Anda di halaman 1dari 2

KEMENTERIAN KEUANGAN REPUBLIK INDONESIA

BIRO KEUANGAN

LAPORAN MONITORING KONTRAK

Tanggal : 01-09-2023 s.d. 09-09-2023

Jangka Waktu
No Satker No CAN Supplier Tgl.Upload Tgl.Kontrak Nomor Uraian Akun Tgl Mulai Tgl Akhir Nilai Kontrak Nilai Realisasi Nilai Sisa
Penyampaian
1 466348 A/133.23007449/0/0 PT. 06-SEP-23 01-SEP-23 Tidak terlambat 32/SPK/KPA-B.III/09/20 PEKERJAAN 524119 08-SEP-23 09-SEP-23 84,095,820 0 84,095,820
INTERFORU 23 RAPAT
Kontrak
M CONVEX KERJA
EVALUASI
KINERJA
KEUANGAN
BIRO
KEUANGAN
TAHUN
ANGGARAN
2023
2 466348 A/133.23007449/0/0 PT. 06-SEP-23 01-SEP-23 Tidak terlambat 32/SPK/KPA-B.III/09/20 PEKERJAAN 521219 08-SEP-23 09-SEP-23 390,599,180 0 390,599,180
INTERFORU 23 RAPAT
M CONVEX KERJA
EVALUASI
KINERJA
KEUANGAN
BIRO
KEUANGAN
TAHUN
ANGGARAN
2023
3 466348 A/133.23007726/0/0 PT TRI 13-SEP-23 08-SEP-23 Tidak terlambat 37/SPK/KPA-B.III/09/20 PEKERJAAN 524119 13-SEP-23 15-SEP-23 205,314,000 0 205,314,000
ARTHA 23 BIMTEK
MAHADYA PENGELOLA
AN
KEUANGAN
BLU
4 466348 A/133.23007726/0/0 PT TRI 13-SEP-23 08-SEP-23 Tidak terlambat 37/SPK/KPA-B.III/09/20 PEKERJAAN 521219 13-SEP-23 15-SEP-23 114,430,970 0 114,430,970
ARTHA 23 BIMTEK
MAHADYA PENGELOLA
AN
KEUANGAN
BLU

Hal : 1/2 Dicetak : 2023-09-13 16:10:26


5 466348 A/133.23007726/0/0 PT TRI 13-SEP-23 08-SEP-23 Tidak terlambat 37/SPK/KPA-B.III/09/20 PEKERJAAN 524114 13-SEP-23 15-SEP-23 28,755,030 0 28,755,030
ARTHA 23 BIMTEK
MAHADYA PENGELOLA
AN
KEUANGAN
BLU

Hal : 2/2 Dicetak : 2023-09-13 16:10:26

Anda mungkin juga menyukai