DAFTAR KEBUTUHAN MATERIAL

KAMAR MANDI
HARI /TANGGAL PESANAN :
LOKASI :
NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN KETERANGAN TOTAL
1 PASIR GUNUNG 6 M3 6 COLT
2 PASIR COR 1 M3 1 COLT
3 SEMEN 50 KG 3 ZAK
4 BATA MERAH 0,2*0,5*0,1 CM 650 BUAH
5 CNP 0.75 MM 3 BATANG
6 BAUD CNP 2 CM 1 DUS
7 SPANDEK 0.35 MM 1 LEMBAR
8 BAUD SPANDEK 7 CM 1 DUS
9 CLOSET 1 BUAH 1 BUAH
10 KRAN AIR 0,5 INC 1 BUAH
11 KRAMIK LANTAI KM 20*20 CM 2 DUS
12 ROSTER BATAPRESS 20*20 CM 6 BUAH
13 KAWAT BENDRAT 1 1 KG
14 BESI 8 MM 15 BATANG
15 BESI 6 MM 12 BATANG
16 PIPA 0,5 INC 1 BATANG
17 PIPA 3 INC 1 BATANG
18 KNEE 3 INC 1 BUAH
19 SPLIT 1 M3 1 COLT
20 PAKU 5 CM 1 KG
21 KABEL 2*1,5 NYM 10 METER
22 SAKLAR 1 1 BUAH
23 LAMPU 9 WATT 1 BUAH
24 PIPA KABEL 1 BUAH
25 TRIPLEK CORR 0.5 CM 1 LEMBAR

DAFTAR KEBUTUHAN MATERIAL


KAMAR MANDI
HARI /TANGGAL PESANAN :
LOKASI :
NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN KETERANGAN
1 PASIR GUNUNG
2 PASIR COR
3 SEMEN
4 BATA MERAH
5 CNP
6 BAUD CNP
7 SPANDEK
8 BAUD SPANDEK
9 CLOSET
10 KRAN AIR
11 KRAMIK LANTAI KM
12 ROSTER BATAPRESS
13 KAWAT BENDRAT
14 BESI
15 BESI
16 BESI
17 PIPA
18 PIPA
19 PIPA
20 PAKU
21 KABEL
22 SAKLAR
23 LAMPU
DAFTAR KEBUTUHAN MATERIAL
SEPTI TANK & RESAPAN
HARI /TANGGAL PESANAN :
LOKASI :
NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN KETERANGAN
1 PASIR GUNUNG
2 PASIR COR 4 M3 4 C0LT
3 SEMEN 50 KG 5 ZAK
4 BATA MERAH 20*10*50 MM 240 BUAH
5 KAWAT BENDRAT 1 KG 1 KG
6 BESI 10 INC 5 BATANG
7 BESI 6 INC 4 BATANG
8 TRIPLEK CORR 0,5 MM 3 LEMBAR
9 KASO 3 M 4 BATANG
10 PIPA 3 INC 2 BATANG
11 PIPA 0,5 INC 1 BATANG
12 PAKU 5&7 CM 2 KG
13 LEM PIPA 2 TUBE
14 HONG+TUTUP 1 M 1

DAFTAR KEBUTUHAN MATERIAL


SEPTI TANK & RESAPAN
HARI /TANGGAL PESANAN :
LOKASI :
NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN KETERANGAN
1 PASIR GUNUNG
2 PASIR COR
3 SEMEN
4 BATA MERAH
5 KAWAT BENDRAT
6 ROASTER BATAPRESS
7 BESI
8 BESI
9 BESI
10 TRIPLEK CORR
11 PAPAN CORR
12 PIPA
13 PIPA
14 PIPA
15 PAKU
16 LEM PIPA
HARGA TOTAL
Rp 150,000 Rp -
Rp 250,000 Rp 1,000,000
Rp 55,000 Rp 275,000
Rp 700 Rp 168,000
Rp 20,000 Rp 20,000
Rp 52,000 Rp 260,000
Rp 32,000 Rp 128,000
Rp 25,000 Rp 75,000
Rp 25,000 Rp 100,000
Rp 5,000 Rp 10,000
Rp 25,000 Rp 25,000
Rp 10,000 Rp 20,000
Rp 12,000 Rp 24,000
Rp 220,000 Rp 220,000
Rp -
Rp 2,325,000

Rp 3,000,000
Rp 3,000,000
DAFTAR RINCIAN BIAYA PELAKSANAAN
KAMAR MANDI
NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN HARGA TOTAL
1 PASIR GUNUNG 3 M3 3 COLT Rp 150,000 Rp 450,000
2 PASIR COR 1 M3 1 COLT Rp 250,000 Rp 250,000
3 SEMEN 50 KG 3 ZAK Rp 58,000 Rp 174,000
4 BATA MERAH 0,2*0,5*0,1 CM 650 BUAH Rp 700 Rp 455,000
5 CNP 0.75 MM 3 BATANG Rp 90,000 Rp 270,000
6 BAUD CNP 2 CM 100 BUAH Rp 250 Rp 25,000
7 SPANDEK 0.35 MM 1 LEMBAR Rp 270,000 Rp 270,000
8 BAUD SPANDEK 7 CM 50 BUAH Rp 1,000 Rp 50,000
9 CLOSET 1 BUAH 1 BUAH Rp 130,000 Rp 130,000
10 KRAN AIR 0,5 INC 1 BUAH Rp 16,000 Rp 16,000
11 KRAMIK LANTAI KM 20*20 CM 2 DUS Rp 45,000 Rp 90,000
12 ROSTER BATAPRESS 20*20 CM 6 BUAH Rp 5,000 Rp 30,000
13 KAWAT BENDRAT 1 1 KG Rp 19,000 Rp 19,000
14 BESI 8 MM 15 BATANG Rp 45,000 Rp 675,000
15 BESI 6 MM 12 BATANG Rp 30,000 Rp 360,000
16 PIPA 0,5 INC 1 BATANG Rp 15,000 Rp 15,000
17 PIPA 3 INC 1 BATANG Rp 39,000 Rp 39,000
18 KNEE 3 INC 1 BUAH Rp 9,000 Rp 9,000
19 SPLIT 1 M3 1 COLT Rp 250,000 Rp 250,000
20 PAKU 5 CM 1 KG Rp 14,000 Rp 14,000
21 KABEL 2*1,5 NYM 10 METER Rp 10,000 Rp 100,000
22 SAKLAR 1 1 BUAH Rp 18,000 Rp 18,000
23 LAMPU 10 WATT 1 BUAH Rp 10,000 Rp 10,000
24 PIPA KABEL 1 BUAH Rp 8,000 Rp 8,000
25 TRIPLEK CORR 0.9 CM 1 LEMBAR Rp 85,000 Rp 85,000

ANGGARAN MATERIAL KAMAR MANDI Rp 3,812,000

UPAH KERJA KAMAR MANDI Rp 3,000,000


ANGGARAN MATERIAL + UPAH KAMAR MANDI Rp 6,812,000

SEPTI TANK & RESAPAN


NO NAMA MATERIAL UKURAN SATUAN JUMLAH SATUAN HARGA TOTAL
1 PASIR GUNUNG Rp 150,000 Rp -
2 PASIR COR 4 M3 4 C0LT Rp 250,000 Rp 1,000,000
3 SEMEN 50 KG 5 ZAK Rp 55,000 Rp 275,000
4 BATA MERAH 20*10*50 MM 240 BUAH Rp 700 Rp 168,000
5 KAWAT BENDRAT 1 KG 1 KG Rp 19,000 Rp 19,000
6 BESI 10 INC 5 BATANG Rp 52,000 Rp 260,000
7 BESI 6 INC 4 BATANG Rp 32,000 Rp 128,000
8 TRIPLEK CORR 0,5 MM 3 LEMBAR Rp 25,000 Rp 75,000
9 KASO 3 M 4 BATANG Rp 19,000 Rp 76,000
10 PIPA 3 INC 2 BATANG Rp 5,000 Rp 10,000
11 PIPA 0,5 INC 1 BATANG Rp 25,000 Rp 25,000
12 PAKU 5&7 CM 2 KG Rp 10,000 Rp 20,000
13 LEM PIPA 2 TUBE Rp 11,000 Rp 22,000
14 HONG+TUTUP 1 M 1 Rp 220,000 Rp 220,000

ANGGARAN MATERIAL SEPTICTANK DLL Rp 2,298,000

UPAH KERJA SEPTICTANK Rp 1,000,000


TOTAL MATERIAL SEPTICTANK + UPAH Rp 3,298,000

TOTAL ANGGARAN FULL SET UPAH DAN MATERIAL Rp 10,110,000


TOTAL ANGGARAN BIAYA
NO URAIAN NILAI JUMLAH PEKERJAAN TOTAL
MATERIAL KAMAR MANDI Rp 3,812,000 12 Rp 45,744,000
UPAH KAMAR MANDI Rp 3,000,000 12 Rp 36,000,000

MATERIAL SEPTICTANK Rp 2,298,000 35 Rp 80,430,000


UPAH SEPTICTANK Rp 1,000,000 35 Rp 35,000,000
TOTAL ANGGARAN Rp 197,174,000