BPJS Ketena
Kelebihan Jam
Jumlah Upah Tunj. Premi Shift SPHK
No. Tenaga Kerja Kerja (LS) Upah / bulan THRK JKK
TK Pokok Daerah
0,346820809 0,867052023 0,17 1,74%
SUPPORT
1 LOGISTIC & WAREHOUSE 1 5.000.000 - - - 5.000.000 416.667 833.333 87.000
2 OFFICE BOY/GIRL 2 3.100.000 - - - 3.100.000 258.333 516.667 53.940
CFMR
3 INSTRUMENT & ELECTRICAL 3 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
4 MECHANICAL ROTATING & 3 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
5 FABRICATION 3 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
6 SUPPORT SERVICE MAINTENANCE 2 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
PRODUCTION
7 PRODUCTION OPERATOR 12 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
8 LINE TRANSPORTATION & CHECKER 6 2.500.000 500.000 1.040.462 2.601.156 6.641.618 250.000 500.000 52.200
BPJS Ketena
Jumlah SPHK
No. Tenaga Kerja Upah Pokok Kelebihan Jam Kerja Upah / bulan THRK JKK
TK
0,08 1,74%
GA DEPT.
1 SECURITY 1 4.416.200 1.059.377 5.475.577 368.017 368.017 76.842
2 OFFICE BOY/GIRL 2 4.416.200 2.297.445 6.713.645 368.017 368.017 76.842
3 KURIR/MESSENGER 1 4.416.200 1.059.377 5.475.577 368.017 368.017 76.842
4 PERLENGKAPAN KERJA LS - - - - - -
- - - - - - - 6.400.000 6.400.000
- - - - - - - 43.500.000 43.500.000
- - - - - - - 30.000.000 30.000.000
- - - - - - - 7.950.000 7.950.000