TENAGA
1 Pekerja 22.20 OH 95,000.00 2,109,000.00
2 Tukang 9.40 OH 125,000.00 1,175,000.00
3 Kepala tukang 0.96 OH 150,000.00 144,000.00
4 Mandor 1.34 OH 125,000.00 167,500.00
JUMLAH 12,845,200.00
Marobo, 2016
(______________________________________) (______________________________________)
RENCANA ANGGARAN BIAYA (RAB)
9 Acian Semen
Volume = 19.78 m2
Bahan
Semen Portland zak 0.0650 1.3 80,000 104,000.0
Tenaga
Pekerja OH 0.200 4 95,000 380,000.0
Tukang batu OH 0.100 2 125,000 250,000.0
Kepala tukang OH 0.010 0.2 150,000 30,000.0
Mandor OH 0.010 0.2 125,000 25,000.0
12,845,200.00
Marobo, 2016
(______________________________________) (______________________________________)
RENCANA ANGGARAN BIAYA (RAB)
#REF!
PEKERJAAN
pembangunan talud
LOKASI
desa marobo
KECAMATAN marobo
TAHUN ANGGARAN
2016