Anda di halaman 1dari 8
Re ee REKAPITULASI ANGGARAN BIAYA, KEMENTERIAN 2 PEKERJAAN UMUM : SVNT/SATKER PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM SULAWESI BARAT + PEKERJAAN, : PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI IKK TAPALANG LOKASIPROYEK ———:_ KECAMATAN TAPALANG, KABUPATEN MAMUJU, PROVINSI SULAWESI BARAT. SUMBER DANA APBN-P 2011 No, URAIAN PEKERJAAN VOLUME, JUMLAHHARGA Gi z z z 1 | PIKIERJAAN PERSIAPAN to Re. 73178,000.00 2. | ENGADAAN DAN PEMASANGAN PIPA PVC DIA. 100 mm 1 obs Rp. 67,672,73490 3. | PENGADAAN DAN PEMASANGAN PIPA PVC DIA. 75 min 1. bs Rp. 398,090,647.56 4 | PENGADAAN DAN PEMASANGAN PIPA PVC DIA. $0 mm 1 ous Rp. 78,834,054.85 5. | PENGADAAN &PEMAS. PIPA LINTASAN & SELUBUNG fe Rp. 19,045,281.48 6 | DOKUMENTASI, PELAPORAN & ASBUILT DRAWING. 1 oo Rp. $643,000.00 JUMLAH Rp 976,463,718.79 PPN 10% Rp 57,646,371.88 TOTAL Rp 634,110,090.67 DIBULATKAN | — Rp ___634,110,000.00 [erbiane ‘nam Ratus Tiga Puluh Empat Juta SeratusSepuluh Riba Rupiah ABDUL KARIM Direktur Mamuju, 12 September 2011 GY. DELTA PERDANA KONSTRUKSI RINCIAN ANGGARAN BIAYA KEMENTERIAN PEKERJAAN UMUM SVNT/SATKER PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM SULAWESI BARAT LOKASI PROYEK JAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI IKK TAPALANG KECAMATAN TAPALANG, KABUPATEN MAMUJU, PROVINSI SULAWES SUMBER DANA APBN-P 2011 se Hiarga Satuan, No. Usnian Pekerjaan tuan | Volume jumlah Harga (Rp. Pekeri sa |S rea RP) T z z z z z 1 | Pekerjaan Persiapa, 7,178,000.00 1 Perijinan dan administrasi proyek Ls 1.00] 1,485,000.00 1.485,000.00 2 Direksi Keet dan Gudang unit | 1.00] 4:950,000.00 4,950,000.00 3 Papan Nama Proyek Unit | 1.00 "743,000.00 743,000.00 | Pengadaun dan Pemasangua Pips PVC 9 100 mm 61,672,73490 1 Pengadaan Pipa dan Accessories Ls 1} 409418,778.31 40,418,778.31 2 Peinasungun Pipa @ 100 mm dan Accessories 1) 24,881,005.30 24,881,005. 3 Pengetesan dan Pengurasin 1) 237295130 2.372,981.30 11 | Pengadaun dan Pemasangan Pipa PVC 9 75 mm 398,090,647.56 1 Pengadaun Pipa dun Accessories bs 1 | 232,466,585.27 232,466,545.27 2 Pemasungan Pipa (B75 mm dan Accessories 1] 149,889,081.35 149,889,081.35 8 Pengetesan dan Pengurasan 1| 1573498098 15,734,980.94 1V | Pengadean dan Pemasangan Pipa PVC 050. mm 78,834,054.85 1 Pengadaan Pipa dan Accessories 1} 36,511,031.26 36,511,031.26 2 Peaasungan Pipa 50 mm dan Accessories 1] 38,503,697.23 38,503,697.23 \Pengetesan dan Pengurasan 1] 3.819,32636 3,819,326.36 V_ | rengadaan dan Penuasangan pips Liotasan & Selubung 19,045,281.48 1 Pipa Lintasan O75 mm,L = 4 meter Unit 1} 5\545,472.73 55545472.73 2 Pipa Lintasan 75 mm ,L = 3 meter Unit 2] 4956,550.71 91913,101.42 3° Pipa Selubung @75 mm, L = 2 meter Usit 2 976,274.87 1,752;549.74 4 Pipa Selubung @ $0 mm, L = 2 meter Unit 3 611,385.86 183418759 VU | Dokumentasi, Pelaporan & Asbuilt Drawing 5,643,000.00 1 Dokumentasi Ls 1.00) 1,485,000.00 1,485,000.00 2 Pelaporan 1s 100] 2,475,000.00 2,475,000.00 3 Asbuil Drawing Ls 1.00 1,683,000.00 1,683,000.00, 576,463,718.79 Pengadaan dan Pemasangan Pipa PVC @ 100 mm Harga Sarwan No. Ursin Pekerjaan Satuan | Volume | MES Josiah Haran Rp) T z z z 3 é 1 | Pekeriaan Pengadaan Pipa dan Accessories 40,418,778.31 1 Pengadaan Pipa PVC @ 100 mm = 492 68,700.00, 33,800,400.00 2 Mobilisusi/ Pengangkutan pips m 492 7991.62 3,931,878.31 3 Bell Bend 90° @ 100 mm Buah | 2.00 228,700.00 *457,400.00 4 ‘Bell Reducer 0 100 mm X75 mm Bush | 1.00 127,400.00 127,400.00 5) Flange Bell Ead @ 100 mm + lengkap baut tusk | 1.00 201,600.00 201,600.00, (6 Blange Spygot 0 100 mm + lengkap bout Woah | 1.00 185,900.00 185,900.00 7 Valve All Flange @ 100 man Bat oo | 1,253,300.00 1,253,300.00, A Karet Packing @ 100 mm Puan | 200 18'900.00 37,800.00 9 Valve Cover @ 100 mm Bush | 1.00 423,100.00 423,100.00 11 | vemussngan Pipa PVC © 100 mim dan Accessories 24,881,008.30 1 Pengukuran dan Pematokan pada Jalur Pipa m 492 70185 345,311.10 2. Pemasangan Pipa PVC @ 100 mm m 465 4491472 20,885,344.88 \ Pemasangan Pipa PVC @ 100 mm - Bawah Jalan m n 115,251.34 33111,786.28, 4) Bell Bend 99° @ 100 mim bush | 1.00 $5,667.00 35,667.00 Sell Reducer @ 100 mm X75 mm Bush | 1.00 24,687.74 24,687.74 7 Wlange Bell End © 100 mm + lengkap baut Buah | 1.00 24,687.74 24,687.74 A Blange Spygot © 100 mm + lengkap baut Buah | 1.00 24,687.74 24,687.74 9 Valve All Flange @ 100 mm Bush | 1.00 143,197.06 143,197.06 10. Valve Cover @ 100 mm Buah | 100] = 265,635.75, 265,635.75, Ut | PENGETESAN DAN PENGURASAN 2,372,951.30 1 Pegetesun jaringan Pipa PVC @ 100 mm 492 2.87688 1415 423.55, 2 Pengurasanjaringan Pipa PVC @ 100 mm m 492 1,946.19 987,527.75, L JUMLAH (61,612,73490 Anas SAG Hiarga Satual No. Satuun | Volume | "#858 rele Z z z 3 1 | Pengadaan Pipa dan Accessories 232,466,585.27 1 Pengadaan Pipa PVC 075 mm ma | 43 47,300.00 203,910,300.00 2 Mobilisusi/ Pengangkutan pipa m | 4311 4495.29 19,379,185.27 3 Dresser Joint @ 100 mm Buah | 3.00 178,600.00 535,800.00 4 Bell Tee Bell @ 100375 x 100 mm Bush | 200 373,400.00 1,146,800.00 5 Bell Tee Bell 875 x75 75 mm Bush | 3.00 534,800.00 1)604,400.00, Bell Bend 90°75 mm Buan | 1.00 121,200.00 121,200.00 7 Bell Bend 45° 975 mm Bush | 1.00 101,300.00 101,300.00 Bell Bend 22,5975 mm Bush | 2.00 87,700.00 175,400.00 9 Valve All Flange @ 75 mm Buss | 3.00 —1,128,000.00 3,384,000.00 10 Flanged Bell End @ 75 mm Bush | 3.00 277,800.00 333,400.00 11 Flanged Spigot 075 mm Bush | 300 254,800.00 764,400.00 12. Karet Packing 75 mm Buah | 6.00 18,900.00 113,400.00 13. Bell Cap 075 mm Buah | 5.00 79,400.00 397,000.00 11 | Pemasungun Pips PVC 9 75 mm dan Accessories 149,889,081.35 1 Pengukuran dan Pematokan pada Jalur Pipa m | 430 701.85 3,025,683.27 2 Pemasangan Pipa PVC @75 mm m | 4293 33,611.55 144,294,396.02 3° Pemasangan Pipa PVC @ 75 mm~ Bawah Jalan m | 1800 92,81437 1,670,658.73, 44 Bell Tee Bell © 100 78 x 100 mm Bush | 2.00 39,581.62 79,163.23 5) Bell Tee Bell 975 x75 x75 mm Bush | 3.00 26,302.12 78,906.36 6 Dresser Joint @ 100 mm Bush | 300] - 24,687.74 74,063.22 7 ‘Bell Bend 90° 75 mem Busk | 1.00 34,040.94 34,046.94 Bell Bend 45° 75 mm Bush | 1.00, 23,323.35 23,323.35 9 Well Bend 22,5° 075 mm Busk | 200 19,153.06, 38,306.12 10 Valve All Flange 675 mm Bush | 3.00 108,035.08 324,105.16 11 Flanged Bell End @ 75 mm Bush | 3.00 19,153.06 $7459.18 12. Flanged Spigot © 75 mm Bush | 3.00 19,153.06 57,489.18 ) 13 Bell Cap 075 mm Bush | 5.00 26,302.12 131,510.60 y ut | PENGETESAN DAN PENGURASAN 15,734,980.94 1 Pegetesan jaringan Pipa PVC @75 mm m | 43 2,099.30 93080,091.73 2 Pengurasanjaringan Pipa PVC @ 75 mm m | 43u 155066 6,684,889.21, JUMLAH 398,090,647.56 Pengadaan Dan Pemasangan Pipa PVC @ 50 mm nm D cana No. ‘Uruinn Pekerjaan Satuan | Volume | har Jumlab Harge (Rp) Z 3 z z = a | Pekerjann Pengaduan Pipa dan Accessories 36,511,031.26 1 Pengadaan Pipa PYC @ 50 mm m | 132 22,700.00 30,009,400.00 2 Mobilisasi/Pengangkutan pipa m 322 1,997.1 2,681,231.26 3 Bell Tee Bell @ 100 X 50X 100 mm Buah | 1.00 564,000.00 ‘564,000.00, 4 Bell Tee Bell O75 X'50X75 mmm Bush | 5.00 496,100.00, 480,500.00 5 Bell Tee Bell @ $0 X 0X SO mm Bush | 1.00 407,300.00 407,300.00 6 Bell Bend 90- 0 50mm Buah | 1.00 56,400.00, 6,400.00 7 Bell Bend 45 - 9 50mm Buah | 1.00 44,900.00 4400.00, 8 Bell Cap @ 50mm Buah | 7.00, 43,900.00, 307,300.00 U1 | Pemasungan Pipa PVC © 50 mm dan Accessories 38,503,697.23 1 Pengukuran dan Pematokan pada Jalur Pipa = 1322 701.85 927,848.13, 2 Pemasangaa Pipa PVC @ 50 mm m | ia 2865.44 3734711. 3. Pemasungan Pipa PVC @ 50 mm - Bawah Jalan m 84,093.64 : 4 Bell Yee Bell @ 100X $0X 100 mm Bush | 1.00 39,581.62 39,581.62 ell ee Mell (175 X 50X78 mm Bush | 5.0 2630212 131,310.60 Well Tee Bell $0 X 50 X SO mm Bush | 1.00 17,302.46 17,302.46 7 Well Hend 45 - @ 50 mm Bush | 1.0 195323.68 14,323.68 Bell Bend 90- @ 50mm Baan | 1.00 17330246 1730246 9 Well Cap B50 mm tun | 7.00 17,302.46 nuns ut | PENGETESAN DAN PENGURASAN - 3,819,326.36, 1 Pegeteson jaringan Pipa PVC @ 50 mm m 1322 1699.71 2247 015.39 2 Pengueasanjaringan Pipa PVC @ 50 mm m 322 his9.34 1,372,310.97 JUMLAH 4084.85 Pengadaan dan Pemasangan Pipa Lintasan 675 mm ;L = 4 meter No. Uraian Pekerjaan Satuan | Volume | #88 S*89. | juaiah Hangs Rp) ®p) . T z z z 3 z ‘s. | PENGADAAN PIPA DAN ACCESSORIES 4446,976.46 1 Pipa Gip @ 75 mm a 3.00 199,300.00 996,500.00 2. Pengangkutan Pips Gip 075 mm = 5.00 4,495.29 22,476.44 4 Flange Bell End 075 mm Bush | 1.00 277,800.00, 277,800.00, 4 Flange Spygot 9 75 mm Bush | 1.00 24,800.00, 254,800.00 3 Wend Gip 45-075 mm Bush | 4.00 313,300.00 1,253,200.00 6 lange Steel! @75 mm + lengkap baut Buah | 14.00 106,500.00 149,000.00, 7 Karet Packing 975 mm Bush | x00 14,900.00, 151,200.00 | PEMASANGAN 1,080,246.49) Pebarjaan Sipil 402,029.89 1 Galian 960 31,587.50 3,032.40 2 Unugan Kembali 0.320 1os8.35 347.47 \ Rahat Heton Bertulang .0%0 | 4.152,608.36 398,650.02 Pamasangan Pipa dam Accesories 678,216.61 1 “Penyeteian Pipa m 5.0 40,752.70, 203,763.48 2 Pemasungan Bend Gip 45 - 75 mm Buah | 400 108,035.05, 432,140.21 8 Pemasangan Flange Bell End @ 75 ma Buah | 1.00 19,153.06 19,153.06, 4 Pemasangan Flange Spygot Q 75 mm Bush | 100 195153.06 19,153.06 5 Pengecetan Pelinias mt 012 32,816.20 44,006.80 | PENGETESAN DAN PENGURASAN 18,249.80, 1 Pengetesanjaringan pipa 0 75 mm m S00 2,099.30 10,496.51 2 Pengurasanjaringan pipa O75 mma m 5.00 1,550.66 7,783.29 JUMLAH 3,545,472.73 Pengadaan dan Pemasangan Pipa Lintasan @ 75 mm; L = 3 meter zi Targa Sarva fo. raian Pekerjaan atuan | Volume jumlah Harga (Rp) Ne c er si r ®o) Jumlab Hargs (Rp) T z z 4 5 z ‘| PENGADAAN PIA DAN ACCESSORIES 424318115 1 Pipa Gip 975 mm ® 4.0 199,300.00 797,200.00, 2 Pengangkutan Pipa Gip @ 75 mm mo 4.00 4495.29 7981s 4 lunge Bell End 9 75 mm Bush | 100 277,400.00 277,800.00 4 Flange Spygot 8 75 mm tush | 1.00 1254,500.00, 254,800.00 Send Gip 45-75 mm Bor | 400 313,300.00 1,253,200.00 6 Flange Sell @75 mm + lengkap baut Bush | 14.00 106,500.00 391,000.00 7 Karet Packing 75 mm Bush | 8.00 14,900.00, 131,200.00, | PEMASANGAN 698,769.72 Pekerjaan Sip 61,450.84 1 Galian rm | 0.0%60 31,587.50 3,032.40 2 Urugan Kembal m | 00320 10,858.35 34747 4 Rabat Beton m | 0.0960 604,906.00 $8,070.98 Pemasangan Pipa dan Accesories 637,318.87 1 Penyetelan Pipa » 4.00 40,782.70 163,010.74 2 Pemasangan Bend Gip 45-075 mm push | 400 108,035.05 432,140.21 3 Pemasangan Flange Bell End @ 75 mm Bush | 1.00 195153.06 19,153.06 4 Pemasangan Flange Spygot 0 75 mm Buan | 100 193153.06 19,183.06, 5 Pengecetan Pelintas mi 012 32,816.20 3,861.76 ¢ | PENGETESAN DAN PENGURASAN e 14,599.84 1 Pengetesan jaringan pipa O75 mm a 4.00 2,099.30 539721 2 Pengurasanjaringan pipa @ 75 mm m 4.00 1,550.66 6,202.63 UMEATE THsESOTT Pengadaan dan Pemasangan Pipa Sclubung @ 100 mm;L = 1 meter Ni ‘Uraian Pekerjaan Satuan | Volume | Maren SS"* | jumtan Hares (Rp) z 3 4 s e ‘| PENGADAAN PIPA SELUBUNG ‘ 1,033,762.30 o 1 PipaGip@ 150mm m 2.00 498,900.00, 997,800.00 2. Pengangatan Pip Gip 150 mm m | 200 179815 3596230 3 PengcetanPeinat m | ons sasi620 444131 [MTA TOSI] RINCIAN ANGGARAN BIAYA Pengadaan dan Pemasangan Pipa Selubung @ 75 mm;L = 2 meter No ‘Ursien Pekeriaan Saran | Volume | TRESS | jemtah Hare RP) 7 z ra $ = A. | PENGADAAN PIPA SELUBUNG srea7e7 1 Pipa Gip@ 100 mm m | 300} 28410000 #5230000 2. Pengangkutan Pipa Gip © 100 mm m | 300 799182 291487 3 Pengesran Petintas m | oi] sasi620 4055.8 JUMLAH 876,274.87. RINCIAN ANGGARAN BIAYA Pengadaan dan Pemasangan Pipa Selubung @ 50 mm;L = 2 meter No. Uraian Pekerjaan Satvan | Volume eee ‘Jumlab Harge (Rp) T z pacaca 3 cao ‘| PENGADAAN Pipa SELUBUNG ennatsas 1 Pipa Gip 975 mm m | 300] 19930000 97.90000 2 Penganghutan Pips Gip 078 mm m | 300 4995.29 1348.66 3 Pengeetan Patina m | ot sai620 ‘4055.14 CS OMIA ass ee

Anda mungkin juga menyukai