PEKERJAAN PASANGAN
1 1,000 M3 250.000,00 300.000,0
PAS. 0
80.500,00
BATU 24.150,0
KOSONG 85.000,0 127.500,0 0
0 0
1,2000Batu Kali
150.000,0 11.250,0
M3 Pasir Urug 0 0
0,3000Pekerja 138.750,00 324.150,00 462.900,00
M3
Mandor
1,5000
OH
0,0750
OH
2 1,000 M3 MP. 1PC : 250.000,00 300.000,00
PAS. 5PS 136.000,00
BATU 250.000,00
Batu Kali 218.960,00
KALI CA 80.500,00
Pasir
1,2000 85.000,0 21.250,0
Semen 50 0 0
M3
Kg 150.000,0 1.500,0
0,5440
Pekerja 0 0
M3
Mandor 22.750,00 654.960,00 677.710,00
2,7200
Zak
0,2500
OH
0,0100
OH
3 1,000 M3MP. 1PC : 1.250,00 812.500,00
PAS. 6PS 160.000,00 68.480,00
BATU Batu Bata
BATA CA 76.000,0 93.875,20
Pasir 0
650,0000
Semen 50
100.000,0
Kg
0,4280 Tukang 0 150.000,00
M3 120.000,00 18.000,00
Batu
1,2352 Kep. 85.000,0 382.500,00
Zak Tukang 0
1,5000 Batu 150.000,0
OH Pekerja 0 33.750,00
974.855,20 1.559.105,20
0,1500 Mandor
OH 584.250,00
Per M2 = 187.092,62
4,5000
OH
0,2250
OH
974.855,20 197.340,05
5 1,000 M2 PLESTERAN
(1 : 3)
0,0194 M3 Pasir 160.000,00 3.104,00
0,1304 Zak Semen 50 Kg 76.000,00 9.910,40
0,2500 Pekerja 85.000,00
21.250,00
0,0100 Mandor 150.000,00 1.50
0,00
22.750,00 13.014,40 35.764,40
6 1,000 M2 PEKERJAAN
ACIAN
0,0416 Zak Semen 50 Kg 76.000,00 3.161,60
0,3500 Tukang Labur / cat 100.000,00 35.000,00
0,0350 Kepala Tukang Labur/cat 120.000,00 4.200,00
0,0035 Mandor 150.000,00 525,00
Pekerjaan : Penyusunan DED Gedung/Unit 39, 40, 41, 42, 43, 44, 45 dan 46 Pusat
Pemerintahan (PUSPEM) Kabupaten Badung Tahun Anggar : 2006
No. Uraian Pekerjaan Volume Satuan Harga Satuan(RP.) Jumlah Harga (RP.)
1 2 3 4 5 6
Rumah Genset
A Pekerjaan Pasangan
1 Pasangan Batu Kosong 3,44 m3 462.900,00 1.592.376,00
2 Pasangan Batu Kali 1 : 5 5,81 m3 677.710,00 3.937.495,10
3 Pasangan Batu Bata 1 : 6 59,95 m2 187.092,62
4 Pasangan Batu Bata 1 : 3 (Trasram) 10,80 m2 197.340,05 11.216.202,81
5 Plesteran 1 : 3 6 Acian 1 : 2 127,44 m2 35.764,40 2. 131.272,52
127,44 m2 42.886,60 4.557.815,14
STP-Sand Filler 5.465.468,30
B. Pekerjaan Pasangan
1 Pasangan Batu Kali 1 : 5 4,85 m3 677.710,00
2 Plesteran 1 : 3 1,76 m2 35.764,40 3. 286.893,50
3 Siaran 1 : 2 10,50 m2 54.484,00 62.945,34
572.082,00
(2115113075
1.000.000,00 50.000.000,00
b Pembuatan Kartu Identitas Pekerja (KIP); 50 Orang 26 26 1 -
150.000,00 150.000,00
d Poster; 5 lb 26 26 1
50.000,00 250.000,00
e Papan Informasi K3. 2 bh 26 26 1
500.000,00 1.000.000,00
26
2.000.000,00 10.000.000,00
b Tali Keselamatan (Life Line); 5 Ls 26 26 1
500.000,00 2.500.000,00
c Penahan Jatuh (Safety Deck); 5 Ls 26 26 1
3.000.000,00 15.000.000,00
26
45.000,00 2.250.000,00
b Pelindung Pernafasan Dan Mulut (Masker); 50 bh 26 1 26,0 600,0
0
780.000,00
c Sarung Tangan (Safety Gloves); 50 psg 26 3 8,7 5.000,0
0
2.166.666,67
d Sepatu Keselamatan (Safety Shoes); untuk Staf 50 psg 26 26 1
270.000,00 13.500.000,00
e Sepatu Keselamatan (Rubber Safety Shoes_and toe cap) 50 psg 26 26 1
145.000,00 7.250.000,00
f Rompi Keselamatan (Safety Vest); 50 bh 26 26 1
25.000,00 1.250.000,00
g Pelindung Jatuh (Fall Arrester); 50 Bh 26 26 1
75.000,00 3.750.000,00
2.000.000,00 100.000.000,00
c Surat Ijin Operator; 50 Lb/Alat 26 26 1
3.000.000,00 150.000.000,00
d Surat Ijin Pengesahan Panitia Pembina Keselamatan Dan Kesehatan Kerja 50 ls 26 26 1
(P2K3);
3.000.000,00 150.000.000,00
26 26 1
6 Personil K3 26 26 1
a Petugas K3 5 ob 26 26 1
3.000.000,00 15.000.000,00
b Ass Petugas K3/ Safety Man/Pengatur Lalu Lintas (Flagman ); 5 ob 26 26 1
2.500.000,00 12.500.000,00
26
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1 ls 26 26 1
1.000.000,00 1.000.000,00
b Peralatan Pengasapan (Fogging) 1 Bh 26 26 1
500.000,00 500.000,00
c Obat Pengasapan 5 Kali 26 26 1
200.000,00 1.000.000,00
8 Rambu-Rambu
a Rambu Petunjuk; 4 Bh 26 26 1
75.000,00 300.000,00
b Rambu Larangan; 4 Bh 26 26 1
75.000,00 300.000,00
c Rambu Peringatan; 4 Bh 26 26 1
75.000,00 300.000,00
d Rambu Kewajiban; 4 Bh 26 26 1
75.000,00 300.000,00
e Rambu Informasi; 2 Bh 26 26 1
75.000,00 150.000,00
f Rambu pekerjaan sementara 2 Bh 26 26 1
75.000,00 150.000,00
g Tongkat pengatur lalu lintas 1 Bh 26 26 1
65.000,00 65.000,00
h Kerucut lalu lintas 1 Bh 26 26 1
150.000,00 150.000,00
550.000,00 2.750.000,00
b Bendera K3; 2 bh 26 26 1
75.000,00 150.000,00
26 26 1
TOTAL PENYELENGARAAN K3
1.144.819.167
(22)I Nyoman
Pradnya Gunawan
Putra
(2115113070)
(2115113073)
(2115113075)