Anda di halaman 1dari 2

PLAN KEBUTUHAN MAN POWER TAHUN 2023

PT.GUNUNGMAS SUKSES MAKMUR


Update : Wednesday, July 26, 2023 Job Site Kutai Energi
Kebutuhan Operator
Subcont EGI Qty K.F Qty Shift
Plan Act Act master

EXCAVATOR 1 1.4 2 3 3

D85SS-2 9 1.4 2 25 21

PT GSM 1

Wheel Loader 4 1.4 2 11 10

Dump Truck 3 1.4 2 8 8

TOTAL 17 48 42 0

TOTAL OPERATOR DI SITE


R TAHUN 2023
MAKMUR

n Operator PROSES Deviasi


Keterangan
Deviasi SIMPER BPN
Master :

0 0

Master :

3 3

Master :

1 1

Master :

0 0

5 0 5

42

Anda mungkin juga menyukai