B. PEKERJAAN TANAH
B.1 Pekerjaan Galian
B1.1 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2m'
Pekerja 0.900 Oh 38,000.00
Mandor 0.045 Oh 60,000.00
Jumlah
Jumlah
480.00
760.00
620.00
1,240.00 620.00 1,860.00
1,860.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
36,500.00
608.00
5,751.74
37,108.00 5,751.74 42,859.74
42,859.74
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
0.00
1.25
0.00
0.00
5,350.00
37,500.00
23,100.00
13,617.90
104,176.94
65,951.25 104,176.94 13,617.90 183,746.09
183,746.09
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
567,195.00
4,000.00
24,750.00
19,000.00
5,350.00
15,507.38
79,475.30
620,295.00 79,475.30 15,507.38 715,277.67
715,277.67
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
761,354.75 - -
4,250.00 - -
40,093.00 - -
100,712.22 - -
- 113,301.25 -
906,409.97 113,301.25 - Rp 1,019,711.22
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
32,175.00
131,400.00
3,200.00
45,919.21
42,538.84
212,694.21 42,538.84 255,233.05
255,233.05
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
34,200.00
2,700.00
36,900.00 36,900.00
36,900.00
43,700.00
1,500.00
9,040.00
45,200.00 9,040.00 54,240.00
54,240.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
12,540.00
600.00
13,140.00 13,140.00
13,140.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
60,000.00 - -
- 11,400.00 -
- 600.00 -
60,000.00 12,000.00 - Rp 72,000.00
150,000.00
21,168.00
29,640.00
18,720.00
2,028.00
2,340.00
171,168.00 52,728.00 223,896.00
223,896.00
150,000.00
145,520.00
81,600.00
57,000.00
36,000.00
3,900.00
4,500.00
377,120.00 101,400.00 478,520.00
478,520.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
590,000.00
95,000.00
12,000.00
5,200.00
600.00
31,626.00
590,000.00 112,800.00 31,626.00 734,426.00
734,426.00
62,050.00
30,600.00
6,400.00
4,560.00
13,500.00
8,100.00
3,000.00
99,050.00 29,160.00 128,210.00
128,210.00
94,500.00
2,550.00
2,660.00
3,500.00
378.00
240.00
99,710.00 4,118.00 103,828.00
103,828.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
590,000.00
95,000.00
12,000.00
5,200.00
600.00
31,626.00
590,000.00 112,800.00 31,626.00 734,426.00
734,426.00
62,050.00
30,600.00
6,400.00
4,560.00
13,500.00
8,100.00
3,000.00
99,050.00 29,160.00 128,210.00
128,210.00
94,500.00
2,550.00
2,660.00
3,500.00
378.00
240.00
99,710.00 4,118.00 103,828.00
103,828.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
23,100.00
20,276.50
5,700.00
11,400.00
4,800.00
520.00
900.00
49,076.50 17,620.00 66,696.50
66,696.50
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
23,100.00
15,375.90
6,000.00
11,400.00
4,800.00
520.00
900.00
44,475.90 17,620.00 62,095.90
62,095.90
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
58,300.00
9,951.00
2,700.00
7,760.00
34,200.00
21,600.00
2,340.00
2,700.00
78,711.00 60,840.00 139,551.00
139,551.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
10,939.68
3,000.00
7,600.00
7,200.00
780.00
600.00
13,939.68 16,180.00 30,119.68
30,119.68
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
6,676.80
3,600.00
7,600.00
7,200.00
780.00
600.00
10,276.80 16,180.00 26,456.80
26,456.80
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
3,477.50
5,700.00
4,800.00
520.00
480.00
3,477.50 11,500.00 14,977.50
14,977.50
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
7,560,000.00
18,750.00
30,000.00
228,000.00
900,000.00
97,200.00
18,000.00
7,608,750.00 1,243,200.00 8,851,950.00
8,851,950.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
179,200.00
65,000.00
15,000.00
570.00
30,400.00
120,000.00
12,960.00
2,400.00
259,770.00 165,760.00 425,530.00
425,530.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
216,000.00
9,000.00
30,400.00
120,000.00
12,960.00
2,400.00
225,000.00 165,760.00 390,760.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
61,100.00
450.00
30,400.00
120,000.00
2,400.00
61,550.00 152,800.00 214,350.00
214,350.00
JUMLAH HARGA
JUMLAH HARGA
BAHAN UPAH ALAT
6 7 8 9
90,000.00
9,000.00
90,000.00 9,000.00 99,000.00
18,000.00
1,800.00
18,000.00 1,800.00 19,800.00
13,000.00
1,300.00
13,000.00 1,300.00 14,300.00
10,000.00
1,000.00
10,000.00 1,000.00 11,000.00
10,000.00
1,000.00
10,000.00 1,000.00 11,000.00
1
Rp -
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR 1 1 M3 URUGAN PASIR
1.2000 50,000.00 60,000.00 - Pasir urug
0.3000 38,000.00 - 11,400.00 Pekerja
0.0100 60,000.00 - 600.00 Mandor
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 M3 URUGAN PASIR 1
m3 1.2000 50,000.00 60,000.00 -
Oh 0.3000 38,000.00 - 11,400.00
Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00 Rp 72,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00 -
Pekerja Oh 0.3000 38,000.00 - 11,400.00
Mandor Oh 0.0100 60,000.00 - 600.00
Jumlah 60,000.00 12,000.00
1 1 M3 URUGAN PASIR
Pasir urug m3 1.2000 50,000.00 60,000.00
Pekerja Oh 0.3000 38,000.00 -
Mandor Oh 0.0100 60,000.00 -
Rp 72,000.00 Jumlah 60,000.00
1 1 M3 URUGAN PASIR
- Pasir urug m3 1.2000 50,000.00
11,400.00 Pekerja Oh 0.3000 38,000.00
600.00 Mandor Oh 0.0100 60,000.00
12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
60,000.00 - Pasir urug m3 1.2000
- 11,400.00 Pekerja Oh 0.3000
- 600.00 Mandor Oh 0.0100
60,000.00 12,000.00 Rp 72,000.00 Jumlah
1 1 M3 URUGAN PASIR
50,000.00 60,000.00 - Pasir urug m3
38,000.00 - 11,400.00 Pekerja Oh
60,000.00 - 600.00 Mandor Oh
60,000.00 12,000.00 Rp 72,000.00 Jumlah
UGAN PASIR
1.2000 50,000.00 60,000.00 -
0.3000 38,000.00 - 11,400.00
0.0100 60,000.00 - 600.00
60,000.00 12,000.00 Rp 72,000.00
TABEL 2
ANALISA HARGA SATUAN
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
A. PEKERJAAN PERSIAPAN
A1 1M2 PEK. PEMBERSIHAN DAN PENGUKURAN KEMBALI (SITE)
Tukang Batu 0.010 oh 48,000.00 480.00
Pekerja 0.020 oh 38,000.00 760.00
Peralatan 0.500 lct 1,240.00 620.00
Jumlah 1,240.00 620.00 1,860.00
Jumlah 1,860.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B. PEKERJAAN PONDASI
B1 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2m'
Pekerja 0.900 Oh 38,000.00 34,200.00
Mandor 0.045 Oh 60,000.00 2,700.00
Jumlah 36,900.00 36,900.00
Jumlah 36,900.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B2 1M3 URUGAN KEMBALI TANAH
Pekerja 0.330 Oh 38,000.00 12,540.00
Mandor 0.010 Oh 60,000.00 600.00
Jumlah 13,140.00 13,140.00
Jumlah 13,140.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B3 1M3 PASANGAN ANSTAMPING BATU BELAH
Batu Kali 15cm/20cm 1.200 m3 125,000.00 150,000.00
Pasir Urug 0.432 m3 49,000.00 21,168.00
Pekerja 0.780 Oh 38,000.00 29,640.00
Tukang Batu 0.390 Oh 48,000.00 18,720.00
Kepala Tukang Batu 0.039 Oh 52,000.00 2,028.00
Mandor 0.039 Oh 60,000.00 2,340.00
Jumlah 171,168.00 52,728.00 223,896.00
Jumlah 223,896.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B4 1 M3 PONDASI BATU KALI 1 : 5
Batu Kali 15cm/20cm 1.200 m3 125,000.00 150,000.00
Semen PC 136.000 kg 1,070.00 145,520.00
Pasir Pasang 0.544 m3 150,000.00 81,600.00
Pekerja 1.500 Oh 38,000.00 57,000.00
Tukang Batu 0.750 Oh 48,000.00 36,000.00
Kepala Tukang Batu 0.075 Oh 52,000.00 3,900.00
Mandor 0.075 Oh 60,000.00 4,500.00
Jumlah 377,120.00 101,400.00 478,520.00
Jumlah 478,520.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B5 1 M3 PEK.GALIAN TANAH PONDASI SETEMPAT
Pekerja 1.150 Oh 38,000.00 43,700.00
Mandor 0.025 Oh 60,000.00 1,500.00
Alat Bantu 0.200 lot 45,200.00 9,040.00
Jumlah 45,200.00 9,040.00 54,240.00
Jumlah 54,240.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
B6 PONDASI TELAPAK SETEMPAT
* 1 M3 COR BETON SITE MIX K-225
Adukan K-225 1.000 m3 590,000.00 590,000.00
Pekerja 2.500 Oh 38,000.00 95,000.00
Tukang Batu 0.250 Oh 48,000.00 12,000.00
Kepala Tukang Batu 0.100 Oh 52,000.00 5,200.00
Mandor 0.010 Oh 60,000.00 600.00
Alat Bantu (Sleng+Tes Lab) 0.045 lot 702,800.00 31,626.00
Jumlah 590,000.00 112,800.00 31,626.00 734,426.00
Jumlah 734,426.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
C. PEKERJAAN BETON STRUKTURAL
* 1 M3 COR BETON SITE MIX K-225
Adukan K-225 1.000 m3 590,000.00 590,000.00
Pekerja 2.500 Oh 38,000.00 95,000.00
Tukang Batu 0.250 Oh 48,000.00 12,000.00
Kepala Tukang Batu 0.100 Oh 52,000.00 5,200.00
Mandor 0.010 Oh 60,000.00 600.00
Alat Bantu (Sleng+Tes Lab) 0.045 lot 702,800.00 31,626.00
Jumlah 590,000.00 112,800.00 31,626.00 734,426.00
Jumlah 734,426.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D. PEKERJAAN DINDING
D1 1 M2 PASANGAN BATA MERAH ad 1 : 2
Bata Merah (5x11x22)cm 70.000 bh 330.00 23,100.00
Semen PC 18.950 Kg 1,070.00 20,276.50
Pasir Pasang 0.038 m3 150,000.00 5,700.00
Pekerja 0.300 Oh 38,000.00 11,400.00
Tukang Batu 0.100 Oh 48,000.00 4,800.00
Kepala Tukang Batu 0.010 Oh 52,000.00 520.00
Mandor 0.015 Oh 60,000.00 900.00
Jumlah 49,076.50 17,620.00 66,696.50
Jumlah 66,696.50
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D2 1 M2 PASANGAN BATA MERAH 1 : 4
Bata Merah (5x11x22)cm 70.000 bh 330.00 23,100.00
Semen PC 14.370 Kg 1,070.00 15,375.90
Pasir Pasang 0.040 m3 150,000.00 6,000.00
Pekerja 0.300 Oh 38,000.00 11,400.00
Tukang Batu 0.100 Oh 48,000.00 4,800.00
Kepala Tukang Batu 0.010 Oh 52,000.00 520.00
Mandor 0.015 Oh 60,000.00 900.00
Jumlah 44,475.90 17,620.00 62,095.90
Jumlah 62,095.90
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D3 1 M2 PAS DINDING KERAMIK 20/20 cm
Keramik KW.1 DN 26.500 buah 2,200.00 58,300.00
Semen PC 9.300 kg 1,070.00 9,951.00
Pasir Pasang 0.018 m3 150,000.00 2,700.00
Semen Warna 1.940 kg 4,000.00 7,760.00
Pekerja 0.900 Oh 38,000.00 34,200.00
Tukang Batu 0.450 Oh 48,000.00 21,600.00
Kepala Tukang Batu 0.045 Oh 52,000.00 2,340.00
Mandor 0.045 Oh 60,000.00 2,700.00
Jumlah 78,711.00 60,840.00 139,551.00
Jumlah 139,551.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D4 1 M2 PLESTERAN DINDING 1 : 2 tebal 15 mm
Semen PC 10.224 kg 1,070.00 10,939.68
Pasir Pasang 0.020 m3 150,000.00 3,000.00
Pekerja 0.200 oh 38,000.00 7,600.00
Tukang Batu 0.150 oh 48,000.00 7,200.00
Kepala Tukang Batu 0.015 oh 52,000.00 780.00
Mandor 0.010 oh 60,000.00 600.00
Jumlah 13,939.68 16,180.00 30,119.68
Jumlah 30,119.68
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D5 1M2 PLESTERAN DINDING 1:4, tebal 15 mm
Semen PC 6.240 kg 1,070.00 6,676.80
Pasir Pasang 0.024 m3 150,000.00 3,600.00
Pekerja 0.200 oh 38,000.00 7,600.00
Tukang Batu 0.150 oh 48,000.00 7,200.00
Kepala Tukang Batu 0.015 oh 52,000.00 780.00
Mandor 0.010 oh 60,000 600.00
Jumlah 10,276.80 16,180.00 26,456.80
Jumlah 26,456.80
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
D6 1M2 ACIAN PC
Semen PC 3.250 kg 1,070.00 3,477.50
Pekerja 0.150 oh 38,000.00 5,700.00
Tukang Batu 0.100 oh 48,000.00 4,800.00
Kepala Tukang Batu 0.010 oh 52,000.00 520.00
Mandor 0.008 oh 60,000 480.00
Jumlah 3,477.50 11,500.00 14,977.50
Jumlah 14,977.50
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
E. PEKERJAAN KUSEN PINTU PINTU DAN JENDELA
E.1 1M3 KUSEN KAYU KAMPER BANJARMASIN
Kayu Kamper Banjar 1.200 m3 6,300,000.00 7,560,000.00
Paku 10 cm 1.250 Kg 15,000.00 18,750.00
Lem Kputih (FOX) 1.000 Kg 30,000.00 30,000.00
Pekerja 6.000 oh 38,000.00 228,000.00
Tukang Kayu 18.000 oh 50,000.00 900,000.00
Kepala Tukang Kayu 1.800 oh 54,000.00 97,200.00
Mandor 0.300 oh 60,000.00 18,000.00
Jumlah 7,608,750.00 1,243,200.00 8,851,950.00
Jumlah 8,851,950.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
E.2 1 M2 DAUN PINTU PANIL TEAKWOOD RANGKA KAYU BANJAR
Rangka Papan Kayu Banjar 0.026 m3 7,000,000.00 179,200.00
Teakwood 4 mm uk. Pintu 1.000 lbr 65,000.00 65,000.00
Lem Putuh (FOX) 0.500 kg 30,000.00 15,000.00
Paku Triplek (1-2,5)cm 0.030 kg 19,000.00 570.00
Pekerja 0.800 oh 38,000.00 30,400.00
Tukang Kayu 2.400 oh 50,000.00 120,000.00
Kepala Tukang Kayu 0.240 oh 54,000.00 12,960.00
Mandor 0.040 oh 60,000.00 2,400.00
Jumlah 259,770.00 165,760.00 425,530.00
Jumlah 425,530.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
E.2 1 M2 DAUN JENDELA KACA (TANPA KACA) KAYU KAMPER SAMARINDA
Rangka Kayu Kamper Samarinda 0.024 m3 9,000,000.00 216,000.00
Lem Putih (FOX) 0.300 kg 30,000.00 9,000.00
Pekerja 0.800 oh 38,000.00 30,400.00
Tukang Kayu 2.400 oh 50,000.00 120,000.00
Kepala Tukang Kayu 0.240 oh 54,000.00 12,960.00
Mandor 0.040 oh 60,000.00 2,400.00
225,000.00 165,760.00 390,760.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
E.3 1 M2 PASANG KACA POLOS 5 MM
Kaca polos 5 mm 1.000 m2 17,700.00 17,700.00
Paku 0.030 kg 15,000.00 450.00
Pekerja 0.800 org 38,000.00 30,400.00
Tukang Kayu 2.400 org 50,000.00 120,000.00
Mandor 0.040 org 60,000.00 2,400.00
Jumlah 18,150.00 152,800.00 170,950.00
Jumlah 170,950.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
E.4 PASANG ALAT-ALAT AKSESORIS
A 1 BUAH KUNCI TANAM PINTU
Kunci tanam Alpha 1.000 buah 90,000.00 90,000.00
Onkos pasang 1.000 ls 9,000.00 9,000.00
Jumlah 90,000.00 9,000.00 99,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F. PEKERJAAN ATAP
F1 1 M3 KUDA-KUDA KAYU KAMPER BANJAR
Kayu Balok Kamper Banjar 1.100 m3 4,800,000.00 5,280,000.00
Besi Strip tebal 5 cm 15.000 kg 9,144.89 137,173.35
Paku 5-12 cm 5.600 kg 15,000.00 84,000.00
Pekerja 4.000 oh 38,000.00 152,000.00
Tukang Kayu 12.000 oh 50,000.00 600,000.00
Kepala Tukang Kayu 1.200 oh 54,000.00 64,800.00
Mandor 0.200 oh 60,000.00 12,000.00
Jumlah 5,501,173.35 828,800.00 6,329,973.35
Total 6,329,973.35
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F2 1 M2 PENUTUP ATAP SIRAP (4 LAPIS) + RANGKA ATAP
Kaso-kaso 5/7 Kamper Banjar 0.011 m3 6,300,000.00 69,300.00
Reng Kayu 2/3 Kamper Banjar 4.000 m 3,250.00 13,000.00
Atap Sirap 4 Lapis 80.000 bh 300.00 24,000.00
Paku 5-7 cm 0.250 kg 16,000 4,000.00
Pekerja 0.150 oh 38,000.00 5,700.00
Tukang Kayu 0.150 oh 50,000.00 7,500.00
Kepala Tukang Kayu 0.010 oh 54,000.00 540.00
Mandor 0.005 oh 60,000.00 300.00
Jumlah 110,300.00 14,040.00 124,340.00
Total 124,340.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F3 1 M' PASANG LISTPLANK KAYU KAMPER BANJAR 3/30
Kayu 3/30 kayu kamper Banjar 0.011 m3 7,000,000.00 77,000.00
Paku 5-7 cm 0.050 kg 16,000.00 800.00
Pekerja 0.100 oh 38,000.00 3,800.00
Tukang. Kayu 0.200 oh 50,000.00 10,000.00
Kepala Tukang Kayu 0.020 oh 54,000.00 1,080.00
Mandor 0.005 oh 60,000.00 300.00
Jumlah 77,800.00 15,180.00 92,980.00
Total 92,980.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F4 1 M' PEK. BUBUNG ATAP GENTENG EX JATIWANGI
Genting Bubungan genteng ex. J 4.000 bh 4,000.00 16,000.00
PC (50 kg) 0.130 zak 53,500.00 6,976.40
Pasir Pasang 0.210 lbr 150,000.00 31,500.00
Pekerja 0.150 oh 38,000.00 5,700.00
Tukang Batu 0.200 oh 48,000.00 9,600.00
Kepala Tukang Batu 0.010 oh 52,000.00 520.00
Mandor 0.005 oh 60,000.00 300.00
Peralatan 0.065 lot 70,596.40 4,588.77
Jumlah 54,476.40 16,120.00 4,588.77 75,185.17
Total 75,185.17
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F5 1 M' PASANG LISTPLANK KAYU KAMPER BANJAR 3/30
Kayu 3/30 kayu kamper Banjar 0.011 m3 7,000,000.00 77,000.00
Paku 5-7 cm 0.050 kg 300.00 15.00
Pekerja 0.100 oh 38,000.00 3,800.00
Tukang. Kayu 0.200 oh 38,000.00 7,600.00
Kepala Tukang Kayu 0.020 oh 50,000.00 1,000.00
Mandor 0.005 oh 54,000.00 270.00
Jumlah 77,015.00 12,670.00 89,685.00
Total 89,685.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F6 1 M' PEK. BUBUNG ATAP GENTENG EX JATIWANGI
Genting Bubungan genteng ex. J 4.000 bh 4,000.00 16,000.00
PC (50 kg) 0.130 zak 53,500.00 6,976.40
Pasir Pasang 0.210 lbr 150,000.00 31,500.00
Pekerja 0.150 oh 16,000.00 2,400.00
Tukang Batu 0.200 oh 48,000.00 9,600.00
Kepala Tukang Batu 0.010 oh 52,000.00 520.00
Mandor 0.005 oh 54,000.00 270.00
Peralatan 0.065 lot 70,596.40 4,588.77
Jumlah 54,476.40 12,790.00 4,588.77 71,855.17
Total 71,855.17
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
G. PEKERJAAN PLAFOND
G1 1 M2 PAS. RANGKA PLAFOND BESERTA PENUTUP
Profil Gypsumboard 10 mm 0.3470 lbr 70,000.00 24,290.00
Rangka Besi Hollow 4.0000 m' 10,000.00 40,000.00
Skrup 1.0000 ls 3,000.00 3,000.00
Lem 0.7500 kg 33,000.00 24,750.00
Pekerja 1/2 Terampil 0.2800 oh 35,000.00 9,800.00
Kep. Tukang 0.0800 oh 54,000.00 4,320.00
Mandor 0.0140 oh 60,000.00 840.00
Jumlah 92,040.00 14,960.00 107,000.00
Total 107,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
H.3 PEK.LIST PINGGIR PLAFOND DALAM
List Gypsumboard 7cm 1.000 m' 8,500.00 8,500.00
Paku 0.210 kg 17,000.00 3,570.00
Kepala Tukang Kayu 0.020 Oh 54,000.00 1,080.00
Pekerja 0.070 Oh 38,000.00 2,660.00
Mandor 0.004 Oh 60,000.00 240.00
Jumlah 12,070.00 3,980.00 16,050.00
Total 16,050.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I. PEKERJAAN LANTAI
I1 1 M3 URUGAN TANAH DIBAWAH LANTAI
Pekerja 0.300 Oh 38,000.00 11,400.00
Mandor 0.0100 Oh 60,000.00 600.00
Jumlah 12,000.00 12,000.00
Jumlah 12,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I2 1 M3 URUGAN PASIR URUG
Pasir Urug 1.200 m3 49,000.00 58,800.00
Pekerja 0.300 Oh 38,000.00 11,400.00
Mandor 0.010 Oh 60,000.00 600.00
Jumlah 58,800.00 12,000.00 70,800.00
Jumlah 70,800.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I3 1 M2 PAS.LANTAI GRANITO TILE ESSENZA UKURAN 60 x 60 POLISHED
Total 337,089.44
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I4 1 M2 PAS.LANTAI KERAMIK 30x30 DN BERCORAK
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I6 1 M2 PAS.LANTAI KERAMIK 30x30 DN PUTIH
Keramik KW 1 DN putih polos 11.870 m2 2,250.23 26,710.23
Semen PC 10.000 Kg 55,000.00 550,000.00
Pasir Pasang 0.045 m3 110,000.00 4,950.00
Semen Warna 1.500 Kg 4,000.00 6,000.00
Pekerja 0.700 Oh 38,000.00 26,600.00
Tukang Batu 0.350 Oh 48,000.00 16,800.00
Kepala Tukang Batu 0.035 Oh 52,000.00 1,820.00
Mandor 0.035 Oh 60,000.00 2,100.00
Jumlah 587,660.23 47,320.00 634,980.23
Total 634,980.23
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I7 1M2' PASANGAN PAVING BLOK WARNA TEBAL 8 CM (SNI EDIS REV.2005)
Total 148,144.40
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I. Instalasi Listrik
I1 1 BUAH PAS SAKLAR TUNGGAL
saklar tunggal 1.000 bh 13,500.00 13,500.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
38,500.00 5,000.00 43,500.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I2 1 BUAH PAS SAKLAR SERI
saklar tunggal 1.000 bh 12,000.00 12,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
37,000.00 5,000.00 42,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I3 1 BUAH PAS SOP KONTAK
stop kontak 1.000 bh 11,000.00 11,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
36,000.00 5,000.00 41,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I4 1 BUAH PAS LAMPU SL 40 watt
lampu SL 40 watt 1.000 bh 11,000.00 11,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
36,000.00 5,000.00 41,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I5 1 BUAH PAS LAMPU BARET
lampu baret 1.000 bh 24,000.00 24,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
49,000.00 5,000.00 54,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I6 1 BUAH PAS LAMPU DOWN LIGHT
lampu downlight PL 1.000 bh 110,000.00 110,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
135,000.00 5,000.00 140,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I7 1 BUAH PAS LAMPU GANTUNG
lampu gantung 1.000 bh 200,000.00 200,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
225,000.00 5,000.00 230,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I8 1 BUAH PAS LAMPU SL
lampu SL 15 watt 1.000 bh 11,000.00 11,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
36,000.00 5,000.00 41,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I9 1 BUAH PAS LAMPU TAMAN
lampu taman 1.000 bh 146,500.00 146,500.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 25,000.00 25,000.00
Jumlah
171,500.00 25,000.00 196,500.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
I10 1 BUAH PAS SAKLAR HOTEL
saklar hotel 1.000 bh 250,000.00 250,000.00
kabel 5.0000 m' 5,000.00 25,000.00
ongkos pasang 1.0000 ls 5,000.00 5,000.00
Jumlah
275,000.00 5,000.00 280,000.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
J. PEKERJAAN PENGECATAN
J1 1 M2 PENGECATAN DINDING VINILEX (3x)
Cat Tembok Vinilex 0.200 Kg 14,400.00 2,880.00
Plamir Tembok 0.160 Kg 10,000.00 1,600.00
Rol Cat 0.010 bh 10,000.00 100.00
Ampelas 0.500 lbr 2,500.00 1,250.00
Pekerja 0.160 oh 38,000.00 6,080.00
Tukang Cat 0.280 oh 48,000.00 13,440.00
Kepala tukang Cat 0.030 oh 52,000.00 1,560.00
Mandor 0.010 oh 60,000.00 600.00
Steger Werk 0.045 lot 27,150.00 1,221.75
Jumlah 4,480.00 21,680.00 2,571.75 28,731.75
Jumlah 28,731.75
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
J2 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI
Meni Kayu 0.167 Kg 18,000.00 3,006.00
Plamir Kayu 0.083 Kg 18,000.00 1,494.00
Cat Kayu merk SEIV 0.200 Kg 35,000.00 7,000.00
Amplas Kayu 0.400 lbr 2,500.00 1,000.00
Minyak Cat terpentin 0.150 ltr 5,000.00 750.00
Kwas 3" 0.050 bh 6,500.00 325.00
Pekerja 0.200 oh 38,000.00 7,600.00
Tukang Cat 0.300 oh 48,000.00 14,400.00
Kepala Tukang Cat 0.030 oh 52,000.00 1,560.00
Mandor 0.010 oh 60,000.00 600.00
Jumlah 12,250.00 24,160.00 1,325.00 37,735.00
Jumlah 37,735.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
J3 1 M2 PENGECATAN PLAFOND VINILEX (3x)
Cat Tembok Vinilex 0.200 kg 14,400.00 2,880.00
Plamir Tembok 0.160 kg 10,000.00 1,600.00
Rol Cat 0.010 bh 10,000.00 100.00
Ampelas 0.500 lbr 2,500.00 1,250.00
Pekerja 0.200 oh 38,000.00 7,600.00
Tukang Cat 0.280 oh 48,000.00 13,440.00
Kepala tukang Cat 0.030 oh 52,000.00 1,560.00
Mandor 0.010 oh 60,000.00 600.00
Steger Werk 0.045 lot 27,150.00 1,221.75
Jumlah 4,480.00 23,200.00 2,571.75 30,251.75
Jumlah 30,251.75
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K. Pekerjaan Sanitasi
K1 1 Unit pas mesin pompa air
pompa air merek sanyo 1.000 bh 906,500.00 906,500.00
ongkos pasang 1.0000 ls 75,000.00 75,000.00
Jumlah
906,500.00 75,000.00 981,500.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K2 Memasang 1m' pipa PVC saluran air bersih type aw, dia 3/4"
Pipa PVC 3/4 1.200 m' 25,000.00 30,000.00
Perlengkapan (35%haraga pipa) 1.0000 ls 8,750.00 8,750.00
Pekerja 0.0360 Oh 38,000.00 1,368.00
Tukang Pipa 0.0600 Oh 48,000.00 2,880.00
Kepala Tukang Pipa 0.0060 Oh 52,000.00 312.00
Mandor 0.0020 Oh 60,000.00 120.00
Jumlah
38,750.00 4,680.00 43,430.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K3 Memasang 1 buah kloset duduk
Kloset duduk 1.000 Bh 2,050,000.00 2,050,000.00
Perlengkapan (6%haraga kloset) 1.0000 ls 123,000.00 123,000.00
Pekerja 3.3000 Oh 38,000.00 125,400.00
Tukang Batu 1.1000 Oh 48,000.00 52,800.00
Kepala Tukang Batu 0.0010 Oh 52,000.00 52.00
Mandor 0.0160 Oh 60,000.00 960.00
Jumlah
2,173,000.00 179,212.00 2,352,212.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K.4 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN (SNI.Edisi Rev.2005)
Bahan :
Kloset Jongkok Porselen 1 buah 385,000.00 385,000.00 385,000.00
Semen Portland 6 kg 1,116.20 6,697.20 6,697.20
Pasir Pasang 0.01 m3 111,000.00 1,110.00 1,110.00
Tenaga kerja:
Pekerja 1.0000 oh 45,400.00 45,400.00 45,400.00
Tukang Batu 1.5000 oh 54,200.00 81,300.00 81,300.00
Kepala Tukang Batu 1.5000 oh 59,800.00 89,700.00 89,700.00
Mandor 0.1600 oh 59,800.00 9,568.00 9,568.00
Jumlah 392,807.20 225,968.00 618,775.20
keuntungan (10 %) 39,280.72 22,596.80 61,877.52
jumlah 432,087.92 248,564.80 680,652.72
dibulatkan Rp 432,000.00 Rp 248,500.00 Rp 680,600.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K5 Memasang 1 buah wastafel
Wastafel 1.000 Bh 475,000.00 475,000.00
Perlengkapan (12%haraga wasta 1.0000 ls 57,000.00 57,000.00
Semen Portland 6.0000 kg 1,080.00 6,480.00
Pasir Pasang 0.0100 m3 165,000.00 1,650.00
Pekerja 1.2000 Oh 38,000.00 45,600.00
Tukang Batu 1.4500 Oh 48,000.00 69,600.00
Kepala Tukang Batu 0.1500 Oh 52,000.00 7,800.00
Mandor 0.1000 Oh 60,000.00 6,000.00
Jumlah
540,130.00 129,000.00 669,130.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K6 Memasang 1 bath tube
Bath tube 1.000 Bh 1,500,000.00 1,500,000.00
Perlengkapan (20%haraga bath 1.0000 ls 300,000.00 300,000.00
Tukang Batu 0.7500 Oh 48,000.00 36,000.00
Kepala Tukang Batu 0.0750 Oh 52,000.00 3,900.00
Mandor 0.2500 Oh 60,000.00 15,000.00
Jumlah
1,800,000.00 54,900.00 1,854,900.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K7 Memasang 1 buah bak cuci piring stainless stell
Bak cuci piring Stainless steel 1.000 Bh 211,500.00 211,500.00
Water Drain + Asesoris 1.0000 ls 25,380.00 25,380.00
Pekerja 0.0300 Oh 38,000.00 1,140.00
Tukang Pipa 0.3000 Oh 48,000.00 14,400.00
Kepala Tukang Pipa 0.0300 Oh 52,000.00 1,560.00
Mandor 0.0150 Oh 60,000.00 900.00
Jumlah
236,880.00 18,000.00 254,880.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K8 Memasang 1 buah kran air DIA 1/2" atau 3/4"
Kran air 1.000 Bh 48,000.00 48,000.00
Seal Tape 0.0250 Bh 2,500.00 62.50
Pekerja 0.0100 Oh 38,000.00 380.00
Tukang Pipa 0.1000 Oh 48,000.00 4,800.00
Kepala Tukang Pipa 0.0100 Oh 52,000.00 520.00
Mandor 0.0050 Oh 60,000.00 300.00
Jumlah
48,062.50 6,000.00 54,062.50
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K9 MEMASANG 1 M' PIPA PVC. TYPE AW, DIA 3" (SNI.Edisi Rev.2005)
Bahan :
Pipa PVC 1.2 m' 29,077.50 34,893.00 34,893.00
Perlengkapan (35% x Harga Pipa) 1 Ls 10,177.13 10,177.13 10,177.13
Tenaga kerja:
Pekerja 0.0810 oh 45,400.00 3,677.40 3,677.40
Tukang Pipa 0.1350 oh 54,200.00 7,317.00 7,317.00
Kepala Tukang Pipa 0.0135 oh 59,800.00 807.30 807.30
Mandor 0.0041 oh 59,800.00 245.18 245.18
Jumlah 45,070.13 12,046.88 57,117.01
keuntungan (10 %) 4,507.01 1,204.69 5,711.70
jumlah 49,577.14 13,251.57 62,828.71
dibulatkan Rp 49,500.00 Rp 13,200.00 Rp 62,800.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
K10 1 unit Septictank 2,00 x 1,50 x 1,50 + rembesan
Galian tanah 4.500 m3 33,000.00 148,500.00
Pasir urug 0.2140 m3 50,000.00 10,700.00
Lantai kerja 2.2500 m2 57,084.53 128,440.19
Pas. Bata 1Pc:2Psr + Plesteran 15.0000 m2 112,390.00 1,685,850.00
Plat Beton Penutup 0.3000 m3 8,591,412.59 2,577,423.78
Pipa PVC 4" jenis AW + sambun 5.4000 m' 40,000.00 216,000.00
Pipa GIP 1,5" 1.2000 m' 294,000.00 352,800.00
Galian tanah untuk rembesan 3.3750 m3 36,900.00 124,537.50
Pas. Ijuk 5.4000 m2 7,000.00 37,800.00
Pasangan Kerikil 3,5 cm 1.0500 m2 140,000.00 147,000.00
Pipa PVC 4" berlubang jenis AW 9.0000 m' 58,750.00 528,750.00
Urugan kembali/perataan tanah 1.1250 m3 128,700.00 144,787.50
Tambahan Upah 0.6000 LS 25,000.00 15,000.00
Jumlah
6,102,588.97 15,000.00 6,117,588.97
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
L. PEKERJAAN LAIN-LAIN
L1 1 M2 PASANGAN DINDING BATU TEMPEL HITAM
Batu Tempel Hitam 1.050 m2 100,000.00 105,000.00
Semen Portland 11.750 Kg 1,070.00 12,572.50
Pasir Pasang 0.035 m3 150,000.00 5,250.00
Pekerja 0.62 Oh 38,000.00 23,560.00
Tukang Batu 0.35 Oh 48,000.00 16,800.00
Kepala Tukang Batu 0.04 Oh 52,000.00 1,820.00
Mandor 0.03 Oh 60,000.00 1,800.00
Jumlah 122,822.50 43,980.00 166,802.50
Total 166,802.50
L2 PEGANGAN TANGGA
NO JENIS BAHAN BANGUNAN SAT HARGA
Pegangan tangga ( balustrade ) profil jati m' 107,300.00
L3 PAGAR BALKON
NO JENIS BAHAN BANGUNAN SAT HARGA
Pegangan tangga ( balustrade ) profil jati m' 107,300.00
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F3 1 M' PEK. BUBUNG ATAP GENTENG BETON
Genting Beton Bubungan 3.000 bh 6,500.00 19,500.00
PC (50 kg) 0.130 zak 54,000.00 7,041.60
Paku 0.250 kg 17,000.00 4,250.00
Pekerja 0.100 oh 38,000.00 3,800.00
Tukang Batu 0.200 oh 50,000.00 10,000.00
Kepala Tukang Batu 0.020 oh 54,000.00 1,080.00
Mandor 0.005 oh 60,000.00 300.00
Peralatan 0.065 lot 70,596.40 4,588.77
Jumlah 30,791.60 15,180.00 4,588.77 50,560.37
Total 50,560.37
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
F4 1 M' PASANG BALOK TEMBOK 8/12
Kayu 8/12 kamper banjar 0.010 m3 7,200,000.00 72,000.00
Paku 0.250 kg 17,000.00 4,250.00
Pekerja 0.100 oh 38,000.00 3,800.00
Tukang. Kayu 0.200 oh 50,000.00 10,000.00
Kepala Tukang Kayu 0.020 oh 54,000.00 1,080.00
Mandor 0.005 oh 60,000.00 300.00
Jumlah 76,250.00 15,180.00 91,430.00
Total 91,430.00
HARGA SATUAN JUMLAH HARGA SUB HARGA
NO URAIAN PEKERJAAN VOL SAT
BAHAN UPAH ALAT BAHAN UPAH ALAT BAHAN+UPAH+ALAT
1 2 3 4 5 6 7 8 9
L. PEKERJAAN SANITASI
L1 Pemasangan Mesin Pompa Air 1.00 bh Rp 906,500 Rp 75,000 Rp 906,500.00 Rp 75,000.00
L2 Pemasangan Pipa Air Bersih Dia 3/4" 73.64 m Rp 38,750 Rp 4,680 Rp 2,853,550.00 Rp 344,635.20
L3 MEMASANG 1 M' PIPA PVC. TYPE AW, DIA 3" 43.90 m Rp 45,070 Rp 12,047 Rp 1,978,578.71 Rp 528,858.03
L4 Pemasangan Kloset Duduk 5.00 bh Rp 2,173,000.00 Rp 179,212.00 Rp 10,865,000.00 Rp 896,060.00
L6 Pemasangan Wastafel 2.00 bh Rp 540,130.00 Rp 129,000.00 Rp 1,080,260.00 Rp 258,000.00
L8 Pemasangan Bak Cuci Piring 1.00 bh Rp 236,880.00 Rp 18,000.00 Rp 236,880.00 Rp 18,000.00
L9 Pemasangan Kran Air 8.00 bh Rp 48,062.50 Rp 6,000.00 Rp 384,500.00 Rp 48,000.00
L10 Pemasangan Septictank dan Rembesan 1.00 unit Rp 6,102,588.97 Rp 15,000.00 Rp 6,102,588.97 Rp 15,000.00
Jumlah Rp 24,407,857.68 Rp 2,183,553.23 Rp 26,591,410.91
PEMB
L2 PAGAR BALKON
Pegangan tangga ( balustrade ) profil jati
Jumlah
L3 1 M2 PASANGAN DINDING BATU TEMPEL HITAM
Batu Tempel Hitam
Semen Portland
Pasir Pasang
Jumlah
TOTAL HARG
TABEL
DAFTAR KEBUTUHAN BAHAN
PEMBANGUNAN RUMAH TINGGAL DUA LANTAI
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
138.40 m'
0.01 1.384 3,650,000.00
0.038 5.2592 16,000.00
12 m2
0.1 1.2 5,671,950.00
0.25 3 17,000.00
1.1 13.2 22,500.00
0.5 6 38,000.00
0.1 1.2 53,500.00
0.25 3 150,000.00
70 840 330.00
9 m2
0.1 0.9 5,671,950.00
0.25 2.25 16,000.00
1.1 9.9 22,500.00
0.5 4.5 38,000.00
0.1 0.9 53,500.00
68.00 m'
1.43 97.24 22,500.00
0.036 2.448 3,650,000.00
0.2 13.6 16,000.00
1.8 122.4 25,510.67
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
10.184 m3
1.2 12.2208 50,000.00
15.276 m3
1.200 18.3312 125,000.00
0.432 6.599232 49,000.00
34.626 m3
1.2 41.5512 125,000.00
136 4709.136 1,070.00
0.544 18.836544 150,000.00
`
3.6575 m3
1 3.6575 590,000.00
30.91 m2
0.017 0.52547 3,650,000.00
0.024 0.74184 1,275,000.00
0.4 12.364 16,000.00
701.100 kg
10.5 7361.55 9,000.00
0.15 105.165 17,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
6.228 m3
1 6.228 590,000.00
83.040 m2
0.017 1.4117 3,650,000.00
0.024 1.9930 1,275,000.00
0.4 33.2160 16,000.00
969.215 kg
10.5 10176.7575 9,000.00
0.15 145.3823 17,000.00
2.970 m3
1 2.97 590,000.00
59.40 m2
0.017 1.0098 3,650,000.00
0.024 1.4256 1,275,000.00
0.4 23.7600 16,000.00
644.960 kg
2.160 m3
1 2.16 590,000.00
43.20 m2
0.017 0.7344 3,650,000.00
0.024 1.0368 1,275,000.00
0.4 17.2800 16,000.00
339.630 kg
1.690 m3
1 1.68974 590,000.00
61.468 m2
0.017 1.0450 3,650,000.00
0.024 1.4752 1,275,000.00
0.4 24.5872 16,000.00
516.248 kg
10.5 5420.604 9,000.00
0.15 77.4372 17,000.00
2.982 m3
1 2.9815 590,000.00
49.688 m2
0.017 0.8447 3,650,000.00
0.024 1.1925 1,275,000.00
0.4 19.8750 16,000.00
571.864 kg
10.5 6004.56675 9,000.00
0.15 85.779525 17,000.00
1.569 m3
1 1.569 590,000.00
36.610 m2
0.017 0.6224 3,650,000.00
0.024 0.8786 1,275,000.00
0.4 14.6440 16,000.00
492.290 kg
10.5 5169.0408 9,000.00
0.15 73.84344 17,000.00
12.24 m3
1 12.24 590,000.00
102.0 m2
0.017 1.7340 3,650,000.00
0.024 2.4480 1,275,000.00
0.4 40.8000 16,000.00
40.290 kg
10.5 423.045 9,000.00
0.15 6.0435 17,000.00
2.250 m3
1 2.25 590,000.00
18.525 m2
0.017 0.3149 3,650,000.00
0.024 0.4446 1,275,000.00
0.4 7.4100 16,000.00
71.775 kg
10.5 753.6375 9,000.00
0.15 10.76625 17,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
549.0700 m2
70 38434.9000 330.00
14.37 7890.1359 1,070.00
0.04 21.9628 150,000.00
75.040 m2
70 5252.8 330.00
18.95 1422.008 1,070.00
0.038 2.8515 150,000.00
1098.140 m2
6.24 6852.3936 1,070.00
0.024 26.3554 150,000.00
75.040 m2
10.224 767.20896 1,070.00
0.02 1.5008 150,000.00
63.44 m2
26.500 1681.0275 2,200.00
9.300 589.9455 1,070.00
0.018 1.14183 150,000.00
1.940 123.0639 4,000.00
1173.180 m2
3.25 3812.8350 1,070.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
2.48 m3
1.2 2.975814 6,300,000.00
1.25 3.0998 15,000.00
1 2.4798 30,000.00
45.84 m2
0.0256 1.1736 7,000,000.00
1 45.8434 65,000.00
0.5 22.9217 30,000.00
0.03 1.375302 19,000.00
32.05 m2
1 32.0540 17,700.00
0.03 0.9616 15,000.00
25 Bh
1 25 90,000.00
79 Bh
1 79 18,000.00
48 Bh
1 48 13,000.00
18 Bh
1 18 10,000.00
14 Bh
1 14 10,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
137.7 m2
1.00 137.70 145,000.00
59.60 m'
0.011 0.6556 7,200,000.00
0.25 14.9 17,000.00
52.50 m'
3 157.5 6,500.00
0.1304 6.8460 54,000.00
0.25 13.125 17,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
135.000 m2
0.3470 46.8450 70,000.00
4.0000 540.0000 10,000.00
1.0000 135.0000 3,000.00
0.7500 101.25 33,000.00
198.05 m
1 198.0500 8,500.00
0.21 41.5905 17,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
22.4000 m3
1.2 26.88 49,000.00
158.00 m2
1 158 270,000.00
0.26 41.08 55,000.00
0.03 4.74 110,000.00
1 158 23,000.00
70.00 m2
11.87 830.9 3,240.00
10 700 1,100.00
0.045 3.15 110,000.00
1.5 105 7,000.00
17.50 m2
26.5 463.75 1,720.00
10.4 182 1,070.00
0.045 0.7875 150,000.00
1.62 28.35 4,000.00
22.00 m2
1.01 22.22 100,740.00
0.1 2.2 157,770.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
13 bh
1 13 13,500.00
5 65 5,000.00
11 bh
1 11 12,000.00
5 55 5,000.00
20 bh
1 20 11,000.00
5 100 5,000.00
5 bh
1 5 11,000.00
5 25 5,000.00
10 bh
1 10 24,000.00
5 50 5,000.00
10 bh
1 10 110,000.00
5 50 5,000.00
3 bh
1 3 200,000.00
5 15 5,000.00
20 bh
1 20 11,000.00
5 100 5,000.00
4 bh
1 4 146,500.00
5 20 5,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
1173.180 m2
0.2 234.6360 14,400.00
0.16 187.7088 10,000.00
309 m2
0.167 51.6247 18,000.00
0.083 25.6578 18,000.00
0.2 61.8260 35,000.00
0.15 46.3695 5,000.00
135.00 m2
0.2 27 14,400.00
0.16 21.6 10,000.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
1 bh
1 1 906,500.00
74 m
1.2 88.368 25,000.00
1 73.64 8,750.00
43.9 m
1.2 52.68 29,077.50
1 43.9 10,177.13
5 bh
1 5 2,050,000.00
1 5 123,000.00
2 bh
1 2 475,000.00
1 2 57,000.00
6 12 1,080.00
0.01 0.02 165,000.00
1 bh
1 1 211,500.00
1 1 25,380.00
8 bh
1 8 48,000.00
0.025 0.2 2,500.00
1.00 unit
4.5 4.5 33,000.00
0.214 0.214 50,000.00
3.12 3.12 57,084.53
12 12 112,390.00
0.3304 0.3304 8,591,412.59
5.4 5.4 40,000.00
1.2 1.2 294,000.00
3.375 3.375 36,900.00
5.4 5.4 7,000.00
1.05 1.05 140,000.00
9 9 58,750.00
1.125 1.125 128,700.00
KEBUTUHAN
VOL SAT KOEF BAHAN HARGA SATUAN
3 4 5 6 7
4.80 m'
m' 1.000 4.800 107,300.00
5.00 m'
m' 1.000 5.000 107,300.00
62.74 m2
m2 1.05 65.877 100,000.00
Kg 11.75 737.195 1,070.00
m3 0.04 2.196 150,000.00
5,051,600.00
84,147.20
5,135,747.20
6,806,340.00
51,000.00
297,000.00
228,000.00
64,200.00
450,000.00
277,200.00
8,173,740.00
5,104,755.00
36,000.00
222,750.00
171,000.00
48,150.00
5,582,655.00
2,187,900.00
8,935,200.00
217,600.00
3,122,506.01
14,463,206.01
JUMLAH HARGA
BAHAN BAHAN
8 9
611,040.00
611,040.00
2,291,400
323,362
2,614,762.37
5,193,900.00
5,038,775.52
2,825,481.60
13,058,157
2,157,925.00
2,157,925.00
1,917,965.50
945,846.00
197,824.00
3,061,635.50
6,625,395.00
178,780.50
6,804,175.50
JUMLAH HARGA
BAHAN BAHAN
8 9
3,674,520.00
3,674,520.00
5,152,632.00
2,541,024.00
531,456.00
8,225,112.00
9,159,081.75
247,149.83
9,406,231.58
1,752,300.00
1,752,300.00
3,685,770.00
1,817,640.00
380,160.00
5,883,570.00
6,094,872.00
164,464.80
6,259,336.80
1,274,400.00
1,274,400.00
2,680,560.00
1,321,920.00
276,480.00
4,278,960.00
3,209,503.50
86,605.65 3,296,109.15
996,946.60
996,946.60
3,814,089.40
1,880,920.80
393,395.20
6,088,405.40
4,878,543.60
131,643.24
5,010,186.84
1,759,085.00
1,759,085.00
3,083,109.38
1,520,437.50
318,000.00
4,921,546.88
5,404,110.08
145,825.19
5,549,935.27
925,710.00
925,710.00
2,271,650.50
1,120,266.00
234,304.00
3,626,220.50
4,652,136.72
125,533.85
4,777,670.57
7,221,600.00
7,221,600.00
6,329,100.00
3,121,200.00
652,800.00
10,103,100.00
380,740.50
10,273.95
391,014.45
1,327,500.00
1,327,500.00
1,149,476.25
566,865.00
118,560.00
1,834,901.25
678,273.75
18,302.63
696,576.38
JUMLAH HARGA
BAHAN BAHAN
8 9
12,683,517.00
8,442,445.41
3,294,420.00
24,420,382.41
1,733,424.00
1,521,548.56
427,728.00
3,682,700.56
7,332,061.15
3,953,304.00
11,285,365.15
820,913.59
225,120.00
1,046,033.59
3,698,260.50
631,241.69
171,274.50
492,255.60
4,993,032.29
4,079,733.45
4,079,733.45
JUMLAH HARGA
BAHAN BAHAN
8 9
18,747,628.20
46,497.09
74,395.35
18,868,520.64
8,215,137.28
2,979,821.00
687,651.00
26,130.74
11,908,740.02
567,355.80
14,424.30
581,780.10
2,250,000.00
2,250,000.00
1,422,000.00
1,422,000.00
624,000.00
624,000.00
180,000.00
180,000.00
140,000.00
140,000.00
JUMLAH HARGA
BAHAN BAHAN
8 9
19,966,500.00
19,966,500.00
4,720,320.00
253,300.00
4,973,620.00
1,023,750.00
369,684.00
223,125.00
1,616,559.00
JUMLAH HARGA
BAHAN BAHAN
8 9
3,279,150.00
5,400,000.00
405,000.00
3,341,250.00
12,425,400.00
1,683,425.00
707,038.50
2,390,463.50
JUMLAH HARGA
BAHAN BAHAN
8 9
1,317,120.00
1,317,120.00
42,660,000.00
2,259,400.00
521,400.00
3,634,000.00
49,074,800.00
2,692,116.00
770,000.00
346,500.00
735,000.00
4,543,616.00
797,650.00
194,740.00
118,125.00
113,400.00
1,223,915.00
2,238,442.80
347,094.00
2,585,536.80
JUMLAH HARGA
BAHAN BAHAN
8 9
175,500.00
325,000.00
500,500.00
132,000.00
275,000.00
407,000.00
220,000.00
500,000.00
720,000.00
55,000.00
125,000.00
180,000.00
240,000.00
250,000.00
490,000.00
1,100,000.00
250,000.00
1,350,000.00
600,000.00
75,000.00
675,000.00
220,000.00
500,000.00
720,000.00
586,000.00
100,000.00
686,000.00
JUMLAH HARGA
BAHAN BAHAN
8 9
3,378,758.40
1,877,088.00
5,255,846.40
929,244.78
461,840.22
2,163,910.00
231,847.50
3,786,842.50
388,800.00
216,000.00
604,800.00
JUMLAH HARGA
BAHAN BAHAN
8 9
906,500.00
906,500.00
2,209,200.00
644,350.00
2,853,550.00
1,531,802.70
446,776.01
1,978,578.71
10,250,000.00
615,000.00
10,865,000.00
950,000.00
114,000.00
12,960.00
3,300.00
1,080,260.00
211,500.00
25,380.00
236,880.00
384,000.00
500.00
384,500.00
148,500.00
10,700.00
178,103.73
1,348,680.00
2,838,602.72
216,000.00
352,800.00
124,537.50
37,800.00
147,000.00
528,750.00
144,787.50
6,076,261.45
JUMLAH HARGA
BAHAN BAHAN
8 9
515,040.00
515,040.00 Rp515,040.00
536,500.00
536,500.00 Rp536,500.00
6,587,700.00
788,798.65
329,385.00
7,705,883.65 Rp7,705,883.65
Rp395,058,743.57
TABEL 7
DAFTAR KEBUTUHAN TENAGA KERJA
PEMBANGUNAN RUMAH TINGGAL DUA LA
A UPAH Rp155,446,583.93
TABEL 8
DAFTAR KEBUTUHAN ALAT
PEMBANGUNAN RUMAH TINGGAL DUA LANTAI
A. PEKERJAAN PERSIAPAN
A1 Pembersihan dan Pengukuran 264.00 m2
Peralatan 0.5000
A3 Direksikeet 12.00 m2
Peralatan 0.0200
A4 Los Kerja 9.00 m2
Peralatan 0.0250
NO PEKERJA DAN ALAT VOL SAT KOEF
B. PEKERJAAN TANAH
B1 Galian Tanah
B.2 Volume Galian Total Pondasi Setempat 11.97 m3
Alat Bantu 0.2000
B PEKERJAAN PONDASI
B.6 Pekerjaan Pondasi Telapak
Pondasi Telapak
Volume Cor 3.66 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
NO PEKERJA DAN ALAT VOL SAT KOEF
C.1 Pekerjaan Sloof uk. 15/30
* Volume Cor 6.23 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
C.2 Pekerjaan Kolom
* Pekerjaan Kolom K1 (15/30)
Volume Cor 2.970 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
* Pekerjaan Kolom K2 (15/30)
Volume Cor 2.16 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
* Pekerjaan Kolom K3 (11/11)
Volume Cor 1.69 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
C.3 Pekerjaan Balok Lantai (BL)
* Pekerjaan Ring balk B1 (15/20)
Volume Cor 2.98 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
* Pekerjaan Ringbalk
Volume Cor 1.57 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
C.4 Pekerjaan Pelat Lantai
* Volume Cor 12.24 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
C.5 Pekerjaan Penulangan Tangga
* Volume Cor 2.25 m3
Alat Bantu (Sleng+Tes Lab) 0.0450
NO PEKERJA DAN ALAT VOL SAT KOEF
F PEKERJAAN ATAP
F.1 Pas.Genting Bubungan 52.50 m'
Peralatan 0.0650
NO PEKERJA DAN ALAT VOL SAT KOEF
H PEKERJAAN LANTAI
H.3 Pas. Keramik K1 (Granito Tile Essenza Ukuran 60 X 60 Polished) 158.00 m2
Alat Bantu 0.0240
NO PEKERJA DAN ALAT VOL SAT KOEF
J. PEKERJAAN PENGECATAN
J.1 Pekerjaan Pengecetan Dinding 1173.18 m2
Rol Cat 0.0100
Ampelas 0.5000
Steger Werk 0.0450
J.2 Pekerjaan Pengecetan Kusen 309 m2
Amplas Kayu 0.4000
Kwas 3" 0.0500
J.3 Pekerjaan Pengecetan Plafon 135.000 m2
Rol Cat 0.0100
Ampelas 0.5000
Steger Werk 0.0425
TOTAL HARGA UPAH
EL 8
TUHAN ALAT
TINGGAL DUA LANTAI
HARGA HARGA
K.ALAT
SATUAN JUMLAH ALAT
Jumlah Harga
No Uraian Jenis Pekerjaan
Bahan
JUMLAH BIAYA
6 7
Rp 11,911,095
Rp 13,986,800
Rp 385,747
Rp 2,707,650
Rp 399,000
Rp 112,350
Rp 3,122,506
Rp 277,200
Rp 450,000
Rp 33,352,348.21
JUMLAH BIAYA
6 7
Rp 292,680
Rp 8,283,000
Rp 8,035,614
Rp 4,505,952
Rp 2,912,830
Rp 5,545,409
Rp 2,734,722
Rp 571,968
Rp 940,137.98
Rp 25,369
Rp 33,847,682
JUMLAH BIAYA
6 7
Rp 23,478,165.00
Rp 35,825,715.43
Rp 17,667,476.10
Rp 3,695,158.40
Rp 3,652,603.61
Rp 98,562.32
Rp 84,417,681
JUMLAH BIAYA
6 7
Rp 16,512,884.85
Rp 24,059,696.92
Rp 8,484,583.80
Rp 49,057,165.57
JUMLAH BIAYA
6 7
Rp 12,076,344.00
Rp 48,817.68
Rp 837,318.00
Rp 6,658,785.28
Rp 2,415,296.00
Rp 21,180.29
Rp 5,568,480.00
Rp 2,561,641.94
Rp 1,800,000.00
Rp 1,224,000.00
Rp 572,000.00
Rp 340,000.00
Rp 220,000.00
Rp 34,343,863.19
JUMLAH BIAYA
6 7
Rp 4,171,200.00
Rp 108,366.95
Rp 66,360.00
Rp 13,250,160.00
Rp 2,485,600.00
Rp 4,588,800.00
Rp 808,904.00
Rp 4,245,010.00
Rp 582,080.00
Rp 253,801.43
Rp 1,145,970.00
Rp 31,706,252.38
JUMLAH BIAYA
6 7
Rp 60,099,249.47
Rp 1,007,272.50
Rp 5,573,037.29
Rp 398,879.91
Rp 2,006,085.00
Rp 842,555.70
Rp 69,927,079.87
JUMLAH BIAYA
6 7
Rp 58.91
Rp 96.26
Rp 51,479,820.00
Rp 2,726,523.80
Rp 838,186.80
Rp 4,385,318.00
Rp 1,623,730.54
Rp 464,420.00
Rp 443,310.00
Rp 1,628,117.60
Rp 397,492.16
Rp 241,110.00
Rp 231,465.60
Rp 2,441,937.60
Rp 378,648.00
Rp 67,280,235.26
JUMLAH BIAYA
6 7
Rp -
#VALUE!
#VALUE!
Rp -
Rp 3,990.00
Rp 38,969,000.00
#VALUE!
JUMLAH BIAYA
6 7
Rp -
Rp 842,800.00
Rp -
Rp -
Rp -
Rp 301,000.00
Rp -
Rp 1,143,800
JUMLAH BIAYA
6 7
Rp -
Rp 2,537,700.00
Rp 740,162.50
Rp 1,758,607.20
Rp 512,927.35
Rp 8,640.00
Rp 4,800.00
Rp 385,000.00
Rp 6,697.20
Rp 1,110.00
Rp -
Rp 75.00
Rp -
Rp -
Rp 1,368.00
Rp 2,880.00
Rp 246,000.00
Rp 250,800.00
Rp 53,577.60
Rp 8,880.00
Rp 148,500.00
Rp 10,700.00
Rp 178,103.73
Rp 1,348,680.00
Rp 2,838,602.72
Rp 216,000.00
Rp 352,800.00
Rp 124,537.50
Rp 37,800.00
Rp 147,000.00
Rp 528,750.00
Rp 144,787.50
Rp 12,595,486
Bangun Keliling Pekerjaan Beton
1 14.6 Sloof
2 10 Panjang Jarak Sengkang (buah)
No Sb Horizontal
3 12 (m) (m) (panjang/jarak)+1
4 6 1 A1 2 0.1 21
5 6 2 B 12 0.1 121
6 15 3 B1 7 0.1 71
7 14 4 B2 1.5 0.1 16
8 8 5 C 7.5 0.1 76
9 14 6 C1 5.5 0.1 56
10 21 7 C2 8.5 0.1 86
11 8 8 C3 1.5 0.1 16
12 10 9 A1 4.5 0.1 46
13 11 10 D 22 0.1 221
14 17 Jumlah 730
15 13
Jumlah 179.6
No Sb Vertikal Panjang (m) Jarak (m) Sengkang (buah)
1 1A 2 0.1 21
2 1B 1 0.1 11
3 2 8 0.1 81
4 3 5.5 0.1 56
5 4 7 0.1 71
6 4A 1 0.1 11
7 4B 4.5 0.1 46
8 5 5 0.1 51
9 5A 4 0.1 41
10 6 6 0.1 61
11 1 12 0.1 121
12 7 10.4 0.1 105
Jumlah 676
Panjang Jarak Sengkang (buah)
No Sb Vertikal
(m) (m) (panjang/jarak)+1
1 1A 2 0.1 21
2 1B 1 0.1 11
3 2 8 0.1 81
4 3 5.5 0.1 56
5 4 7 0.1 71
6 4A 1 0.1 11
7 4B 4.5 0.1 46
8 5 5 0.1 51
9 5A 4 0.1 41
10 6 6 0.1 61
11 1 12 0.1 121
12 7 10.4 0.1 105
Jumlah 676