REKLAMASI DAN PENGERUKAN

“DESAIN & ANALISA PENURUNAN KONSOLIDASI TANAH PADA


REKLAMASI DAERAH KECAMATAN JENU KABUPATEN TUBAN
JAWA TIMUR”

DOSEN PENGAMPU MATA KULIAH :


JASISCA MEIRANY ST,M.Si
Nip : 8875370018

Disusun oleh :
HARIS PRIONO (D1111191005)
DITYA AMANDA PRATIWI (D1111191023)

PRODI TEKNIK KELAUTAN


JURUSAN TEKNIK KELAUTAN
FAKULTAS TEKNIK
UNIVERSITAS TANJUNGPURA
2022

1
DAFTAR ISI
BAB 1........................................................................................................................................4
PENDAHULUAN........................................................................................................................4
1.1 Latar belakang...............................................................................................................4
1.2 Tujuan............................................................................................................................5
1.3 Rumusan Masalah.........................................................................................................5
BAB 2........................................................................................................................................6
2.1 Menentukan Desain Bentuk Dan Ukuran Reklamasi....................................................6
2.2 Menentukan Lokasi Quarry...........................................................................................6
2.3 Perencanaan Jangka Waktu Pelaksanaan.....................................................................8
2.4 Data Perhitungan Primer Settlement............................................................................9
2.5 Analisa Perhitungan Primer Settlement Bawah..........................................................10
b. Menghitung σ'0 ( kN/m2 )......................................................................................11
d. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 2..................................................14
e. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 3..................................................15
f. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 4..................................................16
g. Menghitung Hx Cc 1+e 0 log σ ' 0+∆ σ ' σ ' 0 Pada Lapisan 1...........................19
h. Menghitung Hx Cc 1+e 0 log σ ' 0+∆ σ ' σ ' 0 Pada Lapisan 2...........................21
i. Menghitung Hx Cc 1+e 0 log σ ' 0+∆ σ ' σ ' 0 Pada Lapisan 3...........................24
2.6 Data Perhitungan Immediate Settlement (Si) Bawah...................................................36
2.7 Analisa Perhitungan Immediate Settlement Bawah.....................................................37
a. Menghitung y' (kN/m3 )........................................................................................37
b. Menghitung Immediate Settlement...........................................................................39
c. Menghitung HR-H..................................................................................................40
h. Menghitung Pada Lapisan 1...........................46
k. Menghitung Pada Lapisan 2..........................48
.......................................................................................................................................48
l. Menghitung Immediate Settlement (Si)..............................................................50
2.8 Rangkuman Tabel Perhitungan Settlement Total (St)..................................................53
a. Menghitung Settlement Total (St).........................................................................54

1
b. Menghitung HR-H..................................................................................................54
BAB 3......................................................................................................................................55
3.1 Kesimpulan...................................................................................................................55
a. Perhitungan Primer Settlement (Scp).........................................................................55
3.2 Saran............................................................................................................................56

2
BAB 1

PENDAHULUAN
1.1 Latar belakang
Reklamasi adalah salah satu upaya yang dilakukan dalam pembangunan.
Reklamasi dapat diartikan sebagai upaya pengadaan lahan dengan cara
mengeringkan rawa, daerah pasang surut dan sebagainya (Peterson, 2005).
Reklamasi menjadi alasan utama dalam pemekaran kota sehingga alternatif
reklamasi pantai dilakukan karena berbagai alasan berkaitan dari pertambahan
penduduk alami maupun migrasi dan kesejahteraan penduduk yang miskin
mendorong mereka yang semula tinggal di tengah kota memilih ke daerah
pinggiran atau tempat baru untuk dapat memulai usaha demi meningkatkan
kesejahteraannya serta penyebaran keramaian kota, semula semua kegiatan
terpusat di kota sehingga dibutuhkan ruang baru untuk menampung semua
kegiatan yang mana tidak bisa difasilitasi dalam kota (Departemen Kelautan dan
Perikanan, 2001:19).
Reklamasi merupakan subsistem dari sistem pantai. Reklamasi pantai
merupakan upaya teknologi yang dilakukan manusia untuk merubah suatu
lingkungan alam menjadi lingkungan buatan, suatu tipologi ekosistem estuaria,
mangrove dan terumbu karang menjadi suatu bentang alam daratan (Maskur,
2008). Ruang lingkup Undang – Undang No. 27 Tahun 2007 Jo No.1 Tahun 2014
tentang pengelolaan wilayah pesisir dan pulau – pulau kecil, reklamasi wilayah
pesisir dan pulau – pulau kecil dilakukan dalam rangka meningkatkan manfaat
dan/ atau nilai tambah wilayah pesisir dan pulau – pulau kecil ditinjau dari aspek
teknis, lingkungan dan sosial ekonomi.

Kawasan perkotaan yang berada di tepi pantai cenderung mengalami


perubahan yang cukup pesat yang berimbas pada daerah sekitarnya termasuk
kawasan reklamasi pantai yang dilakukan menimbulkan berbagai masalah yang
membawa dampak negatif dan dampak positif di lingkungan perkotaan.

3
Dampak reklamasi pantai adalah hal yang patut dikaji dan diperhatikan
dalam lingkungan perkotaan yang berkelanjutan sehingga kedepannya manusia
tidak mengulangi kesalahan yang sama. Lingkungan perkotaan yang
berkelanjutan mempengaruhi pola perilaku manusia yang ada di dalamnya.
Hubungan timbal balik manusia dengan lingkungan perkotaan merupakan proses
dua arah yang konstruktif, didukung baik oleh ciri citra (image) lingkungan
maupun ciri sifat kegiatan dan kejiwaan manusia. Kota – kota besar di Indonesia
merupakan kota – kota yang berada di tepi pantai dengan jumlah penduduk yang
besar dan kegiatan perekonomian yang pesat, tetapi sering kali lahan yang
tersedia tidak mendukung laju pertumbuhan dan perkembangan wilayah yang
berlangsung di suatu kota.

1.2 Tujuan
Adapun yang menjadi tujuan dalam laporan reklamasi itu sendiri antara lain:

1. Menentukan desain bentuk dan ukuran reklamasi

2. Menentukan lokasi quarry

3. Perencenaan jangka waktu pelaksanaan Reklamasi

4. Mendesain tanggul Reklamasi

5. Mendesain sfock pillng

6. Menghitung Settlement Plate (Scp), menghitung Immediate Settlement


(Si) dan Total Settlement (St).

1.3 Rumusan Masalah


Adapun rumusan masalah pada laporan ini adalah :
1. Bagaimana proses perencanaan reklamasi di Tuban.
2. Bagaimana menentukan perencanaan pembangunan kawasan reklamasi di
Kaupaten Tuban dengan luas 158 Hektar.

4
BAB 2
ANALISA PERHITUNGAN

2.1 Menentukan Desain Bentuk Dan Ukuran Reklamasi

2.2 Menentukan Lokasi Quarry


Penentuan Quarry atau kawasan tempat material yang digunakan untuk
reklamasi disini ada 3, yaitu :

1. Quarry Pasir

Quarry pasir terletak dikecamatan jenu kabupaten tuban provinsi jawa


timur. Jarak quarry pasir ke lokasi reklamasi 8,4 km dengan jarak tempuh
selama ± 20 Menit.

2. Quarry Batu

Quarry Tanah terletak di kecamatan Marakurak, kabupaten Tuban, Jawa


Timur. Posisi quarry batu dengan titik koordinat latitude 6°53’6.71°S,

5
longititude 111°55’45.39°T. Jarak quarry batu ke lokasi reklamasi 11 km
dengan jarak tempuh selama ± 30 Menit.

3. Quarry Tanah dan Batu

Quarry Kerikil terletak di salah satu pegunugan daerah Desa Mliwang,


Kecamatan Kerek, Jawa Timur. Posisi quarry tanah dengan titik koordinat
latitude 6°53’6,71”S, longititude 111°55’45,39”T, Jarak quarry batu ke lokasi
reklamasi 15,9 km dengan jarak tempuh selama ± 2,5 jam.

4. Quarry Kerikil

Quarry kerikil terletak di sekitaran Kecamatan Marakurak, Kabupaten


Tuban, Jawa Timur. Posisi quarry kerikil dengan titik koordinat latitude
6°52’35.97”S, longititude 111°55’39.57”T. Jarak quarry pasir ke lokasi
reklamasi 10,6 km dengan jarak tempuh selama ± 30 menit.

6
2.3 Perencanaan Jangka Waktu Pelaksanaan
Pelaksanaan reklamasi Kubu Raya memerlukan waktu selama 12 tahun
dimana kegiatan pelaksanan reklamasi tersebut memiliki bobot pengerjaan dan
waktu pengerjaannyaa masing-masing yang meliputi :
1. Pekerjaan persiapan
2. Pengukuran dan pengolahan data
3. Pemasangan tanggul dan reklamasi
4. Penyempurnaan

7
2.4 Data Perhitungan Primer Settlement
Tabel 2.1 Data Perhitungan Primer Settlement

Kedalama Ysat yw n
No Jenis Tanah W (%) y' (kN/m3) e0 Cc e Gs
n (m) (kN/m3) (kN/m3) (%)

Pasir seragam
1 2 19 5,61 9,81 -4,20 0,67 0,01 0,51 34 2,68
padat

Pasir berbutir
2 3,5 16 4,75 9,81 -5,06 1,9 0,01 0,43 30 2,65
campuran padat

Lempung lunak
3 sedikit organik 4 70 22,01 9,81 12,20 1,9 0,15 1,9 66 2,65
+ kerikil

Lempung lunak
4 6 110 42,24 9,81 32,43 3 1 3 75 2,65
sangat organik

5 Batu 9,5 0 0,0 0,0 0,00 0,00 0 0 0 0,00

8
2.5 Analisa Perhitungan Primer Settlement Bawah
a. Menghitung y' (kN/m3 )
 Menghitung y' pada lapisan 1
Dik : ysat = 5,61 kN/m3
yw = 9,81 kN/m3
Jawab :
y' = ysat - yw
= 5,61 – 9,81
= -4,2 kN/m3
 Menghitung y' pada lapisan 2
Dik : ysat = 4,75 kN/m3
yw = 9,81 kN/m3
Jawab :
y' = ysat – yw
= 4,75– 9,81
= -5,06 kN/m3
 Menghitung y' pada lapisan 3

Dik : ysat = 22,01kN/m3

yw = 9,81 kN/m3

Jawab :

y' = ysat – yw

= 22,01– 9,8
= 12,21 kN/m3
 Menghitung y' pada lapisan 4
Dik : ysat = 42,24 kN/m3
yw = 9,81 kN/m3
Jawab :

9
y' = ysat – yw

= 42,24 – 9,81
= 32,43 kN/m3
 Menghitung y' pada lapisan 5
Dik : ysat = 0,0 kN/m3
yw = 0,0 kN/m3
Jawab :

y' = ysat – yw

= 0,0 – 0,0
= 0 kN/m3
b. Menghitung σ'0 ( kN/m2 )
 Menghitung σ'0 pada lapisan 1
Dik : y' = 0,24 kN/m3
h =2m
Jawab :
σ'0 = y ' x (h /2)
= 0,24 x (2/2)
= -9,762 kN/m2
 Menghitung σ'0 pada lapisan 2
Dik : y' = 0,20 kN/m3
h = 3,5 m
Jawab :
σ'0 = (y ' x h + y ' x (h /2))
= (0,24 x 2 +0,20 x (3,5 / 2))
= -36,673 kN/m2

 Menghitung σ'0 pada lapisan 3


Dik : y' = 0,88 kN/m3
h =4m

10
Jawab :
σ'0 = (y ' x h + y ' x h + y ' x (h /2))
= (0,24 x 2 +0,20 x 3,5 + 0,88 x (4/ 2))
= -52,545 kN/m2
 Menghitung σ'0 pada lapisan 4
Dik : y' = 1,38 kN/m3
h =6m
Jawab :
σ'0 = (y ' x h+ y ' x h + y ' x h + y ' x (h /2))
= (0,24 x 2 +0,20 x 3,5 + 0,88 x 4 + 32,43 x (6/ 2))
= -62,361 kN/m2
 Menghitung σ'0 pada lapisan 5
Dik : y' = 0 kN/m3
h = 9,50 m
Jawab :
σ'0 = (y ' x h + y ' x h + y ' x h + y ' x h+ y ' x (h /2))
= -99,235 kN/m2

c. Menghitung I (Koreksi OSTERBERG)


Dik : OSTERBERG (0,7 )
 Menghitung ∆σ' = y ' × H × 2I (LWS)
Dik : y' = -4,20 kN/m3
H =2m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -4,20 x 1 x 2(0,7)
= -511,76 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (HWL)
Dik : y' = -4,20 kN/m3
H = 3,5 m

11
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -4,20 x 3,5 x 2(0,7)
= -20,57 kN/m2

 Menghitung ∆σ' = y ' × H × 2I (+3.00 LWS)


Dik : y' = -4,20 kN/m3
H =4m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -4,20 x 4 x 2(0,7)
= -23,51 kN/m2

 Menghitung ∆σ' = y ' × H × 2I (+4.00 LWS)


Dik : y' = -4,20 kN/m3
H =6m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -35,27 x 6 x 2(0,7)
= -35,27 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+5.00 LWS)
Dik : y' = -4,20 kN/m3
H = 9,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -4,20 x 9,5 x 2(0,7)

12
= -55,84 kN/m2

d. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 2


 Menghitung ∆σ' = y ' × H × 2I (LWS)
Dik : y' = -5,06 kN/m3
H =2m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -5,06 x 1 x 2(0,7)
= -14,18 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (HWL)
Dik : y' = -5,06 kN/m3
H = 3,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -5,06 x 3,5 x 2(0,7)
= -24,81 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+3.00 LWS)
Dik : y' = -5,06 kN/m3
H =4m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -5,06 x 4 x 2(0,7)
= -28,36 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+4.00 LWS)
Dik : y' = -5,06 kN/m3
H =6m
I = 0,7

13
Jawab :
∆σ' = y ' × H × 2I
= -5,06 x 6 x 2(0,7)
= -42,53 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+5.00 LWS)
Dik : y' = -5,06 kN/m3
H = 9,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= -5,06 x 9,5 x 2(0,7)
= -67,35 kN/m2
e. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 3
 Menghitung ∆σ' = y ' × H × 2I (LWS)
Dik : y' = 12,20 kN/m3
H =2m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 12,20 x 1 x 2(0,7)
= 34,16 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (HWL)
Dik : y' = 12,20 kN/m3
H = 3,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 12,20 x 3,5 x 2(0,7)
= 59,78 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+3.00 LWS)

14
Dik : y' = 12,20 kN/m3
H =4m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 12,20 x 4 x 2(0,7)
= 68,32 kN/m2

 Menghitung ∆σ' = y ' × H × 2I (+4.00 LWS)


Dik : y' = 12,20 kN/m3
H =6m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 12,20 x 6 x 2(0,7)
= 102,48 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+5.00 LWS)
Dik : y' = 12,20 kN/m3
H = 9,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 12,20 x 9,5 x 2(0,7)
= 162,27 kN/m2
f. Menghitung ∆σ' = y ' × H × 2I Pada Lapisan 4
 Menghitung ∆σ' = y ' × H × 2I (LWS)
Dik : y' = 32,43 kN/m3
H =2m
I = 0,7
Jawab :

15
∆σ' = y ' × H × 2I
= 32,43 x 2 x 2(0,7)
= 90,80 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (HWL)
Dik : y' = 32,43 kN/m3
H = 3,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 32,43 x 3,5 x 2(0,7)
= 158,91 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+3.00 LWS)
Dik : y' = 32,43 kN/m3
H =4m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 32,43 x 4 x 2(0,7)
= 181,61 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+4.00 LWS)
Dik : y' = 32,43 kN/m3
H =6m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 32,43 x 6 x 2(0,7)
= 272,41 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+5.00 LWS)
Dik : y' = 32,43 kN/m3
H = 9,5 m

16
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 32,43 x 9,5 x 2(0,7)
= 431,32 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (HWL)
Dik : y' = 0 kN/m3
H = 3,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 0 x 3,5 x 2(0,7)
= 0 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+3.00 LWS)
Dik : y' = 0 kN/m3
H =4m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 0 x 4 x 2(0,7)
= 0 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+4.00 LWS)
Dik : y' = 0 kN/m3
H =6m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 0 x 6 x 2(0,7)
= 0 kN/m2
 Menghitung ∆σ' = y ' × H × 2I (+5.00 LWS)

17
Dik : y' = 0 kN/m3
H = 9,5 m
I = 0,7
Jawab :
∆σ' = y ' × H × 2I
= 0 x 9,5 x 2(0,7)
= 0 kN/m2

Hx Cc σ '0 + ∆ σ '
g. Menghitung log Pada Lapisan 1
1+e 0 σ '0

Hx Cc σ '0 + ∆ σ '
 Menghitung log (LWS)
1+e 0 σ '0

Dik : H =2m
Cc = 0,01
e0 = 0,51
’0 = -9,762kN/m2
’ = -11,76 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

2 x 0,0100 −9,762+−11,76
= log
1+0,51 −9,762
= 0,01 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (HWL)
1+e 0 σ '0

Dik : H = 3,5 m
Cc = 0,01

18
e0 = 0,51
’0 = -9,762kN/m2
’ = -20,57 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

3,5 x 0,0100 −9,762±20,57


= log
1+0,51 −9,762

= 0,02 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (+3.00 LWS)
1+e 0 σ '0

Dik : H =4m
Cc = 0,01
e0 = 0,51
’0 = -9,762kN/m2
’ = -23,51 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

4 x 0,0100 −9,762±23,51
= log
1+ 0,51 −9,762

= 0,0212 m

Hx Cc σ '0 + ∆ σ '
 Menghitung log (+4.00 LWS)
1+e 0 σ '0

19
Dik : H =6m
Cc = 0,01
e0 = 0,51
’0 = -9,762kN/m2
’ = -35,27 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

5 x 0,0100 −9,762±35,27
= log
1+0,51 −9,762

= 0,0264 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (+5.00 LWS)
1+e 0 σ '0

Dik : H = 9,5 m
Cc = 0,01
e0 = 0,51
’0 = -9,762kN/m2
’ = -55,84 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

6 x 0,0100 −9,762+−55,84
= log
1+ 0,51 −9,762

= 0,0264 m

20
Hx Cc σ '0 + ∆ σ '
h. Menghitung log Pada Lapisan 2
1+e 0 σ '0
Hx Cc σ ' +∆ σ '
 Menghitung log 0 (LWS)
1+e 0 σ '0

Dik : H =2m
Cc = 0,01
e0 = 0,43
’0 = -36,673kN/m2
’ = -14,18 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

3 x 0,01 −36,673±14,18
= log
1+0,43 −36,673

= 0,0037 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (HWL)
1+e 0 σ '0

Dik : H = 3,5 m
Cc = 0,01
e0 = 0,43
’0 = -36,673 kN/m2
’ = -24,81 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

21
3 x 0,01 −36,673+−24,81
= log
1+0,43 −36,673

= 0,01 m

Hx Cc σ ' +∆ σ '
 Menghitung log 0 (+3.00 LWS)
1+e 0 σ '0

Dik : H =4m
Cc = 0,01
e0 = 0,43
’0 = -36,673 kN/m2
’ = -28,36 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

4 x 0,01 −36,673+−28,36 7
= log
1+ 0,43 −36,67

= 0,0104 m

Hx Cc σ ' +∆ σ '
 Menghitung log 0 (+4.00 LWS)
1+e 0 σ '0

Dik : H =6m
Cc = 0,01
e0 = 0,43
’0 = -36,673 kN/m2

22
’ = -42,53 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

6 x 0,01 −36,673+−42,53
= log
1+0,43 −36,673

= 0,0140 m

Hx Cc σ ' +∆ σ '
 Menghitung log 0 (+5.00 LWS)
1+e 0 σ '0

Dik : H = 9,5 m
Cc = 0,01
e0 = 0,43
’0 = -36,673 kN/m2
’ = -67,35 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

6 x 0,01 −36,673+−67,35
= log
1+0,43 −36,673

= 0,0190 m

Hx Cc σ ' +∆ σ '
i. Menghitung log 0 Pada Lapisan 3
1+e 0 σ '0

23
Hx Cc σ '0 + ∆ σ '
 Menghitung log (LWS)
1+e 0 σ '0

Dik : H =3m
Cc = 0,15
e0 = 1,90
’0 = -52,545 kN/m2
’ = 34,16 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

3 x 0,15 −52,545+34,16
= log
1+1,90 −52,545

= -0,1415 m
Hx Cc σ ' +∆ σ '
 Menghitung log 0 (HWL)
1+e 0 σ '0

Dik : H = 3,5 m
Cc = 0,15
e0 = 1,90
’0 = -52,545 kN/m2
’ = 59,78 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

3,5 x 0,15 −52,545+59,78


= log
1+1,90 −52,545

24
= 0,1769 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (+3.00 LWS)
1+e 0 σ '0

Dik : H =4m
Cc = 0,15
e0 = 1,90
’0 = -52,545 kN/m2
’ = 68,32 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

4 x 0,15 −52,545+68,32
= log
1+ 1,90 −52,545

= 0,1903 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (+4.00 LWS)
1+e 0 σ '0

Dik : H =6m
Cc = 0,15
e0 = 1,90
’0 = -52,545 kN/m2
’ = 102,48 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0
6 x 0,15 −52,545+102,48
= log
1+1,90 −52,545

25
= 0,2335 m

Hx Cc σ '0 + ∆ σ '
 Menghitung log (+5.00 LWS)
1+e 0 σ '0

Dik : H = 9,5 m
Cc = 0,15
e0 = 1,90
’0 = -52,545 kN/m2
’ = 102,48 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

9,5 x 0,15 −52,545+102,48


= log
1+1,90 −52,545

= 0,2864 m

Hx Cc σ '0 + ∆ σ '
 Menghitung log Pada Lapisan 4
1+e 0 σ '0

Hx Cc σ '0 + ∆ σ '
 Menghitung log (LWS)
1+e 0 σ '0

Dik : H =2m
Cc = 1,00
e0 = 3,00
’0 = -62,361 kN/m2

26
’ = 90,80 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

2 x 0,15 −62,361+90,80
= log
1+1,90 −62,361

= 0,7474 m

Hx Cc σ '0 + ∆ σ '
Menghitung log (HWL)
1+e 0 σ '0
Dik : H = 3,5 m
Cc = 1,00
e0 = 1,90
’0 = 3,00 kN/m2
’ = 158,91 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

3,5 x 0,15 −52,545+158,91


= log
1+1,90 −52,545
= 1,0167 m

Hx Cc σ '0 + ∆ σ '
 Menghitung log (+3.00 LWS)
1+e 0 σ '0

Dik : H =4m
Cc = 1,00
e0 = 1,90

27
’0 = 3,00 kN/m2
’ = 181,61 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

4 x 0,15 −52,545+181,61
= log
1+ 1,90 −52,545

= 1,0863 m
Hx Cc σ '0 + ∆ σ '
 Menghitung log (+4.00 LWS)
1+e 0 σ '0

Dik : H =6m
Cc = 1,00
e0 = 1,90
’0 = 3,00 kN/m2
’ = 272,41 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

6 x 0,15 −52,545+272,41
= log
1+1,90 −52,545

= 1,3082 m
Hx Cc σ ' +∆ σ '
 Menghitung log 0 (+5.00 LWS)
1+e 0 σ '0

Dik : H = 9,5 m
Cc = 1,00

28
e0 = 1,90
’0 = 3,00kN/m2
’ = 431,32 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

9,5 x 0,15 −52,545+ 431,32


= log
1+1,90 −52,545

=1,5745 m

HxCc σ '0 + ∆ σ '


j. Menghitung log Pada Lapisan 5
1+e 0 σ '0
Hx Cc σ '0 + ∆ σ '
 Menghitung log (LWS)
1+e 0 σ '0

Dik : H =2m
Cc =0
e0 =0
’0 = -99,235 kN/m2
’ = 0 kN/m2
Jawab :
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

2x 0 −99,235+0
= log
1+0 −99,235

29
=0m

Hx Cc σ ' +∆ σ '
 Menghitung log 0 (HWL)
1+e 0 σ '0

Dik : H = 3,5 m
Cc =0
e0 =0
’0 = -99,235 kN/m2
’ = 0 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

3,5 x 0 −99,235+0
= log
1+0 −99,235

=0m

Hx Cc σ '0 + ∆ σ '
 Menghitung log (+3.00 LWS)
1+e 0 σ '0

Dik : H =4m
Cc =0
e0 =0
’0 = -99,235 kN/m2
’ = 0 kN/m2
Jawab :

30
HxCc σ '0 + ∆ σ '
∆h1 = log
1+e 0 σ '0

1x 0 −99,235+0
= log
1+0 −99,235

=0m

HxCc σ ' +∆ σ '


 Menghitung log 0 (+4.00 LWS)
1+e 0 σ '0

Dik : H =6m
Cc =0
e0 =0
’0 = -99,235 kN/m2
’ = 0 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

6 x0 −99,235+ 0
= log
1+0 −99,235

=0m
HxCc σ '0 + ∆ σ '
 Menghitung log (+5.00 LWS)
1+e 0 σ '0

Dik : H = 9,5 m
Cc =0
e0 =0

31
’0 = -99,235 kN/m2
’ = 0 kN/m2
Jawab :
HxCc σ ' +∆ σ '
∆h1 = log 0
1+e 0 σ '0

9,5 x 0 −99,235+ 0
= log
1+0 −99,235

=0m

k. Menghitung Primer Settlement


 Menghitung Primer Settlement (LWS)

Dik : ∆h1 = 0,01 m


∆h2 = 0,0037 m
∆h3 = -0,1415 m
∆h4 = 0,7474 m
∆h5 = 0,0000 m

Jawab :
Scp = ∆h1 + ∆h2 + ∆h3 + ∆h4 + ∆h5
= 0,01 + 0,0037 + -0,1415 + 0,7474 +0,0000
= 0,623 m

 Menghitung Primer Settlement (HWL)


Dik : ∆h1 = 0,02 m
∆h2 = 0,01 m
∆h3 = 0,1769 m

32
∆h4 = 1,0167 m
∆h5 = 0,0000 m

Jawab :
Scp = ∆h1 + ∆h2 + ∆h3 + ∆h4 + ∆h5
= 0,02 + 0,01 + 0,1769 + 1,0167 +0,0000
= 1,223 m
 Menghitung Primer Settlement (+3.00 LWS)
Dik : ∆h1 = 0,0212 m
∆h2 = 0,0104 m
∆h3 = 0,1903 m
∆h4 = 1,0863 m
∆h5 = 0,0000 m

Jawab :
Scp = ∆h1 + ∆h2 + ∆h3 + ∆h4 + ∆h5
= 0,0212 + 0,0104 + 0,1903 + 1,0863 +0,0000
= 1,308 m

 Menghitung Primer Settlement (+4.00 LWS)

Dik : ∆h1 = 0,0264 m


∆h2 = 0,0140 m
∆h3 = 0,2335 m
∆h4 = 0,2864 m
∆h5 = 0,0000 m

Jawab :
Scp = ∆h1 + ∆h2 + ∆h3 + ∆h4 + ∆h5
= 0,0264 + 0,0140 + 0,2335 + 0,2864 +0,0000

33
= 1,582 m
 Menghitung Primer Settlement (+5.00 LWS)

Dik : ∆h1 = 0,0329 m


∆h2 = 0,0190 m
∆h3 = 0,2864 m
∆h4 = 1,5755 m
∆h5 = 0,0000 m

Jawab :
Scp = ∆h1 + ∆h2 + ∆h3 + ∆h4 + ∆h5
= 0,0329 + 0,0190 + 0,2864 + 1,5755 + 0,0000
= 1,913 m

34
Elevasi Timbunan +3.0 +4.0
SETTLEMENT LWS HWL
LWS LWS

HR (m) 2 3,5 4 6
Koreksi
OSTERBERG (I) 0,7 0,7 0,7 0,7

∆σ'1=g' × H × 2I -11,76 -20,57 -23,51 -35,27


SA ∆σ'2=g' × H × 2I -14,18 -24,81 -28,36 -42,53
(H ×
∆h log (σ'0+∆σ')/σ'0 ∆σ'3=g' × H × 2I 34,16 59,78 68,32 102,48
Cc)/(1+e0)
90,80 158,91 181,61 272,41
0,00 0,00 0,00 0,00

∆h1 0,040 log (-9,762+∆σ')/-9,762 ∆h1 0,01 0,02 0,0212 0,0264

∆h2 0,042 log (-36,673+∆σ')/-36,673 ∆h2 0,0037 0,01 0,0104 0,0140


(-52,545+∆σ')/-52,545
∆h3 0,310 log ∆h3 -0,1415 0,1769 0,1903 0,2335

∆h4 1,500 log (-62,361+∆σ')/-62,361 ∆h4 0,7474 1,0167 1,0863 1,3082

∆h5 5,413 log (-99,235+∆σ')/-99,235 ∆h5 0,0000 0,0000 0,0000 0,0000

ER SETTLEMENT Scp 0,623 1,223 1,308 1,582

35
2.6 Data Perhitungan Immediate Settlement (Si) Bawah

W Ysat yw y' n
Lapisa Kedalama
Jenis Tanah (% (kN/ (kN/m3 (kN/m3 Cc e (% Gs
n n (m)
) m3) ) ) )

Pasir
0,010
1 padat+Kerik 2,00 19 5,61 9,81 -4,20 0,51 34 2,68
0
il

Tanah
2 3,50 16 4,75 9,81 -5,06 0,01 0,43 30 2,65
kuning

Lempung
3 4,00 70 22,01 9,81 12,20 0,15 1,90 66 2,65
lunak

Lempung
4 lunak sangat 6,00 110 42,24 9,81 32,43 1,00 3,00 75 2,65
organik

5 Batu cadas 9,50 0 0 0 0,00 0 0 0 0,00

36
2.7 Analisa Perhitungan Immediate Settlement Bawah
a. Menghitung y' (kN/m3 )
 Menghitung y' pada lapisan 1
Dik : ysat = 5,61kN/m3
yw = 9,81 kN/m3
Jawab :
y' = ysat - yw
= 5,61– 9,81
= -4,20 kN/m3
 Menghitung y' pada lapisan 2
Dik : ysat = 4,75kN/m3
yw = 9,81 kN/m3
Jawab :
y' = ysat – yw
= 45,8488 – 9,81
= -5,06 kN/m3

 Menghitung y' pada lapisan 3


Dik : ysat = 22,01 kN/m3
yw = 9,81 kN/m3
Jawab :
y' = ysat – yw
= 22,01 – 9,81
= 12,20 kN/m3

 Menghitung y' pada lapisan 4


Dik : ysat = 42,24kN/m3
yw = 9,81 kN/m3

37
Jawab :
y' = ysat – yw
= 42,24 – 9,81
= 32,43 kN/m3

 Menghitung y' pada lapisan 5


Dik : ysat = 0 kN/m3
yw = 0 kN/m3
Jawab :
y' = ysat – yw
=0 –0
= 0 kN/m3

RANGKUMAN HASIL PERHITUNGAN BAGIAN BAWAH

Tinggi Timbunan Rencana = +3.00 m LWS atau H = 25 m dari Sea Bed


No HR Scp Si St HR-H
1 2 0,623 0,313 0,936 -23
2 3,5 1,223 0,547 1,770 -21,5
3 4 1,308 0,625 1,933 -21
4 6 1,582 0,938 2,520 -19
5 9,5 1,913 1,485 3,398 -15,5

38
b. Menghitung Immediate Settlement
 Menghitung Settlement Total (St) Yang Ke-1
Dik : Scp = 0,623 m
Si = 0,313 m
Jawab :
St = Scp + Si
= 0,623 + 0,313
= 0,936 m

 Menghitung Settlement Total (St) Yang Ke-2


Dik : Scp = 1,223 m
Si = 0,547 m
Jawab :
St = Scp + Si
= 1,223 + 0,547
= 1,770 m

 Menghitung Settlement Total (St) Yang Ke-3


Dik : Scp = 1,308 m
Si = 0,625 m
Jawab :
St = Scp + Si
= 1,308 + 0,625
= 1,933 m

39
 Menghitung Settlement Total (St) Yang Ke-4
Dik : Scp = 1,582 m
Si = 0,938 m
Jawab :
St = Scp + Si
= 1,582 + 0,938
= 2,520 m

 Menghitung Settlement Total (St) Yang Ke-5


Dik : Scp = 1,913 m
Si = 0,625 m
Jawab :
St = Scp + Si
= 1,308 + 1,485
= 3,398 m

c. Menghitung HR-H
 Menghitung HR-H Yang Ke-1
Dik : HR =2
H = 25
Jawab :
HR-H = 2-25
= -23

40
 Menghitung HR-H Yang Ke-2
Dik : HR = 3,5
H = 25
Jawab :
HR-H = 3,5-25
= -21,5

 Menghitung HR-H Yang Ke-3


Dik : HR =4
H = 25
Jawab :
HR-H = 4-25
= -21

 Menghitung HR-H Yang Ke-4


Dik : HR =6
H = 25
Jawab :
HR-H = 6-25
= -19

 Menghitung HR-H Yang Ke-5


Dik : HR = 9,5
H = 25
Jawab :

41
HR-H = 9,5 - 25
= -15,5

Ked
ala W Ysat y'
n
c Jenis Tanah ma (% (kN/ (kN/m3 Cc e Gs
(%)
n ) m3) )
(m)

Pasir seragam
1 2 19 5,61 -4,20 0,01 0,51 34 2,68
padat

Pasir berbutir
2 campuran 3,5 16 4,75 -5,06 0,01 0,43 30 2,65
padat

d. Menghitung σ' Atas


 Menghitung σ' Pada Lapisan 1
Dik : y' = -4,20 kN/m3
h =2m
Jawab :
σ' =y'xh
= -4,20 x 2
= -9,762 kN/m2

 Menghitung σ' Pada Lapisan 2


Dik : y' = -5,06 kN/m3
h = 3,5 m

42
Jawab :
σ' =y'xh
= -5,06 x 3,5
= -17,149 kN/m2

e. Menghitung Eeod Immidiate Settlement (Si) Atas


 Menghitung Eeod Immidiate Settlement Pada Lapisan 1
Dik : ' = -8,398 kN/m2
e0 = 0,51
Cc = 0,0100
Jawab :
2.3 x ' ¿ )
Eeod =

2.3 x−8,398 ¿)
=

= -9,762 kN/m2

 Menghitung Eeod Immidiate Settlement Pada Lapisan 2


Dik : ' = -17,723 kN/m2
e0 = 0,43
Cc = 0.01
Jawab :
2.3 x ' ¿ )
Eeod =

43
2.3 x−17,723 ¿)
=

= -17,149 kN/m2

f. Menghitung Eeod Immidiate Settlement (Si) Atas


 Menghitung Eeod Immidiate Settlement Pada Lapisan 1
Dik : ' = -8,398 kN/m2
e0 = 0,51
Cc = 0,0100
Jawab :
2.3 x ' ¿ )
Eeod =

2.3 x−8,398 ¿)
=

= -9,762 kN/m2

 Menghitung Eeod Immidiate Settlement Pada Lapisan 2


Dik : ' = -17,723 kN/m2
e0 = 0,43
Cc = 0.01
Jawab :
2.3 x ' ¿ )
Eeod =

2.3 x−17,723 ¿)
=

= -17,149 kN/m2

44
g. Menghitung y 'timb × Htimb Pada Lapisan 1
 Menghitung y 'timb × Htimb (LWS)
Dik : y' = -4,20 kN/m3
H =2m
Jawab :
y 'timb × Htimb = y ' × H
= -4,20 x 2
= -8,40 kN/m2

 Menghitung y 'timb × Htimb (HWL)


Dik : y' = -4,20 kN/m3
H = 3,5 m
Jawab :
y 'timb × Htimb = y ' × H
= -4,20 x 3,5
= -14,70 kN/m2

 Menghitung y 'timb × Htimb (+3.0 LWS)


Dik : y' = -4,20 kN/m3
H =4m
Jawab :
y 'timb × Htimb = y ' × H
= -4,20 x 4
= -16,80 kN/m2

 Menghitung y 'timb × Htimb (+4.0 LWS)


Dik : y' = -4,20 kN/m3
H =6m
Jawab :
y 'timb × Htimb = y ' × H

45
= -4,20 x 6
= -25,19 kN/m2

 Menghitung y 'timb × Htimb (+5.0 LWS)


Dik : y' = -4,20 kN/m3
H = 9,5 m
Jawab :
y 'timb × Htimb = y ' × H
= -4,20 x 9,5
= -39,89 kN/m2

hi
h. Menghitung y ' timb × H timb ∑ Pada Lapisan 1
E oed

 Menghitung (LWS)

Dik : y 'timb × Htimb = -0,0006858 kN/m2


H =2m
Eoed = -9,762 kN/m2

Jawab : hi
y ' timb × H timb ∑
∆h1 = E oed

2
= −0,0006858 ∑
−0,0006004

= 0,00576 m

hi
 Menghitung y ' timb × H timb ∑ (HWL)
E oed

Dik : y 'timb × Htimb = -0,0006858 kN/m2


H = 3,5 m

46
Eoed = -9,762 kN/m2
Jawab :
hi
∆h1 = y ' timb × H timb ∑
E oed

2
= −0,0006858 ∑ −0,0006004

= 0,010008 m

hi
 Menghitung y ' timb × H timb ∑ (+3.0 LWS)
E oed

Dik : y 'timb × Htimb = -0,0006858 kN/m2


H =4m
Eoed = -9,762 kN/m2
Jawab :
hi
∆h1 = y ' timb × H timb ∑
E oed

4
= −0,0006858 ∑ −0,0006004

= 0,01152 m

hi
i. Menghitung y ' timb × H timb ∑ (+4.0 LWS)
E oed

Dik : y 'timb × Htimb = -0,0006858 kN/m2


H =6m
Eoed = -9,762 kN/m2
Jawab :
hi
∆h1 = y ' timb × H timb ∑
E oed

6
−0,0006858 ∑
−0,0006004

47
=

= 0,01728 m

hi
j. Menghitung y ' timb × H timb ∑ (+5.0 LWS)
E oed

Dik : y 'timb × Htimb = -0,0006858 kN/m2


H = 9,5 m
Eoed = -9,762 kN/m2
Jawab :
hi
∆h1 = y ' timb × H timb ∑
E oed

9,5
= −0,0006858 ∑ −0,0006004

= 0,02735 m

hi
k. Menghitung y ' timb × H timb ∑ Pada Lapisan 2
E oed

hi
 Menghitung y ' timb × H timb ∑ (LWS)
E oed

Dik : y ‘timb × Htimb = -0,0006004 kN/m2


H =2m
Eoed = -17,149 kN/m2
Jawab : hi
y ' timb × H timb ∑
∆h2 = E oed

2
= −0,0006004 ∑
−17,149

48
= -0,0050423 m

hi
 Menghitung y ' timb × H timb ∑ (HWL)
E oed

Dik : y ‘timb × Htimb = -0,0006004 kN/m2


H = 3,5 m
Eoed = -17,149 kN/m2
Jawab : hi
y ' timb × H timb ∑
∆h2 = E oed

3,5
−0,0006004 ∑
= −17,149

= 0,0088240908 m

hi
 Menghitung y ' timb × H timb ∑ (+3.0 LWS)
E oed

Dik : y ‘timb × Htimb = -0,0006004 kN/m2


H =4m
Eoed = -17,149 kN/m2
Jawab : hi
y ' timb × H timb ∑
∆h2 = E oed

4
−0,0006004 ∑
= −17,149

= 0,0100846752m

hi
 Menghitung y ' timb × H timb ∑ (+4.0 LWS)
E oed

49
Dik : y ‘timb × Htimb = -0,0006004 kN/m2
H =6m
Eoed = -17,149 kN/m2
Jawab : hi
y ' timb × H timb ∑
∆h2 = E oed

6
−0,0006004 ∑
= −17,149

= 0,0151270128 m

hi
 Menghitung y ' timb × H timb ∑ (+5.0 LWS)
E oed

Dik : y ‘timb × Htimb = -0,0006004 kN/m2


H = 9,5 m
Eoed = -17,149 kN/m2
Jawab : hi
y ' timb × H timb ∑
∆h2 = E oed

9,5
−0,0006004 ∑
= −17,149

= 0,0239511036 m

l. Menghitung Immediate Settlement (Si)


 Menghitung Immediate Settlement (LWS)

Dik : ∆h1 = 0,00576 m


∆h2 = 0,0050423 m
Jawab :
Si = ∆h1 + ∆h2
= 0,00576 + 0,0050423

50
= 0,01080 m

 Menghitung Immediate Settlement (HWL)

Dik : ∆h1 = 0,01008 m


∆h2 = 0,0088240908 m
Jawab :
Si = ∆h1 + ∆h2
= 0,01008 + 0,0088240908

= 0,01890 m

 Menghitung Immediate Settlement (+3.0 LWS)

Dik : ∆h1 = 0,01152 m


∆h2 = 0,0100846752 m
Jawab :
Si = ∆h1 + ∆h2
= 0,01152 + 0,0100846752

= 0,02160 m

 Menghitung Immediate Settlement (+4.0 LWS)

Dik : ∆h1 = 0,01728 m


∆h2 = 0,0151270128 m
Jawab :
Si = ∆h1 + ∆h2
= 0,01728 + 0,0151270128

51
= 0,03240 m

 Menghitung Immediate Settlement (+5.0 LWS)

Dik : ∆h1 = 0,02735 m


∆h2 = 0,0239511036 m
Jawab :
Si = ∆h1 + ∆h2
= 0,02735 + 0,0239511036

= 0,05130 m

Elevasi
SETTLEMENT Timbunan LWS HWL

HR (m) 8 10

LAPISA g'timb x HRtimb1 -4,20 -12,60

52
g'timb x HRtimb2 288,310 360,388
N g'timb x Htimb
∆h
∆h
1 g'timb x Htimb 0,0006858 ∆h1 0,00288 0,00864
1

∆h 0,000001 0,000000000
2 g'timb x Htimb 0,0006004 ∆h2
2 7 0

IMMEDIATE SETTLEMENT Si 0,00288 0,00864

LWS HWL (+3.0 LWS) (+4.0 LWS) (+5.0 LWS)

2 3,5 4 6 9,5

-8,40 -14,70 -16,80 -25,19 -39,89

0,00576
0,01008 0,01152 0,01728 0,02735

0,0050423 0,0088240908 0,0100846752 0,0151270128 0,0239511036

0,01080 0,01890 0,02160 0,03240 0,05130

53
2.8 Rangkuman Tabel Perhitungan Settlement Total (St)

RANGKUMAN HASIL PERHITUNGAN BAGIAN ATAS

Tinggi Timbunan Rencana = +3.00 m LWS atau H = 8 m dari Sea Bed


No HR Scp Si St HR-H
1 2 0,0110 0,001080 0,022 -6
2 3,5 0,0160 0,01890 0,035 -4,5

a. Menghitung Settlement Total (St)


 Menghitung Settlement Total (St) Yang Ke-1
Dik : Scp = 0,0110 m
Si = 0,0110288 m
Jawab :
St = Scp + Si
= 0,0110 + 0,0110288
= 0,022 m

 Menghitung Settlement Total (St) Yang Ke-2


Dik : Scp = 0,0160 m
Si = 0,01890 m
Jawab :
St = Scp + Si
= 0,0160 + 0,01890
= 0,035 m
b. Menghitung HR-H
 Menghitung HR-H Yang Ke-1

54
Dik : HR =2
H =8
Jawab :
HR-H = 2-8
= -6
 Menghitung HR-H Yang Ke-2
Dik : HR = 3,5
H =8
Jawab :
HR-H = 3,5-8
= -4,5

BAB 3
KESIMPULAN DAN SARAN
3.1 Kesimpulan
a. Perhitungan Primer Settlement (Scp)
Pada analisa perhitungan di atas, ada 5 lapisan tanah yang diperhitunkan
dimana ketiga lapisan tanah tersebut terdiri dari jenis pasir seragam padat
dengan kedalaman 2,00 m, jenis pasir berbutir campuran padat dengan
kedalaman 3,50 m, lempung lunak sedikit organic dan kerikil dengan
kedalaman 4,00 m, jenis tanah lempung lunak sangat organik degan
kedalaman 6,00 m dan jenis tanah Batu dengan kedalaman 9,50 m. Dari
analisa perhitungan keempat jenis tanah tersebut nilai Primer Settlement yang
didapat, antara lain :
1. Pada elevasi timbunan dengan HR 2 m nilai Primer Settlement nyaa
adalah 0,623 m.
2. Pada elevasi timbunan dengan HR 3,5 m nilai Primer Settlement nya
adalah 1,223 m.

55
3. Pada elevasi timbunan dengan HR 4 m nilai Primer Settlement nya
adalah 1,308 m.
4. Pada elevasi timbunan dengan HR 6 m nilai Primer Settlement nya
adalah 1,582 m.
5. Pada elevasi timbunan dengan HR 9,5 m nilai Primer Settlement nya
adalah 1,913 m.
b. Perhitungan Immediate Settlement (Si)

Untuk hasil perhitungan Immediate Settlement diperoleh nilai sebagai


berikut :
1. Pada elevasi timbunan dengan HR 2 m nilai Immediate Settlement nya
adalah 0,313 m.
2. Pada elevasi timbunan dengan HR 3,5 m nilai Immediate Settlement
nya adalah 0,547 m.
3. Pada elevasi timbunan dengan HR 4 m nilai Immediate Settlement nya
adalah 0,625 m.
4. Pada elevasi timbunan dengan HR 6 m nilai Immediate Settlement nya
adalah 0,938 m.
5. Pada elevasi timbunan dengan 9,5 m nilai Immediate Settlement nya
adalah 1,485 m.
c. Perhitungan Total Settlement (St)

Nilai Primer Settlement dan Immediate Settlement yang didapat


dijumlah maka nilai Total Setlement nyaa sebagai berikut :
1. Pada elevasi timbunan dengan HR 2 m nilai Total Settlement nya
adalah 0,936 m.
2. Pada elevasi timbunan dengan HR 3,5 m nilai Total Settlement nya
adalah 1,770 m.
3. Pada elevasi timbunan dengan HR 4 m nilai Total Settlement nya
adalah 1,933 m.

56
4. Pada elevasi timbunan dengan HR 6 m nilai Total Settlement nya
adalah 2,520 m.
5. Pada elevasi timbunan dengan HR 9,5 m nilai Total Settlement nya
adalah 3,398 m.

3.2 Saran
1. Nilai – nilai Wc (%), , e0 dan nilai Cc harus sesuai dengan jenis tanah yanag
akan kita perhitungkan dan mengikuti petunjuk – petunjuk rumus yang ada,
agar hasil perhitungan konsolidasi penurunan total settlement yang diperoleh
dapat sesuai dengan jenis tanah yang kita perhitungkan.
2. Saat melalukan perhitungan disarankan agar lebih teliti dalam penggunaan
rumusnya, karena kesusaian rumus yang digunakan tersebut sangat
berpengaruh pada hasil perhitungan.