DIREKTORAT JENDERAL PERKERETAAPIAN

BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN


KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 051/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Structure Excavation with Support NO. ITEM PEKERJAAN : 203 (4)
LOKASI : Manggarai P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP02 KUANTITAS : 6,035.74 M3

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Structure Excavation with Support Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Structure Excavation with Support M3 22,612.53 6,035.74 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 052/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Cast-In Place Concrete Pile (Dia. 1200mm) NO. ITEM PEKERJAAN : 211 (1)
LOKASI : Manggarai P11-1, P12-1, P13-1, P14-1, P14-2, P15-1, P16-1, P-17-1, MP02 KUANTITAS : 3,498.00 M'

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Cast-In Place Concrete Pile (Dia. 1200mm) Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Cast-In Place Concrete Pile (Dia. 1200mm) M' 15,112.00 3,498.00 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 053/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Concrete Pile Load Test NO. ITEM PEKERJAAN : 211 (3)
LOKASI : Manggarai P13-PC3 KUANTITAS : 1.00 Ls

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Concrete Pile Load Test Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Concrete Pile Load Test Ls 2.00 1.00 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 055/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Concrete Class A NO. ITEM PEKERJAAN : 214 (1)
LOKASI : Portal P09 PC2-PC3 KUANTITAS : 368.22 M3

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Concrete Class A Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Concrete Class A M3 5,204.36 368.22 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 056/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Concrete Class B NO. ITEM PEKERJAAN : 214 (2)
LOKASI : Pilecap P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP02 Portal MP03/P21, P9 KUANTITAS : 4,008.87 M3
Kolom P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP01-2, MP02, MP04
TANGGAL & WAKTU : 04 Agustus 2022
UNTUK PEMERIKSAAN : Concrete Class B Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Concrete Class B M3 19,734.78 4,008.87 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 057/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Concrete Class F NO. ITEM PEKERJAAN : 214 (6)
LOKASI : Manggarai Pilecap P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP02 KUANTITAS : 115.41 M3

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Concrete Class F Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Concrete Class F M3 680.97 115.41 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 058/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Reinforce Bar NO. ITEM PEKERJAAN : 215
LOKASI : Pilecap P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP02 Portal MP03/P21, P9 KUANTITAS : 754,383.54 kg
Kolom P10-2, P11-1, P11-2, P12-1, P13-3, P15-1, P16-1, P17-1, MP01-2, MP02, MP04
TANGGAL & WAKTU : 04 Agustus 2022
UNTUK PEMERIKSAAN : Reinforce Bar Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Reinforce Bar kg 3,626,869.61 754,383.54 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 059/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Prestress Concrete Wire NO. ITEM PEKERJAAN : 216
LOKASI : Manggarai P09 KUANTITAS : 13,170.93 kg

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Prestress Concrete Wire Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Prestress Concrete Wire kg 607,994.56 13,170.93 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 060/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Pipe Drain Type D for Bridge Segmen NO. ITEM PEKERJAAN : 244
LOKASI : Bekasi Line MP04-MA01 KUANTITAS : 639.35 m

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Pipe Drain Type D for Bridge Segmen Manggarai At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Sipil Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Pipe Drain Type D for Bridge Segmen m 2,628.62 639.35 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 061/WKU-KSO/RFI/IV/2022 Tanggal : 04 Agustus 2022


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Double Slip Switch Removal NO. ITEM PEKERJAAN : 415 (4)
LOKASI : Jalur 1&2 Eksisting Manggarai KUANTITAS : 2.00 set

TANGGAL & WAKTU : 04 Agustus 2022


UNTUK PEMERIKSAAN : Double Slip Switch Removal Jalur 1&2 Eksisting Manggarai

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA TEGUH WIYONO PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Jalan Kereta Api Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Double Slip Switch Removal set 6.00 2.00 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 062/WKU-KSO/RFI/XI/2021 Tanggal : 08 November 2021


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Pipe drain Type D NO. ITEM PEKERJAAN : 229 (4)
LOKASI : Bogor At Grade KUANTITAS : 130.80 m

TANGGAL & WAKTU : 08 November 2021


UNTUK PEMERIKSAAN : Pipe drain Type D Bogor At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Jalan Kereta Api Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Pipe drain Type D m 130.80 130.80 Terlampir

Komentar Konsultan :
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN WILAYAH JAKARTA DAN BANTEN
KEGIATAN PENGEMBANGAN DOUBLE-DOUBLE TRACK

PROYEK PEMBANGUNAN FASILITAS PERKERETAAPIAN UNTUK MANGGARAI S/D JATINEGARA (PAKET A)(TAHAP II)
"PEKERJAAN MAIN LINE II"

PENGAJUAN UNTUK INSPEKSI (RFI) No : 062/WKU-KSO/RFI/XI/2021 Tanggal : 08 November 2021


KONTRAK NOMOR : 002/P1/K/BTPWJB/X/2019 KONTRAKTOR : WASKITA UTAMA KSO
ITEM PEKERJAAN : Cleaning And Grubbing NO. ITEM PEKERJAAN : 202
LOKASI : Bogor At Grade KUANTITAS : 5,367.31 m

TANGGAL & WAKTU : 08 November 2021


UNTUK PEMERIKSAAN : Cleaning And Grubbing Bogor At Grade

KONSULTAN KONTRAKTOR
KEPALA DIVISI TEKNIS PENGEMBANGAN DOUBLE - DOUBLE DAYACIPTA - LAUDZA - SCALARINDO KSO WASKITA - UTAMA KSO
TRACK (PAKET A)

ANGGI SANJAYA A.A Eka Sari Wulandari PANGERAN SITOMPUL


NIP. 199101282019021001 Tenaga Ahli Jalan Kereta Api Site Operation Manager
Tanggal : Tanggal : Tanggal :

Uraian :

Volume Keterangan
No. Uraian Satuan
Kontrak RFI (Data Lokasi / Layout )
1 Cleaning And Grubbing m 5,367.31 5,367.31 Terlampir

Komentar Konsultan :