Tugas Besar Sistem Penyaliran Tambang

TA3225

Oleh:

I Nyoman Gading Prasada

12120083

Program Studi Teknik Pertambangan

Fakultas Teknik Pertambangan Dan Perminyakan

Institut Teknologi Bandung

2023
182000,000000 184000,000000 186000,000000 188000,000000 190000,000000 192000,000000 194000,000000
PETA DAERAH ALIRAN SUNGAI
IUP PT. XYZ
9488000,000000

9488000,000000
250 250 250

Kabupaten Bone, Provinsi Sulawesi


250
650 200
200
700 200

Selatan
600
550 500 150
400

500 300
200
Tahun 2023
450

µ
200
9486000,000000

9486000,000000
250
450 400
500 150
250 150
550
9484000,000000

9484000,000000
350

100
1:55.000
250
200 Coordinate System: Indonesian 1974 UTM Zone 51S
Projection: Transverse Mercator
Datum: Indonesian 1974
9482000,000000

9482000,000000
0 0,5 1 2 3 4
250

Kilometers
300
250
350

200 100
Legenda
150
Kontur
9480000,000000

9480000,000000
400 350
450 Sungai Besar
300
500 350
200 DAS 1 (96,81 sq km)
550 National Geographic, Esri,
300 100
150 150 DAS 2 (47,13 sq km) Garmin, HERE, UNEP-
WCMC, USGS, NASA, ESA,
750
100
200
9478000,000000

9478000,000000
550 400 300 Sumber Data: Tanggal:
200 250 150 1. Sistem Penyaliran Tambang, 2023 2 Mei 2023
750 700 100 2. Badan Informasi Geospasial
600
500 300
Dibuat Oleh: Ukuran Peta:
I Nyoman Gading Prasada (12120083)
700 650 600 500 450
350
400 300 250
A3
9476000,000000

9476000,000000
250 250
750
Diperiksa Oleh: Revisi:
400
200
250
200 Kadek Demmy Wedana (12119019) 1
750

750
700 150
250 250
Program Studi Teknik Pertambangan
750 350
150
300
250 200
Institut Teknologi Bandung
700
182000,000000 184000,000000 186000,000000 188000,000000 190000,000000 192000,000000 194000,000000
182000,000000 184000,000000 186000,000000 188000,000000 190000,000000 192000,000000 194000,000000
PETA KEMIRINGAN LERENG
IUP PT. XYZ
9488000,000000

9488000,000000
250 250 250

Kabupaten Bone, Provinsi Sulawesi


250
650 200
200
700 200

Selatan
600
550 500 150
400

500 300
200
Tahun 2023
450

µ
200
9486000,000000

9486000,000000
250
450 400
500 150
250 150
550
9484000,000000

9484000,000000
350

100
1:55.000
250
200 Coordinate System: Indonesian 1974 UTM Zone 51S
Projection: Transverse Mercator
Datum: Indonesian 1974
9482000,000000

9482000,000000
0 0,5 1 2 3 4
250

Kilometers
300
250
350

200 100 150


Legenda
9480000,000000

9480000,000000
400 350 Kontur
450
300
500 350
200
< 7,5
National Geographic, Esri,
>7,5
550 300 100 Garmin, HERE, UNEP-
150 150 WCMC, USGS, NASA, ESA,
750
100
200
9478000,000000

9478000,000000
550 400 300 Sumber Data: Tanggal:
200 250 150 1. Sistem Penyaliran Tambang, 2023 2 Mei 2023
750 700 100 2. Badan Informasi Geospasial
600
500 300
Dibuat Oleh: Ukuran Peta:
I Nyoman Gading Prasada (12120083)
700 650 600 500 450
350
400 300 250
A3
9476000,000000

9476000,000000
250 250
750
Diperiksa Oleh: Revisi:
400
200
250
200 Kadek Demmy Wedana (12119019) 1
750

750
700 150
250 250
Program Studi Teknik Pertambangan
750 350
150
300
250 200
Institut Teknologi Bandung
700
182000,000000 184000,000000 186000,000000 188000,000000 190000,000000 192000,000000 194000,000000
File terlampir
Perhitungan Infrastruktur Sarana Penyaliran

Pembuatan jalan tambang sebagai sarana hauling alat angkut membutuhkan infrastruktur
penyaliran yang sesuai. Daerah tangkapan hujan di sekitar pembuatan jalan tambang dapat
berubah. Kebutuhan sarana penyaliran ini diawali dengan menghitung debit aliran air yang dapat
ditampung oleh sarana penyaliran menggunakan Distribusi Gumbel serta menggunakan rumus
Mononobe

Diketahui data curah hujan dari 5 stasiun pengukur curah hujan pada periode tahun 2010 sampai
2021

Menggunakan metode Distribusi Gumbel, diperoleh intensitas hujan rencan sebagai berikut:

Gumbel
Periode
Yn Sn Xt
No Ulang, T K SD
(μy) (σy) (R24)
(Tahun)
1 1.1 0.5362 1.1124 -1.2683 17.238 65.904
2 2 0.5362 1.1124 -0.1523 17.238 85.141
3 5 0.5362 1.1124 0.8668 17.238 102.708
10 0.5362 1.1124 1.5415 17.238 114.340
5 15 0.5362 1.1124 1.9216 17.238 120.891
6 20 0.5362 1.1124 2.1887 17.238 125.496
7 25 0.5362 1.1124 2.3941 17.238 129.035
8 50 0.5362 1.1124 3.0265 17.238 139.937
9 75 0.5362 1.1124 3.3941 17.238 146.274
10 100 0.5362 1.1124 3.6543 17.238 150.760
11 200 0.5362 1.1124 4.2797 17.238 161.541
12 500 0.5362 1.1124 5.1050 17.238 175.767
13 1000 0.5362 1.1124 5.7287 17.238 186.519

Dengan intensitas hujan jangka pendek sebesar:


Dur Periode Ulang (T tahun)
asi
(me Durasi
nit) (jam) 1.1 2 5 10 15 20 25 50 75 100 1000

0.0833 81.67 122.6 159.9 184.7 198.6 208.4 216.0 239.2 252.6 262.2 338.3
5 3333 652 0731 8698 3558 9853 7503 055 0331 8676 2983 1665

0.1666 51.45 77.23 100.7 116.3 125.1 131.3 136.0 150.6 159.1 165.1 213.1
10 6667 298 7767 8549 7612 7223 3104 7494 8864 8268 9444 2613

39.26 58.94 76.91 88.81 95.52 100.2 103.8 114.9 121.4 126.0 162.6
15 0.25 597 3448 372 1604 4289 2434 4461 9696 7912 6695 4568

24.73 37.13 48.45 55.94 60.17 63.13 65.41 72.44 76.52 79.41 102.4
30 0.5 601 2045 2607 7805 6531 7378 8006 3542 7052 7203 6036

15.58 23.39 30.52 35.24 37.90 39.77 41.21 45.63 48.20 50.02 64.54
60 1 271 1723 323 4908 8839 4056 0761 6572 9022 9703 5981

9.816 14.73 19.22 22.20 23.88 25.05 25.96 28.74 30.36 31.51 40.66
120 2 493 5862 843 2901 1072 6085 1153 9239 9781 6738 142

4.719 7.084 9.244 10.67 11.48 12.04 12.48 13.82 14.60 15.15 19.54
360 6 278 2635 065 4041 0822 5709 0821 1192 0268 1667 7972

2.972 4.462 5.823 6.724 7.232 7.588 7.862 8.706 9.197 9.544 12.31
720 12 959 8064 396 2248 4647 3213 4243 8057 5923 9523 4451

144 1.872 2.811 3.668 4.235 4.556 4.780 4.953 5.484 5.794 6.012 7.757
0 24 847 3919 5096 9962 1673 3429 0169 9439 1201 9432 6178

Berdasarkan data pada tabel intensitas hujan jangka pendek yang didapat, saya berasumsi bahwa
jalan tambang yang saya buat memiliki usia 10 tahun dengan rata-rata durasi hujan per hari sebesar
4 jam. Jalan tambang tersebut akan melewati area yang terdiri dari hutan dan perkebunan.
Akan dihitung debit aliran air yang harus ditampung oleh sarana penyaliran saya. Perhitungan
menggunakan rumus rasional perhitungan debit
𝑄 = 0,278 𝑥 𝐶 𝑥 𝐼 𝑥 𝐴

Keterangan:
• 𝑄=𝐷𝑒𝑏𝑖𝑡 (𝑚3 /𝑠)
• 𝐶=𝐾𝑜𝑒𝑓𝑖𝑠𝑖𝑒𝑛 𝐿𝑖𝑚𝑝𝑎𝑛𝑔𝑎𝑛
• 𝐼=𝐼𝑛𝑡𝑒𝑛𝑠𝑖𝑡𝑎𝑠 ℎ𝑢𝑗𝑎𝑛 (𝑚𝑚/𝑗𝑎𝑚)
• 𝐴=𝐿𝑢𝑎𝑠 𝐷𝑎𝑒𝑟𝑎ℎ 𝑇𝑎𝑛𝑔𝑘𝑎𝑝𝑎𝑛 𝐻𝑢𝑗𝑎𝑛 𝑇𝑒𝑟𝑔𝑎𝑛𝑔𝑔𝑢 (𝑘𝑚2)

Berdasarkan kondisi yang diketahui maka diperoleh beberapa parameter sebagai berikut :
• 𝐺𝑟𝑎𝑑𝑖𝑒𝑛 𝑚𝑎𝑘𝑠=3,4%
• 𝑐=0,4
• 𝐼=64,5 𝑚𝑚/𝑗𝑎𝑚
• 𝐴=0,3924 𝑘𝑚2
𝑄=0,278 𝑥 0,4 𝑥 2322 𝑥 0,3924 𝑄=1,01 𝑚3/𝑠

Maka dibutuhkan suatu sarana penyaliran berupa puritan (trench) yang dapat menampung aliran
limpasan sebesar 1.2 m3/s. Debit sarana penyaliran dapat dihitung menggunakan rumus sebagai
berikut:

𝑄=𝑈 𝑥 𝐴

Keterangan:

Dibuat sebanyak 2 parit yang berada di samping kanan dan kiri shoulder dari jalan tambang yang
telah dibuat, berikut merupakan penampang parit berbentuk trapezoidal:

Dengan:
• 𝑄 = 𝐷𝑒𝑏𝑖𝑡 𝑝𝑒𝑛𝑦𝑎𝑙𝑖𝑟𝑎𝑛 (m3/s)
• 𝑅ℎ = 𝐽𝑎𝑟𝑖−𝑗𝑎𝑟𝑖𝑘 ℎ𝑖𝑑𝑟𝑜𝑙𝑖𝑘=𝐴/𝑃
• 𝐴 = 𝐿𝑢𝑎𝑠 𝑝𝑒𝑛𝑎𝑚𝑝𝑎𝑛𝑔 𝑏𝑎𝑠𝑎ℎ (𝑚2)
• 𝑃 = 𝐾𝑒𝑙𝑖𝑙𝑖𝑛𝑔 𝑏𝑎𝑠𝑎ℎ (𝑚)
• 𝑁 = 𝐾𝑜𝑒𝑓 𝑘𝑒𝑘𝑎𝑠𝑎𝑟𝑎𝑛 𝑀𝑎𝑛𝑛𝑖𝑛𝑔 (𝐾𝑒𝑘𝑎𝑠𝑎𝑟𝑎𝑛 𝑚𝑎𝑡𝑒𝑟𝑖𝑎𝑙 𝑑𝑖𝑛𝑑𝑖𝑛𝑔 𝑠𝑎𝑙𝑢𝑟𝑎𝑛 𝑦𝑎𝑛𝑔
𝑑𝑖𝑡𝑒𝑛𝑡𝑢𝑘𝑎𝑛 𝑚𝑒𝑙𝑎𝑙𝑢𝑖 𝑡𝑎𝑏𝑒𝑙 𝑟𝑒𝑓𝑒𝑟𝑒𝑛𝑠𝑖)
• 𝑆 = 𝑆𝑙𝑜𝑝𝑒 (𝑚𝑚)

Desain parit yang dibuat :


• 𝑦=0,8 𝑚
• 𝑏=2 𝑚
• 𝑎=63o
• 𝑁=0,025 (Kerikil)

Sehingga didapat nilai sebagai berikut :


• 𝐴=1,1974 m2
• 𝑃=1,1974 𝑚
• 𝑅=0,139
• 𝑆=0,028

Debit yang dapat ditampung oleh sarana penyaliran (trench) sebesar:


𝑄=𝑈 𝑥 𝐴 𝑄=1,397 𝑚3/𝑠
Hasil perhitungan diatas menunjukan bahwa parit yang dibuat dapat menampung debit air akibat
pembuatan jalan, dimana debit air yang mampu ditampung oleh parit melebihi debit yang
dihasilkan oleh pembuatan jalan, sehingga jalan tetap dalam kondisi aman dan tidak mengalami
genangan banjir.