Anda di halaman 1dari 4

BILL OF QUANTITY

PROYEK : GUDANG TOB -7 KIK


LOKASI : KAWASAN INDUSTRI KENDAL - JAWA TENGAH
PEKERJAAN : BANGUNAN EXT. 37 M X 30 M ( 2 LANTAI )

Harga Sat. Total Harga


No. PEKERJAAN Sat. Volume
Rp Rp
I. PEKERJAAN PERSIAPAN
1 Pagar Sementara ( Depan Saja) m2 90.00 -
3 traspot pekerja Ls 1.00 -

II PEKERJAAAN TANAH & PONDASI


1 Pengukuran m2 1,110.00 -
2 Galian Tanah : (exavator,hanya perapian galian)
- Galian Pile Cap m3 56.34 -
- Galian Sloof m3 104.76 -
- Pembuangan tanah m3 40.28 -
3 Urug Pasir T. 5 cm di bawah :
- Pile Cap m2 77.31 -
- Sloof ( Tie Beam ) m2 153.00 -
- Lantai m2 1,038.00 -
4 Lantai Kerja t = 5 cm, di bawah :
- Pile Cap m2 77.31 -
- Sloof ( Tie Beam ) m2 153.00 -
- Lantai m2 1,038.00 -
5 Pekerjaan Beton (incl. Tulangan and Bekisting) K-300
a. Pile cap (pembesian,bekisting,cor) m3 45.08 -
b. Sloof 30/50 (pembesian,bekisting,cor) m3 54.00 -
c. Sloof 25/40 (pembesian,bekisting,cor) m3 18.00 -
d. Kolom Pedestal (pembesian,bekiting,cor) m3 21.00 -
e. Dinding Beton Penahan Tanah T. 20 cm (pembesian,bekisting,cor) m3 42.00 -
f. Lantai T = 15 cm, M6 - 2 layer (pembesian,beskiting,cor,trowel halus flat) m2 1,038.00 -

6 Lantai Beton (Lt. 02) t = 17cm (pembesian,bekiting,cor,trowel halus flat) m2 1,110.00 -

III PEKERJAAN ARSITEKTUR & FINISHING


III.A PEKERJAAN DINDING
1 Pas. Dinding bata ringan T. 10 mm (inc. Ring Balk & Kolom Praktis,bongkar psg.scapolding )
-Dinding Pabrik H. 300 cm m2 567.00 -
2 Plester & Acian Dinding m2 1,134.00 -
3 Plester & Acian Kolom Padestal m2 84.00 -
4 Plester & Acian Dinding Penahan Tanah m2 201.00 -

654758760.xlsx hal : 1/4


BILL OF QUANTITY
PROYEK : GUDANG TOB -7 KIK
LOKASI : KAWASAN INDUSTRI KENDAL - JAWA TENGAH
PEKERJAAN : BANGUNAN EXT. 37 M X 30 M ( 2 LANTAI )

Harga Sat. Total Harga


No. PEKERJAAN Sat. Volume
Rp Rp
III.B PEKERJAAN OPENINGAN KUSEN
1 Kusen Alumunium uk. 3'' ex. Alexindo PC Putih m' 58.34 -
2 Daun Pintu Kaca 6mm , Rangka Alumunium ex. Alexindo PC Putih m' 28.16 -
3 Daun Jendela Kaca 6mm , Rangka Alumunium ex. Alexindo PC Putih m' 43.60 -
4 Daun KM/WC , Panel Alumunium ex. Alexindo PC Putih m' 5.00 -
5 Pintu Besi 100 x 220 cm Unit 10.00 -
6 Pintu Rolling Door
-Pintu Rolling Door - Uk. @ 4 x 4 m 7 unit (kolom 30x30, Ring balok 30x40) m' 84.00 -

III.C PEKERJAAN FINISHING LANTAI DAN DINDING


2 Lt. Toilet Keramik 40 x 40 ex. Roman / Setara m2 8.00 -
3 Dinding Keramik Toilet 20x 40 ex. Roman / setara m2 38.40 -

IV PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


a PEKERJAAN SANITAIR
1 Closet duduk ex. TOTO, CW 420J/SW 420 JP unit 1.00 -
2 Wastafel LW 781 CJ ex. TOTO unit 2.00 -
3 Floor Drain ex. TOTO, TX 1 AN unit 2.00 -
4 Urinoir ex. TOTO unit 3.00 -
5 Jet Washer ex. San-Ei unit 1.00 -
6 Meja Wastafel (meja beton,keramik+wastafel) unit 2.00 -

654758760.xlsx hal : 2/4


BILL OF QUANTITY
PROYEK : GUDANG TOB -7 KIK
LOKASI : KAWASAN INDUSTRI KENDAL - JAWA TENGAH
PEKERJAAN : BANGUNAN EXT. 37 M X 30 M ( 2 LANTAI )

Harga Sat. Total Harga


No. PEKERJAAN Sat. Volume
Rp Rp
b Pekerjaan Lain - lain
Ground tank 1.5 x 1.5 x 2 (pembesian,bekisting,cor,pasang keramik,upah psg
1 unit 1.00 -
waterprofing coating)
2 Septic tank & resapan (pembesian,bekisting,cor) unit 1.00 -
4 Saluran Buis Beton dia 40cm (incl. Bak Kontrol) m' 135.74 -

V PEKERJAAN HALAMAN , PAGAR & BETON DUIKER (JALAN MASUK)


a PEKERJAAN PAGAR
PINTU PAGAR DEPAN
1 - Galian Tanah m3 2.00 -
2 - Urug Kembali m3 1.00 -
3 - Pondasi Tapak 80 x 80 (pembesian,bekisting,cor) m3 0.32 -
4 - Kolom 30 x 30 H. 300 cm (pembesian,bekisting,cor) m3 0.65 -
b PEKERJAAN DUIKER BETON JALAN MASUK
-Duiker Jalan Masuk 6m x 12 m
1 Pondasi Batu Kali
- Galian Tanah m3 96.00 -
- Urug Kembali m3 48.00 -
- Pondasi Batu Kali m3 60.00 -
2 Beton Jalan Masuk (Duiker)
- Balok Beton 25 x 50 (pembesian,bekisting,cor) m3 6.75 -
- Beton K. 300-T. 20 cm (pembesian,bekisting,cor,trowel garis) m3 14.40 -

654758760.xlsx hal : 3/4


BILL OF QUANTITY
PROYEK : GUDANG TOB -7 KIK
LOKASI : KAWASAN INDUSTRI KENDAL - JAWA TENGAH
PEKERJAAN : BANGUNAN EXT. 37 M X 30 M ( 2 LANTAI )

Harga Sat. Total Harga


No. PEKERJAAN Sat. Volume
Rp Rp
VI PEKERJAAN JEMBATAN CONNECTING
a Pekerjaan Beton (incl. Tulangan and Bekisting) K-300
1 - Pile cap (pembesian,bekisting,cor) m3 0.43 -
2 - Kolom Padestal (pembesian,bekisting,cor) m3 1.75 -

SUBTOTAL PEKERJAAN EXTENSION -

654758760.xlsx hal : 4/4