043 3.16 3.16 - 3.16 100.00%
Sub Total 0.000 0.00
PEKERJAAN PONDASI 0.000 0.00
Pek. Pasangan batu kosong (anstamping) m3 3.99 2,066,796.01 0.107 0.107 3.99 100.00 0.107 3.99 100.00 0.107 3.99 100.00 0.107 3.99 3.99 - 3.99 100.00%
Pek. Pas. Batu kali 1ps 6 pp m3 1.20 966,933.10 0.050 0.050 1.20 100.00 0.050 1.20 100.00 0.050 1.20 100.00 0.050 1.20 1.20 - 1.20 100.00%
Sub Total 0.000 0.00
PEKERJAAN PASANGAN DAN 0.000 0.00
PLESTERAN LANTAI 1
Pek. Pas.batu bata merah 1ps 6 pp tebal 1\/2 m2 28.20 3,459,265.41 0.180 0.180 22.56 80.00 0.144 28.20 100.00 0.180 22.56 80.00 0.144 28.20 22.56 - 22.56 100.00%
bata
Pek. Pasangan Plesteran 1 Pc 6 pp m2 54.28 3,763,031.80 0.195 0.195 0.00 - 0.000 54.28 100.00 0.195 0.00 - 0.000 54.28 - - 0.00 100.00%
Pek. Acian m2 54.28 1,602,219.40 0.083 0.083 0.00 - 0.000 54.28 100.00 0.083 0.00 - 0.000 54.28 - - 0.00 100.00%
Rooster 20x20 buah 8.00 133,200.00 0.007 0.007 8.00 100.00 0.007 8.00 100.00 0.007 8.00 100.00 0.007 8.00 8.00 - 8.00 100.00%
Glasblock 20x20 buah 8.00 222,000.00 0.012 0.012 8.00 100.00 0.012 8.00 100.00 0.012 8.00 100.00 0.012 8.00 8.00 - 8.00 100.00%
Sub Total 0.000 0.00
PEKERJAAN PINTU TOILET 0.000 0.00
Pek. Pasang Pintu KM Alumunium buah 2.00 1,887,000.00 0.098 0.098 0.00 - 0.000 2.00 100.00 0.098 0.00 - 0.000 2.00 - - 0.00 100.00%
Sub Total 0.000 0.00
PEKERJAAN BETON 0.000 0.00
Pek. Beton Bertulang Ringbalok 12\/18 0.000 0.00
Bekisting 2x pakai m2 2.39 377,708.63 0.020 0.020 0.00 - 0.000 2.39 100.00 0.020 0.00 - 0.000 2.39 - - 0.00 100.00%
Pembesian kg 57.90 836,228.22 0.043 0.043 0.00 - 0.000 57.90 100.00 0.043 0.00 - 0.000 57.90 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00 100.00%
Pek. Beton Bertulang Sloof 12\/18 0.000 0.00
Page 293
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30 100.00%
Pembesian kg 56.70 818,897.07 0.043 0.043 45.36 - 0.000 56.70 515.45 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36 100.00%
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20 100.00%
Plat beton toilet tebal 10 cm 0.000 0.00
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00 100.00%
Pembesian kg 142.39 2,056,485.95 0.107 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00 100.00%
Kolom 15\/15 0.000 0.00
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03 100.00%
Pembesian kg 24.48 353,555.56 0.018 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58 100.00%
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22 100.00%
Lantai Beton Rabat bawah lantai toilet fc=7,4 m3 4.46 4,480,895.21 0.233 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00 100.00%
Mpa
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 m3 4.93 4,953,097.17 0.257 0.257 4.44 90.00 0.232 4.93 100.00 0.257 4.44 90.00 0.232 4.93 4.44 - 4.44 100.00%
cm
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 m3 3.90 3,918,271.59 0.204 0.204 3.51 90.00 0.183 3.90 100.00 0.204 3.51 90.00 0.183 3.90 3.51 - 3.51 100.00%
cm
Sub Total 0.000 0.00
PEKERJAAN KERAMIK 0.000 0.00
Pek. Pasangan Keramik 60 x 60 cm Motif m2 106.78 16,551,861.29 0.860 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
ex.platinum
Pek. Dinding keramik motif warna 25x40 m2 12.82 2,200,881.87 0.114 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00 100.00%
ASIA TILE (Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA m2 6.86 1,063,361.76 0.055 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00 100.00%
TILE (Toilet)
Sub Total 0.000 0.00
PEKERJAAN INSTALASI LISTRIK 0.000 0.00
Pek. Pasangan instalasi listrik titik lampu kabel titik 4.00 1,006,104.00 0.052 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00 100.00%
NYM 2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00 100.00%
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN SANITASI 0.000 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara bh 1.00 628,866.01 0.033 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00 100.00%
INA)
Pek. Pasangan Kloset duduk Porselen (setara bh 1.00 1,973,166.53 0.103 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00 100.00%
INA)
Pek. Pasang Kran dapur (leher angsa) Stainless bh 1.00 731,287.43 0.038 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00 100.00%
steel
Pek. Pasang Meja Dapur Portable + Bak cuci unit 1.00 1,665,000.00 0.086 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00 100.00%
Stainles stell
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00 100.00%
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00 100.00%
Page 294
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00 100.00%
Sub Total 0.144 1.00
PEKERJAAN PENGECATAN 0.000 0.00
Pekerjaan Pengecatan tembok lantai 1 m2 240.89 6,915,653.80 0.359 0.359 0.00 - 0.000 240.89 100.00 0.359 0.00 - 0.000 240.89 - - 0.00 100.00%
(Exsisting)
Pekerjaan Pengecatan tembok Toilet m2 54.28 1,389,424.12 0.072 0.072 0.00 - 0.000 54.28 100.00 0.072 0.00 - 0.000 54.28 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN LAIN LAIN 0.000 0.00 -
Tulisan KECAMATAN PEKALONGAN unit 1.00 1,665,000.00 0.086 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - - 0.00 0.00%
TIMUR KOTA PEKALONGAN Stainless
steel + Logo Partisi
Pemasangan Kota Rangka Metal stud untuk m2 11.47 1,454,615.82 0.076 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Front Office
Pemasangan Partisi Plywood tebal 9 mm m2 11.47 2,482,681.50 0.129 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 Lapis HPL
Pemasangan Partisi Rangka Metal stud untuk m2 13.86 1,757,713.63 0.091 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Rapat Staf
Pemasangan Partisi Plywood tebal 9 mm m2 13.86 2,999,997.00 0.156 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 Lapis HPL
Sub Total 0.000 0.00
TOTAL A 0.000 0.00
PEKERJAAN PEMBANGUNAN LANTAI 0.000 0.00
2
PEKERJAAN PASANGAN DAN 0.000 0.00
PLESTERAN LANTAI 2
Pek. Pasangan batu bata 1 6 m2 553.82 67,936,537.83 3.529 3.529 0.00 - 0.000 553.82 100.00 3.529 0.00 - 0.000 553.82 - - 0.00 100.00%
Pek. Plesteran 1 6 m2 1,107.63 76,787,894.43 3.989 3.989 0.00 - 0.000 1,107.63 100.00 3.989 0.00 - 0.000 1,107.63 - - 0.00 100.00%
Pek. Acian m2 1,107.63 32,694,662.36 1.698 1.698 0.00 - 0.000 1,107.63 100.00 1.698 0.00 - 0.000 1,107.63 - - 0.00 100.00%
Pek. Sponengan m 167.20 2,319,900.00 0.121 0.121 0.00 - 0.000 167.20 100.00 0.121 0.00 - 0.000 167.20 - - 0.00 100.00%
Sub Total 0.000 0.00
PEKERJAAN PASANGAN KUSEN DAN 0.000 0.00
DAUN JENDELA UPVC
Pek. Pintu Panel Type P1.a Unit 2.00 5,407,920.00 0.281 0.281 0.00 - 0.000 2.00 100.00 0.281 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pintu Kupu Tarung Type P2.b Unit 4.00 28,455,960.00 1.478 1.478 0.00 - 0.000 4.00 100.00 1.478 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Pintu Kupu Tarung Type P2.c Unit 4.00 23,434,320.00 1.217 1.217 0.00 - 0.000 4.00 100.00 1.217 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Jendela Type J3 Unit 16.00 135,919,056.00 7.061 7.061 0.00 - 0.000 16.00 100.00 7.061 0.00 - 0.000 16.00 - - 0.00 100.00%
Pek. Bouven Type BV1 Unit 4.00 2,575,200.00 0.134 0.134 0.00 - 0.000 4.00 100.00 0.134 0.00 - 0.000 4.00 - - 0.00 100.00%
Sub Total 0.000 0.00
PEKERJAAN BETON 0.000 0.00
Pek. Beton Bertulang Kolom Praktis 15 x 15 0.000 0.00
Bekisting 2x pakai m2 7.56 1,118,837.34 0.058 0.058 0.00 - 0.000 7.56 100.00 0.058 0.00 - 0.000 7.56 - - 0.00 100.00%
Pembesian kg 136.39 1,969,830.17 0.102 0.102 0.00 - 0.000 136.39 100.00 0.102 0.00 - 0.000 136.39 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.81 891,377.99 0.046 0.046 0.00 - 0.000 0.81 100.00 0.046 0.00 - 0.000 0.81 - - 0.00 100.00%
Pek. Beton Bertulang Kolom Struktur 40 x 0.000 1,6*4,4*32
40 T = 4,3 m
Bekisting 2x pakai m2 143.36 21,216,471.09 1.102 1.220 143.36 100.00 1.102 158.66 110.68 1.220 150.73 95.00 1.159 158.66 129.02 21.71 150.73 110.68%
Page 295
Pembesian kg 2,430.36 35,100,787.88 1.823 1.823 2,308.84 95.00 1.732 2,430.36 100.00 1.823 2,308.84 95.00 1.732 2,430.36 2,308.84 - 2,308.84 100.00%
Beton Cor (Mutu beton K-225) m3 20.48 23,658,901.26 1.229 1.229 18.43 90.00 1.106 20.48 100.00 1.229 18.43 90.00 1.106 20.48 18.43 - 18.43 100.00%
Pek. Beton Bertulang Kolom Teras 40 x 30 0.000 1,1*3,5*10
T = 4,1 m
Bekisting 2x pakai m2 28.49 4,216,359.25 0.219 0.252 28.49 100.00 0.219 32.73 114.86 0.252 32.73 100.00 0.252 32.73 28.49 4.24 32.73 114.86%
Pembesian kg 672.04 9,706,024.41 0.504 0.504 672.04 100.00 0.504 672.04 100.00 0.504 672.04 100.00 0.504 672.04 672.04 - 672.04 100.00%
Beton Cor (Mutu beton K-225) m3 4.44 5,129,175.86 0.266 0.266 4.44 100.00 0.266 4.44 100.00 0.266 4.44 100.00 0.266 4.44 4.44 - 4.44 100.00%
Pek. Beton Bertulang Balok 25\/40 0.000 31+31+15,5+15,5+14+7+7,5
Bekisting 2x pakai m2 68.04 10,752,843.09 0.559 0.938 68.04 100.00 0.559 114.25 167.92 0.938 91.40 80.00 0.750 114.25 47.63 43.77 91.40 167.92%
Pembesian kg 1,793.10 25,897,078.10 1.345 1.395 1,486.94 82.93 1.116 1,858.68 103.66 1.395 1,486.94 80.00 1.116 1,858.68 1,255.17 231.77 1,486.94 103.66%
Beton Cor (Mutu beton K-225) m3 12.15 14,035,920.42 0.729 0.834 6.95 57.20 0.417 13.90 114.40 0.834 6.95 50.00 0.417 13.90 6.08 0.88 6.95 114.40%
Pek. Beton Bertulang Balok 20\/30 0.000 31+31+(3,5*10)+15,5
Bekisting 2x pakai m2 62.72 9,912,085.81 0.515 0.789 62.72 100.00 0.515 96.05 153.14 0.789 96.05 100.00 0.789 96.05 62.72 33.33 96.05 153.14%
Pembesian kg 1,641.10 23,701,798.49 1.231 1.231 1,641.10 100.00 1.231 1,641.10 100.00 1.231 1,641.10 100.00 1.231 1,641.10 1,641.10 - 1,641.10 100.00%
Beton Cor (Mutu beton K-225) m3 6.72 7,763,076.97 0.403 0.425 6.72 100.00 0.403 7.08 105.36 0.425 7.08 100.00 0.425 7.08 6.72 0.36 7.08 105.36%
Pek. Beton Bertulang Ring Balok 12\/18 0.000 0.00
Bekisting 2x pakai m2 2.02 319,234.91 0.017 0.017 0.00 - 0.000 2.02 100.00 0.017 0.00 - 0.000 2.02 - - 0.00 100.00%
Pembesian kg 39.79 574,672.21 0.030 0.031 0.00 - 0.000 41.78 105.00 0.031 0.00 - 0.000 41.78 - - 0.00 105.00%
Beton Cor (Mutu beton K-175) m3 0.17 187,079.33 0.010 0.010 0.00 - 0.000 0.17 100.00 0.010 0.00 - 0.000 0.17 - - 0.00 100.00%
Pek. Beton Bertulang Balok Latiu 12\/15 0.000 0.00 -
Bekisting 2x pakai m2 29.02 4,586,236.13 0.238 0.342 0.00 - 0.000 41.62 143.43 0.342 0.00 - 0.000 41.62 - - 0.00 143.43%
Pembesian kg 389.54 5,625,981.71 0.292 0.327 0.00 - 0.000 436.39 112.03 0.327 0.00 - 0.000 436.39 - - 0.00 112.03%
Beton Cor (Mutu beton K-175) m3 1.78 1,958,830.65 0.102 0.102 0.00 - 0.000 1.78 100.21 0.102 0.00 - 0.000 1.78 - - 0.00 100.21%
Pek. Beton Bertulang Balok Balustred 15\/15 0.000 0.00
Bekisting 2x pakai m2 7.22 1,141,027.74 0.059 0.059 0.00 - 0.000 7.22 100.00 0.059 0.00 - 0.000 7.22 - - 0.00 100.00%
Pembesian kg 133.95 1,934,590.16 0.100 0.100 0.00 - 0.000 133.95 100.00 0.100 0.00 - 0.000 133.95 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.77 847,359.33 0.044 0.044 0.00 - 0.000 0.77 100.00 0.044 0.00 - 0.000 0.77 - - 0.00 100.00%
Balok Konsul Aula Lantai 2 0.000 0.00
Bekisting 2x pakai m2 4.80 758,578.00 0.039 0.039 0.00 - 0.000 4.80 100.00 0.039 0.00 - 0.000 4.80 - - 0.00 100.00%
Pembesian kg 101.45 1,465,204.71 0.076 0.076 0.00 - 0.000 101.45 100.00 0.076 0.00 - 0.000 101.45 - - 0.00 100.00%
Beton Cor (Mutu beton K-225) m3 0.69 759,321.99 0.039 0.039 0.00 - 0.000 0.69 100.00 0.039 0.00 - 0.000 0.69 - - 0.00 100.00%
Plat Topi - Topi tbl. 10 cm Selasar 0.000 0.00
Bekisting 2x pakai m2 15.43 2,415,433.15 0.125 0.125 0.00 - 0.000 15.43 100.00 0.125 0.00 - 0.000 15.43 - - 0.00 100.00%
Pembesian kg 336.60 4,861,388.93 0.253 0.253 0.00 - 0.000 336.60 100.00 0.253 0.00 - 0.000 336.60 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 2.77 3,048,292.65 0.158 0.158 0.00 - 0.000 2.77 100.00 0.158 0.00 - 0.000 2.77 - - 0.00 100.00%
Plat Topi - Topi tbl. 10 cm Jendela Bouven 0.000 0.00
Bekisting 2x pakai m2 10.68 1,671,861.70 0.087 0.087 0.00 - 0.000 10.68 100.00 0.087 0.00 - 0.000 10.68 - - 0.00 100.00%
Pembesian kg 232.97 3,364,699.28 0.175 0.175 0.00 - 0.000 232.97 100.00 0.175 0.00 - 0.000 232.97 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 1.92 2,112,895.99 0.110 0.110 0.00 - 0.000 1.92 100.00 0.110 0.00 - 0.000 1.92 - - 0.00 100.00%
Pek. Bertulang Plat beton Tebal 12 cm 0.000 0.00
Bondex 0,75 m2 127.05 19,888,579.47 1.033 1.066 127.05 100.00 1.033 131.13 103.21 1.066 131.13 100.00 1.066 131.13 127.05 4.08 131.13 103.21%
Pembesian kg 1,197.92 17,301,114.16 0.899 0.978 1,197.92 100.00 0.899 1,303.35 108.80 0.978 1,303.35 100.00 0.978 1,303.35 1,197.92 105.43 1,303.35 108.80%
Beton Cor (Mutu beton K-225) m3 17.23 18,961,040.54 0.985 0.900 15.74 91.33 0.900 15.74 91.33 0.900 15.74 100.00 0.900 15.74 15.51 0.23 15.74 91.33%
Pek. Plat beton selasar lantai 2 Tebal 12 cm 0.000 0.00
(Dudukan water tank)
Page 296
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.085 3.68 100.00 0.030 10.50 285.33 0.085 10.50 100.00 0.085 10.50 - 10.50 10.50 285.33%
Pembesian kg 77.25 1,115,693.09 0.058 0.113 77.25 100.00 0.058 150.00 194.17 0.113 150.00 100.00 0.113 150.00 - 150.00 150.00 194.17%
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.072 0.75 100.00 0.043 1.26 168.00 0.072 1.26 100.00 0.072 1.26 - 1.26 1.26 168.00%
Sub Total 0.000 0.00
PEKERJAAN LANTAI KERAMIK 0.000 0.00
Pek. Lantai Keramik Motif ukuran 25x25 m2 11.84 1,835,306.59 0.095 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00 100.00%
ASIA TILE (Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 m2 13.68 2,348,522.93 0.122 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00 100.00%
ASIA TILE (Toilet) Tinggi 1.20 m
Sub Total 0.000 0.00
PEKERJAAN RANGKA ATAP DAN 0.000 0.00
PENUTUP ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie kg 710.00 19,332,093.00 1.004 1.004 497.00 70.00 0.703 710.00 100.00 1.004 497.00 70.00 0.703 710.00 213.00 284.00 497.00 100.00%
Besi)
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 9.791 4,603.35 100.00 6.511 6,922.39 150.38 9.791 4,845.67 70.00 6.854 6,922.39 1,381.01 3,464.67 4,845.67 150.38%
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 2.232 1,183.57 80.25 1.674 1,578.09 107.00 2.232 1,183.57 75.00 1.674 1,578.09 442.43 741.13 1,183.57 107.00%
Rangka Gording Besi CNP 75.45.2,3 kg 0.00 0.00 0.000 0.552 0.00 - 0.000 390.00 - 0.552 273.00 70.00 0.386 390.00 - 273.00 273.00 0.00%
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 1,150.84 31,335,416.77 1.628 3.211 1,150.84 100.00 1.628 2,269.81 197.23 3.211 1,588.86 70.00 2.247 2,269.81 345.25 1,243.61 1,588.86 197.23%
(Jurai Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 1.261 0.00 - 0.000 514.60 76.28 1.261 0.00 - 0.000 514.60 - - 0.00 76.28%
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.185 91.74 70.00 0.130 131.06 100.00 0.185 91.74 70.00 0.130 131.06 39.32 52.42 91.74 100.00%
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.289 142.80 70.00 0.202 204.00 100.00 0.289 142.80 70.00 0.202 204.00 61.20 81.60 142.80 100.00%
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00 100.00%
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.093 453.60 70.00 0.065 648.00 100.00 0.093 453.60 70.00 0.065 648.00 - 453.60 453.60 100.00%
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70. buah 1,872.00 5,194,800.00 0.270 0.270 1,310.40 70.00 0.189 1,872.00 100.00 0.270 1,310.40 70.00 0.189 1,872.00 - 1,310.40 1,310.40 100.00%
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.098 131.21 100.00 0.098 131.21 100.00 0.098 131.21 100.00 0.098 131.21 39.36 91.85 131.21 100.00%
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00 100.00%
Pek. Pasang rangka atap baja ringan Usuk m2 663.30 71,067,786.08 3.692 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00 100.00%
C.75.075 dan Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00 100.00%
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00 100.00%
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Memasang Lisplank WOODPLANK m 101.00 2,802,750.00 0.146 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00 100.00%
elephant.ukuran (8x20x400)
Sub Total 0.000 0.00
PEKERJAAN INSTALASI LISTRIK 0.000 0.00
Pek. Penangkal petir konvensional (split, arde unit 2.00 3,330,000.00 0.173 0.173 0.00 - 0.000 2.00 100.00 2.000 0.00 - 0.000 2.00 - - 0.00 100.00%
BC dan assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00 100.00%
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00 100.00%
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00 100.00%
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00 100.00%
putih),Panasonic
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00 100.00%
Pek. Instalasi listrik lampu dan stop kontak ttk 65.00 16,349,190.00 0.849 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00 100.00%
NYM Eterna + pipa conduit
Page 297
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00 100.00%
Pembesian kg 235.77 3,405,138.65 0.177 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00 100.00%
Beton K.175 m3 1.02 1,122,475.99 0.058 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00 100.00%
Pek. Balok Aula 20\/35 (B2) 0.000 0.00
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.153 13.23 100.00 0.109 18.63 140.82 0.153 18.63 100.00 0.153 18.63 13.23 5.40 18.63 140.82%
Pembesian kg 418.04 6,037,596.64 0.314 0.226 300.89 71.98 0.226 300.89 71.98 0.226 300.89 100.00 0.226 300.89 292.63 8.26 300.89 71.98%
Beton K.225 m3 1.47 1,698,173.09 0.088 0.087 1.45 98.57 0.087 1.45 98.57 0.087 1.45 100.00 0.087 1.45 1.32 0.13 1.45 98.57%
Pek. Balok Konsul Pendopo Bawah Talang 0.000 0.00
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 4.50 - 4.50 100.00%
Pembesian kg 169.58 2,449,181.03 0.127 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 169.58 - 169.58 100.00%
Beton K.175 m3 0.46 506,214.66 0.026 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 0.46 - 0.46 100.00%
Pek. Balok Konsul Topi-Topi 0.000 0.00
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00 100.00%
Pembesian kg 52.04 751,594.41 0.039 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00 100.00%
Beton K.175 m3 0.59 649,275.33 0.034 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00 100.00%
Pek. Plat beton talang aula tebal 12 cm 0.000 0.00
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.383 23.80 100.00 0.194 47.04 197.65 0.383 47.04 100.00 0.383 47.04 23.80 23.24 47.04 197.65%
Pembesian kg 1,430.69 20,662,924.92 1.073 1.030 1,373.06 95.97 1.030 1,373.06 95.97 1.030 1,373.06 100.00 1.030 1,373.06 1,359.16 13.91 1,373.06 95.97%
Beton K.225 m3 3.62 4,181,895.63 0.217 0.339 3.62 100.00 0.217 5.64 155.93 0.339 5.64 100.00 0.339 5.64 3.62 2.02 5.64 155.93%
Pek. Plat beton topi-topi tebal 10 cm 0.000 0.00
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00 100.00%
Pembesian kg 448.41 6,476,219.28 0.336 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00 100.00%
Beton K.175 m3 3.63 3,994,693.97 0.208 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00 100.00%
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.000 0.00
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.542 47.60 100.00 0.391 66.00 138.66 0.542 66.00 100.00 0.542 66.00 47.60 18.40 66.00 138.66%
Pembesian kg 1,088.91 15,726,723.17 0.817 0.826 1,088.91 100.00 0.817 1,100.88 101.10 0.826 1,100.88 100.00 0.826 1,100.88 1,088.91 11.97 1,100.88 101.10%
Beton K.225 m3 7.07 8,167,403.90 0.424 0.407 6.78 95.91 0.407 6.78 95.91 0.407 6.78 100.00 0.407 6.78 6.36 0.42 6.78 95.91%
Pek. Balok Konsul Topi-topi 0.000 0.00
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00 100.00%
Pembesian kg 169.58 2,449,181.03 0.127 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00 100.00%
Beton K.175 m3 0.46 506,214.66 0.026 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00 100.00%
Pek. Plat deker Gapura Pendopo 0.000 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00 100.00%
Pembesian kg 107.41 1,551,282.78 0.081 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00 100.00%
Beton K.225 m3 0.48 554,505.50 0.029 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00 100.00%
Pek. Plat Talang Gapuro tebal 8 cm 0.000 0.00
Bekisting 2x pakai m2 5.97 934,551.90 0.049 0.049 5.97 100.00 0.049 5.97 100.00 0.049 5.97 100.00 0.049 5.97 5.97 - 5.97 100.00%
Pembesian kg 56.81 820,485.75 0.043 0.043 56.81 100.00 0.043 56.81 100.00 0.043 56.81 100.00 0.043 56.81 56.81 - 56.81 100.00%
Beton K.225 m3 0.48 554,505.50 0.029 0.029 0.48 100.00 0.029 0.48 100.00 0.029 0.48 100.00 0.029 0.48 0.48 - 0.48 100.00%
Lantai Beton Rabat Keliling Pendopo fc=7,4 m3 1.95 1,959,135.80 0.102 0.102 0.00 - 0.000 1.95 100.00 0.102 0.00 - 0.000 1.95 - - 0.00 100.00%
Mpa
Lantai Beton Rabat Bawah Lantai Pendopo m3 12.78 12,839,874.60 0.667 0.667 0.00 - 0.000 12.78 100.00 0.667 0.00 - 0.000 12.78 - - 0.00 100.00%
fc=7,4 Mpa
Pek. Waterproofing dak Talang m2 68.00 3,774,000.00 0.196 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Total 0.000 0.00
Page 300
Pek. Lampu LED Downlight 18 Watt setara bh 8.00 1,554,000.00 0.081 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00 100.00%
Phillips + fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00 100.00%
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00 100.00%
Total 0.000 0.00
PEKERJAAN LAIN-LAIN 0.000 0.00
Pek. Tulisan timbul (bahan Akrilic + Logo ls 1.00 1,665,000.00 0.086 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00 100.00%
Kota + lampu lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pemasangan Partisi Rangka Metal stud untuk m2 19.56 2,480,582.87 0.129 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow m2 3.52 722,832.00 0.038 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - - 0.00 0.00%
Stainless Steel (Jalur Difable)
Total 0.000 0.00 -
TOTAL ( C ) 0.000 0.00 -
PEKERJAAN HALAMAN 0.000 0.00 -
PEKERJAAN TANAH 0.000 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Sub Total 0.000 0.00
PEKERJAAN PAVING 0.000 0.00
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Acian m2 28.50 841,253.74 0.044 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Pasang Paving Hexagonal warna Tb. 6 m2 124.17 28,764,353.51 1.494 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Cm Tanpa Spesi (Tanpa Pemadatan) Halaman
Pendopo
Sub Total 0.000 0.00
TOTAL D 0.000 0.00
PEKERJAAN BIAYA PENERAPAN 0.000 0.00
SISTEM MANAJEMEN KESELAMATAN
KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50 100.00%
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55 100.00%
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.058 1.00 100.00 0.058 1.00 100.00 0.058 1.00 100.00 0.058 1.00 0.90 0.10 1.00 100.00%
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.088 0.50 50.00 0.044 1.00 100.00 0.088 0.50 50.00 0.044 1.00 0.10 0.40 0.50 100.00%
Fasilitas sarana, Prasarana dan Alat kesehatan ( ls 1.00 1,110,000.00 0.058 0.058 0.50 50.00 0.029 1.00 100.00 0.058 0.50 50.00 0.029 1.00 - 0.50 0.50 100.00%
Termasuk Protokol Kesehatan Penanganan
COVID
TOTAL 19 E )
JULI'22 AGUSTUS' 2022 SEPTEMBER' 2022 OKTOBER' 2022 NOVEMBER' 2022 DESEMBER' 2022
KEMAJUAN PROGRESS 29/07/22-
05/08/22-01/09/22 02/09/22-29/09/22 30/09/22-27/10/22 28/10/22-24/11/22 25/11/22-15/12/22
BOBOT (CCO -1) 04/08/22
NO URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20
(%)
PERIODE PERIODE TOTAL 29-Jul-22 5-Aug-22 12-Aug-22 19-Aug-22 26-Aug-22 2-Sep-22 9-Sep-22 16-Sep-22 23-Sep-22 30-Sep-22 7-Oct-22 14-Oct-22 21-Oct-22 28-Oct-22 4-Nov-22 11-Nov-22 18-Oct-22 25-Nov-22 2-Dec-22 9-Dec-22
LALU INI (∑) CCO 4-Aug-22 11-Aug-22 18-Aug-22 25-Aug-22 1-Sep-22 8-Sep-22 15-Sep-22 22-Sep-22 29-Sep-22 6-Oct-22 13-Oct-22 20-Oct-22 27-Oct-22 3-Nov-22 10-Nov-22 17-Nov-22 24-Nov-22 1-Dec-22 8-Dec-22 15-Dec-22
A PEKERJAAN PENYEMPURNAAN LANTAI 1 5.018 MUTUAL CEK 0% (MC -%) CONTRACT CHANGE ORDER -1
PEKERJAAN PERSIAPAN 0.040 0.040 0.000 0.040 0.008 0.008 0.008 0.008 0.008
PEKERJAAN TANAH 0.142 0.142 0.000 0.142 0.071 0.071
PEKERJAAN PONDASI 0.158 0.158 0.000 0.158 0.079 0.079 95.218
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 1 0.477 0.162 0.000 0.162 0.119 0.119 0.119 0.119
PEKERJAAN PINTU TOILET 0.098 0.000 0.000 0.000 0.049 0.049
PEKERJAAN BETON 1.177 0.532 0.000 0.532 0.300 0.200 0.100 0.289 0.289
85.591
PEKERJAAN KERAMIK 1.029 #DIV/0! #DIV/0! #DIV/0! 0.257 0.257 0.257 0.257
PEKERJAAN INSTALASI LISTRIK 0.076 0.000 0.000 0.000 0.019 0.019 0.019 0.019
PEKERJAAN SANITASI 0.852 0.000 0.000 0.000 0.213 0.213 0.213 0.213
PEKERJAAN PENGECATAN 0.431 0.000 0.000 0.000 0.108 0.108
76.446 0.108 0.108
PEKERJAAN LAIN LAIN 0.538 #DIV/0! #DIV/0! #DIV/0! 0.135 0.135 0.135 0.135
B PEKERJAAN PEMBANGUNAN LANTAI 2 62.184
PEKERJAAN PASANGAN DAN PLESTERAN LANTAI 2 9.337 0.000 0.353 0.353 1.167 1.167 1.167 1.167 0.500 0.500 0.734 0.734 0.734 0.734 0.734
PEK. PASANGAN KUSEN DAN DAUN JENDELA UPVC 10.171 0.000 0.000 0.000 65.640 3.390 3.390 3.390
PEKERJAAN BETON 15.136 12.961 1.695 14.656 2.699 2.702 2.702 2.702 2.702 1.629
PEKERJAAN LANTAI KERAMIK 0.217 0.000 0.000 0.000 0.109 0.109
PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 22.446 #DIV/0! #DIV/0! #DIV/0! 1.803 2.398 2.398 1.373 1.000 1.000 2.495 2.495 2.495 2.495 2.495
PEKERJAAN INSTALASI LISTRIK 1.661 0.000 0.000 0.000 55.843
0.332 0.332 0.332 0.332 0.332
PEK. PENERANGAN - BUSBAR, KABEL KONTROL, ACC 0.241 0.000 0.000 0.000 0.048 0.048 0.048 0.048 0.048
PEKERJAAN SDP 0.228 0.000 0.000 0.000 0.046 0.046 0.046 0.046 0.046
PEKERJAAN PANEL AC LANTAI 2 0.358 0.000 0.000 0.000 48.208 0.072 0.072 0.072 0.072 0.072
PEKERJAAN SANITASI 0.575 0.000 0.000 0.000 23.570 0.115 0.115 0.115 0.115 0.115
22.576
PEKERJAAN PENGECATAN 1.349 #DIV/0! #DIV/0! #DIV/0! 0.270 0.270 0.270 0.270 0.270
41.298
PEKERJAAN LAIN-LAIN 0.463 #DIV/0! #DIV/0! #DIV/0! 0.154 0.154 0.154
C PEKERJAAN GEDUNG PENDOPO 29.615 36.793
PEKERJAAN GEDUNG PENDOPO (LANJUTAN) 17.269 34.293
PEKERJAAN TANAH 0.505 0.000 0.000 0.000 0.168
32.120 0.168 0.168
PEKERJAAN PONDASI 0.076 0.000 0.000 0.000 0.025 0.025 0.025
PEKERJAAN BETON 9.091 #DIV/0! #DIV/0! #DIV/0! 13.248 27.110 1.000 1.000 1.773 1.773 1.773 1.773
PEKERJAAN PASANGAN 8.015 2.105 0.301 2.406 1.336 1.336 1.336 1.336 1.336 1.336
PEKERJAAN PENUTUP LANTAI 3.030 0.000 0.000 0.000 9.428 0.757 0.757 0.757 0.757
PEKERJAAN LANGIT- LANGIT 2.938 0.000 0.000 0.000 20.100 0.735 0.735 0.735 0.735
7.602
PEKERJAAN ATAP 2.883 #DIV/0! #DIV/0! #DIV/0! 0.577 0.577 0.577 0.577 0.577
PEKERJAAN SANITASI 0.448 0.000 0.000 0.000 0.149 0.149 0.149
13.090
PEKERJAAN PENGECATAN 1.505 0.000 0.000 0.000 3.659 0.376 0.376 0.000 0.752
PEKERJAAN LISTRIK 0.595 0.000 0.000 0.000 2.206 0.149 0.149 0.149 0.149
PEKERJAAN LAIN-LAIN 0.529 #DIV/0! #DIV/0! #DIV/0! 7.010 0.176 0.176 0.176
0.635
D PEKERJAAN HALAMAN 2.922 #DIV/0! #DIV/0! #DIV/0! 3.900 0.730 0.730 0.730 0.730
E PEK. BIAYA PENERAPAN SMKK 0.261 0.161 0.000 0.161 0.102 0.052 0.680
0.052 1.090
0.052 0.003
0.110 0.170
PEKERJAAN PENYEMPURNAAN
LANTAI 1
PEKERJAAN PERSIAPAN
Pek. Uitzet Dan Pengukuran ls 1.00 555,000.00 0.029 0.029 1.00 100.00 0.029 1.00 100.00 0.029 1.00 100.00 0.029 1.00 1.00 - 1.00 100.00%
Pek. Papan Nama Proyek ls 1.00 222,000.00 0.012 0.012 1.00 100.00 0.012 1.00 100.00 0.012 1.00 100.00 0.012 1.00 1.00 - 1.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN TANAH 0.000 0.00 -
Pek. Galian tanah biasa 1 m m3 2.74 228,333.11 0.012 0.012 2.74 100.00 0.012 2.74 100.00 0.012 2.74 100.00 0.012 2.74 2.74 - 2.74 100.00%
Pek. Urugan tanah kembali bekas galian m3 0.68 18,888.87 0.001 0.001 0.68 100.00 0.001 0.68 100.00 0.001 0.68 100.00 0.001 0.68 0.68 - 0.68 100.00%
Pek. Pasir bawah pondasi m3 0.40 142,270.92 0.007 0.007 0.40 100.00 0.007 0.40 100.00 0.007 0.40 100.00 0.007 0.40 0.40 - 0.40 100.00%
Pek. Pasir bawah lantai m3 4.24 1,508,071.75 0.078 0.078 4.24 100.00 0.078 4.24 100.00 0.078 4.24 100.00 0.078 4.24 4.24 - 4.24 100.00%
Pek. Urugan tanah baru padat m3 3.16 835,334.94 0.043 0.043 3.16 100.00 0.043 3.16 100.00 0.043 3.16 100.00 0.043 3.16 3.16 - 3.16 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN PONDASI 0.000 0.00 -
Pek. Pasangan batu kosong (anstamping) m3 3.99 2,066,796.01 0.107 0.107 3.99 100.00 0.107 3.99 100.00 0.107 3.99 100.00 0.107 3.99 3.99 - 3.99 100.00%
Pek. Pas. Batu kali 1ps 6 pp m3 1.20 966,933.10 0.050 0.050 1.20 100.00 0.050 1.20 100.00 0.050 1.20 100.00 0.050 1.20 1.20 - 1.20 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN PASANGAN DAN 0.000 0.00 -
PLESTERAN LANTAI 1
Pek. Pas.batu bata merah 1ps 6 pp tebal 1\/2 m2 28.20 3,459,265.41 0.180 0.180 22.56 80.00 0.144 28.20 100.00 0.180 22.56 80.00 0.144 28.20 22.56 - 22.56 100.00%
bata
Pek. Pasangan Plesteran 1 Pc 6 pp m2 54.28 3,763,031.80 0.195 0.195 0.00 - 0.000 54.28 100.00 0.195 0.00 - 0.000 54.28 - - 0.00 100.00%
Pek. Acian m2 54.28 1,602,219.40 0.083 0.083 0.00 - 0.000 54.28 100.00 0.083 0.00 - 0.000 54.28 - - 0.00 100.00%
Rooster 20x20 buah 8.00 133,200.00 0.007 0.007 8.00 100.00 0.007 8.00 100.00 0.007 8.00 100.00 0.007 8.00 8.00 - 8.00 100.00%
Glasblock 20x20 buah 8.00 222,000.00 0.012 0.012 8.00 100.00 0.012 8.00 100.00 0.012 8.00 100.00 0.012 8.00 8.00 - 8.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN PINTU TOILET 0.000 0.00 -
Pek. Pasang Pintu KM Alumunium buah 2.00 1,887,000.00 0.098 0.098 0.00 - 0.000 2.00 100.00 0.098 0.00 - 0.000 2.00 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN BETON 0.000 0.00 -
Pek. Beton Bertulang Ringbalok 12\/18 0.000 0.00 -
Bekisting 2x pakai m2 2.39 377,708.63 0.020 0.020 0.00 - 0.000 2.39 100.00 0.020 0.00 - 0.000 2.39 - - 0.00 100.00%
Pembesian kg 57.90 836,228.22 0.043 0.043 0.00 - 0.000 57.90 100.00 0.043 0.00 - 0.000 57.90 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.014 0.00 - 0.000 0.25 100.00 0.014 0.00 - 0.000 0.25 - - 0.00 100.00%
Pek. Beton Bertulang Sloof 12\/18 0.000 0.00 -
Page 305
Bekisting 2x pakai m2 2.87 322,445.40 0.017 0.017 2.30 80.00 0.013 2.87 100.00 0.017 2.30 80.00 0.013 2.87 2.30 - 2.30 100.00%
Pembesian kg 56.70 818,897.07 0.043 0.043 45.36 - 0.000 56.70 515.45 0.043 45.36 80.00 0.034 56.70 45.36 - 45.36 100.00%
Beton Cor (Mutu beton K-175) m3 0.25 275,116.66 0.014 0.014 0.20 80.00 0.011 0.25 100.00 0.014 0.20 80.00 0.011 0.25 0.20 - 0.20 100.00%
Plat beton toilet tebal 10 cm 0.000 0.00 -
Bekisting 2x pakai m2 9.41 1,473,054.17 0.077 0.077 0.00 - 0.000 9.41 100.00 0.077 0.00 - 0.000 9.41 - - 0.00 100.00%
Pembesian kg 142.39 2,056,485.95 0.107 0.107 0.00 - 0.000 142.39 100.00 0.107 0.00 - 0.000 142.39 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 1.34 1,474,625.32 0.077 0.077 0.00 - 0.000 1.34 100.00 0.077 0.00 - 0.000 1.34 - - 0.00 100.00%
Kolom 15\/15 0.000 0.00 -
Bekisting 2x pakai m2 5.04 745,891.56 0.039 0.039 4.03 80.00 0.031 5.04 100.00 0.039 4.03 80.00 0.031 5.04 4.03 - 4.03 100.00%
Pembesian kg 24.48 353,555.56 0.018 0.018 19.58 80.00 0.015 24.48 100.00 0.018 19.58 80.00 0.015 24.48 19.58 - 19.58 100.00%
Beton Cor (Mutu beton K-175) m3 0.27 297,126.00 0.015 0.015 0.22 80.00 0.012 0.27 100.00 0.015 0.22 80.00 0.012 0.27 0.22 - 0.22 100.00%
Lantai Beton Rabat bawah lantai toilet fc=7,4 m3 4.46 4,480,895.21 0.233 0.233 0.00 - 0.000 4.46 100.00 0.233 0.00 - 0.000 4.46 - - 0.00 100.00%
Mpa
Lantai Beton Rabat Garasi fc=7,4 Mpa tebal 4 m3 4.93 4,953,097.17 0.257 0.257 4.44 90.00 0.232 4.93 100.00 0.257 4.44 90.00 0.232 4.93 4.44 - 4.44 100.00%
cm
Lantai Beton Utara Aula fc=7,4 Mpa tebal 6 m3 3.90 3,918,271.59 0.204 0.204 3.51 90.00 0.183 3.90 100.00 0.204 3.51 90.00 0.183 3.90 3.51 - 3.51 100.00%
cm
Sub Total 0.000 0.00 -
PEKERJAAN KERAMIK 0.000 0.00 -
Pek. Pasangan Keramik 60 x 60 cm Motif m2 106.78 16,551,861.29 0.860 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
ex.platinum
Pek. Dinding keramik motif warna 25x40 m2 12.82 2,200,881.87 0.114 0.114 0.00 - 0.000 12.82 100.00 0.114 0.00 - 0.000 12.82 - - 0.00 100.00%
ASIA TILE (Toilet)
Pek. Lantai keramik motif warna 25x25 ASIA m2 6.86 1,063,361.76 0.055 0.055 0.00 - 0.000 6.86 100.00 0.055 0.00 - 0.000 6.86 - - 0.00 100.00%
TILE (Toilet)
Sub Total 0.000 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.000 0.00 -
Pek. Pasangan instalasi listrik titik lampu kabel titik 4.00 1,006,104.00 0.052 0.052 0.00 - 0.000 4.00 100.00 0.052 0.00 - 0.000 4.00 - - 0.00 100.00%
NYM 2X2,5mm pipa counduit
Pek. Lampu Panel LED Downlight (18 watt bh 2.00 388,500.00 0.020 0.020 0.00 - 0.000 2.00 100.00 0.020 0.00 - 0.000 2.00 - - 0.00 100.00%
putih),Panasonic
Pek. Pasangan saklar Tunggal bh 2.00 59,096.40 0.003 0.003 0.00 - 0.000 2.00 100.00 0.003 0.00 - 0.000 2.00 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN SANITASI 0.000 0.00 -
Pek. Pasangan Kloset jongkok Porselen (setara bh 1.00 628,866.01 0.033 0.033 0.00 - 0.000 1.00 100.00 0.033 0.00 - 0.000 1.00 - - 0.00 100.00%
INA)
Pek. Pasangan Kloset duduk Porselen (setara bh 1.00 1,973,166.53 0.103 0.103 0.00 - 0.000 1.00 100.00 0.103 0.00 - 0.000 1.00 - - 0.00 100.00%
INA)
Pek. Pasang Kran dapur (leher angsa) Stainless bh 1.00 731,287.43 0.038 0.038 0.00 - 0.000 1.00 100.00 0.038 0.00 - 0.000 1.00 - - 0.00 100.00%
steel
Pek. Pasang Meja Dapur Portable + Bak cuci unit 1.00 1,665,000.00 0.086 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00 100.00%
Stainles stell
Pek. Pasangan kran air dia.3\/4 bh 2.00 410,988.60 0.021 0.021 0.00 - 0.000 2.00 100.00 0.021 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pasangan floor drain bh 2.00 334,248.75 0.017 0.017 0.00 - 0.000 2.00 100.00 0.017 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pasangan pipa PVC AW dia.4 m 15.00 1,880,011.86 0.098 0.098 0.00 - 0.000 15.00 100.00 0.098 0.00 - 0.000 15.00 - - 0.00 100.00%
Pek. Pasangan pipa PVC tipe AW dia.3\/4 m 15.00 354,669.98 0.018 0.018 0.00 - 0.000 15.00 100.00 0.018 0.00 - 0.000 15.00 - - 0.00 100.00%
Page 306
Pek. Pasang Wastafel Sekualitas TOTO bh 4.00 8,414,033.10 0.437 0.437 0.00 - 0.000 4.00 100.00 0.437 0.00 - 0.000 4.00 - - 0.00 100.00%
Sub Total 0.144 1.00 -
PEKERJAAN PENGECATAN 0.000 0.00 -
Pekerjaan Pengecatan tembok lantai 1 m2 240.89 6,915,653.80 0.359 0.359 0.00 - 0.000 240.89 100.00 0.359 0.00 - 0.000 240.89 - - 0.00 100.00%
(Exsisting)
Pekerjaan Pengecatan tembok Toilet m2 54.28 1,389,424.12 0.072 0.072 0.00 - 0.000 54.28 100.00 0.072 0.00 - 0.000 54.28 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN LAIN LAIN 0.000 0.00 -
Tulisan KECAMATAN PEKALONGAN unit 1.00 1,665,000.00 0.086 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - - 0.00 0.00%
TIMUR KOTA PEKALONGAN Stainless
steel + Logo Partisi
Pemasangan Kota Rangka Metal stud untuk m2 11.47 1,454,615.82 0.076 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Front Office
Pemasangan Partisi Plywood tebal 9 mm m2 11.47 2,482,681.50 0.129 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 Lapis HPL
Pemasangan Partisi Rangka Metal stud untuk m2 13.86 1,757,713.63 0.091 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Rapat Staf
Pemasangan Partisi Plywood tebal 9 mm m2 13.86 2,999,997.00 0.156 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 Lapis HPL
Sub Total 0.000 0.00 -
TOTAL A 0.000 0.00 -
PEKERJAAN PEMBANGUNAN LANTAI 0.000 0.00 -
2
PEKERJAAN PASANGAN DAN 0.000 0.00 -
PLESTERAN LANTAI 2
Pek. Pasangan batu bata 1 6 m2 553.82 67,936,537.83 3.529 3.529 55.38 10.00 0.353 553.82 100.00 3.529 55.38 10.00 0.353 553.82 - 55.38 55.38 100.00%
Pek. Plesteran 1 6 m2 1,107.63 76,787,894.43 3.989 3.989 0.00 - 0.000 1,107.63 100.00 3.989 0.00 - 0.000 1,107.63 - - 0.00 100.00%
Pek. Acian m2 1,107.63 32,694,662.36 1.698 1.698 0.00 - 0.000 1,107.63 100.00 1.698 0.00 - 0.000 1,107.63 - - 0.00 100.00%
Pek. Sponengan m 167.20 2,319,900.00 0.121 0.121 0.00 - 0.000 167.20 100.00 0.121 0.00 - 0.000 167.20 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN PASANGAN KUSEN DAN 0.000 0.00 -
DAUN JENDELA UPVC
Pek. Pintu Panel Type P1.a Unit 2.00 5,407,920.00 0.281 0.281 0.00 - 0.000 2.00 100.00 0.281 0.00 - 0.000 2.00 - - 0.00 100.00%
Pek. Pintu Kupu Tarung Type P2.b Unit 4.00 28,455,960.00 1.478 1.478 0.00 - 0.000 4.00 100.00 1.478 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Pintu Kupu Tarung Type P2.c Unit 4.00 23,434,320.00 1.217 1.217 0.00 - 0.000 4.00 100.00 1.217 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Jendela Type J3 Unit 16.00 135,919,056.00 7.061 7.061 0.00 - 0.000 16.00 100.00 7.061 0.00 - 0.000 16.00 - - 0.00 100.00%
Pek. Bouven Type BV1 Unit 4.00 2,575,200.00 0.134 0.134 0.00 - 0.000 4.00 100.00 0.134 0.00 - 0.000 4.00 - - 0.00 100.00%
Sub Total 0.000 0.00 -
PEKERJAAN BETON 0.000 0.00 -
Pek. Beton Bertulang Kolom Praktis 15 x 15 0.000 0.00 -
Bekisting 2x pakai m2 7.56 1,118,837.34 0.058 0.058 0.00 - 0.000 7.56 100.00 0.058 0.00 - 0.000 7.56 - - 0.00 100.00%
Pembesian kg 136.39 1,969,830.17 0.102 0.102 0.00 - 0.000 136.39 100.00 0.102 0.00 - 0.000 136.39 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.81 891,377.99 0.046 0.046 0.00 - 0.000 0.81 100.00 0.046 0.00 - 0.000 0.81 - - 0.00 100.00%
Pek. Beton Bertulang Kolom Struktur 40 x 0.000 1,6*4,4*32 -
40 T = 4,3 m
Bekisting 2x pakai m2 143.36 21,216,471.09 1.102 1.220 143.36 100.00 1.102 158.66 110.68 1.220 158.66 100.00 1.220 158.66 150.73 7.93 158.66 110.68%
Page 307
Pembesian kg 2,430.36 35,100,787.88 1.823 1.823 2,430.36 100.00 1.823 2,430.36 100.00 1.823 2,430.36 100.00 1.823 2,430.36 2,308.84 121.52 2,430.36 100.00%
Beton Cor (Mutu beton K-225) m3 20.48 23,658,901.26 1.229 1.229 20.48 100.00 1.229 20.48 100.00 1.229 20.48 100.00 1.229 20.48 18.43 2.05 20.48 100.00%
Pek. Beton Bertulang Kolom Teras 40 x 30 0.000 1,1*3,5*10 -
T = 4,1 m
Bekisting 2x pakai m2 28.49 4,216,359.25 0.219 0.252 28.49 100.00 0.219 32.73 114.86 0.252 32.73 100.00 0.252 32.73 32.73 - 32.73 114.86%
Pembesian kg 672.04 9,706,024.41 0.504 0.504 672.04 100.00 0.504 672.04 100.00 0.504 672.04 100.00 0.504 672.04 672.04 - 672.04 100.00%
Beton Cor (Mutu beton K-225) m3 4.44 5,129,175.86 0.266 0.266 4.44 100.00 0.266 4.44 100.00 0.266 4.44 100.00 0.266 4.44 4.44 - 4.44 100.00%
Pek. Beton Bertulang Balok 25\/40 0.000 31+31+15,5 -
Bekisting 2x pakai m2 68.04 10,752,843.09 0.559 0.938 68.04 100.00 0.559 114.25 167.92 0.938 114.25 100.00 0.938 114.25 91.40 22.85 114.25 167.92%
Pembesian kg 1,793.10 25,897,078.10 1.345 1.395 1,793.10 100.00 1.345 1,858.68 103.66 1.395 1,858.68 100.00 1.395 1,858.68 1,486.94 371.74 1,858.68 103.66%
Beton Cor (Mutu beton K-225) m3 12.15 14,035,920.42 0.729 0.834 12.15 100.00 0.729 13.90 114.40 0.834 13.90 100.00 0.834 13.90 6.95 6.95 13.90 114.40%
Pek. Beton Bertulang Balok 20\/30 0.000 31+31+(3,5 -
Bekisting 2x pakai m2 62.72 9,912,085.81 0.515 0.789 62.72 100.00 0.515 96.05 153.14 0.789 96.05 100.00 0.789 96.05 96.05 - 96.05 153.14%
Pembesian kg 1,641.10 23,701,798.49 1.231 1.231 1,641.10 100.00 1.231 1,641.10 100.00 1.231 1,641.10 100.00 1.231 1,641.10 1,641.10 - 1,641.10 100.00%
Beton Cor (Mutu beton K-225) m3 6.72 7,763,076.97 0.403 0.425 6.72 100.00 0.403 7.08 105.36 0.425 7.08 100.00 0.425 7.08 7.08 - 7.08 105.36%
Pek. Beton Bertulang Ring Balok 12\/18 0.000 0.00 -
Bekisting 2x pakai m2 2.02 319,234.91 0.017 0.017 0.00 - 0.000 2.02 100.00 0.017 0.00 - 0.000 2.02 - - 0.00 100.00%
Pembesian kg 39.79 574,672.21 0.030 0.031 0.00 - 0.000 41.78 105.00 0.031 0.00 - 0.000 41.78 - - 0.00 105.00%
Beton Cor (Mutu beton K-175) m3 0.17 187,079.33 0.010 0.010 0.00 - 0.000 0.17 100.00 0.010 0.00 - 0.000 0.17 - - 0.00 100.00%
Pek. Beton Bertulang Balok Latiu 12\/15 0.000 0.00 -
Bekisting 2x pakai m2 29.02 4,586,236.13 0.238 0.342 0.00 - 0.000 41.62 143.43 0.342 0.00 - 0.000 41.62 - - 0.00 143.43%
Pembesian kg 389.54 5,625,981.71 0.292 0.327 0.00 - 0.000 436.39 112.03 0.327 0.00 - 0.000 436.39 - - 0.00 112.03%
Beton Cor (Mutu beton K-175) m3 1.78 1,958,830.65 0.102 0.102 0.00 - 0.000 1.78 100.21 0.102 0.00 - 0.000 1.78 - - 0.00 100.21%
Pek. Beton Bertulang Balok Balustred 15\/15 0.000 0.00 -
Bekisting 2x pakai m2 7.22 1,141,027.74 0.059 0.059 0.00 - 0.000 7.22 100.00 0.059 0.00 - 0.000 7.22 - - 0.00 100.00%
Pembesian kg 133.95 1,934,590.16 0.100 0.100 0.00 - 0.000 133.95 100.00 0.100 0.00 - 0.000 133.95 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 0.77 847,359.33 0.044 0.044 0.00 - 0.000 0.77 100.00 0.044 0.00 - 0.000 0.77 - - 0.00 100.00%
Balok Konsul Aula Lantai 2 0.000 0.00 -
Bekisting 2x pakai m2 4.80 758,578.00 0.039 0.039 0.00 - 0.000 4.80 100.00 0.039 0.00 - 0.000 4.80 - - 0.00 100.00%
Pembesian kg 101.45 1,465,204.71 0.076 0.076 0.00 - 0.000 101.45 100.00 0.076 0.00 - 0.000 101.45 - - 0.00 100.00%
Beton Cor (Mutu beton K-225) m3 0.69 759,321.99 0.039 0.039 0.00 - 0.000 0.69 100.00 0.039 0.00 - 0.000 0.69 - - 0.00 100.00%
Plat Topi - Topi tbl. 10 cm Selasar 0.000 0.00 -
Bekisting 2x pakai m2 15.43 2,415,433.15 0.125 0.125 15.43 100.00 0.125 15.43 100.00 0.125 15.43 100.00 0.125 15.43 - 15.43 15.43 100.00%
Pembesian kg 336.60 4,861,388.93 0.253 0.253 336.60 100.00 0.253 336.60 100.00 0.253 336.60 100.00 0.253 336.60 - 336.60 336.60 100.00%
Beton Cor (Mutu beton K-175) m3 2.77 3,048,292.65 0.158 0.158 2.77 100.00 0.158 2.77 100.00 0.158 2.77 100.00 0.158 2.77 - 2.77 2.77 100.00%
Plat Topi - Topi tbl. 10 cm Jendela Bouven 0.000 0.00 -
Bekisting 2x pakai m2 10.68 1,671,861.70 0.087 0.087 0.00 - 0.000 10.68 100.00 0.087 0.00 - 0.000 10.68 - - 0.00 100.00%
Pembesian kg 232.97 3,364,699.28 0.175 0.175 0.00 - 0.000 232.97 100.00 0.175 0.00 - 0.000 232.97 - - 0.00 100.00%
Beton Cor (Mutu beton K-175) m3 1.92 2,112,895.99 0.110 0.110 0.00 - 0.000 1.92 100.00 0.110 0.00 - 0.000 1.92 - - 0.00 100.00%
Pek. Bertulang Plat beton Tebal 12 cm 0.000 0.00 -
Bondex 0,75 m2 127.05 19,888,579.47 1.033 1.066 127.05 100.00 1.033 131.13 103.21 1.066 131.13 100.00 1.066 131.13 131.13 - 131.13 103.21%
Pembesian kg 1,197.92 17,301,114.16 0.899 0.978 1,197.92 100.00 0.899 1,303.35 108.80 0.978 1,303.35 100.00 0.978 1,303.35 1,303.35 - 1,303.35 108.80%
Beton Cor (Mutu beton K-225) m3 17.23 18,961,040.54 0.985 0.900 15.74 91.33 0.900 15.74 91.33 0.900 15.74 100.00 0.900 15.74 15.74 - 15.74 91.33%
Pek. Plat beton selasar lantai 2 Tebal 12 cm 0.000 0.00 -
(Dudukan water tank)
Page 308
Bekisting 2x pakai m2 3.68 576,072.20 0.030 0.085 3.68 100.00 0.030 10.50 285.33 0.085 10.50 100.00 0.085 10.50 10.50 - 10.50 285.33%
Pembesian kg 77.25 1,115,693.09 0.058 0.113 77.25 100.00 0.058 150.00 194.17 0.113 150.00 100.00 0.113 150.00 150.00 - 150.00 194.17%
Beton Cor (Mutu beton K-225) m3 0.75 825,349.99 0.043 0.072 0.75 100.00 0.043 1.26 168.00 0.072 1.26 100.00 0.072 1.26 1.26 - 1.26 168.00%
Sub Total 0.000 0.00 -
PEKERJAAN LANTAI KERAMIK 0.000 0.00 -
Pek. Lantai Keramik Motif ukuran 25x25 m2 11.84 1,835,306.59 0.095 0.095 0.00 - 0.000 11.84 100.00 0.095 0.00 - 0.000 11.84 - - 0.00 100.00%
ASIA TILE (Toilet)
Pek. Dinding Keramik Motif ukuran 25x40 m2 13.68 2,348,522.93 0.122 0.122 0.00 - 0.000 13.68 100.00 0.122 0.00 - 0.000 13.68 - - 0.00 100.00%
ASIA TILE (Toilet) Tinggi 1.20 m
Sub Total 0.000 0.00 -
PEKERJAAN RANGKA ATAP DAN 0.000 0.00 -
PENUTUP ATAP
Pasang IWF 250.125.6.9 mm (Finishing Menie kg 710.00 19,332,093.00 1.004 1.004 497.00 70.00 0.703 710.00 100.00 1.004 497.00 70.00 0.703 710.00 497.00 - 497.00 100.00%
Besi)
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 4,603.35 125,341,394.81 6.511 9.791 4,603.35 100.00 6.511 6,922.39 150.38 9.791 4,845.67 70.00 6.854 6,922.39 4,845.67 - 4,845.67 150.38%
Rangka Besi siku 2L.60.60.6 mm. Panjang 6 m kg 1,474.78 40,155,752.27 2.086 2.232 1,183.57 80.25 1.674 1,578.09 107.00 2.232 1,183.57 75.00 1.674 1,578.09 1,183.57 - 1,183.57 107.00%
Rangka Gording Besi CNP 75.45.2,3 kg 0.00 0.00 0.000 0.552 0.00 - 0.000 390.00 - 0.552 273.00 70.00 0.386 390.00 273.00 - 273.00 0.00%
Rangka Besi siku 2L.70.70.7 mm. Panjang 6 m kg 1,150.84 31,335,416.77 1.628 3.211 1,150.84 100.00 1.628 2,269.81 197.23 3.211 1,588.86 70.00 2.247 2,269.81 1,588.86 - 1,588.86 197.23%
(Jurai Luar)
Besi C 75 Tebal 1.00 mm double m1 674.60 31,824,255.00 1.653 1.261 0.00 - 0.000 514.60 76.28 1.261 0.00 - 0.000 514.60 - - 0.00 76.28%
Plat Landas\u00A0(base plate) 10 mm kg 131.06 3,568,541.00 0.185 0.185 91.74 70.00 0.130 131.06 100.00 0.185 91.74 70.00 0.130 131.06 91.74 - 91.74 100.00%
Plat Buhul 8 mm kg 204.00 5,554,573.20 0.289 0.289 142.80 70.00 0.202 204.00 100.00 0.289 142.80 70.00 0.202 204.00 142.80 - 142.80 100.00%
Pasang kait angin 12 mm kg 144.74 2,090,426.13 0.109 0.109 0.00 - 0.000 144.74 100.00 0.109 0.00 - 0.000 144.74 - - 0.00 100.00%
Mur baut 5\/8 HTB (Besi siku 2L.60.60.6 mm) buah 648.00 1,798,200.00 0.093 0.093 453.60 70.00 0.065 648.00 100.00 0.093 453.60 70.00 0.065 648.00 453.60 - 453.60 100.00%
Mur baut 3\/4 HTB\u00A0(Besi siku 2L.70.70. buah 1,872.00 5,194,800.00 0.270 0.270 1,310.40 70.00 0.189 1,872.00 100.00 0.270 1,310.40 70.00 0.189 1,872.00 1,310.40 - 1,310.40 100.00%
Angkur diameter 19 mm panjang 40 cm kg 131.21 1,895,017.35 0.098 0.098 131.21 100.00 0.098 131.21 100.00 0.098 131.21 100.00 0.098 131.21 131.21 - 131.21 100.00%
Pekerjaan 1 cm pengelasan dengan las listrik cm 4,050.00 1,123,875.00 0.058 0.058 0.00 - 0.000 4,050.00 100.00 0.058 0.00 - 0.000 4,050.00 - - 0.00 100.00%
Pek. Pasang rangka atap baja ringan Usuk m2 663.30 71,067,786.08 3.692 3.692 0.00 - 0.000 663.30 100.00 3.692 0.00 - 0.000 663.30 - - 0.00 100.00%
C.75.075 dan Reng B 32 (tebal 0.45)
Pek. Pasangan Atap Genteng Metal Berpasir m2 663.30 74,104,870.95 3.850 3.850 0.00 - 0.000 663.30 100.00 3.850 0.00 - 0.000 663.30 - - 0.00 100.00%
Pek. Pasangan Kerpus Genteng Metal Berpasir m1 68.00 7,023,546.09 0.365 0.365 0.00 - 0.000 68.00 100.00 0.365 0.00 - 0.000 68.00 - - 0.00 100.00%
Pek. Waterproofing Dak Selasar Lantai 2 m2 141.90 7,875,450.00 0.409 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Memasang Lisplank WOODPLANK m 101.00 2,802,750.00 0.146 0.146 0.00 - 0.000 101.00 100.00 0.146 0.00 - 0.000 101.00 - - 0.00 100.00%
elephant.ukuran (8x20x400)
Sub Total 0.000 0.00 -
PEKERJAAN INSTALASI LISTRIK 0.000 0.00 -
Pek. Penangkal petir konvensional (split, arde unit 2.00 3,330,000.00 0.173 0.173 0.00 - 0.000 2.00 100.00 2.000 0.00 - 0.000 2.00 - - 0.00 100.00%
BC dan assesories)
Pek. Stop Kontak bh 17.00 502,319.40 0.026 0.026 0.00 - 0.000 17.00 100.00 0.026 0.00 - 0.000 17.00 - - 0.00 100.00%
Pek. Stop Kontak AC bh 11.00 1,037,850.00 0.054 0.054 0.00 - 0.000 11.00 100.00 0.054 0.00 - 0.000 11.00 - - 0.00 100.00%
Pek. Saklar Tunggal bh 4.00 118,192.80 0.006 0.006 0.00 - 0.000 4.00 100.00 0.006 0.00 - 0.000 4.00 - - 0.00 100.00%
Pek. Saklar Ganda bh 7.00 206,837.40 0.011 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00 100.00%
Pek. Lampu Panel LED Downlight (18 watt bh 28.00 5,439,000.00 0.283 0.283 0.00 - 0.000 28.00 100.00 0.283 0.00 - 0.000 28.00 - - 0.00 100.00%
putih),Panasonic
Pek. Lampu RMI (2Lampu 18 watt) Philips bh 20.00 4,995,000.00 0.259 0.259 0.00 - 0.000 20.00 100.00 0.259 0.00 - 0.000 20.00 - - 0.00 100.00%
Pek. Instalasi listrik lampu dan stop kontak ttk 65.00 16,349,190.00 0.849 0.849 0.00 - 0.000 65.00 100.00 0.849 0.00 - 0.000 65.00 - - 0.00 100.00%
NYM Eterna + pipa conduit
Page 309
Bekisting 2x pakai m2 11.95 1,888,543.14 0.098 0.098 0.00 - 0.000 11.95 100.00 0.098 0.00 - 0.000 11.95 - - 0.00 100.00%
Pembesian kg 235.77 3,405,138.65 0.177 0.177 0.00 - 0.000 235.77 100.00 0.177 0.00 - 0.000 235.77 - - 0.00 100.00%
Beton K.175 m3 1.02 1,122,475.99 0.058 0.058 0.00 - 0.000 1.02 100.00 0.058 0.00 - 0.000 1.02 - - 0.00 100.00%
Pek. Balok Aula 20\/35 (B2) 0.000 0.00 -
Bekisting 2x pakai m2 13.23 2,090,830.60 0.109 0.153 13.23 100.00 0.109 18.63 140.82 0.153 18.63 100.00 0.153 18.63 18.63 - 18.63 140.82%
Pembesian kg 418.04 6,037,596.64 0.314 0.226 300.89 71.98 0.226 300.89 71.98 0.226 300.89 100.00 0.226 300.89 300.89 - 300.89 71.98%
Beton K.225 m3 1.47 1,698,173.09 0.088 0.087 1.45 98.57 0.087 1.45 98.57 0.087 1.45 100.00 0.087 1.45 1.45 - 1.45 98.57%
Pek. Balok Konsul Pendopo Bawah Talang 0.000 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 100.00 0.037 4.50 4.50 - 4.50 100.00%
Pembesian kg 169.58 2,449,181.03 0.127 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 100.00 0.127 169.58 169.58 - 169.58 100.00%
Beton K.175 m3 0.46 506,214.66 0.026 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 100.00 0.026 0.46 0.46 - 0.46 100.00%
Pek. Balok Konsul Topi-Topi 0.000 0.00 -
Bekisting 2x pakai m2 4.12 651,112.78 0.034 0.034 0.00 - 0.000 4.12 100.00 0.034 0.00 - 0.000 4.12 - - 0.00 100.00%
Pembesian kg 52.04 751,594.41 0.039 0.039 0.00 - 0.000 52.04 100.00 0.039 0.00 - 0.000 52.04 - - 0.00 100.00%
Beton K.175 m3 0.59 649,275.33 0.034 0.034 0.00 - 0.000 0.59 100.00 0.034 0.00 - 0.000 0.59 - - 0.00 100.00%
Pek. Plat beton talang aula tebal 12 cm 0.000 0.00 -
Bekisting 2x pakai m2 23.80 3,725,684.31 0.194 0.383 23.80 100.00 0.194 47.04 197.65 0.383 47.04 100.00 0.383 47.04 47.04 - 47.04 197.65%
Pembesian kg 1,430.69 20,662,924.92 1.073 1.030 1,373.06 95.97 1.030 1,373.06 95.97 1.030 1,373.06 100.00 1.030 1,373.06 1,373.06 - 1,373.06 95.97%
Beton K.225 m3 3.62 4,181,895.63 0.217 0.339 3.62 100.00 0.217 5.64 155.93 0.339 5.64 100.00 0.339 5.64 5.64 - 5.64 155.93%
Pek. Plat beton topi-topi tebal 10 cm 0.000 0.00 -
Bekisting 2x pakai m2 29.24 4,577,269.29 0.238 0.238 0.00 - 0.000 29.24 100.00 0.238 0.00 - 0.000 29.24 - - 0.00 100.00%
Pembesian kg 448.41 6,476,219.28 0.336 0.336 0.00 - 0.000 448.41 100.00 0.336 0.00 - 0.000 448.41 - - 0.00 100.00%
Beton K.175 m3 3.63 3,994,693.97 0.208 0.208 0.00 - 0.000 3.63 100.00 0.208 0.00 - 0.000 3.63 - - 0.00 100.00%
Pek. Balok Dudukan Kuda-kuda 20\/52 (B5) 0.000 0.00 -
Bekisting 2x pakai m2 47.60 7,522,565.13 0.391 0.542 47.60 100.00 0.391 66.00 138.66 0.542 66.00 100.00 0.542 66.00 66.00 - 66.00 138.66%
Pembesian kg 1,088.91 15,726,723.17 0.817 0.826 1,088.91 100.00 0.817 1,100.88 101.10 0.826 1,100.88 100.00 0.826 1,100.88 1,100.88 - 1,100.88 101.10%
Beton K.225 m3 7.07 8,167,403.90 0.424 0.407 6.78 95.91 0.407 6.78 95.91 0.407 6.78 100.00 0.407 6.78 6.78 - 6.78 95.91%
Pek. Balok Konsul Topi-topi 0.000 0.00 -
Bekisting 2x pakai m2 4.50 711,166.87 0.037 0.037 0.00 - 0.000 4.50 100.00 0.037 0.00 - 0.000 4.50 - - 0.00 100.00%
Pembesian kg 169.58 2,449,181.03 0.127 0.127 0.00 - 0.000 169.58 100.00 0.127 0.00 - 0.000 169.58 - - 0.00 100.00%
Beton K.175 m3 0.46 506,214.66 0.026 0.026 0.00 - 0.000 0.46 100.00 0.026 0.00 - 0.000 0.46 - - 0.00 100.00%
Pek. Plat deker Gapura Pendopo 0.000 0.00 -
Bekisting 2x pakai m2 6.00 939,248.15 0.049 0.049 0.00 - 0.000 6.00 100.00 0.049 0.00 - 0.000 6.00 - - 0.00 100.00%
Pembesian kg 107.41 1,551,282.78 0.081 0.081 0.00 - 0.000 107.41 100.00 0.081 0.00 - 0.000 107.41 - - 0.00 100.00%
Beton K.225 m3 0.48 554,505.50 0.029 0.029 0.00 - 0.000 0.48 100.00 0.029 0.00 - 0.000 0.48 - - 0.00 100.00%
Pek. Plat Talang Gapuro tebal 8 cm 0.000 0.00 -
Bekisting 2x pakai m2 5.97 934,551.90 0.049 0.049 5.97 100.00 0.049 5.97 100.00 0.049 5.97 100.00 0.049 5.97 5.97 - 5.97 100.00%
Pembesian kg 56.81 820,485.75 0.043 0.043 56.81 100.00 0.043 56.81 100.00 0.043 56.81 100.00 0.043 56.81 56.81 - 56.81 100.00%
Beton K.225 m3 0.48 554,505.50 0.029 0.029 0.48 100.00 0.029 0.48 100.00 0.029 0.48 100.00 0.029 0.48 0.48 - 0.48 100.00%
Lantai Beton Rabat Keliling Pendopo fc=7,4 m3 1.95 1,959,135.80 0.102 0.102 0.00 - 0.000 1.95 100.00 0.102 0.00 - 0.000 1.95 - - 0.00 100.00%
Mpa
Lantai Beton Rabat Bawah Lantai Pendopo m3 12.78 12,839,874.60 0.667 0.667 0.00 - 0.000 12.78 100.00 0.667 0.00 - 0.000 12.78 - - 0.00 100.00%
fc=7,4 Mpa
Pek. Waterproofing dak Talang m2 68.00 3,774,000.00 0.196 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Total 0.000 0.00 -
Page 312
Pek. Lampu LED Downlight 18 Watt setara bh 8.00 1,554,000.00 0.081 0.081 0.00 - 0.000 8.00 100.00 0.081 0.00 - 0.000 8.00 - - 0.00 100.00%
Phillips + fitting
Pek. Sakelar Ganda (Broco) bh 7.00 206,837.40 0.011 0.011 0.00 - 0.000 7.00 100.00 0.011 0.00 - 0.000 7.00 - - 0.00 100.00%
Pek. Stop kontak (Broco) bh 3.00 88,644.60 0.005 0.005 0.00 - 0.000 3.00 100.00 0.005 0.00 - 0.000 3.00 - - 0.00 100.00%
Total 0.000 0.00 -
PEKERJAAN LAIN-LAIN 0.000 0.00 -
Pek. Tulisan timbul (bahan Akrilic + Logo ls 1.00 1,665,000.00 0.086 0.086 0.00 - 0.000 1.00 100.00 0.086 0.00 - 0.000 1.00 - - 0.00 100.00%
Kota + lampu lengkap)
Pek. Pintu Alumunium (Ruang Laktasi) ls 1.00 2,775,000.00 0.144 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pemasangan Partisi Rangka Metal stud untuk m2 19.56 2,480,582.87 0.129 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Ruang Laktasi
Pemasangan Partisi Gypsum Board tebal 9 mm m2 39.12 2,548,135.25 0.132 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Uk.120x240 cm
Pekerjaan Hand Railling Tangga Besi Hollow m2 3.52 722,832.00 0.038 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - 0.000 0.00 - - 0.00 0.00%
Stainless Steel (Jalur Difable)
Total 0.000 0.00 -
TOTAL ( C ) 0.000 0.00 -
PEKERJAAN HALAMAN 0.000 0.00 -
PEKERJAAN TANAH 0.000 0.00 -
Pek . Urugan Sirtu Kelas A m3 86.68 22,913,554.62 1.190 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Sub Total 0.000 0.00 -
PEKERJAAN PAVING 0.000 0.00 -
Pek. Pasangan batu bata 1\/2 bata, 16 m2 14.25 1,748,033.05 0.091 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Plesteran tbl. 15 mm, 16 m2 28.50 1,975,799.67 0.103 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Acian m2 28.50 841,253.74 0.044 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Pek. Pasang Paving Hexagonal warna Tb. 6 m2 124.17 28,764,353.51 1.494 0.000 0.00 - 0.000 0.00 - #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00 - - 0.00 0.00%
Cm Tanpa Spesi (Tanpa Pemadatan) Halaman
Pendopo
Sub Total 0.000 0.00 -
TOTAL D 0.000 0.00 -
PEKERJAAN BIAYA PENERAPAN 0.000 0.00 -
SISTEM MANAJEMEN KESELAMATAN
KONSTRUKSI
Penyiapan RKK ls 1.00 555,000.00 0.029 0.029 0.50 50.00 0.014 1.00 100.00 0.029 0.50 50.00 0.014 1.00 0.50 - 0.50 100.00%
Alat Pelindung Kerja dan Pelindung Diri ls 1.00 555,000.00 0.029 0.029 0.55 55.00 0.016 1.00 100.00 0.029 0.55 55.00 0.016 1.00 0.55 - 0.55 100.00%
Asuransi dan perijinan ls 1.00 1,110,000.00 0.058 0.058 1.00 100.00 0.058 1.00 100.00 0.058 1.00 100.00 0.058 1.00 1.00 - 1.00 100.00%
Personil Keselamatan Konstruksi ls 1.00 1,694,125.04 0.088 0.088 0.50 50.00 0.044 1.00 100.00 0.088 0.50 50.00 0.044 1.00 0.50 - 0.50 100.00%
Fasilitas sarana, Prasarana dan Alat kesehatan ( ls 1.00 1,110,000.00 0.058 0.058 0.50 50.00 0.029 1.00 100.00 0.058 0.50 50.00 0.029 1.00 0.50 - 0.50 100.00%
Termasuk Protokol Kesehatan Penanganan
COVID
TOTAL 19 E )