A.

SUSUNAN TIM
No Nama Jabatan Posisi
1 Aal Sadikin Asst. Mekanik BBSKM1,5
2 Nasib Ka. Mekanik Alat Berat Cuti
3 Erwin Gulo Pembantu Mekanik Alat Berat BBSKM1,5
4 Nelson Hasibuan Ka. Mekanik Kenderaan BBSKM1,5
5 Mulyono Weelder Cuti
6 Benny Admin Mekanik BBSKM1,5
7 Masdin Tyre Man (Harian) BBSKM1,5
8 Adi Juniawan Pembantu Mekanik Kenderaan (Harian) BBSKM1,5

B. KEGIATAN MEKANIK ALAT BERAT


Inspeksi Unit
No Unit Before Status
Next
Date HM

Breakdown - Under
1 BDZ01 Bulldozer D6R XL 12-Feb-23 12-Mar-23
Repair
Breakdown - Under
2 SKD02 Track Skidder 527 22-Feb-23 6,733.0 22-Mar-23
Repair
B. KEGIATAN MEKANIK ALAT BERAT
Inspeksi Unit
No Unit Before Status
Next
Date HM

3 SKD03 Track Skidder 527 25-Feb-23 2,847.0 8-Mar-23 Ready

Breakdown -
4 EXC01 Excavator 320D 3-Feb-23 4,750.0 3-Mar-23
Waiting Part
Ready - Waiting
5 EXC02 Excavator 320D 24-Feb-23 7,221.0 24-Mar-23
Part
6 WHL01 Wheel Loader 966H 28-Feb-23 3,044.0 28-Mar-23 Ready

7 CMP01 Compactor CS533E 31-Mar-23 Ready


Ready - Waiting
8 MGD01 Motorgrader 120K 4-Feb-23 5,065.0 2-Mar-23
Part

C. KEGIATAN MEKANIK KENDERAAN BERAT


Inspeksi Unit
No Unit Before Status
Next
Date KM

Ready - Waiting
1 LT02-Nissan TZA52P Trailer 20-Feb-23 20-Mar-23
Part

Breakdown -
2 LT03-Nissan TZ520 Engkel
Waiting Part
3 LT04-Fuso FN527 Ready

Ready - Waiting
4 DT01-Actross 4043 AK
Mechanic
Breakdown -
5 FT01-Ateco
Waiting Mechanic

D. KEGIATAN MEKANIK KENDERAAN RINGAN


Inspeksi Unit
No Unit Before Status
Next
Date KM
SJ01 - Singel Cabine
1 Breakdown
BM9326TE

SJ02 - Daihatsu Hi-Line Ready - Waiting


2 1-Dec-22 28-Mar-23
BK9899XC mechanic
Ready - Waiting
3 SJ03 - Mega Cabine BK8481CC 15-Feb-23 16-Mar-23
Part

SJ04 - Double Cabine


4 24-Feb-23 24-Mar-23 Ready
BK9706CC

E. KEGIATAN MEKANIK MESIN LAIN-LAIN


Inspeksi Unit
No Unit Before Status
Next
Date KM
A. SEPEDA MOTOR
1
2
3
B. MESIN LISTRIK
1
2
3
4
C. MESIN AIR
1
2
3
D. MESIN PERAHU
1
2
3
E. MESIN LAIN-LAIN
1 Compressor
2 Doorsmeer
Deskripsi DP2B Progress PIC Due Date

No. 039/DP2B/HTI PT. ARM-MADINA/III/23, Tgl. 1.1. Membuka WO untuk pemasangan FIP Benny 3/22/2023
1 Maret 2023 (1 Item), Fuel System (FIP). FIP Done
tiba tanggal 21 Maret 2023.
1.2. Pemasangan FIP Aal, Erwin 3/24/2023
Done
1.3. Koordinasi dengan pihak ketiga (Pak Aal 3/25/2023
Andi) tentang kebocoran FIP pada bagian Done
belakang.
1.4. Pemeriksaan jalur kembali oli dari FIP ke Aal, Erwin 3/25/2023
Engine Done
1.5. Pemasangan Track link Aal, Erwin 28-Mar-23

1.6. Packing FIP dan pengiriman ke bengkel Aal, Erwin 29-Mar-23


pihak ketiga (Pak Andi)
1.1. Pembukaan WO untuk Break System & Aal 3/25/2023
No. 018/DP2B/HTI PT. ARM-MADINA/I/22, Tgl. Inspeksi unit Done
30 Januari 2022 (1 Item), Filter Winch. Direvisi
untuk menyesuaikan dengan part number.

No. 210/DP2B/HTI PT. ARM-MADINA/X/22, Tgl. 3


Oktober 2022 (5 Item), Fuel system. Perlu
dikoordinasikan dengan Pak Aal terkait tidak ada
part number dalam DP2B hal ini untuk
menghindari kesalahan order. Hasil koordinasi
DP2B diperbaharui dengan melengkapi nomor
part number.

No. 013/DP2B/HTI PT. ARM-MADINA/I/23, Tgl. 1.2. Penggantian filter transmisi Aal 3/26/2023
18 Januari 2023 (7 Item), Work Tools. Done
1.3. Pemeriksaan control Valve break Aal, Erwin 3/27/2023
Done
No. 012-1/DP2B/HTI PT. ARM-MADINA/I/23, Tgl. 1.4. Membuat RO baru untuk DP2B no. 18 Aal 28-Mar-23
18 Januari 2023 (2 Item lagi), Tools. Press ring dengan menyesuaikan dengan part number.
piston besar sudah ada 1 Pcs, diharapkan 1 pcs
lagi ukuran kecil.
Aal, Erwin 29-Mar-23
1.5. Membuat RO baru untuk DP2B no. 210
dengan melengkapi dengan Part Number
Deskripsi DP2B Progress PIC Due Date

1.1. Pembukaan WO Electrical System (Motor Benny 3/26/2023


Request order Sekring Original. Starting) Done

1.2. Pemasangan sekring substitusi Erwin 3/27/2023


Done

1.3. Pembuatan RO Sekring Original CAT. Aal 29-Mar-23

1.1. Pembukaan WO untuk penambahan strip Benny 3/27/2023


No. 011/DP2B/HTI PT. ARM-MADINA/I/23, Tgl. shoe 3/28/2023
15 Januari 2023 (1 item lagi), Rantai Logging.
Pembuatan Towing.

No. 026/DP2B/HTI PT. ARM-MADINA/II/23, Tgl.


13 Februari 2023 (7 Item), Undercarriage. Sudah
tiba di camp tanggal 25 Maret 2023

No. … /DP2B … Undercarriage support recoil


spring
1.2. Pengelasan strip shoe Masdin 28-Mar-23

1.3. Pemeriksaan Pump GP injector (Low Erwin 30-Mar-23


Power)

1.4. Pemasangan Alternator Erwin 30-Mar-23


1.5. Pembukaan WO untuk Inspeksi unit Benny 29-Mar-23
1.6. Pelaksanaan Inspeksi Unit Erwin 30-Mar-23
1.7. Pembongkaran cylinder Arm Aal, Erwin 31-Mar-23

No. 101/DP2B/HTI PT. ARM-MADINA/V/22, Tgl. 1.1. Pembukaan WO Inspeksi Unit Benny 27-Mar-23
12 Mei 2022 (1 Item), Hose Stick.
1.2. Pelaksanaan Inspeksi Unit Aal 29-Mar-23
No. 025/DP2B/HTI PT. ARM-MADINA/II/23, Tgl.
13 Februari 2023 (2 Item), Undercarriage. Sudah
tiba di camp tanggal 23 Maret 2023

No. 021/DP2B/HTI PT. ARM-MADINA/II/23, Tgl. 3 1.3. Pembukaan WO Pemindahan Cylinder Benny 29-Mar-23
Februari (10 Item), Undercarriage. Sudah tiba di Arm dari EXC01 ke EXC02
camp tanggal 25 Maret 2023

No. 033/DP2B/HTI PT. ARM-MADINA/II/23, 20 1.4. Pemindahan Cylinder Arm dari EXC01 ke Aal, Erwin 30-Mar-23
Februari 2023 (1 item), Fuel system. (stock EXC02
excavator).
1.5. Pembukaan WO untuk Pemasangan Benny 1-Apr-23
undercarriage
1.6. Pemasangan undercarriage Erwin 3-Apr-23

No. 040/DP2B/HTI PT. ARM-MADINA/III/23, Tgl. 1.1. Pembukaan WO untuk Inspeksi Unit dan Benny 28-Mar-23
1 Maret 2023 (2 Item), Electrical system. Sudah pemasangan switch Start
tiba di camp 22 Maret 2023

1.2. Pelaksanaan Inspeksi Unit dan Aal, Erwin 31-Mar-23


pemsangan switch start

- 1.1. Pembukaan WO untuk Inspeksi Unit Benny 30-Mar-23


1.2. Pelaksanaan Inspeksi Unit Erwin 31-Mar-23
No. 042/DP2B/HTI PT. ARM-MADINA/III/23, Tgl. 1.1. Pembukaan WO inspeksi unit dan Benny 1-Apr-23
8 Maret 2023 (4 Item), Implement & Electrical pergantian oli engine
System.
1.2. Pelaksanaan Inspeksi unit dan Erwin 2-Apr-23
pergantian oli

T
Deskripsi DP2B Progress PIC Due Date

No. 053/DP2B/HTI PT. ARM-MADINA/III/22, Tgl. 1.1. Pembukaan WO Inspeksi unit Benny 29-Mar-23
8 Maret 2022 (13 Item), Gear & Bearing.

No. 041/DP2B/HTI PT. ARM-MADINA/III/23, Tgl.


8 Maret 2023 (1 Item), Compressor.
No. 020/DP2B/HTI PT. ARM-MADINA/II/23, Tgl. 3 1.2. Pelaksanaan Inspeksi Unit Nelson 30-Mar-23
Februari 2023 (2 Item), Cushion rubber. Sudah
tiba di camp 22 Maret 2023
No. 035/DP2B/HTI PT. ARM-MADINA/II/23, Tgl. 1.1. Pembukaan WO Instal sparepart Benny 27-Mar-23
21 Februari 2023 (14 Item), Syncro assy &
Injection.
1.2. Instal sparepart Nelson 27 s/d 28 Maret
2023
1.1. Membuka WO Inspeksi Unit Benny 27-Mar-23

1.2. Pelaksanaan Inspeksi Unit Nelson 28-Mar-23


Masukkan dp2b

N
Deskripsi DP2B Progress PIC Due Date
No. 066/DP2B/HTI PT. ARM-MADINA/III/22, Tgl.
19 Maret 2022 (1 item), Tyre. Hasil pemeriksaan setelah tiba di camp masih Aal 27-Mar-23
ada kekurangan selama proses perbaikan
No. 096/DP2B/HTI PT. ARM-MADINA/IV/22, Tgl. menggunakan jasa pihak ketiga (Bengkel
17 April 2022 (1 item), Chamber. Luar) sehingga belum bisa diinstal ke unit.
Perlu koordinasi lagi dengan Pak Yuda.
No. 136/DP2B/HTI PT. ARM-MADINA/VI/22, Tgl.
13 Juni 2022 (5 Item), Engine.

No. 166/DP2B/HTI PT. ARM-MADINA/VIII/22, Tgl.


1 Agustus 2022 (4 Item), Brake system.

No. 166-1/DP2B/HTI PT. ARM-MADINA/VIII/22,


Tgl. 1 Agustus 2022 (2 Item), Gear Shift.

No. 193/DP2B/HTI PT. ARM-MADINA/IX/22, Tgl.


8 September 2022 (3 Item), Shaft.

No. 212/DP2B/HTI PT. ARM-MADINA/X/22, Tgl.


10 Oktober 2022 (3 Item), Bearing & Engine.

No. 070/DP2B/HTI PT. ARM-MADINA/III/22, Tgl.


1.1. Perbaikan electrical system Aal, Sihol 27-Mar-28
22 Maret 2022 (1 Item), Metal bulan.
1.1. Repair Speeder Joint Nelson, Adi, 3/27/2023
Masdin Done
No. 113/DP2B/HTI PT. ARM-MADINA/V/22, Tgl
29 Mei 2022 (3 Item), Communication system.

No. 237/DP2B/HTI PT. ARM-MADINA/X/22, Tgl.


28 November 2022 (3 Item), Engine & Break
system. Sudah ada dicamp

No. 004/DP2B/HTI PT. ARM-MADINA/I/23, Tgl. 2


Januari 2023 (13 Item), Cooling System & Shaft.
12 item sudah tiba di camp namun Shroud
Cooling fan belum ada.

masukkan lagi dp2b terakhir

Reques Order (Tyre, Bearing, Disc Clutch, etc) 1.1. Inspeksi unit Aal 24-Mar-23
1.2. Followup Pembukaan DP2B Aal 27-Mar-23

Deskripsi DP2B Progress PIC Due Date


Update :26-Mar-23

Lokasi Keterangan

BBSKM1,5

KM3 Terdapat kebocoran pada FIP bagian belakang.

BBSKM1,5 Hasil koordinasi : pemeriksaan jalur kembali oli


dari FIP

KM3 Jalur kembali oli kondisi bagus (tidak ada


sumbatan)
KM3 Track link rekondisi (penambahan strip shoe)

KM3

Camp Produksi Pemeriksaan pasca test operasi


Terkait electrical and starting system (page,
123) :
a. Posisi teming (OK)
b. Censor speed Ply Wheel (OK)
c. Censor preassure (OK)
d. Valve over flow (OK)
Kemungkinan perlu dilakukan kalibrasi injection
pump

Camp Produksi

Camp Produksi Setelah pembersihan unit dan pemeriksaan


terdapat kebocoran oli dari control valve.
BBSKM1,5

Camp Produksi
Lokasi Keterangan

BBSKM1,5

Lapangan Sekring (logging) substitusi sering putus

BBSKM1,5

BBSKM1,5
KM3 Pemasangan undercarriage menunggu
perbaikan support recoil spring. DP2B No …….
Untuk EXC02 karena pertimbangan operasional
sehingga dilakukan pemindahan spare part
support recoil spring dari EXC01 ke EXC02.

KM3 Trouble shooting :


1. Check Oil Pump 2 : Pompa lemah saat
berbeban
2. Censor Speed (Flywheel) : Normal
3. Censor Preasure : Normal
4. Exhaust : terdapat kebocoran pada gas
buang (selesai)
5. Turbo Catridge : terdapat kebocoran

KM3
BBSKM1,5
KM3
KM3 Pertimbangan operasional EXC02 di IPK Sawmill
sangat dibutuhkan dimana berdasarkan hasil
inspeksi EXC02 tanggal 29 Maret 2023 Dimana
terdapat kebocoran pada Cylinder Arm sehingga
dilakukan pemindahan dari EXC01.

BBSKM1,5
IPK Sawmill

IPK Sawmill

KM3 - IPK
Sawmill

BBSKM1,5

IPK Sawmill

BBSKM1,5 Dalam pengawasan mekanik

KM3 Pelaksanaan bersamaan dengan pembongkaran


cylinder arm EXC01.

BBSKM1,5
BBSKM1,5 Posisi 150 HM sejak Overhaul dilakukan
pergantian oli engine.
BBSKM1,5

BBSKM1,5

Lokasi Keterangan

BBSKM1,5

BBSKM1,5

BBSKM1,5

BBSKM1,5 instal sparepart yang sudah masuk.


Rencana perbaikan Chassis ditunda kegiatan
difokuskan pada EXC01 Excavator 320D
pembuatan towing dan penambahan stripshoe
karena dalam kondisi chassis saat ini masih bisa
hauling.

Mechanic Mercy

Mechanic Mercy

Lokasi Keterangan
BBSKM1.5

Electrical system :
1. Lampu Depan
2. Alternator (pengisian batteray)
BBSKM1.5
3. Starting System
4. Pre Heater (engine)
5. Klakson
BBSKM1.5

BBSKM1.5 Lampiran hasil inspeksi


BBSKM1.5

Lokasi Keterangan
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn

TAHUN 2022
1 066/DP2B/HTI PT. ARM-MADINA/III/22 19 Maret 2022 BAN LUAR MAXXIS BIGHOM 4 BH SJ01 - Single Cabine BM9326TE

1 096/DP2B/HTI PT. ARM-MADINA/IV/22 17 April 2022 JET COMBUSTION CHAMBER 1 PCS SJ01 - Single Cabine BM9326TE

1 136/DP2B/HTI PT. ARM-MADINA/VI/22 13 Juni 2022 Gasket Cylinder Block Side Cover 1 Pcs SJ01 - Single Cabine BM9326TE
2 Hose Engine Breather 1 Pcs SJ01 - Single Cabine BM9326TE
3 Gasket Cylinder Head 1 Pcs SJ01 - Single Cabine BM9326TE
4 Guide Timing Chain Tension Side 1 Pcs SJ01 - Single Cabine BM9326TE
5 Nozle Holder Assy Fuel Injection 4 Pcs SJ01 - Single Cabine BM9326TE

1 166/DP2B/HTI PT. ARM-MADINA/VIII/22 01/08/2022 Pin FR Brake ( Y ) 1 Pcs SJ01 - Single Cabine BM9326TE
2 Pin FR Brake ( X ) 1 Pcs SJ01 - Single Cabine BM9326TE
3 Bolt FR Brake ( Y ) 1 Pcs SJ01 - Single Cabine BM9326TE
4 Bolt FR Brake ( X ) 1 Pcs SJ01 - Single Cabine BM9326TE

1 166-1/DP2B/HTI PT. ARM-MADINA/VIII/22 01/08/2022 Spring M/T Gear Shift Neutral Return 2 Pcs SJ01 - Single Cabine BM9326TE
2 Spring M/T Gear Shift Control (Komplit) 1 Set SJ01 - Single Cabine BM9326TE

1 193/DP2B/HTI PT. ARM-MADINA/IX/22 08/09/2022 Shaft Assy, FR Axle Drive LH 1 Pcs SJ01 - Single Cabine BM9326TE
2 Shaft Assy, FR Axle Drive RH 1 Pcs SJ01 - Single Cabine BM9326TE
3 Dust Seal,FR Axle Housing Tube 2 Pcs SJ01 - Single Cabine BM9326TE

1 212/DP2B/HTI PT. ARM-MADINA/X/22 10/10/2022 BEARING BALANCER SHAFT 2 Pcs SJ01 - Single Cabine BM9326TE
2 O-RING BALANCER 2 Pcs SJ01 - Single Cabine BM9326TE
3 GASKET KIT,ENGINE OVER HOULE 2 Pcs SJ01 - Single Cabine BM9326TE

1 070/DP2B/HTI PT. ARM-MADINA/III/22 22 Maret 2022 Metal Bulan 3 Set SJ02 - Pickup Hi-Line BK9899XC

1 113/DP2B/HTI PT. ARM-MADINA/V/22 29 Mei 2022 BRACKET ANTENA 1 BH SJ03 - Mega Cabine BK8481CC
2 KABEL FOWER RADIO RIG 1 BH SJ03 - Mega Cabine BK8481CC
3 KABEL EXTRA MIG 1 BH SJ03 - Mega Cabine BK8481CC

1 237/DP2B/HTI PT. ARM-MADINA/X/22 28/11/2022 Case Timing Gear 1 Pcs SJ03 - Mega Cabine BK8481CC
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn
2 Gasket Kit Engine 1 Pcs SJ03 - Mega Cabine BK8481CC
3 Cylinder Kit Brake 1 Pcs SJ03 - Mega Cabine BK8481CC

1 004/DP2B/HTI PT. ARM-MADINA/I/23 02 Januari 2023 Shroud Cooling Fan MR 497133 1 Pcs SJ03 - Mega Cabine BK8481CC
2 Belt Alternator MH 14050 1 Pcs SJ03 - Mega Cabine BK8481CC
3 Thermostat ME 191593 1 Pcs SJ03 - Mega Cabine BK8481CC
4 Shaft T/F FR Out Put MR 222565 1 Pcs SJ03 - Mega Cabine BK8481CC
5 Sprocket T/F Chain MR 263693 1 Pcs SJ03 - Mega Cabine BK8481CC
6 Flange Frewhel Hub MB 160942 2 Pcs SJ03 - Mega Cabine BK8481CC
7 Cap, FR Wheel Hub MB 160679 2 Pcs SJ03 - Mega Cabine BK8481CC
8 Shaft Assy Axle drive LH MR 276871 1 Pcs SJ03 - Mega Cabine BK8481CC
9 Shaft Assy Axle drive RH MR 276870 1 Pcs SJ03 - Mega Cabine BK8481CC
10 Knuckle RH MR 113893 1 Pcs SJ03 - Mega Cabine BK8481CC
11 Knuckle LH MR 113892 1 Pcs SJ03 - Mega Cabine BK8481CC
12 Bearing Knuckle MB 160670 2 Pcs SJ03 - Mega Cabine BK8481CC
13 Cylinder Kit Brake Master MR 449522 1 Pcs SJ03 - Mega Cabine BK8481CC

1 238/DP2B/HTI PT. ARM-MADINA/X/22 28/11/2022 Bushing 2 Pcs Double Cabin BK 9706 CC


2 Bolt RR Susp 2 Pcs

1 053/DP2B/HTI PT. ARM-MADINA/III/22 08 Maret 2022 GEAR HIGH SPEED 1 PCS LT02 - Nissan TZA52P Trailer
2 NEEDLE ASSY 2 PCS LT02 - Nissan TZA52P Trailer
3 BEARING BALL 1 PCS LT02 - Nissan TZA52P Trailer
4 BEARING BALL 1 PCS LT02 - Nissan TZA52P Trailer
5 GEAR LOW 1 PCS LT02 - Nissan TZA52P Trailer
6 BEARING TAPER 1 PCS LT02 - Nissan TZA52P Trailer
7 MAIN SHAFT 1 PCS LT02 - Nissan TZA52P Trailer
8 GEAR REDUKTION 1 PCS LT02 - Nissan TZA52P Trailer
9 GEAR 1 PCS LT02 - Nissan TZA52P Trailer
10 SHAFT IDLER 1 PCS LT02 - Nissan TZA52P Trailer
11 GEAR 1 PCS LT02 - Nissan TZA52P Trailer
12 BEARING ROLLER 1 PCS LT02 - Nissan TZA52P Trailer
13 BEARING BALL 1 PCS LT02 - Nissan TZA52P Trailer

1 020/DP2B/HTI PT. ARM-MADINA/II/23 03 Februari 2023 Cushion - Rubber 33173-900002 4 Pcs LT02 - Nissan TZA52P Trailer
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn

2 Cushion - Rubber 33173-90014 4 Pcs LT02 - Nissan TZA52P Trailer

1 035/DP2B/HTI PT. ARM-MADINA/II/23 21 Februari 2023 Tube Injection (R.H. No.1) 16682 - 97015 1 PCS LT03 - Nissan TZ520 Engkel

2 Tube Injection (R.H. No.2) 16683 - 97016 1 PCS LT03 - Nissan TZ520 Engkel

3 Tube Injection (R.H. No.3) 16684 - 97016 1 PCS LT03 - Nissan TZ520 Engkel

4 Tube Injection (R.H. No.4) 16685 - 97016 1 PCS LT03 - Nissan TZ520 Engkel

5 Tube Injection (L.H. No.1) 16687 - 97017 1 PCS LT03 - Nissan TZ520 Engkel

6 Tube Injection (L.H. No.2) 16688 - 97017 1 PCS LT03 - Nissan TZ520 Engkel

7 Tube Injection (L.H. No.3) 16689 - 97015 1 PCS LT03 - Nissan TZ520 Engkel

8 Tube Injection (L.H. No.4) 16690 - 97015 1 PCS LT03 - Nissan TZ520 Engkel

9 Contac Rear Spring 55532 - 90074 4 PCS LT03 - Nissan TZ520 Engkel

10 Chamber Assy Air 44320 - 90303 1 PCS LT03 - Nissan TZ520 Engkel
11 Syncro Assy ( 1 st dan 2 nd Gear ) 32610 - 90366 1 PCS LT03 - Nissan TZ520 Engkel

12 Syncro Assy ( 3 rd dan 4 th Gear ) 32610 - 90361 1 PCS LT03 - Nissan TZ520 Engkel

13 Cushion - Rubber 33173 - 90014 4 PCS LT03 - Nissan TZ520 Engkel


14 Cushion - Rubber 33173 - 90002 4 PCS LT03 - Nissan TZ520 Engkel

1 130/DP2B/HTI PT. ARM-MADINA/VI/22 08 Juni 2022 SEAL RING 2 PCS DT01 Dumptruck Actros 4043 AK

1 039/DP2B/HTI PT. ARM-MADINA/III/23 01 Maret 2023 Pump GP-Unit Injector Hyd 319-0678 1 Pcs BDZ01 - Bulldozer D6R XL

1 018/DP2B/HTI PT. ARM-MADINA/I/22 30/Jan/22 Filter Winch 1 Pc SKD02 - Track Skidder 527

1 210/DP2B/HTI PT. ARM-MADINA/X/22 03/10/2022 Tank As - Fuel 1 Pcs SKD02 - Track Skidder 527
2 Valve Ball 1 Pcs SKD02 - Track Skidder 527
3 Strainer-Fuel (Tank) 1 Pcs SKD02 - Track Skidder 527
4 Sender Al -Fuel Level 1 Pcs SKD02 - Track Skidder 527
5 Seal - O-Ring 2 Pcs SKD02 - Track Skidder 527

1 012-1/DP2B/HTI PT. ARM-MADINA/I/23 18 Januari 2023 Tools Press Ring Piston Besar 2 Pcs SKD02 - Track Skidder 527
2 Tools Press Ring Piston Sedang 1 Pcs SKD02 - Track Skidder 527

1 18 Januari 2023 EDGE - CUTTING 4T-0731 2 Pcs


013/DP2B/HTI PT. ARM-MADINA/I/23 SKD02 - Track Skidder 527
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn
BIT - END ( RH ) 140-6787
2 1 Pcs SKD02 - Track Skidder 527
3 BIT - END ( LH ) 140-6788 1 Pcs SKD02 - Track Skidder 527
EDGE - CUTTING 268-9847
4 1 Pcs SKD02 - Track Skidder 527
5 NUT FULL ( 3/4/10-THD ) 2J-3506
23 Pcs SKD02 - Track Skidder 527
BOLT -PLOW ( 3/4-10X2,5-IN ) 5J-4773
6 23 Pcs SKD02 - Track Skidder 527
7 WASHER HEARD (20X36,5X3,5-MMTHK) 5P-8248
23 Pcs SKD02 - Track Skidder 527

1 011/DP2B/HTI PT. ARM-MADINA/I/23 15 Januari 2023 Rantai Logging 15 Mtr EXC01 - Excavator 320D

1 026/DP2B/HTI PT. ARM-MADINA/II/23 13 Februari 2023 Roller GP - Track Carrier 8E - 5600 4 Pcs EXC01 - Excavator 320D

2 Roller GP - Track Single Flange 163-4143 14 Pcs EXC01 - Excavator 320D


3 Idler GP - Front 248-7143 2 Pcs EXC01 - Excavator 320D

4 Bolt 8T -4140 8 Pcs EXC01 - Excavator 320D

5 Bushing 240-2913 2 Pcs EXC01 - Excavator 320D


6 Switch As - Presure 309-7569 3 Pcs EXC01 - Excavator 320D

7 Gasket Cylinder Head 294-1682 1 Pcs EXC01 - Excavator 320D

1 101/DP2B/HTI PT. ARM-MADINA/V/22 12 Mei 2022 HOSE STICK CYLINDER 1 PCS EXC02 - Excavator 320D

1 025/DP2B/HTI PT. ARM-MADINA/II/23 13 Februari 2023 Sprocket - Track ( 21 Teeth) 8E - 9805 2 Pcs EXC02 - Excavator 320D

2 Bolt ( M20x2,5x45 MM) 7X - 2562 32 Pcs EXC02 - Excavator 320D

1 021/DP2B/HTI PT. ARM-MADINA/II/23 03 Februari 2023 Roller GP - Track Carrier 8E - 5600 4 Pcs EXC02 - Excavator 320D

2 Roller GP - Track Single Flange 163-4143 14 Pcs EXC02 - Excavator 320D

3 Idler GP - Front 248-7143 2 Pcs EXC02 - Excavator 320D

4 Bolt 8T -4140 8 Pcs EXC02 - Excavator 320D

5 Bushing 240-2913 2 Pcs EXC02 - Excavator 320D

6 Switch As - Presure 309-7569 3 Pcs EXC02 - Excavator 320D

7 Hose As 199-7403 1 Pcs EXC02 - Excavator 320D

8 Link As - Track 194-1609 2 Set EXC02 - Excavator 320D

9 Bolt ( M20x1,5x55 MM ) 9W-3619 360 Pcs EXC02 - Excavator 320D

10 Nut ( M20x1,5-THD ) 9W-3361 360 Pcs EXC02 - Excavator 320D


REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn

1 040/DP2B/HTI PT. ARM-MADINA/III/23 01 Maret 2023 Switch Gp-Magnetic 241-8368 1 Pcs WHL01 - Wheel Loader 966H

2 Switch As-Start 110-7887 1 Pcs WHL01 - Wheel Loader 966H

1 095/DP2B/HTI PT. ARM-MADINA/IV/22 17 April 2022 METAL BULAN 2 SET U/ STRADA TRITON

1 033/DP2B/HTI PT. ARM-MADINA/II/23 20 Februari 2023 Fuel Filter 1R - 0751 6 PCS Excavator

1 038/DP2B/HTI PT. ARM-MADINA/II/23 25 Februari 2023 Oli Mesin DEO 15 W40 - 208 L 3E9840 2 EM Alat Berat Caterpilar

1 035/DP2B/HTI PT. ARM-MADINA/II/22 17/Feb/22 Catalog Winch u/Skidder 2 Bh U/Mekanik/Gdg


2 Catalog Winch u/Skidder 2 Bh
3 Catalog Logging Truck 2 Bh
4 Catalog Excavatror 2 Bh
5 Catalog L.200 Mega Cabin 2 Bh
6 Catalog Pick - Up 2 Bh
7 Catalog Truck Tangki 2 Bh

1 036/DP2B/HTI PT. ARM-MADINA/II/22 17/Feb/22 Shop Manual Log Loader 1 Bh U/Mekanik/Gdg


2 Shop Manual Skidder 1 Bh
3 Shop Manual Winch u/Skidder 1 Bh
4 Shop Manual Winch u/Skidder 1 Bh
5 Shop Manual Logging Truck 1 Bh
6 Shop Manual Logging Truck 1 Bh
7 Shop Manual Catalog Buldozer 1 Bh
8 Shop Manual Dump Truck 1 Bh
9 Shop Manual Excavatror 1 Bh
10 Shop Manual Grader 1 Bh
11 Shop Manual Compactor 1 Bh
12 Shop Manual Tritone Single Cabin 1 Bh
13 Shop Manual L.200 Mega Cabin 1 Bh
14 Shop Manual Pick - Up 1 Bh
15 Catalog Truck Tangki 1 Bh

1 053-1/DP2B/HTI PT. ARM-MADINA/III/22 08 Maret 2022 GEAR HIGH SPEED 1 PCS U/LOGGING TRUCK 01
2 NEEDLE ASSY 2 PCS
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn
3 BEARING BALL 1 PCS
4 BEARING BALL 1 PCS
5 GEAR LOW 1 PCS
6 BEARING TAPER 1 PCS
7 MAIN SHAFT 1 PCS
8 GEAR REDUKTION 1 PCS
9 GEAR 1 PCS
10 SHAFT IDLER 1 PCS
11 GEAR 1 PCS
12 BEARING ROLLER 1 PCS
13 BEARING BALL 1 PCS

1 072/DP2B/HTI PT. ARM-MADINA/III/22 22 Maret 2022 Oring Set Petak 1 Ktk U/Kend & Alat Berat
2 Oring Set Bulat 1 Ktk

1 075/DP2B/HTI PT. ARM-MADINA/III/22 23 Maret 2022 Cat Minyak /Kayu Warna Hitam 5 Klg U/ Material Kerja
2 Cat Minyak /Kayu Warna Kuning 16 Klg Blok THPB II - 2022
3 Cat Minyak /Kayu Warna Merah 11 Klg
4 Cat Minyak /Kayu Warna Putih 13 Klg

1 086/DP2B/HTI PT. ARM-MADINA/IV/22 06 April 2022 Mesin Bubut Kecil 1 Unit U/WORKSHOP

1 090/DP2B/HTI PT. ARM-MADINA/IV/22 12 April 2022 GPS 2 Unit U/PRODUKSI

1 092/DP2B/HTI PT. ARM-MADINA/IV/22 12 April 2022 PRINTER BROTHER 1 Unit U/CAMP TARIK

1 124/DP2B/HTI PT. ARM-MADINA/VI/22 05 Juni 2022 GAGANG SHOCK OTOMATIS 1 PCS U/MEKANIK

1 132/DP2B/HTI PT. ARM-MADINA/VI/22 10 Juni 2022 BROTI 0.68 M3 U/RUANG MSN BUBUT
2 BROTI 0.89 M3
3 BROTI 0.47 M3
4 PAPAN 3.17 M3
5 PAPAN 0.09 M3
6 PAKU 5 INCHI 3 KG
7 PAKU 4 INCHI 2 KG
8 HANDLE JENDELA 12 BH
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn
9 STOP KONTAK 4 LOBANG 2 BH
10 STOP KONTAK 2 LOBANG 2 BH
11 SAKLAR TUNGGAL 4 BH
12 SENG 68 LBR
13 PAKU SENG 4 KG

1 133/DP2B/HTI PT. ARM-MADINA/VI/22 11 Juni 2022 MESIN GENSET + DINAMO 5 KVA 1 UNIT U/CAMP TARIK BARU
2 TELEVISI 34 INCHI 1 UNIT
3 PARABOLA 1 UNIT
4 RECEIVER 1 UNIT

1 177/DP2B/HTI PT. ARM-MADINA/VIII/22 15/08/2022 TV LED 32 Inchi 1 Unit U/Camp Tarik

1 213/DP2B/HTI PT. ARM-MADINA/X/22 10/10/2022 Broti Uk 5 x 7 Cm x 4 Mtr 0.34 M3 U/Pemb. Meja & Rak
2 Papan 2 x 10 Cm X 4 Mtr 0.51 M3
3 Papan 2 x 20 Cm X 4 Mtr 1.01 M3
4 Papan 2 x 7 Cm X 4 Mtr 0.43 M3
5 Papan 3 x 20 Cm X 4 Mtr 3.71 M3

1 253/DP2B/HTI PT. ARM-MADINA/XII/22 13/12/2022 Perahu Panjang 12 Mtr 1 Unit Transport Bibit

1 254/DP2B/HTI PT. ARM-MADINA/XII/22 26/12/2022 Laptop Dell Latitude 7490 1 Unit Asst. Perencanaan
Core i7-8650
Prosesor Core i7 8850U
Memori 8 GB DDR4
Penyimpanan 512 GB SSD

TAHUN 2023
1 003/DP2B/HTI PT. ARM-MADINA/I/23 02 Januari 2023 Takaran Liter Uk. 10 Ltr 1 Pcs Gudang Material
2 Takaran Liter Uk. 5 Ltr 1 Pcs
3 Takaran Liter Uk. 2 Ltr 1 Pcs

1 008/DP2B/HTI PT. ARM-MADINA/I/23 07 Januari 2023 Label Pohon Warna Kuning 5154 Lbr Itsp - 01-0081
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn

2 Label Pohon Warna Merah 28105 Lbr Itsp - 01-0082


3 Plastik Satin Putih 3 Roll

1 022/DP2B/HTI PT. ARM-MADINA/II/23 04 Februari 2023 Flow Meter 3 Unit U/BBM Solar ke Unit

Drum Biru 6 Bh

Jerigen Uk. 35 Ltr 6 Bh

1 024/DP2B/HTI PT. ARM-MADINA/II/23 07 Februari 2023 Karpet Uk. 2 Mtr 10 Roll U/Kantor HTI Baru

Cat Vinilex Putih @ 20 Kg 10 Pail

027/DP2B/HTI PT. ARM-MADINA/II/23 13 Februari 2023 Batrey Laptop HP 919682 - 421 1 Bh U/Adm Lingkungan

028/DP2B/HTI PT. ARM-MADINA/II/23 13 Februari 2023 Kolor Kut 1 Pcs U/Alat BBM Solar

029/DP2B/HTI PT. ARM-MADINA/II/23 13 Februari 2023 Packing Yamgen 1 Pcs U/KEBUTUHAN GENSET 04

SEAL KOR AS DEPAN (12-KVA / 9,6 KW) 1 Pcs

SEAL KOR AS BELAKANG 1 Pcs

1 030/DP2B/HTI PT. ARM-MADINA/II/23 17 Februari 2023 Kain Majun 50 Kg Workshop

2 Contact Cleaner 5 Btl

3 Minyak Rem Jumbo 12 Btl

4 Regulator Oksigen 2 Pcs

5 Regulator LPG 2 Pcs

6 Stang Las 3 Psg

1 031/DP2B/HTI PT. ARM-MADINA/II/23 17 Februari 2023 Pulpen 6 Lsn U/Keb. Alat Tulis Kantor

2 Letter File Besar 20 Bh

3 Letter File Kecil 10 Bh

4 Lakban Hitam 10 Roll

1 032/DP2B/HTI PT. ARM-MADINA/II/23 20 Februari 2023 Rantai Potong Chainsaw 52 STIHL 5 Bh CS Borongan

2 Cincin Sprocket 10 Bh
REKAPITULASI MONITORING DP2B OUTSTANDING
PERIODE : 01 Januari s/d 28 Februari 2023

BASE CAMP BUNIAN SALIM KANTOR MEDAN


DP2B Camp Pemenuhan DP2B
No
Permintaan Barang Pengiriman Barang
Keterangan
No. DP2B Tanggal Nama Barang Part Number Jumlah Stn SPB Nomor Tanggal Nama Barang Jumlah Stn

3 Kikir Bulat Besar 24 Bh

1 034/DP2B/HTI PT. ARM-MADINA/II/23 20 Februari 2023 Polybag Uk. 12 x 17 Cm 150 Kg Persemaian

1 036/DP2B/HTI PT. ARM-MADINA/II/23 21 Februari 2023 Deepstik Stick Sounding Kuningan Ukuran 3 Mtr 1 PCS Alat ukur BBM Solar

Bukit Bunian Salim ,01 Maret 2023


Dibuat Oleh, Diperiksa Oleh, Diketahui Oleh Diperiksa Oleh, Diketahui Oleh,

Irwan Fuadi Abdullah Purba Sihol M.Hutahaean Yudha Teguh Haryanto


Ka.Logistik/Gudang KTU Plt.Manager HTI Bagian Pembelian Kabag Produksi
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan

iketahui Oleh,

Teguh Haryanto

Kabag Produksi