C. PEKERJAAN PONDASI
12
C.1.1. Urugan Pasir
= 94 x 0,8 x 0,1
= 7,52m3
= 2,664 m3
JUMLAH HARGA
NO PEKERJA DAN BAHAN KOEF SAT HARGA SATUAN JUMLAH HARGA
BAHAN UPAH ALAT
1 2 3 4 5 6 7 8 9
C.1 Pekerjaan Pondasi Batu Kali
C.1.1 1 M3 URUGAN PASIR
Pasir urug m3 1,2000 50.000,00 60.000,00 - -
Pekerja Oh 0,3000 38.000,00 - 11.400,00 -
Mandor Oh 0,0100 60.000,00 - 600,00 -
C.1.2. Aanstamping
= 94 x 0,15 x 0,8
= 11,28 m3
= 3,996 m3
13
Tabel3.2 AHS Pekerjaan Pondasi Batu Kali
JUMLAH HARGA
PEKERJA DAN SA HARGA JUMLAH
NO KOEF ALA
BAHAN T SATUAN BAHAN HARGA
UPAH T
1 2 3 4 5 7 8 9
6
1 M3 PONDASI
B4 BATU KALI 1 : 5
Batu Kali 125,000.
15cm/20cm 1.200 m3 00 150,000.00
136.00
Semen PC 0 kg 1,070.00 145,520.00
150,000.
PasirPasang 0.544 m3 00 81,600.00
38,000.0 57,000.0
Pekerja 1.500 Oh 0 0
48,000.0 36,000.0
TukangBatu 0.750 Oh 0 0
KepalaTukangBa 52,000.0
tu 0.075 Oh 0 3,900.00
60,000.0
Mandor 0.075 Oh 0 4,500.00
101,400. 478,520.0
Jumlah 377,120.00 00 0
478,520.
Jumlah 00
a. Pondasi type 1
Volume :
V = ((0,25+0,6)/2).0,6). 94 = 23,97 m3
b. Pondasi type 2
Volume :
Volume total :
14
Tabel3.3 AHS Pekerjaan Pondasi Batu Kali
JUMLAH HARGA
PEKERJA DAN SA HARGA JUMLAH
NO KOEF ALA
BAHAN T SATUAN BAHAN HARGA
UPAH T
1 2 3 4 5 7 8 9
6
1 M3 PONDASI
B4 BATU KALI 1 : 5
Batu Kali 125,000.
15cm/20cm 1.200 m3 00 150,000.00
136.00
Semen PC 0 kg 1,070.00 145,520.00
150,000.
PasirPasang 0.544 m3 00 81,600.00
38,000.0 57,000.0
Pekerja 1.500 Oh 0 0
48,000.0 36,000.0
TukangBatu 0.750 Oh 0 0
KepalaTukangBa 52,000.0
tu 0.075 Oh 0 3,900.00
60,000.0
Mandor 0.075 Oh 0 4,500.00
101,400. 478,520.0
Jumlah 377,120.00 00 0
478,520.
Jumlah 00
15
Gambar3.3 Pondasi Setempat
16
Jumlah = 0,16625 m3
C.2.2 Bekisting
C.2.3. Tulangan
JUMLAH
PEKERJA DAN KOE SA HARGA
NO JUMLAH HARGA HARGA
BAHAN F T SATUAN
BAHAN UPAH ALAT
1 2 3 4 5 7 8 9
6
PONDASI TELAPAK
B6 SETEMPAT
1 M3 COR BETON
* SITE MIX K-225
1.00 590,000.0 590,000.
Adukan K-225 0 m3 0 00
2.50 95,000.0
Pekerja 0 Oh 38,000.00 0
0.25 12,000.0
TukangBatu 0 Oh 48,000.00 0
0.10
KepalaTukangBatu 0 Oh 52,000.00 5,200.00
0.01
Mandor 0 Oh 60,000.00 600.00
Alat Bantu 0.04 702,800.0 31,626.
(Sleng+Tes Lab) 5 lot 0 00
18
590,000. 112,800. 31,626. 734,426.0
Jumlah 00 00 00 0
734,426.
Jumlah 00
1 M2 BEKISTING
* DENGAN PAPAN
Kaso 5/7 borneo 0.01 3,650,000. 62,050.0
(2x pakai) 7 m3 00 0
PapanTerentang 0.02 1,275,000. 30,600.0
(2x pakai) 4 m3 00 0
0.40
Paku 0 kg 16,000.00 6,400.00
0.12
Pekerja 0 Oh 38,000.00 4,560.00
0.27 13,500.0
TukangKayu 0 Oh 50,000.00 0
0.15
KepalaTukangKayu 0 Oh 54,000.00 8,100.00
0.05
Mandor 0 Oh 60,000.00 3,000.00
99,050.0 29,160.0 128,210.0
Jumlah 0 0 0
128,210.
Jumlah 00
10 KG BESI BETON
TERPASANG
* Pllos/Ulir
BesiBetonPolos/Uli 10.5 94,500.0
r 00 Kg 9,000.00 0
0.15
KawatBeton 0 Kg 17,000.00 2,550.00
0.07
Pekerja 0 Oh 38,000.00 2,660.00
0.07
TukangBesi 0 Oh 50,000.00 3,500.00
0.00
kepalaTukangBesi 7 Oh 54,000.00 378.00
0.00
Mandor 4 Oh 60,000.00 240.00
99,710.0 103,828.0
Jumlah 0 4,118.00 0
103,828.
Jumlah 00
19