Anda di halaman 1dari 34

PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA 0
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 - - -
2 0 Rp 18,470,000.00 4.54 - - -
3 0 Rp 84,749,595.52 20.82 - - -
4 0 Rp 60,920,900.04 14.97 - - -
5 0 Rp 238,363,356.24 58.57 - - -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 - - -
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - I (SATU)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - - - - - -
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 - - - - - - -
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 - - - - - - -
Sub Total Rp 4,500,000.00 1.11 - - -
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 - - - - - - -
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 - - - - - - -
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 - - - - - - -
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 - - - - - - -
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 - - - - - - -
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 - - - - - - -
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 - - - - - - -
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 - - - - - - -
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 - - - - - - -
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - - - - - -
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 - - - - - - -
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 - - - - - - -
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - - - - - -
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - - - - - -
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - - - - - -
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 - - - - - - -
Sub Total Rp 18,470,000.00 4.54 - - -
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 - - - - - - -
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - - - - - -
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 - - - - - - -
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - - - - - -
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - - - - - -
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 - - - - - - -
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - - - - - -
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - - - - - -
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - - - - - -
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - - - - - -
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - - - - - -
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - - - - - -
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - - - - - -
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - - - - - -
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - - - - - -
Sub Total Rp 84,749,595.52 20.82 - - -
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - - - - - -
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - - - - - -
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - - - - - -
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - - - - - -
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - - - - - -
Sub Total Rp 60,920,900.04 14.97 - - -
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - - - - - -
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - - -

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 - - -
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA 0
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 - 0.27 0.27
2 0 Rp 18,470,000.00 4.54 - 2.20 2.20
3 0 Rp 84,749,595.52 20.82 - 0.09 0.09
4 0 Rp 60,920,900.04 14.97 - - -
5 0 Rp 238,363,356.24 58.57 - - -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 - 2.57 2.57
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - II (DUA)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - 0.10 0.07 0.10 0.07 10
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 - - 0.30 0.07 0.30 0.07 30
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 - - 1.00 0.12 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 - 0.27 0.27
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 - - 1.00 0.25 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 - - 1.00 0.07 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 - - 1.00 0.10 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 - - 8.00 0.10 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 - - 8.00 0.07 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 - - 8.00 0.02 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 - - 8.00 0.02 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 - - 8.00 0.29 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 - - 8.00 0.07 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - 1.00 0.74 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 - - 0.45 0.33 0.45 0.33 15
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 - - 1.00 0.07 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 - - 0.08 0.04 0.08 0.04 8
Sub Total Rp 18,470,000.00 4.54 - 2.20 2.20
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 - - 4.01 0.09 4.01 0.09 30
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - - - - - -
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 - - - - - - -
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - - - - - -
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - - - - - -
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 - - - - - - -
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - - - - - -
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - - - - - -
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - - - - - -
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - - - - - -
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - - - - - -
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - - - - - -
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - - - - - -
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - - - - - -
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - - - - - -
Sub Total Rp 84,749,595.52 20.82 - 0.09 0.09
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - - - - - -
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - - - - - -
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - - - - - -
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - - - - - -
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - - - - - -
Sub Total Rp 60,920,900.04 14.97 - - -
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - - - - - -
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - - -

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 - 2.57 2.57
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA 0
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.27 0.32 0.59
2 0 Rp 18,470,000.00 4.54 2.20 0.26 2.46
3 0 Rp 84,749,595.52 20.82 0.09 1.24 1.33
4 0 Rp 60,920,900.04 14.97 - - -
5 0 Rp 238,363,356.24 58.57 - - -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 2.47 1.82 4.39
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - III (TIGA)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.10 0.07 0.20 0.15 0.30 0.22 30
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 0.30 0.07 0.70 0.17 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.27 0.32 0.59
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 0.45 0.33 0.30 0.22 0.75 0.55 25
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.08 0.04 0.08 0.04 0.15 0.07 15
Sub Total Rp 18,470,000.00 4.54 2.20 0.26 2.46
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 4.01 0.09 6.68 0.15 10.68 0.25 80
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - - - - - -
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 - - 0.08 0.02 0.08 0.02 30
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - - - - - -
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - - - - - -
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 - - 4.38 1.07 4.38 1.07 40
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - - - - - -
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - - - - - -
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - - - - - -
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - - - - - -
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - - - - - -
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - - - - - -
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - - - - - -
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - - - - - -
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - - - - - -
Sub Total Rp 84,749,595.52 20.82 0.09 1.24 1.33
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - - - - - -
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - - - - - -
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - - - - - -
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - - - - - -
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - - - - - -
Sub Total Rp 60,920,900.04 14.97 - - -
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - - - - - -
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - - -

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 2.57 1.82 4.39
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA 0
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.59 0.04 0.63
2 0 Rp 18,470,000.00 4.54 2.46 0.18 2.65
3 0 Rp 84,749,595.52 20.82 1.33 3.24 4.58
4 0 Rp 60,920,900.04 14.97 - 1.44 1.44
5 0 Rp 238,363,356.24 58.57 - - -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 3.05 4.91 9.29
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - IV (EMPAT)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.30 0.22 0.05 0.04 0.35 0.26 35
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.59 0.04 0.63
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 0.75 0.55 0.15 0.11 0.90 0.66 30
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.15 0.07 0.15 0.07 0.30 0.15 30
Sub Total Rp 18,470,000.00 4.54 2.46 0.18 2.65
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 10.68 0.25 2.67 0.06 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - 3.12 0.03 3.12 0.03 70
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.08 0.02 0.11 0.03 0.19 0.05 70
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - - - - - -
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - 15.29 0.61 15.29 0.61 20
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 4.38 1.07 3.29 0.80 7.67 1.87 70
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - 1.02 0.28 1.02 0.28 30
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - 143.04 0.62 143.04 0.62 30
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - 15.77 0.53 15.77 0.53 30
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - 0.16 0.04 0.16 0.04 20
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - 28.01 0.12 28.01 0.12 20
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - 2.29 0.11 2.29 0.11 20
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - - - - - -
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - - - - - -
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - - - - - -
Sub Total Rp 84,749,595.52 20.82 1.33 3.24 4.58
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - - - - - -
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - - - - - -
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - - - - - -
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - 29.90 1.06 29.90 1.06 30
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - 19.93 0.38 19.93 0.38 10
Sub Total Rp 60,920,900.04 14.97 - 1.44 1.44
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - - - - - -
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - - -

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 4.39 4.91 9.29
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN BULANAN


PEKERJAAN : 0 BULAN KE -
LOKASI : 0 PERIDE TGL.
NO. SPK : 0 SUMBER DANA
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN
NILAI SPK : Rp 0 PELAKSANA
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS
JUMLAH HARGA BOBOT BULAN LALU
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%)
1 2 3 4 5
1 0 Rp 4,500,000.00 1.11 -
2 0 Rp 18,470,000.00 4.54 -
3 0 Rp 84,749,595.52 20.82 -
4 0 Rp 60,920,900.04 14.97 -
5 0 Rp 238,363,356.24 58.57 -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 0.00
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0
0 0
0 0
0

0 0
0 0
AH KOTA SUBULUSSALAM

0
0
0
OTA SUBULUSSALAM

ASI LAPORAN BULANAN


I.
30 Desember 1899 S/D 30 Desember 1899
0
2022
0
0
BULAN INI S/D BULAN INI % ITEM
BOBOT (%) BOBOT (%) PEKERJAAN
6 7 8
0.63 0.63
2.65 2.65
4.58 4.58
1.44 1.44
- -

9.29 9.29

-
-
-

0
-
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN BULANAN

PEKERJAAN : 0 BULAN KE - I (SATU)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT BULAN LALU BULAN INI S/D BULAN INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.30 0.22 0.05 0.04 0.35 0.26 35
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.59 0.04 0.63
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 0.75 0.55 0.15 0.11 0.90 0.66 30
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.15 0.07 0.15 0.07 0.30 0.15 30
Sub Total Rp 18,470,000.00 4.54 2.46 0.18 2.65
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 10.68 0.25 2.67 0.06 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - 3.12 0.03 3.12 0.03 70
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.08 0.02 0.11 0.03 0.19 0.05 70
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - - - - - -
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - 15.29 0.61 15.29 0.61 20
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 4.38 1.07 3.29 0.80 7.67 1.87 70
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - 1.02 0.28 1.02 0.28 30
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - 143.04 0.62 143.04 0.62 30
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - 15.77 0.53 15.77 0.53 30
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - 0.16 0.04 0.16 0.04 20
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - 28.01 0.12 28.01 0.12 20
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - 2.29 0.11 2.29 0.11 20
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - - - - - -
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - - - - - -
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - - - - - -
Sub Total Rp 84,749,595.52 20.82 1.33 3.24 4.58
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - - - - - -
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - - - - - -
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - - - - - -
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - 29.90 1.06 29.90 1.06 30
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - 19.93 0.38 19.93 0.38 10
Sub Total Rp 60,920,900.04 14.97 - 1.44 1.44
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - - - - - -
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - - -

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 4.39 4.91 9.29
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.63 0.04 0.66
2 0 Rp 18,470,000.00 4.54 2.65 0.14 2.78
3 0 Rp 84,749,595.52 20.82 4.58 4.06 8.63
4 0 Rp 60,920,900.04 14.97 1.44 2.74 4.18
5 0 Rp 238,363,356.24 58.57 - 6.22 6.22
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 3.27 13.19 22.48
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - V (LIMA)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.35 0.26 0.05 0.04 0.40 0.29 40
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.63 0.04 0.66
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 0.90 0.66 0.15 0.11 1.05 0.77 35
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.30 0.15 0.05 0.02 0.35 0.17 35
Sub Total Rp 18,470,000.00 4.54 2.65 0.14 2.78
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 13.35 0.31 - - 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 3.12 0.03 1.34 0.01 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.19 0.05 0.03 0.01 0.22 0.06 80
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - 2.94 0.80 2.94 0.80 10
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 15.29 0.61 7.64 0.31 22.93 0.92 30
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 7.67 1.87 3.29 0.80 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 1.02 0.28 1.02 0.28 2.05 0.56 60
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 143.04 0.62 143.04 0.62 286.08 1.25 60
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 15.77 0.53 15.77 0.53 31.54 1.05 60
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 0.16 0.04 0.31 0.09 0.47 0.13 60
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 28.01 0.12 56.02 0.24 84.03 0.37 60
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 2.29 0.11 4.58 0.23 6.86 0.34 60
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - 0.08 0.02 0.08 0.02 30
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - 12.12 0.05 12.12 0.05 30
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - 1.30 0.06 1.30 0.06 30
Sub Total Rp 84,749,595.52 20.82 4.58 4.06 8.63
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - 0.34 0.58 0.34 0.58 30
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - 0.13 0.22 0.13 0.22 30
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - 0.29 0.49 0.29 0.49 10
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 29.90 1.06 29.90 1.06 59.80 2.12 60
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 19.93 0.38 19.93 0.38 39.86 0.77 20
Sub Total Rp 60,920,900.04 14.97 1.44 2.74 4.18
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - 3.63 6.22 3.63 6.22 20
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - - - - - -
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - - - - - -
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - 6.22 6.22

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 9.29 13.19 22.48
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 30 Desember 1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.66 0.04 0.70
2 0 Rp 18,470,000.00 4.54 2.78 0.14 2.92
3 0 Rp 84,749,595.52 20.82 8.63 3.80 12.43
4 0 Rp 60,920,900.04 14.97 4.18 3.28 7.46
5 0 Rp 238,363,356.24 58.57 6.22 11.02 17.25
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 3.44 18.28 40.75
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - VI (ENAM)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12/30/1899
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.40 0.29 0.05 0.04 0.45 0.33 45
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.66 0.04 0.70
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 1.05 0.77 0.15 0.11 1.20 0.88 40
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.35 0.17 0.05 0.02 0.40 0.20 40
Sub Total Rp 18,470,000.00 4.54 2.78 0.14 2.92
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 13.35 0.31 - - 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 4.45 0.05 - - 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.22 0.06 0.05 0.01 0.27 0.07 100
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 2.94 0.80 1.47 0.40 4.41 1.21 15
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 22.93 0.92 22.93 0.92 45.86 1.84 60
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 10.95 2.66 - - 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 2.05 0.56 1.36 0.37 3.41 0.93 100
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 286.08 1.25 190.72 0.83 476.80 2.08 100
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 31.54 1.05 21.02 0.70 52.56 1.75 100
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 0.47 0.13 0.23 0.06 0.70 0.19 90
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 84.03 0.37 42.02 0.18 126.05 0.55 90
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 6.86 0.34 3.43 0.17 10.30 0.51 90
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 0.08 0.02 0.08 0.02 0.17 0.05 60
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 12.12 0.05 12.12 0.05 24.24 0.11 60
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 1.30 0.06 1.30 0.06 2.59 0.13 60
Sub Total Rp 84,749,595.52 20.82 8.63 3.80 12.43
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 0.34 0.58 0.34 0.58 0.68 1.16 60
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 0.13 0.22 0.13 0.22 0.25 0.43 60
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 0.29 0.49 0.29 0.49 0.58 0.99 20
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 59.80 2.12 39.86 1.41 99.66 3.54 100
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 39.86 0.77 29.90 0.57 69.76 1.34 35
Sub Total Rp 60,920,900.04 14.97 4.18 3.28 7.46
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 3.63 6.22 2.72 4.67 6.35 10.89 35
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - 26.30 0.16 26.30 0.16 20
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - 228.22 6.20 228.22 6.20 30
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 6.22 11.02 17.25

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 22.48 18.28 40.75
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 30 Desember 1899 S/D 05 September 2022
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.70 0.04 0.74
2 0 Rp 18,470,000.00 4.54 2.92 0.14 3.05
3 0 Rp 84,749,595.52 20.82 12.43 1.19 13.62
4 0 Rp 60,920,900.04 14.97 7.46 2.04 9.50
5 0 Rp 238,363,356.24 58.57 17.25 8.36 25.60
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 3.62 11.76 52.51
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - VII (TUJUH)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 05 September 2022
NO. SPK : 0 SUMBER DANA PEN
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.45 0.33 0.05 0.04 0.50 0.37 50
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.70 0.04 0.74
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 1.20 0.88 0.15 0.11 1.35 1.00 45
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.40 0.20 0.05 0.02 0.45 0.22 45
Sub Total Rp 18,470,000.00 4.54 2.92 0.14 3.05
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 13.35 0.31 - - 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 4.45 0.05 - - 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.27 0.07 - - 0.27 0.07 100
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 4.41 1.21 2.94 0.80 7.35 2.01 25
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 45.86 1.84 3.82 0.15 49.69 1.99 65
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 10.95 2.66 - - 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 3.41 0.93 - - 3.41 0.93 100
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 476.80 2.08 - - 476.80 2.08 100
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 52.56 1.75 - - 52.56 1.75 100
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 0.70 0.19 0.08 0.02 0.78 0.21 100
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 126.05 0.55 14.01 0.06 140.05 0.61 100
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 10.30 0.51 1.14 0.06 11.44 0.56 100
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 0.17 0.05 0.06 0.02 0.22 0.06 80
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 24.24 0.11 8.08 0.04 32.32 0.14 80
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 2.59 0.13 0.86 0.04 3.46 0.17 80
Sub Total Rp 84,749,595.52 20.82 12.43 1.19 13.62
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 0.68 1.16 0.23 0.39 0.90 1.55 80
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 0.25 0.43 0.08 0.14 0.34 0.58 80
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 0.58 0.99 0.43 0.74 1.01 1.73 35
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 99.66 3.54 - - 99.66 3.54 100
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 69.76 1.34 39.86 0.77 109.63 2.11 55
Sub Total Rp 60,920,900.04 14.97 7.46 2.04 9.50
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 6.35 10.89 1.81 3.11 8.16 14.00 45
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 26.30 0.16 13.15 0.08 39.46 0.24 30
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 228.22 6.20 190.18 5.16 418.40 11.36 55
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 17.25 8.36 25.60

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 40.75 11.76 52.51
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN MINGGUAN


PEKERJAAN : 0 MINGGU KE - 0
LOKASI : 0 PERIDE TGL. 06 September 2022 S/D 12 September 2022
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%) BOBOT (%) BOBOT (%) PEKERJAAN
1 2 3 4 5 6 7 8
1 0 Rp 4,500,000.00 1.11 0.74 0.07 0.81
2 0 Rp 18,470,000.00 4.54 3.05 0.41 3.46
3 0 Rp 84,749,595.52 20.82 13.62 0.65 14.27
4 0 Rp 60,920,900.04 14.97 9.50 1.96 11.46
5 0 Rp 238,363,356.24 58.57 25.60 13.83 39.43
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 3.79 16.91 69.42
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0 -
0 0 -
0 0 -
0

0 0 0
0 0 -
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN MINGGUAN

PEKERJAAN : 0 MINGGU KE - VIII (DELAPAN)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. 06 September 2022 S/D 12 September 2022
NO. SPK : 0 SUMBER DANA PEN
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.50 0.37 0.10 0.07 0.60 0.44 60
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.74 0.07 0.81
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 1.35 1.00 0.45 0.33 1.80 1.33 60
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.45 0.22 0.15 0.07 0.60 0.29 60
Sub Total Rp 18,470,000.00 4.54 3.05 0.41 3.46
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 13.35 0.31 - - 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 4.45 0.05 - - 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.27 0.07 - - 0.27 0.07 100
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 7.35 2.01 1.47 0.40 8.82 2.41 30
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 49.69 1.99 3.82 0.15 53.51 2.14 70
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 10.95 2.66 - - 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 3.41 0.93 - - 3.41 0.93 100
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 476.80 2.08 - - 476.80 2.08 100
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 52.56 1.75 - - 52.56 1.75 100
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 0.78 0.21 - - 0.78 0.21 100
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 140.05 0.61 - - 140.05 0.61 100
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 11.44 0.56 - - 11.44 0.56 100
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 0.22 0.06 0.06 0.02 0.28 0.08 100
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 32.32 0.14 8.08 0.04 40.40 0.18 100
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 3.46 0.17 0.86 0.04 4.32 0.22 100
Sub Total Rp 84,749,595.52 20.82 13.62 0.65 14.27
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 0.90 1.55 0.23 0.39 1.13 1.94 100
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 0.34 0.58 0.08 0.14 0.42 0.72 100
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 1.01 1.73 0.72 1.24 1.73 2.96 60
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 99.66 3.54 - - 99.66 3.54 100
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 109.63 2.11 9.97 0.19 119.59 2.30 60
Sub Total Rp 60,920,900.04 14.97 9.50 1.96 11.46
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 8.16 14.00 5.44 9.33 13.60 23.33 75
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 39.46 0.24 59.18 0.36 98.64 0.61 75
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 418.40 11.36 152.14 4.13 570.54 15.49 75
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 25.60 13.83 39.43

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 52.51 16.91 69.42
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
PEMERINTAH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

REKAPITULASI LAPORAN BULANAN


PEKERJAAN : 0 BULAN KE -
LOKASI : 0 PERIDE TGL.
NO. SPK : 0 SUMBER DANA
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN
NILAI SPK : Rp 0 PELAKSANA
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS
JUMLAH HARGA BOBOT BULAN LALU
NO. URAIAN PEKERJAAN
( Rp ) (%) BOBOT (%)
1 2 3 4 5
1 0 Rp 4,500,000.00 1.11 0.63
2 0 Rp 18,470,000.00 4.54 2.65
3 0 Rp 84,749,595.52 20.82 4.58
4 0 Rp 60,920,900.04 14.97 1.44
5 0 Rp 238,363,356.24 58.57 -
SUB JUMLAH Rp 407,003,851.80
PPn 11 % Rp 44,770,423.70
100.00 9.29
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

0 0
0 0
0 0
0

0 0
0 0
AH KOTA SUBULUSSALAM

0
0
0
KOTA SUBULUSSALAM

LASI LAPORAN BULANAN


II.
30 Desember 1899 S/D 12 September 2022
0
2022
0
0
BULAN INI S/D BULAN INI % ITEM
BOBOT (%) BOBOT (%) PEKERJAAN
6 7 8
0.18 0.81
0.81 3.46
9.69 14.27
10.01 11.46
39.43 39.43

60.13 69.42

-
-
-

0
-
0

0
KOTA SUBULUSSALAM
0
0

LAPORAN BULANAN

PEKERJAAN : 0 BULAN KE - II (DUA)


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12 September 2022
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT BULAN LALU BULAN INI S/D BULAN INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 0.35 0.26 0.25 0.18 0.60 0.44 60
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 1.00 0.12 - - 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 0.63 0.18 0.81
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 1.00 0.25 - - 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 1.00 0.10 - - 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 8.00 0.10 - - 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 8.00 0.02 - - 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 8.00 0.29 - - 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 8.00 0.07 - - 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 1.00 0.74 - - 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 0.90 0.66 0.90 0.66 1.80 1.33 60
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 1.00 0.07 - - 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 1.00 0.01 - - 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 0.30 0.15 0.30 0.15 0.60 0.29 60
Sub Total Rp 18,470,000.00 4.54 2.65 0.81 3.46
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 13.35 0.31 - - 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 3.12 0.03 1.34 0.01 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 0.19 0.05 0.08 0.02 0.27 0.07 100
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - 8.82 2.41 8.82 2.41 30
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 15.29 0.61 38.22 1.53 53.51 2.14 70
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 7.67 1.87 3.29 0.80 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 1.02 0.28 2.39 0.65 3.41 0.93 100
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 143.04 0.62 333.76 1.45 476.80 2.08 100
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 15.77 0.53 36.79 1.23 52.56 1.75 100
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 0.16 0.04 0.62 0.17 0.78 0.21 100
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 28.01 0.12 112.04 0.49 140.05 0.61 100
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 2.29 0.11 9.15 0.45 11.44 0.56 100
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - 0.28 0.08 0.28 0.08 100
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - 40.40 0.18 40.40 0.18 100
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - 4.32 0.22 4.32 0.22 100
Sub Total Rp 84,749,595.52 20.82 4.58 9.69 14.27
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - 1.13 1.94 1.13 1.94 100
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - 0.42 0.72 0.42 0.72 100
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - 1.73 2.96 1.73 2.96 60
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 29.90 1.06 69.76 2.47 99.66 3.54 100
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 19.93 0.38 99.66 1.92 119.59 2.30 60
Sub Total Rp 60,920,900.04 14.97 1.44 10.01 11.46
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - 13.60 23.33 13.60 23.33 75
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - 98.64 0.61 98.64 0.61 75
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - 570.54 15.49 570.54 15.49 75
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - 39.43 39.43

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 9.29 60.13 69.42
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: Diperiksa oleh: Diajukan oleh:


0 0 -
0 0 -
Kota Subulussalam

0 0 0
0 0 0
0

0
KOTA SUBULUSSALAM
0
0

TERMYN 01

PEKERJAAN : 0 SAAT KE - TERMIN 1


LOKASI : KOTA SUBULUSSALAM PERIDE TGL. ### S/D 12 September 2022
NO. SPK : 0 SUMBER DANA APBK
TANGGAL SPK : 30 Desember 1899 TAHUN ANGGARAN 2022
NILAI SPK : Rp 0 PELAKSANA 0
WAKTU PELAKSANAAN : 0 KONSULTAN PENGAWAS 0
HARGA SATUAN JUMLAH HARGA BOBOT SAAT LALU SAAT INI S/D SAAT INI % ITEM
NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp ) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PEKERJAAN
1 2 3 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan Awal dan Akhir 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - 0.60 0.44 0.60 0.44 60
2 Pemasangan Bowplank 1.00 Ls 1,000,000.00 Rp 1,000,000.00 0.25 - - 1.00 0.25 1.00 0.25 100
3 Papan Nama Proyek 1.00 Ls 500,000.00 Rp 500,000.00 0.12 - - 1.00 0.12 1.00 0.12 100
Sub Total Rp 4,500,000.00 1.11 - 0.81 0.81
4 SMK3
1 A Penyiapan RK3K terdiri atas :
2 - Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 Set 1,000,000.00 Rp 1,000,000.00 0.25 - - 1.00 0.25 1.00 0.25 100
3 B Sosialisasi dan Promosi K3 terdiri atas :
4 - Spanduk (banner) 1.00 Lbr 300,000.00 Rp 300,000.00 0.07 - - 1.00 0.07 1.00 0.07 100
5 - Papan Informasi K3 1.00 Bh 400,000.00 Rp 400,000.00 0.10 - - 1.00 0.10 1.00 0.10 100
6 C Alat Pelindung Diri terdiri atas :
7 - Topi Pelindung (Safety Helmet) 8.00 Bh 50,000.00 Rp 400,000.00 0.10 - - 8.00 0.10 8.00 0.10 100
8 - Pelindung Mata (Goggles, Spectacles) 8.00 Psg 35,000.00 Rp 280,000.00 0.07 - - 8.00 0.07 8.00 0.07 100
9 - Pelindung Pernafasan dan Mulut (masker) 8.00 Bh 10,000.00 Rp 80,000.00 0.02 - - 8.00 0.02 8.00 0.02 100
### - Sarung Tangan (Safety Gloves); 8.00 Psg 10,000.00 Rp 80,000.00 0.02 - - 8.00 0.02 8.00 0.02 100
### - Sepatu Keselamatan (Safety Shoes); untuk Staf 8.00 Psg 150,000.00 Rp 1,200,000.00 0.29 - - 8.00 0.29 8.00 0.29 100
### - Rompi Keselamatan (Safety Vest) 8.00 Bh 35,000.00 Rp 280,000.00 0.07 - - 8.00 0.07 8.00 0.07 100
### D Asuransi dan Perizinan
### Asuransi dan Kesehatan 1.00 Ls 3,000,000.00 Rp 3,000,000.00 0.74 - - 1.00 0.74 1.00 0.74 100
### E Personil K3 terdiri atas :
### Petugas K3 3.00 OB 3,000,000.00 Rp 9,000,000.00 2.21 - - 1.80 1.33 1.80 1.33 60
### F Fasilitas sarana kesehatan :
### Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 300,000.00 Rp 300,000.00 0.07 - - 1.00 0.07 1.00 0.07 100
### G Rambu-rambu terdiri atas :
### - Rambu Larangan 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### - Rambu Informasi 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### H Lain-lain Terkait Pengendalian Resiko K3
### - Bendera K3 1.00 Bh 50,000.00 Rp 50,000.00 0.01 - - 1.00 0.01 1.00 0.01 100
### 5 Administrasi dan Dokumentasi 1.00 Ls 2,000,000.00 Rp 2,000,000.00 0.49 - - 0.60 0.29 0.60 0.29 60
Sub Total Rp 18,470,000.00 4.54 - 3.46 3.46
B PEKERJAAN GALIAN DAN TANAH
1 Pekerjaan Galian Tanah Pondasi 13.35 M3 94,050.00 Rp 1,255,567.50 0.31 - - 13.35 0.31 13.35 0.31 100
2 Mengurug Kembali Galian 4.45 M3 41,245.60 Rp 183,542.92 0.05 - - 4.45 0.05 4.45 0.05 100
3 Pondasi Umpak Beton Cor (K-175) 0.27 M3 1,114,106.40 Rp 300,808.73 0.07 - - 0.27 0.07 0.27 0.07 100
4 Beton Tumbuk Untuk Lantai (K-175) 29.40 M3 1,114,106.40 Rp 32,754,728.16 8.05 - - 8.82 2.41 8.82 2.41 30
5 Timbunan Bawah Lantai 76.44 M3 163,020.00 Rp 12,461,248.80 3.06 - - 53.51 2.14 53.51 2.14 70
1 2 3 5 6 7 8 9 10 11 12 13 14
6 Pondasi Menerus/ Batu Kali 10.95 M3 990,412.50 Rp 10,845,016.88 2.66 - - 10.95 2.66 10.95 2.66 100
C PEKERJAAN BETON
1 Pekerjaan Sloof
- Beton 3.41 M3 1,114,106.40 Rp 3,799,102.82 0.93 - - 3.41 0.93 3.41 0.93 100
- Besi Polos 476.80 Kg 17,725.95 Rp 8,451,732.96 2.08 - - 476.80 2.08 476.80 2.08 100
- Begisting 52.56 M2 135,874.75 Rp 7,141,576.86 1.75 - - 52.56 1.75 52.56 1.75 100
2 Pekerjaan Kolom
- Beton 0.78 M3 1,114,106.40 Rp 869,002.99 0.21 - - 0.78 0.21 0.78 0.21 100
- Besi Polos 140.05 Kg 17,725.95 Rp 2,482,519.30 0.61 - - 140.05 0.61 140.05 0.61 100
- Begisting 11.44 M2 200,858.63 Rp 2,297,822.67 0.56 - - 11.44 0.56 11.44 0.56 100
3 Pekerjaan Balok
- Beton 0.28 M3 1,114,106.40 Rp 311,949.79 0.08 - - 0.28 0.08 0.28 0.08 100
- Besi Polos 40.40 Kg 17,725.95 Rp 716,128.38 0.18 - - 40.40 0.18 40.40 0.18 100
- Begisting 4.32 M2 203,436.75 Rp 878,846.76 0.22 - - 4.32 0.22 4.32 0.22 100
Sub Total Rp 84,749,595.52 20.82 - 14.27 14.27
D PEKERJAAN KAYU DAN DINDING
1 Tiag Kayu 10/10 Cm 1.13 M3 6,982,800.00 Rp 7,890,564.00 1.94 - - 1.13 1.94 1.13 1.94 100
2 Tiang Kayu 5/10 Cm 0.42 M3 6,982,800.00 Rp 2,932,776.00 0.72 - - 0.42 0.72 0.42 0.72 100
3 Balok Kayu Bawah 5/10 Cm 2.88 M3 6,982,800.00 Rp 20,110,464.00 4.94 - - 1.73 2.96 1.73 2.96 60
4 Pasangan Dinding Bata Merah Tebal 1/2 Bata Campuran 1 : 4 99.66 M2 144,375.00 Rp 14,388,412.50 3.54 - - 99.66 3.54 99.66 3.54 100
5 Plesteran 1:4 Tebal 15 mm 199.32 M2 78,259.50 Rp 15,598,683.54 3.83 - - 119.59 2.30 119.59 2.30 60
Sub Total Rp 60,920,900.04 14.97 - 11.46 11.46
E PEKERJAAN ATAP DAN KUSEN
1 Kuda - Kuda Kayu 18.13 M3 6,982,800.00 Rp 126,598,164.00 31.10 - - 13.60 23.33 13.60 23.33 75
2 Listplank Kayu 131.52 M 25,000.00 Rp 3,288,000.00 0.81 - - 98.64 0.61 98.64 0.61 75
3 Penutup Atap Spandek C-30 + Rabung Lenkap Terpasang 760.72 M2 110,517.00 Rp 84,072,492.24 20.66 - - 570.54 15.49 570.54 15.49 75
4 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P1 2.00 Unit 1,200,000.00 Rp 2,400,000.00 0.59 - - - - - - -
5 Kusen Kayu + Pintu Kayu + Aksesoris Lenkap Terpasang P2 1.00 Unit 800,000.00 Rp 800,000.00 0.20 - - - - - - -
6 Kusen Jendela 1.00 Unit 300,000.00 Rp 300,000.00 0.07 - - - - - - -
7 Jaring Pagar Penutup Dinding 205.80 M2 6,500.00 Rp 1,337,700.00 0.33 - - - - - - -
8 Terpal Putup Dinding 142.30 M2 10,000.00 Rp 1,423,000.00 0.35 - - - - - - -
9 Cooling Pads Cell Deck Sel Dek 150 X 60 X 15 Cm 45.36 M2 400,000.00 Rp 18,144,000.00 4.46 - - - - - - -
Sub Total Rp 238,363,356.24 58.57 - 39.43 39.43

SUB JUMLAH Rp 407,003,851.80


PPn 11 % Rp 44,770,423.70
100.00 - 69.42 69.42
JUMLAH TOTAL Rp 451,774,275.50
DIBULATKAN Rp 451,774,200.00

Diketahui oleh: 30 Rp 122,101,155.54 Diperiksa oleh: Diajukan oleh:


0 38 Rp 142,451,348.13 0 -
0 68 0 -
Kota Subulussalam 32 Rp 142,451,348.13
Rp 407,003,851.80

0 0 0
0 Rp 610,505.78 0 0

Anda mungkin juga menyukai