AHSP 2018 Semester II
AHSP 2018 Semester II
Semen Beton Hebel Zak 188,000.00 semen untuk bata hebel ; 1 Zak @ 40 Kg
4. BATU BATA Batu bata bh 610.00 uk. 8x8x16 cm; batu bata lubang press
mesin
Batu bata ringan / hebel bh 8,036.00 uk. 60x20x75 cm ; 1 m3 @111 bh
1. SENG BJLS Seng gelombang uk. 5' kpg 31,500.00 uk. 0,8 m x 1,50 m
Seng gelombang uk. 7' kpg 43,500.00 uk. 0,8 m x 2,1 m
Seng gelombang uk. 10' kpg 62,000.00 uk. 0,8 m x 3,0 m
Seng polos m 28,000.00 lebar 88 cm
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 38,000.00 setara Sakura Merpati roof; 1 m2 @ 1,62
lbr
Genteng metal uk. 2x4 (0.3mm) lbr 46,000.00 setara Sakura Elang roof; 1 m2 @ 1,62
lbr
Genteng metal berpasir 2x5 (0,45mm) lbr 98,000.00 setara Multiroof; 1m2 @ 1,3 lbr
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 64,000.00 uk.lebar 105 cm
Atap Zincalume warna (t. 0,35 mm) m' 72,000.00 uk.lebar 105 cm
Atap Alkan (t.0,35 mm) m' 62,000.00 uk. Lebar 105 cm
Nok Zincalume 0,30 m' 26,000.00 uk. 300x60
I-1
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
Atap Zincalume warna (t.022mm) lbr 52,000.00 uk. 1600 mm x 740 mm, setara soka
Atap Zincalume warna (t.045mm) m' 97,000.00 setara bluecsoope; uk.lebar 105 cm
8. ATAP BITUMEN Atap bitumen motif gelombang lbr 149,500.00 setara onduline; warna merah/
coklat/hitam; uk. 200x95x0,3 cm
Atap bitumen motif genteng lbr 45,500.00 setara onduline; uk. 105x40x0,3 cm
Nok atap bitumen bh 80,000.00 setara onduline;; uk. 90cm x 50 cm
buah 3,800.00
30 x 30 kotak 61,200.00 setara mulia ; 1 kotak @ 11 kpg
buah 5,563.64
40 x 40 kotak 65,600.00 setara Milan; 1 kotak @ 6 kpg
buah 10,933.33
50x50 kotak 128,000.00 setara Roman; 1 kotak @ 4 kpg
buah 32,000.00
bh 5,563.64
33,5x33,5 (tekstur) kotak 105,000.00 setara Roman; 1 kotak @ 8 kpg
bh 13,125.00
40 x 40 kotak 70,700.00 setara KIA; 1 kotak @ 6 kpg
bh 11,783.33
50x50 kotak 131,000.00 setara Roman; 1 kotak @ 4 kpg
bh 32,750.00
50x50 (tekstur) kotak 131,000.00 setara Roman; 1 kotak @ 4 kpg
bh 32,750.00
30x60 ktk 130,800.00 setara platinum; 1 kotak @ 5 kpg
bh 26,160.00
I-2
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
3. GRANITE TILE 60 x 60 kotak 309,600.00 setara Sincere; 1 kotak @ 4 kpg
bh 77,400.00
60 x 60 (tekstur) kotak 533,000.00 setara Indogres; 1 kotak @ 4 kpg
bh 133,250.00
80 x 80 kotak 663,360.00 setara Elegenza; 1 kotak @ 2 kpg
bh 331,680.00
80 x 80 (tekstur) kotak 838,000.00 setara elegenza; 1 kotak @ 2 kpg
bh 419,000.00
Granite Pola uk. 1,2 x 1,2 m ls 2,550,000.00 setara Indecor
Step nosing 30 x 60 bh 92,600.00 setara granito
Step nosing 20 x 60 bh 58,700.00 setara granito
V BAHAN CETAK
1. BUIS BETON Buis beton dia. 100cm m 975,000.00 d0=100 cm; d1=120cm
Buis beton dia. 80cm m 875,000.00 d0=80 cm; d1=100cm
Buis beton dia. 60cm m 625,000.00 d0=60 cm; d1=75cm
Buis beton dia.40cm m 450,000.00 d0=40 cm; d1=48cm
Buis beton dia. 30cm m 345,000.00 d0=30 cm; d1=38cm
Buis beton dia. 20cm m 250,000.00 d0=20 cm; d1=25cm
I-3
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
8. JENDELA UPVC Jendela kaca dan kusen UPVC (uk. 1 m x bh 1,500,000.00 dua daun jendela
1,2 m)
Jendela kaca dan kusen UPVC (uk. 0.6 m bh 995,000.00 satu daun jendela
x 1,5 m)
3. ALUMINIUM Profil daun pintu kaca m 55,000.00 setara CA; warna silver; panjang 6 m
Profil kusen 3" m 120,000.00 setara CA; warna silver; panjang 6 m
Profil kusen 4" m 133,500.00 setara CA; warna silver; panjang 6 m
Aluminium strip m 120,500.00 setara CA; warna silver; panjang 6 m
4. BAJA RINGAN Profil C channel 100.75 btg 128,000.00 Tegangan leleh minimum 550 MPa;p. 6
m
Profil C channel 80.75 btg 92,000.00 Tegangan leleh minimum 550 MPa;p. 6
m
Profil C channel 75.75 btg 82,000.00 Tegangan leleh minimum 550 Mpa;p. 6
m
Profil C channel 75.65 btg 73,000.00 Tegangan leleh minimum 550 Mpa;p. 6
m
Reng R.40.45 btg 40,000.00 Tegangan leleh minimum 550 Mpa;p. 6
m
Screw truss 12x 3/4 bh 165.00
Dynabolt bh 1,500.00 p. 10 mm
Talang Jurai dalam m 39,000.00 panjang 6 m
5. PINTU BESI Folding Gate t.0,4 mm m2 430,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,6mm m2 505,000.00 min. 7 m2; finish cat standar
Folding Gate t.0,8mm (jumbo) m2 655,000.00 min. 7 m2; finish cat standar
Rolling door aluminum t.0,8 mm m2 600,000.00 min. 6 m2; panjang + 50 cm
Rolling door besi t.± 0,5 mm m2 550,000.00 min. 6 m2; panjang + 50 cm; finish cat
standar
Rolling door galvanum t.± 0,5 mm m2 400,000.00 min. 6 m2; panjang + 50 cm
6. PEGANGAN TANGGA Pegangan tangga stainless kombinasi m' 317,000.00 setara star
STAINLESS acylic (3/4", 1" & 2")
Pegangan tangga stainless (3/4" & 2") m' 673,000.00 setara star
I-4
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
1. PIPA PVC Pipa PVC AW 1/2" btg 25,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3/4" btg 32,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3" btg 195,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 4" btg 294,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 3" btg 96,000.00 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 4" btg 151,000.00 setara Wavin; 1 batang @ 4 m
2. SOFT BOARD Gypsum 9 mm uk. 1,2 x 2,4 m kpg 75,000.00 setara Jayaboard
4. PLAFOND PVC Plafond PVC putih + pasang m2 175,000.00 setara Shunda plafond
Plafond PVC warna + pasang m2 250,000.00 setara Shunda plafond
Ornamen PVC unit 5,000,000.00 setara Shunda plafond; uk. 1,2m x 1,6m
I-5
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
3. TEMBOK Cat tembok eksterior liter 95,950.00 setara Dulux Weather Shield; 1 galon @
2,5 l
Cat tembok interior kg 22,240.00 setara Vinilex; 1 galon @ 5 kg
Plamir dinding/kayu kg 18,000.00 setara Rj
Cat dasar/sealer interior kg 33,025.10 setara Vinilex
Cat dasar/sealer eksterior liter 48,000.00 setara Dulux
Cat antibocor kg 52,000.00 setara aquaproof; 1 kaleng @ 1 kg
X. BAHAN KACA
I-6
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
2. ENGSEL/GRENDEL Engsel 3" stainless steel ktk 60,000.00 setara unikey; 1 ktk @ 2 pcs
Engsel 3" biasa ktk 48,000.00 1 ktk @ 2 pcs (untuk jendela)
Engsel 4" stainless steel ktk 81,000.00 setara unikey; 1 ktk @ 2 pcs (untuk
pintu)
Engsel 4" biasa ktk 60,000.00 1 ktk @ 2 pcs (untuk pintu)
Engsel tanam set 1,137,500.00 setara Dekson
Grendel 2" stainless steel bh 23,000.00
Grendel 3" stainless steel bh 30,000.00
Grendel 8 " bh 100,000.00 paloma
Grendel 12 " bh 200,000.00
Grendel tanam bh 220,000.00 setara unikey : 1 ktk @2 pcs
7. PENAMPUNG AIR Penampung air fiber kap. 250L unit 510,000.00 setara tedmont
Penampung air fiber kap. 550 L unit 926,000.00 setara tedmont
I-7
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
2. LEM Lem kayu kg 19,500.00 setara lem fox; 1 bungkus @ 800 gram
Lem aica aibon kg 51,580.00
Sealent tube 28,000.00
XV. LAIN-LAIN
1 Pekerja OH 120,000.00
2 Tukang OH 150,000.00
3 Kepala Tukang OH 170,000.00
4 Mandor OH 185,000.00
I-8
DAFTAR HARGA SATUAN PEKERJAAN KOTA PALEMBANG
TAHUN 2019 SEMESTER I
II - 9
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
3. Pengerjaan 100 kg pekerjaan perakitan kg 54,147.75
4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 836,239.75
5. Pengerjaan 10 cm pengelasan dengan las listrik cm 17,811.20
6. Pemasangan 1 m2 pintu lipat (folding door) t. 0,8 mm m2 903,152.50
7. Pemasangan 1 m kusen pintu aluminium m 168,750.43
8. Pemasangan 1 m2 pintu aluminium strip lebar 8 cm m2 2,659,342.80
9. Pemasangan 1 m2 pintu kaca polos 8 mm rangka aluminium m2 862,459.75
10 . Pemasangan 1 m2 terali besi strip (2x3) mm m2 693,569.00
11 . Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm m 135,303.25
12 . Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi m2 113,093.88
13 . Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60x60cm, plafon m2 142,347.00
14 Pemasangan 1 bh pintu KM/WC Aluminium warna lengkap (kusen, kunci engsel setara bh 2,934,973.65
. dekson) - frame louver
15 . Pemasangan 1 bh pintu Aluminium warna lengkap (kusen, kunci engsel setara dekson) - ice bh 4,429,973.65
glass
16 . Pemasangan 1 bh pintu KM/WC Aluminium warna urat kayu lengkap (kusen, kunci engsel bh 4,257,473.65
setara dekson) - frame louver
17 . Pemasangan 1 bh pintu Aluminium warna urat kayu lengkap (kusen, kunci engsel setara bh 5,062,473.65
dekson) - ice glass
4 . Pemasangan 1 m2 dinding bata lubang (8x8x16) cm tebal 1/2 batu campuran 1 SP:4PP m2 123,391.75
II - 10
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
3. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm (tebal 9 mm) m2 65,952.50
4. Pemasangan 1 m' list langit-langit kayu profil m 22,749.72
5. Pemasangan 1 m' list langit-langit gypsum profil m 31,047.29
6. Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm) m2 63,440.90
II - 11
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
1. Pemasangan 1 m2 roof polycarbonate m2 144,986.25
2. Pemasangan 1 m2 atap asbes gelombang m2 88,716.75
3. Pemasangan 1 m' nok asbes m 89,585.00
4. Pemasangan 1 m2 genteng keramik warna natural m2 247,583.50
5. Pemasangan 1 m2 genteng metal m2 121,951.75
6. Pemasangan 1 m' nok genteng keramik m 246,228.80
7. Pemasangan 1 m' nok genteng metal m 97,088.75
8. Pemasangan 1 m2 atap seng gelombang m2 62,846.93
9. Pemasangan 1 m' nok atap seng m 45,908.00
10 . Pemasangan 1 m2 atap aluminium/alkan m2 126,063.00
11 . Pemasangan 1 m' nok aluminium m 98,405.50
12 . Pemasangan 1 m2 aluminium foil m2 88,153.25
13 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 152,565.67
>=15° jarak gording 60 cm
14 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 156,984.14
antara 10°-15° jarak gording 45 cm
15 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap m2 256,431.03
antara 5°-10° memakai decking plywood 12 mm
16 . Pemasangan 1 m2 atap bitumen motif genteng (uk. 106x40x0,3 cm) jarak gording 32 cm m2 234,380.24
II - 12
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
3 . Pelaburan 1 m2 bidang kayu dengan teak oil m2 53,147.25
4 . Pelaburan 1 m2 bidang kayu dengan politur m2 68,092.65
5 . Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 16,887.75
II - 13
DIV. NO. JENIS PEKERJAAN SATUAN HARGA (RP)
6 . Pelaburan 1 m2 bidang kayu dengan vernis m2 64,819.75
7 . Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat m2 28,015.05
penutup)
8 . Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 21,729.49
9 . Pengecatan 1 m2 permukaan baja dengan menie besi m2 50,651.75
10 . Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat m2 48,098.75
11 . Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
penutup) m2 50,054.34
12 . Pengecatan 1 m2 plafond (2 lapis cat penutup) m2 17,172.03
13 . Pelapisan anti bocor 1 m2 (2 lapis ) m3 60,408.35
II - 14
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
1. Membuat 1 m3 beton mutu F'c=9,8 Mpa (K125), slump (12±2) cm, w/c=0,78
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 259,365.00
B BAHAN
Semen Portland kg 276.000 1,340.00 369,840.00
Pasir Beton kg 828.000 96.43 79,842.86
Kerikil (Maks. 30mm) kg 1012.000 351.85 356,074.07
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 820,075.93
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa (K100) slump (3-6)cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 120,000.00 144,000.00
Tukang Batu L.02 OH 0.200 150,000.00 30,000.00
Kepala Tukang L.03 OH 0.020 170,000.00 3,400.00
Mandor L.04 OH 0.060 185,000.00 11,100.00
JUMLAH TENAGA KERJA 188,500.00
B BAHAN
Semen Portland kg 230.000 1,340.00 308,200.00
Pasir Beton kg 893.000 96.43 86,110.71
Kerikil (Maks. 30mm) kg 1027.000 351.85 361,351.85
Air Liter 200.000 66.60 13,320.00
JUMLAH TENAGA BAHAN 768,982.57
C. PERALATAN
-
JUMLAH TENAGA ALAT -
3. Membuat 1 m3 beton mutu F'c=14,5 Mpa (K175), slump (12±2) cm, w/c=0,66
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 259,365.00
B BAHAN
Semen Portland kg 326.000 1,340.00 436,840.00
Pasir Beton kg 760.000 96.43 73,285.71
Kerikil (Maks. 30mm) kg 1029.000 351.85 362,055.56
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 886,500.27
C. PERALATAN
-
JUMLAH TENAGA ALAT -
5. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (12±2) cm, w/c=0,56
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 259,365.00
B BAHAN
Semen Portland kg 384.000 1,340.00 514,560.00
Pasir Beton kg 692.000 96.43 66,728.57
Kerikil (Maks. 30mm) kg 1039.000 351.85 365,574.07
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 961,181.65
C. PERALATAN
-
JUMLAH TENAGA ALAT -
6. Membuat 1 m3 beton mutu F'c=26,4 Mpa (K300), slump (12±2) cm, w/c=0,52
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 259,365.00
B BAHAN
Semen Portland kg 413.000 1,340.00 553,420.00
Pasir Beton kg 681.000 96.43 65,667.86
Kerikil (Maks. 30mm) kg 1021.000 351.85 359,240.74
Air Liter 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 992,647.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
25. Membuat 1 m3 beton mutu F'c=21,7 Mpa (K250), slump (12±2) cm, w/c=0,56 menggunakan molen
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.323 120,000.00 158,760.00
Tukang Batu L.02 OH 0.189 150,000.00 28,350.00
Kepala Tukang L.03 OH 0.019 170,000.00 3,230.00
Mandor L.04 OH 0.1320 185,000.00 24,420.00
JUMLAH TENAGA KERJA 214,760.00
B BAHAN
Semen Portland kg 384.00 1,340.00 514,560.00
Pasir beton kg 692.00 96.43 66,728.57
Kerikil (maks. 30mm) kg 1,039.00 351.85 365,574.07
Air Liter 215.00 66.60 14,319.00
JUMLAH TENAGA BAHAN 961,181.65
C. PERALATAN
Molen sewa/hari 0.25 600,000.00 150,000.00
JUMLAH TENAGA ALAT 150,000.00
12. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 120,000.00 30,000.00
Tukang Besi L.02 OH 0.250 150,000.00 37,500.00
Kepala Tukang L.03 OH 0.025 170,000.00 4,250.00
Mandor L.04 OH 0.013 185,000.00 2,405.00
JUMLAH TENAGA KERJA 74,155.00
B BAHAN
Rangka metal hollow 40.40.2 mm m' 3.500 5,375.00 18,812.50
Assesoris (perkuatan, las dll) Ls 100%xrangka 5,375.00
JUMLAH TENAGA BAHAN 24,187.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 bh pintu KM/WC Aluminium warna lengkap (kusen, kunci engsel setara dekson) - frame
louver
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang L.03 OH 0.500 150,000.00 75,000.00
Kepala Tukang L.03 OH 0.050 170,000.00 8,500.00
Mandor L.04 OH 0.0030 185,000.00 555.00
JUMLAH TENAGA KERJA 90,055.00
B BAHAN
Pintu Aluminium - frame louver unit 1.000 2,450,000.00 2,450,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 2,462,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
15. Pemasangan 1 bh pintu Aluminium warna lengkap (kusen, kunci engsel setara dekson) - ice glass
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang L.03 OH 0.500 150,000.00 75,000.00
Kepala Tukang L.03 OH 0.050 170,000.00 8,500.00
Mandor L.04 OH 0.0030 185,000.00 555.00
JUMLAH TENAGA KERJA 90,055.00
B BAHAN
Pintu Aluminium - ice glass unit 1.000 3,750,000.00 3,750,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 3,762,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
17. Pemasangan 1 bh pintu Aluminium warna urat kayu lengkap (kusen, kunci engsel setara dekson) - ice
glass
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang L.03 OH 0.500 150,000.00 75,000.00
Kepala Tukang L.03 OH 0.050 170,000.00 8,500.00
Mandor L.04 OH 0.0030 185,000.00 555.00
JUMLAH TENAGA KERJA 90,055.00
B BAHAN
Pintu Aluminium - ice glass unit 1.000 4,300,000.00 4,300,000.00
Sealent tube 0.432 28,000.00 12,096.00
JUMLAH TENAGA BAHAN 4,312,096.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
3. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1/2 batu campuran 1 SP:3PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.015 185,000.00 2,775.00
JUMLAH TENAGA KERJA 55,475.00
B BAHAN
Bata merah bh 66.000 610.00 40,260.00
Semen Portland kg 7.832 1,340.00 10,494.41
Pasir pasang m3 0.022 135,000.00 2,943.00
JUMLAH TENAGA BAHAN 53,697.41
C. PERALATAN
-
JUMLAH TENAGA ALAT -
9. Pemasangan 1 m2 acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.010 185,000.00 1,850.00
JUMLAH TENAGA KERJA 42,550.00
B BAHAN
Semen Portland kg 3.250 1,340.00 4,355.00
JUMLAH TENAGA BAHAN 4,355.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 2
7. Pemasangan 1 m2 lantai keramik warna ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 120,000.00 30,000.00
Tukang Batu L.02 OH 0.125 150,000.00 18,750.00
Kepala Tukang L.03 OH 0.013 170,000.00 2,210.00
Mandor L.04 OH 0.013 185,000.00 2,405.00
JUMLAH TENAGA KERJA 53,365.00
B BAHAN
Keramik 40x40 warna bh 6.630 11,783.33 78,123.50
Semen Portland kg 10.000 1,340.00 13,400.00
Pasir pasang kg 0.045 135,000.00 6,075.00
Semen warna kg 1.500 16,500.00 24,750.00
JUMLAH TENAGA BAHAN 122,348.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 3
10. Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 60 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 120,000.00 10,800.00
Tukang Batu L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 31,175.00
B BAHAN
Plint granite tile bh 1.760 12,900.00 22,704.00
Semen Portland kg 1.140 1,340.00 1,527.60
Pasir pasang kg 0.003 135,000.00 405.00
Semen warna kg 0.050 16,500.00 825.00
JUMLAH TENAGA BAHAN 25,461.60
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 4
13. Pemasangan 1 m2 lantai lantai karpet t. 4-5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 120,000.00 20,400.00
Tukang Batu L.02 OH 0.170 150,000.00 25,500.00
Kepala Tukang L.03 OH 0.017 170,000.00 2,890.00
Mandor L.04 OH 0.009 185,000.00 1,665.00
JUMLAH TENAGA KERJA 50,455.00
B BAHAN
Karpet m2 1.050 87,500.00 91,875.00
Lem kg 0.350 51,580.00 18,053.00
JUMLAH TENAGA BAHAN 109,928.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 5
16. Pemasangan 1 m2 dinding keramik putih ukuran 20cm x 25cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 120,000.00 22,500.00
Tukang Batu L.02 OH 0.3750 150,000.00 56,250.00
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0188 185,000.00 3,478.00
JUMLAH TENAGA KERJA 89,878.00
B BAHAN
Keramik 20x25 putih bh 22.000 3,800.00 83,600.00
Semen Portland kg 9.300 1,340.00 12,462.00
Pasir pasang kg 0.018 135,000.00 2,430.00
Semen warna kg 1.940 16,500.00 32,010.00
JUMLAH TENAGA BAHAN 130,502.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.4.3 - 6
19. Pemasangan 1 m2 dinding batu tempel hitam
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 120,000.00 84,000.00
Tukang Batu L.02 OH 0.350 150,000.00 52,500.00
Kepala Tukang L.03 OH 0.035 170,000.00 5,950.00
Mandor L.04 OH 0.035 185,000.00 6,475.00
JUMLAH TENAGA KERJA 148,925.00
B BAHAN
Batu tempel m2 1.100 130,000.00 143,000.00
Semen Portland kg 11.750 1,340.00 15,745.00
Pasir pasang kg 0.035 135,000.00 4,725.00
JUMLAH TENAGA BAHAN 163,470.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 120,000.00 12,000.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 29,625.00
B BAHAN
Plywood 4mm Lembar 0.375 70,000.00 26,250.00
Paku tripleks kg 0.030 25,000.00 750.00
JUMLAH TENAGA BAHAN 27,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.02 OH 0.070 150,000.00 10,500.00
Kepala Tukang L.03 OH 0.007 170,000.00 1,190.00
Mandor L.04 OH 0.007 185,000.00 1,295.00
JUMLAH TENAGA KERJA 29,785.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.641 149,500.00 95,829.50
Paku ex. onduline bh 7.051 1,000.00 7,051.30
JUMLAH TENAGA BAHAN 102,880.80
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 10°-15°
jarak gording 45 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.02 OH 0.070 150,000.00 10,500.00
Kepala Tukang L.03 OH 0.007 170,000.00 1,190.00
Mandor L.04 OH 0.007 185,000.00 1,295.00
JUMLAH TENAGA KERJA 29,785.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.667 149,500.00 99,671.65
Paku ex. onduline bh 7.051 1,000.00 7,051.30
JUMLAH TENAGA BAHAN 106,722.95
C. PERALATAN
-
JUMLAH TENAGA ALAT -
15. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 5°-10°
memakai decking plywood 12 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 120,000.00 16,800.00
Tukang Kayu L.02 OH 0.070 150,000.00 10,500.00
Kepala Tukang L.03 OH 0.007 170,000.00 1,190.00
Mandor L.04 OH 0.007 185,000.00 1,295.00
JUMLAH TENAGA KERJA 29,785.00
B BAHAN
Atap bitumen ex. Onduline Lbr 0.783 149,500.00 117,058.50
Plywood 12 mm Lbr 0.336 180,000.00 60,480.00
Paku ex. onduline bh 15.660 1,000.00 15,660.00
JUMLAH TENAGA BAHAN 193,198.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 120,000.00 720,000.00
Tukang Kayu L.02 OH 18.000 150,000.00 2,700,000.00
Kepala Tukang L.03 OH 1.800 170,000.00 306,000.00
Mandor L.04 OH 0.300 185,000.00 55,500.00
JUMLAH TENAGA KERJA 3,781,500.00
B BAHAN
Balok kayu klas II m3 1.200 5,800,000.00 6,960,000.00
Paku 10 cm kg 1.250 18,000.00 22,500.00
Lem kayu kg 1.000 19,500.00 19,500.00
JUMLAH TENAGA BAHAN 7,002,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
14. Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 120,000.00 3,360.00
Tukang Kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.860 170,000.00 146,200.00
Mandor L.04 OH 0.560 185,000.00 103,600.00
JUMLAH TENAGA KERJA 275,660.00
B BAHAN
Balok kayu klas III, 6x12 m3 0.0280 4,300,000.00 120,400.00
Paku kg 0.1500 18,000.00 2,700.00
Plywood 4 mm, 120x240 Lembar 0.8600 70,000.00 60,200.00
Lem kayu kg 0.560 19,500.00 10,920.00
JUMLAH TENAGA BAHAN 194,220.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 4.6.2 - 2
8. Pemasangan 1 buah kait angin
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 120,000.00 1,800.00
Tukang Kayu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang L.03 OH 0.015 170,000.00 2,550.00
Mandor L.04 OH 0.0080 185,000.00 1,480.00
JUMLAH TENAGA KERJA 28,330.00
B BAHAN
Kait angin stainless stell bh 1.000 30,000.00 30,000.00
JUMLAH TENAGA BAHAN 30,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
2. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 120,000.00 8,400.00
Tukang cat L.02 OH 0.009 150,000.00 1,350.00
Kepala tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 11,325.00
B BAHAN
Cat menie kg 0.200 48,000.00 9,600.00
Plamir kg 0.150 18,000.00 2,700.00
Cat dasar kg 0.170 31,000.00 5,270.00
Cat penutup kg 0.260 56,000.00 14,560.00
Kuas bh 0.010 11,500.00 115.00
Pengencer kg 0.030 28,000.00 840.00
Amplas Lbr 0.200 8,000.00 1,600.00
JUMLAH TENAGA BAHAN 34,685.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
11. Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 120,000.00 2,400.00
Tukang cat L.02 OH 0.063 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0063 170,000.00 1,071.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 13,476.00
B BAHAN
Plamir L 0.100 18,000.00 1,800.00
Cat dasar Kg 0.100 33,025.10 3,302.51
Cat penutup ex. Dulux L 0.260 95,950.00 24,947.00
JUMLAH TENAGA BAHAN 30,049.51
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 5.1.1 -4
13. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 120,000.00 4,320.00
Tukang batu L.02 OH 0.060 150,000.00 9,000.00
Kepala Tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.002 185,000.00 370.00
JUMLAH TENAGA KERJA 14,710.00
B BAHAN
Pipa PVC tipe AW 3/4" m 1.200 8,000.00 9,600.00
Perlengkapan Ls 35%xpipa 2,800.00
JUMLAH TENAGA BAHAN 12,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
DIV. 5.1.1 -5
16. Pemasangan 1 m' pipa beton diameter 40 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 120,000.00 45,600.00
Tukang batu L.02 OH 0.190 150,000.00 28,500.00
Kepala Tukang L.03 OH 0.019 170,000.00 3,230.00
Mandor L.04 OH 0.019 185,000.00 3,515.00
JUMLAH TENAGA KERJA 80,845.00
B BAHAN
Buis beton dia. 40 bh 1.100 450,000.00 495,000.00
Batu bata m3 0.550 610.00 335.50
Semen Portland kg 10.300 1,340.00 13,802.00
Pasir pasang m3 0.061 135,000.00 8,235.00
Pasir urug m3 0.069 120,000.00 8,280.00
JUMLAH TENAGA BAHAN 525,652.50
C. PERALATAN
-
JUMLAH TENAGA ALAT -
12. Pemasangan 1 m2 ACP + rangka besi siku mm, modul 100x100cm eksterior
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Besi L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 259,365.00
B BAHAN
Rangka besi siku 40.40.4mm m' 11.200 13,800.00 154,560.00
Alimunium Composite m2 1.118 255,500.00 285,700.10
sealent m' 2.000 5,600.00 11,200.00
Assesoris (perkuatan, las dll) cm 56.000 1,781.12 99,742.72
JUMLAH TENAGA BAHAN 551,202.82
C. PERALATAN
-
JUMLAH TENAGA ALAT -