Anda di halaman 1dari 15
RENCANA KERJA MINGGUAN = 'PROVEX GEDUNG E3 PT. SHOETOWN LIGUNG INDONES ‘Kegistan Lapengan ame [Rencane [ Reais Pitiaié Peasargun sage rg, ral dan ponusargan ng Paratarosatirg ap Parser sg ana Pessoa Penang tage og, rian peruangncinang Perssengan tah Wap Perasanga tag aan Persson Pevaugan sage de, Prada parang cdg Persson ating ay, Panesar Peraingan tag dg, Prk dar penasngncntrg Penstangan ting a, Panes Peneangan tag, rosin panaargnctrg Penaeargin tir ap Paras PT MWLTICITRA GRAHA LAPORAN HARIAN [Mo. OBA H-PGESAZO73 es | _ ‘PROVEK GEDUNG E3 PT. SHOETOWN LIGUNG Int tk [rat :_J09 Januari 2023 “inggu 7 Bulan ke = 01707 “Tenaga Kerja Pengadaan Peralatan 7m ras “im — fe] —— ant i= —| 1__ Erection 20 1. [Crane 25 ton a 0 2 Weider 7 2: [Travolas 6 3__Operator Crane o 4 Saft 6 i PEKERIUN YANG I FARIA No. Pekerjaan ‘Volume. ‘Satuan 1 Erection, 0 ton | z ~~ Backisting, 7 0 m | 4 Bondeck ive oo m2 3 Shear stud o cs 6 sag rod ata © ton 7 Purlin atap = Oo [ton 8 __ Sag rod dinding 0.02 ton 3 Purtin nding O [ton 10 “Talang 0 ™ 1 Pemasangan atap bavah o m2 2 Pemasangan Atap atas ma os i m2, 13 —_Pemasangan cladding = 138.5 mz. 14 Pemasangan louvre 0 mz 15 Pengelasan plat angkur kolom 7 100, % 16 Pemasangan plafon atap span atas 0 1 PENGADAAN MATERIAL Wo. Tenis Material una Keadaan Cuaca GM [on009.00_: _C ~It0.00-11.007:—€ ~|18.00-12.007:¢ }13.00-14.00 H }15.00-16.00 H 17.00-18.00-: HW Jat —fizin Kerja ke WK freterangan /catatan¢ ‘Disetujur Oteh, ‘Dibuat Oleh, Koneultan ak ain Kontraktor PT. MULTI CTTBA GRAHA PT. PRO CHAIN KONSTRUKSI INDONESIA Site Engineer Hats saan rT CTRA GAA LAPORAN HARIAN fo orotnnPoesn eee PROVEX GEDUNG ET. SHOETOWRVLIGUNG 1NOORESTA i 10 Januar 2025 “Minggu 7 Bulan Ke 01701 “Tenaga Kerja Pengadaan Peralatan Wo. Keahlian Jamiah enis Alat Tomah erection 20 0 2 Welder z 6 3 Operator Grane "a0, 4 Staff 7 é CERTAAN YANG DILAKSANAKAN HART INL We Pekerjaan Vouume Satuan fi = Erection. 0 ton 3 __Backisting 0 m. 4 Bondeck o m2, 3 Shear stud 0 pes 6 Sag rod atap 0 ton, 7 Purtin atep 0 ‘ton 8 Sag rod dinding 0.05 ton. 9 Purlin dinding 0 ton. 10 “Talang. al 0 m i Pemasangan Atap bawah 0 mz wz Pemasangan Atap atas, 0 m2 3 Pemasangan cladding 167.57 m2 4 Pemasangan louvre 0. m2 5 ‘Pengelasan plat angkur kolom 7007 ¥ 16 ‘Bemasangan plafon atap span atas 0 a PENGADAAN MATERIAL Wo. enis Material Junta Keadaan Cuaca, & 08.00.00: C 10.00-11.00: C fe 11.0012.00 : a 13.00-14.00-: 5.00-16.00_: - —}17.00-18.00-: ——_|és = izin Kerja ke WK - DECATUT OER, Konsultan mk ‘awe Kara PT. MULTI CITRA GRAHA, (2 wan Inspector Sipil Ars a. PT. PRO CHAIN KONSTRUKSI INDONESIA qr She Engineer ats 2das7 ‘site Engineer FrAT OTRAGRAR TAPORAN HARIAN [eonanecewaen sews [FRG YEXGEDUNG EP. SHOETOWN UGUNG NE fers ‘Minggu / Bulan ke: 01701 “Tenaga Kerja Pengadaan Peralatan No. Keahlian dumiah | We. Jeni Alat iomiah Erection _ 25 1. |€rane 25 ton _ 0 2 Welder =a 2 2. [Travo las 6 3_Operator Crane ° “ie = 4 Staff — é [ TPEKERJAAN YANG DILAKSANAKAN HARTINT To. Pekerjaan- Volume: Satuan 1 Erection = © ton 3 Backisting 0 m 4 Bondeck of mz 5 Shear stud oO Pes: 6 Sag rod atap =a 0 ‘ton 7 Purtin atap 0 ‘ton s ‘Sag rod dinding oo | ton 9 Partin dinding oo | ton. 10 “Falang o m if Pemasangan Atap bawah = o mz i Pemasangan Atap atas oO mt 3 Pemasangan cladding a 14 Pemasangan (ouvre = 0 | m2 5 Pengelasan plat anghur Kolom 1007 i 16 Pemasangan plafon atap span atas o — FENGADAAN MATERIAL Wo. Tenis Materfal Jumiah Keadaan cuca, GM _| —____|08.0059.00 10,00-11.00 1.00-12.00 3.00-14.00 5.00-16.00 17.00-18.00 ast ~ icin kerja ke MK Keterangan 7 Catatan BIE OER, ‘Main Kontraktor PT. PRO CHAIN KONSTRUKSI INDONESIA at: 37 TAPORAN HARIAN Pro ormanrcewre ‘PROVEX GEDUNG EP SHOETOWN UIGUNG NDORESIA fre: [12 Januari 2025 ia, 00k PEKERIAAN YANG ARIINT We. Pekerjaan Volume Satan 1 Erection 0 3 Backisting, 0, 4 Bondeck o 5 Shear stud 0 6 Sag rod atap Oi 7 Purlinatap — 0 8 Sag rod dinding 07 9 Purtin dinding 0 10 Talang 0 if Pemasangan Atap baviah — o 1 ‘Pemasangan Atap atas 0 3 Pemasangan cladding. 7 2004 14 Pemasangan lowre o 5 ‘ergelasan plat angi Kotom =| “100 16 Pemasangan plafon atep span atas 0 PENGADAAN MATERIAL, Te. Tenis Matertat Jumlah Readaan cuaca HG, = = ____|08:00-9.00 = }10.00-11,00. = ~~ ]it.00-12.00 = ]13.00-14.00-: Ss 5 ——"}15.00-16.00. = ]17.00-18.00-: Es fast 7 ~~ fain era he TT Freterangan /catatan DaeeUT OT, DIBURE OTE, onsltan Mk ‘Main Kontraktor PT. MULTI CTT PT, PRO CHAIN KONSTRUKSI INDONESIA Mata dat? ru oRAGA TAPORAN HARIAN [re orsueccavom anes PROVEK GEDING EDP. SHOETOWN GING KDORESA fac [13 Jonuae 2005 ‘Minggu 7 Bolan ke: 01704 "Tenaga Kerja Pengadaan Peralatan Te. Reahilian Tumah [We Tenis alat ah 1 erection zB [Crane 25 ton 2 Welder z Fravo las : 3 Operator Crane © - 4 Staff 6 = - t - TPEXERIAN YANG DILAKSANARAN HARTI We Pekerjean Volume 7 Erection 0 3 Backisting o 4 Bondeck ° 5 Shear stud o 6 Sag rod atap_ _ 0 7 Purln ata © 3 Sag rod dinding = 0.03 3 Purtn dnding o 10 Talang. o m it Pemasangan Atap bavah = ° ma 2 Pemasangan Atap atas o m2 3 Pemasangan cladding = 4a | ma 14 Pemasangan louvre 0 1 5 Pengelasan plat angkur Kolom 700 % 18 Pemasangan plafon atap span atas 7 @ mm PENGADAAN MATERIAL We ents Material una Kendaan Cunca WC 08,00-9.00 c ~|10.00-11.00:¢~ ~~ |it.00-12.00-: 13.00-14.00-: ¢ 15.00-6.00-: € 7 ]i.00-18.00-: ast iin kerja ke WK TT Jreterangan 7 cataten DseTUT OER, onaultan MK PT. MULTI CITRA Gf bP tts Sif at: 56a7 [he oistnrcesuaars PruUTOTRAGRARA TAPORAN HARIAN eames ‘ROVER GEDUNG PT. SHOETOWN UIGUNG ROONESTA fa [13 Januar 2005, ‘Minggu 7 Bulan ke 01701 “Tenaga Kerja Pengadaan Peralatan To. Keahiian Jumtah | Wo. Tenis Alat Tamla 1 erection 3 1. [Grane 25 ton 0 [2 Welder i 7 2. [Travo las 6 3 Operator Crane _ “0 — 4 sat é —= PEKERIAAN YANG DI THARIINI No. Pekerjaan Volume ‘Satwan 1 Erection ton, 3 Backisting ™ 4 Bondeck ma 5 Shear stud Pes: é Sag rod atap ton. 7 Purtin atep ton. 8 Sag rod dinding ‘ton. 9 Purtin dinding ton 10 Talang ™m if Pemasangan Atap bawah ma 2 Pemasangan Atap atas mz 13 Pemasangan cladding m2: 14 Pemasangan louvre mz 5 Pengelasan plat anghur kolom % 16 ‘Pemasangan plafon atap span atas mz PENGADAAN MATERIAL We. enis Material Jumlah Readaan CuacaH, GM [o8.00-9.00 Cc = }10.00-11.00 —]1¥-00-12.00-:¢ 13.00-14.00-: ¢ —~"}15.00-16.00-- C 17.00-18.00 + _¢ a ldst DRE OER, Dibuat OTe, Konsultan MK ‘ain Kontraktor PT, MULTI CITRA GRAHA PT. PRO CHAIN KONSTRUKSI INDONESIA imbang Kurnihwan Ste Engineer Wat 6ns7 wamomacamm | ————SC*iCA PORN HARTAN_______feamuironmon ares FRGTER GDN EP SHOETOW fat: [13 Januar 2005 ‘Minggu 7 Bulan ke = 01/01 “Tenaga Kerja Pengadaan Peralatan, Te Teahien i Tenis Alat “Tmiah 1 _frection 1. [Grane 25 ton 0 Welder = 2. [Travo las — a6 3 Operator Crane 4 Staff PEKERIAAN YANG DILAKSANAKAN HARIINI We Pekerjoan Volume Satan 7 Erection ° ton 3 Tracking ° m 4 T—~Bondeck. oo md 3 Shear stud 0 es é Sag rod aap 0 ton 7 Para atap 0 ton |_8 ‘Sag rod dinding. 00 | ‘ton 9 Purtn dining oO ton 70 TTalang 0 a if Pemasangan Atap bawah = 0 mz iz Pemasangan Atap atas = a 3 Pemasangan cladding 22.2 m2, 4 Pemasangan louvre ° m2 5 Pengelasan plat anglur Kafom 700 x 6 Pemasangan plafon atap span atas ° mz FENGADAAN MATERIAL Te “Tenis Material Juniah Keadean Cuaca i, GM ~ 08.00.00 Be 10.00-11.00 a H1.00-12.00-: = 3.00-14.00-: 15.00-16.00 17.00-18.00 Bs ~ ast = = iain Kerja ke RK ieterangen/ cts DET OK uaE OE, Konstan MK Main Kontraktor PT, MULTI CITRA GRAHA PPT. PRO CHAIN KONSTRUKSI INDONESIA Bafpband Kurriaa “ay I Sipil Site Engineer 0k + PT MULTI CITRA GRAHA TZIN_PELAKSANAAN PEKERJAAN _ |No. 00S"PP-PGESN2025, MARNAEMEN KONTRUNSL PROYEK GEDUNG EFT, SHOETOWN LGUNG INDONESIA Tals OF tri 2003 ‘Minggu 7 Bulan ke 01/01 NO, Lokasi Uralan Pekerjaan + | Gridline 1-16 (B dan H) Pemasangan sagrod dinding 2 Gridine 34 & Lift bagian dalam Produks! dan pemasangan cladding | 3 | ‘Area Atap Lift Pemasangan flashing atap 4 | Gridline 1-167H ~___Pemasangan kist-kist | NO. ‘CATATAN KONSULTAN NIK 7 PENGAWAS Pemberl Tugas Disetujul Oleh, Dibuat Oleh, PT. SHOETOWN LIGUNG INDONESIA Konsultan MK Main Kontraktor Project Manager PT. MULTI CITRA GRAHA PT. PRO CHAIN KONSTRUKSI INDONESIA, Gp. Site Engineer Resident Engineer Hats 1 dan'7 PT MULTI CITRA GRAHA TZIN_PELAKSANAAN PEKERJAAN __[No. O10"PP-PcESN2023 ManAsenenKOnTAUS, PROYEK GEDUNG E3 PT, SHOETOWN LIGUNG INDONESIA Tal = tO oouet 2023 ‘Minggu 7 Bulan ke 2/04 NO, Lokasi Uralan Pekerjaan 1 Gridline 1-16 (B dan H) i Pemasangan sagrod dinding | 2 | Gridline 34 & Lift bagian dalam ___Produkst dan pemasangan cladding 3 ‘Area Atap Lift Pemasangan flashing atap 4 16/H a Pemasangan kisi-kist NO.| CATATAN KONSULTAN MK / PENGAWAS ember Togas Disetujut Oleh, Dibuat Oleh, PT. SHOETOWN LIGUNG INDONESIA Konsuitan MK Main Kontraktor Project Manager No: Dok. PT. MULTI CITRA GRAHA, PT. PRO CHAIN KONSTRUKSI INDONESIA la Site Engineer Hal: 2an7 TZIN PELAKSANAAN PEKERJAAN [Ne O1snPPPGESZO2 | PT MULTI CITRA GRAHA Manse KONTAUES! PROYEX GEDUNG EF SHOETOWN GUNG INDONESIA Ta Hoenuari2003 | Minggu 7 Bulan ke 02/04 NO, Lokast Uraian Pekerjaan 1 Gridline 1-16 (BdanH) Pemasangan sagrod dinding 2 Gridline 34 & Lift bagian dalam Produks! dan pemasangan cladding 3 ‘Area Atap Lift. Pemasangan flashing atap val Gridtine 1-16/4 ~_Pemasangan kisi-Kist NO.) CATATAN KONSULTAN MK 7 PENGAWAS Pemberi Tugas PT. SHOETOWN LIGUNG INDONESIA Project Manager + Na Doke Disetujut Oleh, Konsultan MK PT, MULTI CITRA GRAHA, Resident Enfineer Dibuat Oleh, Main Kontraktor PT. PRO CHAIN KONSTRUKSI INDONESIA qe Site Engineer Hal: 3dan7 PT MULTI CITRA GRAHA MANAIEMEN KONTHUNSI TZIN_PELAKSANAAN PEKERJAAN [No f@nPP-PGESnz023 'PROYEX GEDUNG E3 PT, SHOETOWN LIGUNG INDONESIA Tes Janvari2003 —T] ‘Minggu / Bulan ke 02/04 NO.| Lokasi Uraian Pekerjaan 1 | Gridline 1-16 (B dan H) Pemasangan sagrod dinding | 2 | Gridline 34 & Lift bagian dalam _ Produksi dan pemasangan cladding 3 ‘Area Atap Lift, Pemasangan flashing atap 4 | Gridline 1-16/H Pemasangan kist-kisi NO, CCATATAN KONSULTAN NIK 7 PENGAWAS Pemberl Tures Disetujut Oleh, Dibvat Oleh, PT, SHOETOWN LIGUNG INDONESIA Konsultan MK ‘Main Kontraktor Project Manager PT. MULTI CITRA GRAHA PT. PRO CHAIN KONSTRUKSI INDONESIA gh Site Engineer Hal: Adar? PT MULTI CITRA GRAHA |_ TZIN_PELAKSANAAN PEKERJAAN [No. OfanPP-PGESAzO23 MANALEENKCNTRURSE ROYEX GEDUNG E3 PT, SHOETOWN LIGUNG INDONESUA Tae 13 Januari 2003 Minggu / Bulan ke : 02/01 Lokasi Gridline 1-16 (6 dan H) Uratan Pekerjaan ~_Pemasangan sagrod dinding Gridline 34 & Lift bagian dalam Produkst dan pemasangan cladding ‘Area Atap Lift. Pemasangan flashing atap Pemasangan kisi-kist NO. 1 2 3 a Gridline 1-16/4 ‘CATATAN KONSULTAN MK 7 PENGAWAS_ Pemberi Tugas PT, SHOETOWN LIGUNG INDONESIA Project Manager 1+ No, Boke Disetujut Oleh, Konsultan MK PT, MULTI CITRA GRAHA Resident Engineer Dibuat Oleh, ‘Main Kontraktor PT. PRO CHAIN KONSTRUKSI INDONESIA je Site Engineer dan? PT MULTI CITRA GRAHA TZIN _PELAKSANAAN PEKERJAAN No. o14nPP-PGESNZ0z3 MANAEMEN KOATRUS, TPROYEK GEDUNG EF. SHOETOWN LIGUNG IRDONESIA Ts tamara] ‘Minggu 7 Bulan ke :__02/0f nO. Lokast Uraian Pekerjaan 1 Gridline 1-16 (B dan H) Pemasangan sagrod dinding 2 | Produksi dan pemasangan cladding 3 | - Pemasangan flashing atap ~ 4 Gridline 1-16/H —______ Pemasangan kisi-kisi __ NO. CCATATAN KONSULTAN NK 7 PENGAWAS Pemberi Tugas PT, SHOETOWN LIGUNG INDONESIA Project Manager Disetujul Oleh, Konsultan MK PT. MULTICITRA GRAHA Dibuat Oleh, ‘Main Kontraktor PT, PRO CHAIN KONSTRUKSI INDONESIA pe Site Engineer Hal: 6aar7 PT MULTI CITRA GRAHA. TZIN_PELAKSANAAN PEKERJAAN No. o1siPP-PGESAZ2023 ANMEMENRONTRURL PROTEK GEDUNG E PT, SHOETOWN GUNG NOONESA Tal: Sonor am ‘Minggu 7 Bulan ke : 02/01 NO, Lokast Uraian Pekerjaan | 1 Gridline 1-16 (BdanH) __Pemasangan sagrod dinding E [2 | Gridline 34 & Lift bagian dalam Produks! dan pemasangan cladding 3 ‘Area Atap Lift Pemasangan flashing atap 4 Gridline 1-16/H _| ~__Pemasangan kist-kisl NO CCATATAN KONSULTAN NK 7 PENGAWAS Pemberi Tugas Disetujut Oleh, Dibuat Oleh, PT, SHOETOWN LIGUNG INDONESIA Konsultan MK ‘Main Kontraktor PT. MULTICITRA GRAHA PT. PRO CHAIN KONSTRUKSI INDONESIA Project Manager Resident Engineer Site Engineer No, Dok: Hal 7 dart?

Anda mungkin juga menyukai