8 MENARA AIR
RENCANA TEKNIK AKHIR JALAN TOL CIAWI - SUKABUMI
RUAS CIBADAK - SUKABUMI BARAT
STA.26+500 ~ STA.40+200 (SEKSI - 3)
KONSULTAN PERENCANA DIGAMBAR DIRENCANAKAN DIPERIKSA / DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV. TANGGAL KETERANGAN TTD
Trans RENCANA TEKNIK AKHIR
JALAN TOL CIAWI - SUKABUMI I.II.8 - 01
DENAHMENARAAIR,DENAHPONDASI&DETILPONDASI
Jabar PT. MULTI PHI BETA CIBADAK - SUKABUMI BARAT
CONSULTING ENGINEERS SKALA :
Tol STA.26+500 ~ STA.40+200
investor ruas ciawi - sukabumi
SUKATNO MARDIYATI DADAN RUSLI YULIUS FAHRIZAL SEKSI NO. REF. TANGGAL 1 : 40 & 1:20
SEKSI 3 DRAFTMAN ARCHITEKTUR TEAM LEADER BUJT

20/20
200 L60.60.6 2000
600 800 600 250

8Ø12

600
200

250
Plat t=3 mm Ø6 - 200

KOLOM 25/25

2000
2000

800
B
250
150

200
600
4Ø12

200

200
TAMPAK ATAS Ø6 - 200
2000 Skala 1 : 50
SLOOF 15/20
A

600
DENAH
Skala 1 : 50 Ø10 - 150

150
50
Lantai Kerja

50
200
Pasir Urug
250
250

Ø10 - 150
700
150
Ø10 - 150
2000

Pondasi Footplat 70x70 700


Kolom 25/25
Sloof 15/20
PENULANGAN PONDASI
Skala 1 : 20

2000

DENAH PONDASI DAN SLOOF


Skala 1 : 50
KONSULTAN PERENCANA DIGAMBAR DIRENCANAKAN DIPERIKSA / DISETUJUI DIKETAHUI JUDUL GAMBAR : NO. GAMBAR : REV. TANGGAL KETERANGAN TTD
Trans RENCANA TEKNIK AKHIR
JALAN TOL CIAWI - SUKABUMI I.II.8 - 02
TAMPAK A & TAMPAK B MENARA AIR
Jabar PT. MULTI PHI BETA CIBADAK - SUKABUMI BARAT
CONSULTING ENGINEERS SKALA :
Tol STA.26+500 ~ STA.40+200
investor ruas ciawi - sukabumi
SUKATNO MARDIYATI DADAN RUSLI YULIUS FAHRIZAL SEKSI NO. REF. TANGGAL 1 : 50
SEKSI 3 DRAFTMAN ARCHITEKTUR TEAM LEADER BUJT

2000

VOLUME 4 M3

1400
2300
PIPA BESI
Ø 1" + Ø 3/4 "

900

800
1000

1000
L60.60.6 L60.60.6

L50.50.5 L50.50.5

1000

1000

5000
1000

1000
1000

1000
Tangga Tangga
L50.50.5 L50.50.5
1000

1000
200
200

200
800

800
150

150
50

50
2000 2000
800

TAMPAK A TAMPAK B
Skala 1 : 50 Skala 1 : 50