1,000,000 Rp 1,000,000
25,000 Rp 494,000
285,000 Rp 7,884,240
285,000 Rp 501,600
TOTAL Rp 9,879,840
185,000 Rp 4,662,000
750,000 Rp 741,000
1,800,000 Rp 1,778,400
2,100,000 Rp 3,696,000
400,000 Rp 400,000
180,000 Rp 4,536,000
675,000 Rp 9,450,000
650,000 Rp 16,380,000
15,000 Rp 378,000
105,000 Rp 4,221,000
105,000 Rp 4,221,000
350,000 Rp 14,070,000
300,000 Rp 5,700,000
7,000,000 Rp 7,000,000
10,000 Rp 402,000
650,000 Rp 1,300,000
1,500,000 Rp 1,500,000
TOTAL Rp 80,435,400
5,100,000 Rp 5,100,000
4,100,000 Rp 4,100,000
250,000 Rp 250,000
3,000,000 Rp 3,000,000
1,500,000 Rp 1,500,000
1,100,000 Rp 1,100,000
225,000 Rp 675,000
TOTAL Rp 15,725,000
2,950,000 Rp 2,950,000
1,750,000 Rp 1,750,000
2,250,000 Rp 4,500,000
650,000 Rp 650,000
TOTAL Rp 9,850,000
TOTAL KESELURUHAN PEKERJAAN SUB TOTAL
TOTAL Rp
DISKON 5% Rp
TOTAL KESELURUHAN Rp
SUB TOTAL
9,879,840
80,435,400
15,725,000
9,850,000
115,890,240
5,794,512
110,095,728
Nb:
- Garansi kebocoran kolam renang selama 5 (lima) tahun diluar bencana alam
- Gransi mesin mati 6 (enam) bulan di luar spare part
- Maksimal Pengerjaan 60 Hari Kalender
- Harga sudah termasuk biaya material dan jasa
- Penawaran ini berlaku 1 bulan setelah berkas diterima
PROSEDUR PENAGIHAN DAN PEMBAYARAN
1. Termin I (Satu) 30 % Dari nilai total Pekerjaan dibayarkan setelah SPK ini di tanda tangani dan tukang (pekerja) mulai pekerjaan.
2. Termin II (Dua) 40 % Dari nilai total Pekerjaan dibayarkan akan dilakukan pengecoran.
3. Termin III (Tiga) 25 % Dari nilai total Pekerjaan dibayarka setelah selesai waterprofing,plester selesai sebelum dilakukan pemasangan keramik & equipment
4. Termin IV (Empat) 5 % Dari nilai total Pekerjaan dibayarkan setelah pekerjaan di nyatakan selesai Pekerjaan
- Serah Terima Pekerjaan
- Retensi Satu (1) Minggu
Demikian kami buat prosedur penagihan dan pembayaran pekerjaan pembuatan kolam renang. NB : pembayaran dilakukan via transfer melalui :3610199169 a/n DARM