Anda di halaman 1dari 4

REKAPAN ANGGARAN PROJECT

Selasa, 28 Maret 2023


No. MATERIAL Jumlah Harga Satuan
1 Limit Switch 8 1300
2 PCB Layer 2x8 4 3500
3 Lampu Pilot 3 12500
4 Buzzer 1 27500
5 Bensin 2 10000
6 Pilox Hitam 1 44000
7 Pilox Putih 1 27000
8 Engsel 8 3500
9 Lampu Pilot Besar 24V 2 12000
10 BOX Polos Jumbo 2 14500
11 LEM G 1 10500
Total

Rabu, 29 Maret 2023


12 BOX Polos Kecil 1 11000
13 Banana Plug 2 3000
14 Jasa Cutting Laser 1 34800
15 Triplek 5mm 390 25
Total

Kamis, 30 Maret 2023


16 15 mm Spacer Besi M3 4 2000
17 Jasa Cutting, Engraving Laser CO2 dan design 1 32200
18 Akrilik 3mm Bening 146 45
19 Baut M3 x 50 mm diameter 3 mm 4 400
20 Mur M3 3mm Hexagonal 8 100
21 Contra Jeck Banana Kecil 14 1750
22 Jeck Banana Kembang + Baut 1 2500
Total

Jumat, 31 Maret 2023


22 Bensin 2 10000
23 Step Down DC-DC Converter + Display 1 35000
Total

REKAP KESELURUHAN
TOTAL BELANJA
TOTAL ANGGARAN
SISA
JECT

Total
10400
14000
37500
27500
20000
44000
27000
28000
24000
29000
10500
271900

11000
6000
34800
9750
61550

8000
32200
6570
1600
800
24500
2500
76170

20000
35000
55000

NILAI
464620
500000
35380

Anda mungkin juga menyukai