2 1 M2 PEKERJAAN ACIAN
3.2500 kg Semen Portland 40 Kg 3,573.74 11,614.67
0.2000 oh Pekerja 120,080.00 24,016.00
0.1000 oh Tukang Labur/Cat 154,903.20 15,490.32
0.0100 oh Kepala Tukang 160,907.20 1,609.07
0.0100 oh Mandor 166,310.80 1,663.11
Total : 42,778.50 11,614.67 54,393.17
1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
3.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 30,777.44 92,332.32
1.0000 bt Pipa Clipsal 20 mm hitam 52,397.95 52,397.95
3.0000 bj Klem clipsal 20 mm hitam 7,885.13 23,655.39
1.0000 bj Inbow dos plastik clipsal E 157 P 14,244.10 14,244.10
1.0000 ttk Biaya pasang 75,000.00 75,000.00
Total : 75,000.00 182,629.76 257,629.76
HARGA
NO NAMA BARANG SATUAN
(Rp.)