PLTM BAYANG NYALO 3 X 2 MW

COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-STR-0001-04 s/d WK-BNH-STR-0009-04 04 Closed Sandtrap Denah, Tampak, Potongan 17-Apr-23
2 WK-BNH-STR-0009-01 s/d WK-BNH-STR-0057-04 04 Checked Sandtrap Reinforcement 11-May-23
3 WK-BNH-STR-0058-02 2 Revisi Sandtrap Flushing Gate 19-May-23

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Merubah Dimensi Sandtrap menjadi ukuran 9x28x5.5 m 1
2 Ukuran Dan jenisnya font disamakan 2
3 Menambahkan beberapa detail potongan pada pintu sandtrap 3
4 Menambahkan informasi Spesifikasi pintu sandtrap 4
5 5
6 6

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0003-01 s/d WK-BNH-PWH-0020-01 03 Revisi Steel Structure 31-Mar-23
1 31-Mar-23

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Ukuran dan Tulisan Font Disamakan
Anotasi dan ukuran di cek kembali
2

Review By Checked by
Pemberi Pekerjaan Konsultan MK
PT. Bayang Nyalo Hydro PT. Kwarsa Hexagon

San Akri T. Hakiki Syahputra


PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0003-01 s/d WK-BNH-PWH-0020-01 01 Revisi Potongan Section Power House 21-Nov-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Perubahan Ketebalan Beton Pondasi Power House
dari tebal 1.9m menjadi 1.4m (terhitung dari elevasi 355.400)
2 Perubahan Ketebalan Beton Pondasi Power House
dari tebal 1.1m menjadi 0.6m (terhitung dari elevasi 354.600)
3 Meratakan Bagian Bawah Pondasi Untuk Section B-B, Section C-C
dan Section B'-B'

Review By Checked by
Pemberi Pekerjaan Konsultan MK
PT. Bayang Nyalo Hydro PT. Kwarsa Hexagon

San Akri T. Hakiki Syahputra


PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0003-01 s/d WK-BNH-PWH-0020-01 02 Revisi Potongan Section Power House 2-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Merubah data Existing pada potongan,
menyesuaikan kondisi lapangan saat ini

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0040-01 s/d WK-BNH-PWH-0042-01 1 Revisi Grounding Power House 12-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Lampirkan perhitungan yang telah dilakukan
2 Total Point 18, tetapi tertulis 12 point
3 Berikan tanda untuk NGR-1, NGR-2, dll pada gambar
4 Tentukan grounding untuk penangkal petir, apakah tergabung dengan
bangunan atau terdapat tarikan kabel ke tanah

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0057-01 s/d WK-BNH-PWH-0059-01 1 Revisi Grounding Power House 12-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Lampirkan perhitungan yang telah dilakukan 1 Calculation Sheet merupakan skope Konsultan Perencana
2 Total Point 18, tetapi tertulis 12 point 2 - 12 titik ground rod hanya hanya diposisi
3 Berikan tanda untuk NGR-1, NGR-2, dll pada gambar machine bay & CCR
4 Tentukan grounding untuk penangkal petir, apakah tergabung dengan - Sisa ground rod 6 titik dipasang d area NGR & Trafo
bangunan atau terdapat tarikan kabel ke tanah - Box Control termasuk ground rod
3 - Posisi NGR masih dalam konseptual menunggu arahan BNH
- Gambar grounding NGR & Trafo akan disampaikan kemudian
4 Gambar ini hanya utk grounding,
terdapat gambar tersendiri utk item Lightning

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0057-02 s/d WK-BNH-PWH-0059-02 2 Revisi Grounding Power House 14-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Pemindahan posisi Tapping Point Equipment di Cable Channel
2 Pada Area Loading bay, di buat 4 titik Grounding Rood

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-HDP-0009-01 s/d WK-BNH-HDP-0010-01 1 Revisi Plan and Profile Of Spillway 17-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Penyesuaian elevasi as pipa spillway, sesuai dengan existing lapangan
2 Penambahan pipa horizontal sebelum pipa masuk ke Stilling Well Dissipater
3 Membuat potongan di Stilling Well Dissipater dan di tengah pipa

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-0005-02 s/d WK-BNH-PWH-0054-02 03 Revisi Potongan Section Power House 23-Dec-22

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Perubahan ketebalan beton power house area,
dari ketebalan 1.9m menjadi 1.4m
2 Meratakan bagian pondasi bawah yang bukan di area draft tube outlet

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-003A-01 s/d WK-BNH-PWH-003B-01 01 Revisi Denah Kolom Power House 18-Jan-23

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Pengecekan Kembali Koordinat As Kolom Power House 1 Koordinat yang dilampirkan, sudah disesuaikan dengan koordinat kolom
yang telah disesuaikan.
Pergeseran kolom power house dikarnakan kolom terkena
area draft tube outlet

Review By
Pemberi Pekerjaan
PT. Bayang Nyalo Hydro

San Akri
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PWH-003A-01 s/d WK-BNH-PWH-003B-01 01 Revisi Denah Kolom Power House 18-Jan-23

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Tidak perlu menampilkan koordinat X,Y pada gambar yang diajukan

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra
PLTM BAYANG NYALO 3 X 2 MW
COMMENT SHEET

REVIEW APPROVAL DRAWINGS/DOCUMENT


DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT TITLE DATE
NO DRAWING/DOCUMENT NUMBER REV STATUS
1 WK-BNH-PST-0016-01 s/d WK-BNH-PST-0017-01 01 Revisi Potongan Penstock 11-May-23

Comment Comment
Owner/Consultan Comment Contractor Response
No. No.
1 Membuat Typical Structural Concrete, serta pembesiannya 3 diakomodir, tetapi akan dijadikan dasar kerja tambah
2 Membuat Plan Structural Concrete yang akan dibahas lebih lanjut
3 Menambahkan Pipa PVC 2inch didalam beton, untuk Fiber Optic 4 diakomodir tetapi kontraktor meminta owner untuk menerbitkan
4 Menambahkan 1 potongan SP/RP diantara RP2 dan AB2 DED Penstock terbaru, terkait dimensi dan posisi potongan penstock
5 Melengkapi dimensi pada potongan penstock STA.0+141.53 - STA.0+165.37
6 Menambahkan potongan Detour

Checked by
Konsultan MK
PT. Kwarsa Hexagon

T. Hakiki Syahputra