NO URAIAN SATUAN
KOTA UTA
1 2 3 4 5 6
7 8 9 10 11
Menyetujui,
Kepala Bidang
KETERANGAN
13
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DAFTAR HARGA SATUAN BAHAN
SEMESTER I KABUPATEN GRESIK TAHUN 2017
WILAYAH GRESIK TENGAH / KOTA
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
1 BAHAN PASIR :
a. Pasir Urug M3 180,000 200,000
b. Pasir Pasang/ Kasar M3 216,000 240,000
c. Pasir Cor M3 252,000 280,000
d. Sirtu M3 175,500 195,000
2 BAHAN TANAH :
a. Tanah Urug M3 63,000 70,000
b. Tanah Tanam M3 198,000 220,000
c. Pedel M3 99,000 110,000
d. Limestone M3 112,500 125,000
e. Tanah Paras M3 72,000 80,000
3 BAHAN BATU :
a. Batu Karang M3 198,000 220,000
b. Batu Belah M3 207,000 230,000
c. Batu Pecah 5/7 M3 292,500 325,000
d. Batu Pecah 3/5 M3 294,750 327,500
e. Batu Pecah 2/3 M3 297,000 330,000
f. Batu Pecah 1/2 M3 337,500 375,000
g. Batu Pecah 1/1 M3 342,000 380,000
h. Batu Pecah 0.5/0.5 M3 346,500 385,000
i. Agregat Kelas A M3 216,000 240,000
j. Agregat Kelas B M3 207,000 230,000
k. Agregat Kelas C M3 189,000 210,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
1
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
- tebal 6 cm Warna M2 72,000 80,000
- tebal 8 cm Warna M2 85,500 95,000
-Ukuran 20.20.6 polos M2 67,500 75,000
-Ukuran 20.20.8 polos M2 76,500 85,000
-Ukuran 20.20.6 war M2 81,000 90,000
-Ukuran 20.20.8 war M2 94,500 105,000
K400 ==> - tebal 8 cm Polos M2 85,500 95,000
- tebal 8 cm Warna Fu M2 108,000 120,000
- tebal 10 cm Polos M2 117,000 130,000
- tebal 10 cm Warna F M2 126,000 140,000
K500 ==> - tebal 8 cm Polos M2 94,500 105,000
- tebal 10 cm Polos M2 126,000 140,000
l. Uskup
K175 ==> - tebal 6 cm Polos bj 3,150 3,500
- tebal 8 cm Polos bj 4,500 5,000
- tebal 6 cm Warna bj 4,050 4,500
- tebal 8 cm Warna bj 5,400 6,000
K300 ==> - tebal 6 cm Polos bj 4,275 4,750
- tebal 8 cm Polos bj 4,950 5,500
- tebal 6 cm Warna bj 5,850 6,500
- tebal 8 cm Warna bj 6,750 7,500
- tebal 6 cm Warna bj 5,175 5,750
- tebal 8 cm Warna bj 5,850 6,500
K400 ==> - tebal 6 cm Polos bj 5,850 6,500
- tebal 8 cm Polos bj 6,750 7,500
- tebal 6 cm Warna bj 7,200 8,000
- tebal 8 cm Warna bj 8,550 9,500
- tebal 10 cm Polos bj 8,550 9,500
- tebal 10 cm warna bj 9,450 10,500
m. Paving Block
K300 ==> - Inter block 4.6 Polos M2 58,500 65,000
- Inter block 4.8 Polos M2 74,250 82,500
- Inter block 4.6 warn M2 72,000 80,000
- Inter block 4.8 warn M2 85,500 95,000
K400 ==> - Inter block 4.6 Polos M2 67,500 75,000
- Inter block 4.8 Polos M2 83,250 92,500
- Inter block 4.6 warn M2 81,000 90,000
- Inter block 4.8 warn M2 94,500 105,000
n. Kanstine
- Uk : 10 x 20 x 40 Buah 11,700 13,000
- Uk : 15 x 25 x 40 Buah 23,400 26,000
- Uk : 15 x 30 x 50 Buah 33,750 37,500
- Uk : 18 x 30 x 60 Buah 42,750 47,500
- Kanstine Sepatu 21 x 18 x 30 x 6 Buah 49,500 55,000
- Kanstine Sepatu 25 x 18 x 30 x 6 Buah 58,500 65,000
5 BAHAN SEMEN/PC :
a. Semen/PPC 40 Kg Zak 45,600 48,000
b. Semen Serba Guna 40 Kg Zak 52,250 55,000
c. Semen Putih Zak 90,250 95,000
d. Semen Warna Kg 9,500 10,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
2
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
e. Semen Instan Kg 12,350 13,000
6 BAHAN KAPUR :
a. Kapur Bubuk/Pasang Kg 3,150 3,500
7 BAHAN BESI :
a. Besi Beton Polos Kg 8,550 9,500
b. Besi Beton Ulir Kg 9,000 10,000
c. Besi Siku Kg 9,450 10,500
d. Besi Profil canal Kg 9,450 10,500
e. Mur Baut 1/2", 5/8", 7/8" Kg 22,500 25,000
f. Plat Bronze Kg 78,300 87,000
g. Besi Plate Kg 9,450 10,500
h. Besi Plate Strip Kg 9,450 10,500
i. Murhez Cor C2 Buah 1,845,000 2,050,000
j. Murhez Cor C3 Buah 1,710,000 1,900,000
k. Murhez Cor A&B Buah 2,700,000 3,000,000
l. Besi Cor C2 Kg 31,500 35,000
m. Besi Cor C3 Kg 31,500 35,000
n. Besi Cor A&B Kg 31,500 35,000
o. Roda Gigi Pasang 3,150,000 3,500,000
p. Pipa Kg 13,050 14,500
q. Niple Buah 16,200 18,000
r. Spie Buah 36,000 40,000
s. Splite Pen Buah 40,500 45,000
t. Gembok pintu air Buah 72,000 80,000
u. Drucklager Besar Buah 270,000 300,000
v. Drucklager Kecil Buah 135,000 150,000
w. Naf + Ring Buah 31,500 35,000
x. Seal Karet M' 292,500 325,000
y.Rolling Dor M2 450,000 500,000
z. Besi Bulat ST. 40 Kg 9,450 10,500
aa. Besi Bulat ST. 60 Kg 10,350 11,500
8 BAHAN KAWAT :
a. Kawat Beton Kg 11,700 13,000
b. Kawat Galvanis Kg 14,400 16,000
c. Kawat Kasa/nyamuk aluminium Meter 18,000 20,000
d. Kawat Harmonika Meter 20,250 22,500
e. Kawat Bronjong Galvanis dia. 2.7
mm (2x1x0.5) Buah 225,000 250,000
f. Kawat Bronjong Galvanis dia. 3.0
mm (2x1x0.5) Buah 256,500 285,000
g. Kawat Bronjong (Gabion)-Heavy
Buah
Galvanized+PVC Coated (2x1x0.5) 324,000 360,000
h. Kawat Bronjong (Matras)-Heavy
Buah
Galvanized+PVC Coated (2x1x0.5) 1,143,000 1,270,000
i. Kawat Bronjong (Gabion)-Heavy
Buah
Galvanized (2x1x0.5) 270,000 300,000
j. Geotextile Non Woven MXS 200 gr/m2 8,550 9,500
k. Geotextile Non Woven MXS 300 gr/m2 12,150 13,500
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
3
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
4
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
Bend RR E 63 mm x 90° Buah 99,000 110,000
Bend RR E 63 mm x 45° Buah 90,900 101,000
Reduser RR E 160 x 110 mm Buah 283,500 315,000
Reduser RR E 160 x 90 mm Buah 238,500 265,000
Reduser RR E 90 x 63 mm Buah 103,500 115,000
Flange Spigot E 200 mm Buah 799,110 887,900
Flange Spigot E 160 mm Buah 513,180 570,200
Flange Spigot E 110 mm Buah 261,630 290,700
Flange Spigot E 90 mm Buah 206,370 229,300
Flange Spigot E 63 mm Buah 149,130 165,700
Flange Soket RR E 200 mm Buah 864,180 960,200
Flange Soket RR E 160 mm Buah 576,000 640,000
Flange Soket RR E 110 mm Buah 292,500 325,000
Flange Soket RR E 90 mm Buah 220,500 245,000
Flange Soket RR E 63 mm Buah 160,110 177,900
Gate Valve E 8" Buah 3,150,000 3,500,000
Gate Valve E 6" Buah 1,890,000 2,100,000
Gate Valve E 4" Buah 801,000 890,000
Gate Valve E 3" Buah 648,000 720,000
Gate Valve E 2" Buah 423,000 470,000
Single Air Valve E 25 mm unit 130,500 145,000
Giboult Join E 8" Buah 387,000 430,000
Giboult Join E 6" Buah 261,000 290,000
Giboult Join E 4" Buah 135,000 150,000
Giboult Join E 3" Buah 99,000 110,000
Dop PVC E 160 mm Buah 94,500 105,000
Dop PVC E 110 mm Buah 45,000 50,000
Dop PVC E 90 mm Buah 29,700 33,000
Dop PVC E 63 mm Buah 24,300 27,000
Karet Pack PVC E 8" Buah 15,300 17,000
Karet Pack PVC E 6" Buah 10,800 12,000
Karet Pack PVC E 4" Buah 9,000 10,000
Karet Pack PVC E 3" Buah 7,200 8,000
Karet Pack PVC E 2" Buah 6,300 7,000
Mur Baut 5/8 x 3" Buah 4,500 5,000
Starport E 6" Buah 144,000 160,000
Hidrant Umum 3000 liter Buah 4,050,000 4,500,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
5
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
Motor : 0,75 kw; 1 phase; 2900 rpm
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
6
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
Liquid End : Polypropylene
Control : Lengt stroke dan frekwensi
Electrical : 230 V ; 1 Phase ; 11 watt
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
7
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
Type Submersible Deep Well Set 8,010,000 8,900,000
Kapasitas 4 m3/ Jam
Head Total 80 m
Material All Stainless Steel (Impeler & Body)
Motor Franklin USA
Pompa APP Taiwan
Listrik 3 phase ; 380 V ; 50 Hz ; 1.5Kw
Assesories
(Pipa AW 1.5 Inc, Kabel NYYHY 4x2.5 mm,
Level Control )
12 BAHAN PAGAR :
a. Pagar BRC
- Type UCP. UK : 0,90 M x 2,40 M Lembar 216,000 240,000
- Type HOTDIP UK : 0,90 M x 2,40Lembar 297,000 330,000
b. Pintu Pagar BRC :
- Swing UCP M2 391,500 435,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
8
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
- Dorong UCP M2 396,000 440,000
- Swing HOTDIP M2 477,000 530,000
- Dorong HOTDIP M2 486,000 540,000
c. Tiang Pagar BRC :
- Diameter 1,5 " UCP M' 81,000 90,000
- Diameter 2 " HOTDIP M' 99,000 110,000
14 BAHAN BETON :
a. Beton Ready Mix K-125 M3 607,500 675,000
b. Beton Ready Mix K-175 M3 643,500 715,000
c. Beton Ready Mix K-225 M3 679,500 755,000
d. Beton Ready Mix K-250 M3 715,500 795,000
e. Beton Ready Mix K-300 M3 751,500 835,000
f. Beton Ready Mix K-350 M3 787,500 875,000
g. Beton Ready Mix K-400 M3 823,500 915,000
h. Beton Ready Mix K-500 M3 859,500 955,000
i. Cement Treated Base ( CTB ) M3 405,000 450,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
9
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
o. U 800x900x1200mm pcs 1,404,000 1,560,000
p. U 800x1000x1200mm pcs 1,503,000 1,670,000
q. U1000x1000x1200mm pcs 1,809,000 2,010,000
r. U1000x1200x1200mm pcs 1,980,000 2,200,000
s. U1200x1200x1200mm pcs 3,217,500 3,575,000
t. U1200x1400x1200mm pcs 3,532,500 3,925,000
u. U1500x1500x1200mm pcs 3,672,000 4,080,000
v. U1500x1600x1200mm pcs 3,816,000 4,240,000
w. U1500x1700x1200mm pcs 3,960,000 4,400,000
x. U1800x1800x1200mm pcs 5,458,500 6,065,000
y. U1800x1900x1200mm pcs 5,652,000 6,280,000
z. U1800x2000x1200mm pcs 5,850,000 6,500,000
aa. U2000x2000x1200mm pcs 6,372,000 7,080,000
bb. U2000x2100x1200mm pcs 6,565,500 7,295,000
cc. U2000x2200x1200mm pcs 6,759,000 7,510,000
dd. CU400x400x1200mm pcs 144,000 160,000
ee. CU500x500x1200mm pcs 121,500 135,000
ff. CU 600x600x1200mm pcs 243,000 270,000
Saluran Tepi Gandar 5 Ton
a. U 300x300x1200mm.5cm pcs 297,000 330,000
b. U 300x400x1200mm.5cm pcs 351,000 390,000
c. U 300x500x1200mm.5cm pcs 405,000 450,000
d. U 400x400x1200mm.6cm pcs 459,000 510,000
e. U 400x500x1200mm.6cm pcs 522,000 580,000
f. U 400x600x1200mm.6cm pcs 585,000 650,000
g. U 500x500x1200mm.6cm pcs 558,000 620,000
h. U 500x600x1200mm.6cm pcs 621,000 690,000
i. U 500x700x1200mm.6cm pcs 684,000 760,000
j. U 600x600x1200mm.6cm pcs 729,000 810,000
k. U 600x700x1200mm.6cm pcs 801,000 890,000
l. U 600x800x1200mm.6cm pcs 864,000 960,000
m.U 800x800x1200mm.8cm pcs 1,260,000 1,400,000
n. U 800x800x1200mm.10cm pcs 1,404,000 1,560,000
o. U 800x900x1200mm.10cm pcs 1,440,000 1,600,000
p. U 800x1000x1200mm.10cm pcs 1,530,000 1,700,000
q. U 1000x1000x1200mm.10cm pcs 1,800,000 2,000,000
r. U 1000x1000x1200mm.12cm pcs 2,227,500 2,475,000
s. U 1000x1200x1200mm.10cm pcs 1,989,000 2,210,000
t. U 1000x1200x1200mm.12cm pcs 2,268,000 2,520,000
u. U 1200x1000x1200mm.10cm pcs 1,935,000 2,150,000
v. U 1200x1000x1200mm.12cm pcs 2,340,000 2,600,000
w. U 1200x1500x1200mm.15cm pcs 3,798,000 4,220,000
x. U 1500x1500x1200mm.15cm pcs 3,960,000 4,400,000
y. CU 300X60X600mm pcs 85,500 95,000
z. CU 400X80X600mm pcs 139,500 155,000
aa. CU 500X100X600mm pcs 207,000 230,000
bb. CU 600X100X600mm pcs 261,000 290,000
cc. CU 800X100X600mm pcs 337,500 375,000
dd. CU 1000x110x1200mm pcs 945,000 1,050,000
ee. CU 300X60X1200mm pcs 135,000 150,000
ff. CU 400x80x1200mm pcs 144,000 160,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
10
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
gg. CU 400x80x1200mm pcs 180,000 200,000
hh. CU 500x80x1200mm pcs 216,000 240,000
ii. CU 500x100x1200mm pcs 256,500 285,000
jj. CU 520x80x1200mm pcs 171,000 190,000
kk. CU 600x80x1200mm pcs 306,000 340,000
ll. CU 600x100x1200mm pcs 396,000 440,000
mm. CU 620x100x1200mm pcs 207,000 230,000
nn. CU 720x100x1200mm pcs 315,000 350,000
oo. CU 760x100x1200mm pcs 337,500 375,000
pp. CU 800x100x1200mm pcs 517,500 575,000
qq. CU 1000x100x1200mm pcs 652,500 725,000
rr. CU 1000x120x1200mm pcs 751,500 835,000
ss. CU 1200x120x1200mm pcs 666,000 740,000
tt. CU 1200x120x1200mm pcs 828,000 920,000
uu. CU 1240x120x1200mm pcs 990,000 1,100,000
vv. CU 1500x150x1200mm pcs 1,417,500 1,575,000
ww. CU 1800x150x1200mm pcs 1,575,000 1,750,000
xx. CU 2000x150x1200mm pcs 1,890,000 2,100,000
Saluran Tepi Gandar 10 Ton
a. U 300x300x1200mm.5cm pcs 337,500 375,000
b. U 300x400x1200mm.5cm pcs 396,000 440,000
c. U 300x500x1200mm.5cm pcs 450,000 500,000
d. U 400x400x1200mm.6cm pcs 504,000 560,000
e. U 400x500x1200mm.6cm pcs 571,500 635,000
f. U 400x600x1200mm.6cm pcs 648,000 720,000
g. U 500x500x1200mm.6cm pcs 607,500 675,000
h. U 500x600x1200mm.6cm pcs 675,000 750,000
i. U 500x700x1200mm.6cm pcs 742,500 825,000
j. U 600x600x1200mm.6cm pcs 778,500 865,000
k. U 600x700x1200mm.8cm pcs 873,000 970,000
l. U 600x800x1200mm.8cm pcs 945,000 1,050,000
m. U 800x800x1200mm.10cm pcs 1,440,000 1,600,000
n. U 800x900x1200mm.10cm pcs 1,530,000 1,700,000
o. U 800x1000x1200mm.12cm pcs 1,620,000 1,800,000
p. U 1000x1000x1200mm.10cm pcs 1,980,000 2,200,000
q. U 1000x1000x1200mm.12cm pcs 2,340,000 2,600,000
r. U 1000x1200x1200mm.10cm pcs 2,115,000 2,350,000
s. U 1000x1200x1200mm.12cm pcs 2,565,000 2,850,000
t. U 1200x1000x1200mm.12cm pcs 2,407,500 2,675,000
u. U 1200x1200x1200mm.12cm pcs 3,735,000 4,150,000
v. U 1200x1400x1200mm.12cm pcs 4,050,000 4,500,000
w. CU 300X90X600mm pcs 162,000 180,000
x. CU 400x100x600mm pcs 225,000 250,000
y. CU 500x120x600mm pcs 297,000 330,000
z. CU 600x120x600mm pcs 346,500 385,000
aa. CU 800x150x600mm pcs 450,000 500,000
bb. CU 800x120x1200mm pcs 675,000 750,000
cc. CU 1000x120x1200mm pcs 810,000 900,000
dd. CU 1200x120x1200mm pcs 1,035,000 1,150,000
ee. CU 1200x180x1200mm pcs 2,115,000 2,350,000
ff. CU 300X80X1200mm pcs 198,000 220,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
11
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
gg. CU 300X100X1200mm pcs 238,500 265,000
hh. CU 400x110x1200mm pcs 337,500 375,000
ii. CU 400x120x1200mm pcs 351,000 390,000
jj. CU 500x110x1200mm pcs 378,000 420,000
kk. CU 500x120x1200mm pcs 405,000 450,000
ll. CU 600x150x1200mm pcs 585,000 650,000
mm. CU 600x120x1200mm pcs 495,000 550,000
nn. CU 800x150x1200mm pcs 751,500 835,000
oo. CU 1000x150x1200mm pcs 1,125,000 1,250,000
pp. CU 1200x150x1200mm pcs 1,327,500 1,475,000
qq. CU 1500x200x1200mm pcs 2,047,500 2,275,000
rr. CU 1800x200x1200mm pcs 2,205,000 2,450,000
ss. CU 2000x200x1200mm pcs 2,655,000 2,950,000
tt. BC 800x800x1200mm.11cm pcs 2,700,000 3,000,000
uu. BC 1000x1000x1200mm.12.5cm pcs 3,420,000 3,800,000
vv. BC 1500x1500x1200mm.20cm pcs 7,110,000 7,900,000
ww. BC 2000x2000x1200mm.20cm pcs 7,875,000 8,750,000
Saluran Tepi Gandar 15 Ton
a. U 600x600x1200mm.10cm pcs 1,304,100 1,449,000
b. U 600x800x1200mm.10cm pcs 1,540,350 1,711,500
c. U 800x800x1200mm.12cm pcs 2,008,125 2,231,250
d. U 800x1000x1200mm.12cm pcs 2,305,800 2,562,000
e. U 1000x1000x1200mm.15cm pcs 2,457,000 2,730,000
f. U 1000x1200x1200mm.15cm pcs 2,749,950 3,055,500
g. U 1200x1500x1200mm.20cm pcs 5,433,750 6,037,500
h. U 1500x1500x1200mm.20cm pcs 5,646,375 6,273,750
i. CU 800X120X1200mm pcs 1,171,800 1,302,000
j. CU 1040x120x1200mm pcs 1,875,825 2,084,250
k. CU 1040x120x1200mm pcs 2,371,950 2,635,500
l. CU 1300x150x1200mm pcs 1,512,000 1,680,000
m. CU 1600x200x1200mm pcs 2,409,750 2,677,500
n. CU 1900X250X1200mm pcs 3,449,250 3,832,500
o. BC 800x800x1200mm pcs 4,167,450 4,630,500
p. BC 1000x1000x1200mm pcs 4,758,075 5,286,750
Saluran Tepi Gandar 20 Ton
a. U 300x300x1200mm.8cm pcs 499,500 555,000
b. U 300x400x1200mm.8cm pcs 589,500 655,000
c. U 300x500x1200mm.8cm pcs 684,000 760,000
d. U 400x400x1200mm.8cm pcs 783,000 870,000
e. U 400x500x1200mm.8cm pcs 891,000 990,000
f. U 400x600x1200mm.8cm pcs 994,500 1,105,000
g. U 500x500x1200mm.8cm pcs 945,000 1,050,000
h. U 500x600x1200mm.8cm pcs 1,048,500 1,165,000
i. U 500x700x1200mm.10cm pcs 1,156,500 1,285,000
j. U 600x600x1200mm.10cm pcs 1,345,500 1,495,000
k. U 600x700x1200mm.10cm pcs 1,467,000 1,630,000
l. U 600x800x1200mm.10cm pcs 1,588,500 1,765,000
m. U 600x800x1200mm.12cm pcs 1,710,000 1,900,000
n. U 800x800x1200mm.12cm pcs 1,836,000 2,040,000
o. U 800x800x1200mm.15cm pcs 2,070,000 2,300,000
p. U 800x900x1200mm.12cm pcs 2,223,000 2,470,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
12
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
q. U 800x1000x1200mm.12cm pcs 2,344,500 2,605,000
r. U 800x1000x1200mm.15cm pcs 2,488,500 2,765,000
s. U 1000x1000x1200mm.15cm pcs 2,619,000 2,910,000
t. U 1000x1000x1200mm.20cm pcs 2,646,000 2,940,000
u. U 1000x1200x1200mm.15cm pcs 2,776,500 3,085,000
v. U 1000x1200x1200mm.20cm pcs 2,907,000 3,230,000
w. U 1000x1500x1200mm.15cm pcs 2,970,000 3,300,000
x. U 1200x1000x1200mm.15cm pcs 5,346,000 5,940,000
y. U 1200x1000x1200mm.20cm pcs 5,868,000 6,520,000
z. U 1500x1500x1200mm.20cm pcs 6,097,500 6,775,000
aa. U 1500x2000x1200mm.20cm pcs 6,223,500 6,915,000
bb. U 2000X2000X1200mm.25cm pcs 10,593,000 11,770,000
cc. CU 300X120X1200mm pcs 342,000 380,000
dd. CU 400x120x1200mm pcs 481,500 535,000
ee. CU 500x150x1200mm pcs 675,000 750,000
ff. CU 600x150x1200mm pcs 918,000 1,020,000
gg. CU 800x150x1200mm pcs 1,206,000 1,340,000
hh. CU 1000x200x1200mm pcs 1,930,500 2,145,000
ii. CU 1200x200x1200mm pcs 2,443,500 2,715,000
jj. BC 800x800x1200mm.11cm pcs 4,297,500 4,775,000
kk. BC 1000x1000x1200mm.12.5cm pcs 4,905,000 5,450,000
ll. BC 1500x1500x1200mm.20cm pcs 8,865,000 9,850,000
mm. BC 2000x2000x1200mm.20cm pcs 11,227,500 12,475,000
RJ-DRAINAGE PIPE
a. RPC 300x2440mm, Type RJ, Cls-2 pcs 356,400 396,000
b. RPC 400x2440mm, Type RJ, Cls-2 pcs 517,500 575,000
c. RPC 500x2440mm, Type RJ, Cls-2 pcs 751,500 835,000
d. RPC 600x2440mm, Type RJ, Cls-2 pcs 936,000 1,040,000
e. RPC 800x2440mm, Type RJ, Cls-2 pcs 3,033,000 3,370,000
f. RPC 1050x2440mm, Type RJ, Cls-2 pcs 4,725,000 5,250,000
g. RPC 1200x2440mm, Type RJ, Cls- pcs 6,862,500 7,625,000
h. RPC 3000/1000-80 pcs 1,733,400 1,926,000
i. RPC 2000/1000-80 pcs 1,300,500 1,445,000
j. RPC 1450/1000-80 pcs 1,066,500 1,185,000
k. RPC 1250/1000-80 pcs 994,500 1,105,000
l.RPC 1100/1000-80 pcs 895,500 995,000
U Gutter + Cover HD
1. Box 3000/1000-1200
a. RCBC top 3000/1000-1200 Consol pcs 12,991,500 14,435,000
b. RCBC bottom 3000/1000-1200 pcs 12,256,200 13,618,000
2. U 3000/1700+Cover
a. U-gutter 3000/1700-1200 pcs 9,234,000 10,260,000
b. Cover 3500x1200x300 pcs 5,346,000 5,940,000
Leg Gutter
a. L Gutter 2200/980-1200 pcs 3,969,000 4,410,000
b. Plat Sambungan L Gutter 4000x1 pcs 5,184,000 5,760,000
c. L Gutter 2500/1250-1200 pcs 4,698,000 5,220,000
d. L Gutter 2000/1250-1200 pcs 4,050,000 4,500,000
Lining Beton
a. Penulangan Balok pcs 198,000 220,000
b. Plat Atas pcs 162,000 180,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
13
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
c. Plat Bawah pcs 153,000 170,000
d. Caping pcs 108,000 120,000
16 BAHAN LANTAI :
a. Keramik Polos :
- Ukuran 10 x 20 cm M2 40,500 45,000
- Ukuran 20 x 20 cm M2 43,200 48,000
- Ukuran 20 x 25 cm M2 46,800 52,000
- Ukuran 25 x 30 cm M2 52,200 58,000
- Ukuran 30 x 30 cm M2 40,500 45,000
- Ukuran 40 x 40 cm M2 45,000 50,000
b. Keramik Motif
- Ukuran 20 x 33 cm M2 51,750 57,500
- Ukuran 25 x 40 cm M2 56,250 62,500
- Ukuran 30 x 30 cm M2 46,800 52,000
- Ukuran 40 x 40 cm M2 52,200 58,000
- Ukuran 50 x 50 cm M2 67,500 75,000
- Ukuran 60 x 60 cm M2 76,500 85,000
- Ukuran 30 x 60 cm M2 85,500 95,000
c. Granit
- Ubin granit 60 x 60 cm M2 108,000 120,000
- Ubin granit 80 x 80 cm M2 135,000 150,000
- Granite Tile 40 x 40 M3 157,500 175,000
- Plint Granitetile 10 x 40 Buah 22,500 25,000
d. Parquet kayu
- Jati 1.2 x 5 x 30 M2 198,000 220,000
- Merbau 1.2 x 7 x 30 M2 189,000 210,000
- Bengkirai 1.2 x 7 x 30 M2 292,500 325,000
17 BAHAN SANITAIR :
a. Kloset Jongkok Porselin Unit 121,500 135,000
b. Kloset Duduk Porselin Unit 540,000 600,000
c. Kloset Duduk Porselin Komplit Unit 1,080,000 1,200,000
d. Urinoir Unit 450,000 500,000
e. Wastafel Komplit Unit 315,000 350,000
f. Bak cuci Stainless Unit 225,000 250,000
g. Afour lantai Unit 18,000 20,000
h. Afour bak air Unit 13,500 15,000
i. Bak Mandi Fiber Glass Unit 225,000 250,000
j. Shower Spray unit 112,500 125,000
k. Shower Set unit 225,000 250,000
l. Tempat Sabun Buah 31,500 35,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
14
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
g. Kran dinding Buah 45,000 50,000
19 BAHAN ATAP :
A. GENTENG :
a.Genteng lokal Buah 2,250 2,500
b.Genteng Pres klas I Buah 2,700 3,000
c.Genteng wuwung jawa / lokal Buah 4,275 4,750
d.Genteng wuwung Pres klas I Buah 5,400 6,000
e.Genteng Karangpilang Buah 4,500 5,000
f. Genteng Nok Karangpilang Buah 13,500 15,000
g.Genteng Beton Buah 9,900 11,000
h.Nok genteng Beton Buah 11,700 13,000
i. Nglayur Buah 2,475 2,750
j. Genteng Glazur setara KIA Buah 9,900 11,000
k. Genteng Glazur setara melas Buah 13,500 15,000
l. Genteng Glazur setara Kanmuri Buah 14,850 16,500
B. ASBES :
B. a. ASBES Gel Besar
a. Asbes Gel Besar Tebal 5 mm (1.80 Lbr 67,500 75,000
b. Asbes Gel Besar Tebal 5 mm (2.40 Lbr 87,300 97,000
c. Asbes Gel Besar Tebal 5 mm (3.05 Lbr 105,750 117,500
B.b. ASBES Gel Kecil
a. Asbes Gel Kecil Tebal 4 mm (1.50 x Lbr 40,500 45,000
b. Asbes Gel Kecil Tebal 4 mm (1.80 x Lbr 49,500 55,000
c. Asbes Gel Kecil Tebal 4 mm (2.40 x Lbr 67,500 75,000
d. Asbes Gel Kecil Tebal 4 mm (3.00 x Lbr 81,000 90,000
B.c. ASBES Plat/Datar
a. Asbes Plat/Datar datar tebal 4 mm (0, Lbr 18,900 21,000
b. Asbes Plat/Datar datar tebal 4 mm (1 Lbr 16,200 18,000
c. Dinding Gypsum/ Kalsiboard tb. 3 (1.2 Lbr 49,950 55,500
d. Dinding Gypsum/ Kalsiboard tb. 4 (1.2 Lbr 54,000 60,000
e. Gypsum Board Lbr 56,250 62,500
f. Rangka plafond metal furing M2 54,000 60,000
B.d. ASBES Wuwung
a.Asbes wuwung gelombang besar te Lbr 58,500 65,000
b.Asbes wuwung gelombang kecil teb Lbr 45,000 50,000
C. SENG :
a. Seng Gelombang bwg 32 (2.40 x 1. Lbr 54,000 60,000
b. Seng Gelombang bwg 32 (3.00 x 1. Lbr 67,500 75,000
c. Seng datar (0.2 x 90 x 100) Lbr 24,750 27,500
d. Seng Aluminium Lbr 36,000 40,000
20 BAHAN KAYU :
A. KAYU JATI :
a. Balok (8/12, 6/12) M3 11,475,000 12,750,000
b. Usuk (5/7, 4/6) M3 11,160,000 12,400,000
c. Papan (2/20) M3 11,925,000 13,250,000
d. Reng (2/3, 3/5) M3 6,525,000 7,250,000
B. KAYU MERANTI :
a. Balok (8/12, 6/12) M3 5,602,500 6,225,000
b. Usuk (5/7, 4/6) M3 4,876,200 5,418,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
15
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
c. Papan (2/20) M3 5,850,000 6,500,000
d. Reng (2/3, 3/5) M3 4,050,000 4,500,000
C. KAYU BANGKIRAI :
a. Balok (8/12, 6/12) M3 6,780,150 7,533,500
b. Usuk (5/7, 4/6) M3 6,584,850 7,316,500
c. Papan (2/20) M3 7,126,650 7,918,500
d. Reng (2/3, 3/5) M3 4,759,650 5,288,500
D. KAYU KAMPER :
a. Balok (8/12, 6/12) M3 7,152,750 7,947,500
b. Usuk (5/7, 4/6) M3 6,729,750 7,477,500
c. Papan (2/20) M3 7,704,000 8,560,000
d. Reng (2/3, 3/5) M3 6,114,150 6,793,500
E. KAYU BEKISTING
a. Meranti (MC) M3 2,925,000 3,250,000
F. kayu bakar M3 180,000 200,000
21 BAHAN BAMBU :
a. Gedeg Guling 2 x 3 Lembar 94,500 105,000
b. Bongkotan/tiang Buah 18,900 21,000
c. Bambu Petung Buah 54,000 60,000
22 BAHAN TRIPLEK :
a. 3 mm ( 2.40 x 1.22 ) Lembar 54,000 60,000
b. 4 mm ( 2.40 x 1.22 ) Lembar 63,000 70,000
c. 9 mm ( 2.40 x 1.22 ) Lembar 108,000 120,000
d. 12 mm ( 2.40 x 1.22 ) Lembar 153,000 170,000
e. 18 mm ( 2.40 x 1.22 ) Lembar 193,500 215,000
TEAK WOOD :
a. 3 mm ( 2.40 x 1.22 ) Lembar 90,000 100,000
b. 4 mm ( 2.40 x 1.22 ) Lembar 103,500 115,000
MILAMIN :
a. 3 mm ( 2.40 x 1.22 ) Lembar 94,500 105,000
b. 4 mm ( 2.40 x 1.22 ) Lembar 103,500 115,000
23 BAHAN ALUMINIUM
a. Kusen Aluminium m' 90,000 100,000
b. Rangka Daun Jendela Aluminium m' 81,000 90,000
c. Rangka Daun Pintu Aluminium m' 85,500 95,000
d. Kusen & Pintu PVC toilet unit 450,000 500,000
24 BAHAN ASPAL :
a. Aspal / Bitumen Kg 6,840 7,600
b. Aspal Curah Kg 6,120 6,800
c. Laston Ton 1,181,250 1,312,500
d. Laston Atas (ATB) Ton 1,094,400 1,216,000
e. Lataston Ton 1,080,000 1,200,000
f. Prime Coat Liter 9,900 11,000
g. Tack Coat Liter 8,550 9,500
h. Latasir Ton 1,125,000 1,250,000
25 BAHAN CAT :
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
16
HARGA SATUAN
NO NAMA BAHAN SAT
TERENDAH HARGA FINAL
1 2 3 4
a. Cat Tembok (Interior) Kg 18,000 20,000
b. Cat Tembok water seal (Eksterior) Kg 85,500 95,000
c. Cat Kayu Kg 49,500 55,000
d. Cat Besi Kg 49,500 55,000
e. Cat Brozen Kg 121,500 135,000
f. Cat pelapis anti bocor Kg 45,000 50,000
g. Meni Kg 27,000 30,000
h. Plamur Kg 20,700 23,000
i. Politur Kg 54,000 60,000
j. Kuas Buah 9,000 10,000
k. Coating Batu Alam Kg 63,000 70,000
26 BAHAN MINYAK :
a. Minyak Tanah Liter 11,250 12,500
b. Solar (Non Subsidi) Liter 7,200 8,000
c. Premium Liter 5,895 6,550
d. Pertalite Liter 6,570 7,300
e. Pelumas/Olie Liter 40,500 45,000
f. Minyak Cat/Thinner A Liter 25,200 28,000
g. Minyak Cat/Thinner B Liter 19,800 22,000
h. Spirtus Liter 13,500 15,000
27 BAHAN KACA :
a. Kaca Polos 3 mm M2 76,500 85,000
b. Kaca Polos 5 mm M2 85,500 95,000
c. Kaca Polos 8 mm M2 135,000 150,000
d. Kaca Polos 10 mm M2 207,000 230,000
e. Kaca Polos 12 mm M2 315,000 350,000
f. Kaca Ray Ben 3 mm M2 85,500 95,000
g. Kaca Ray Ben 5 mm M2 94,500 105,000
h. Kaca Ray Ben 8 mm M2 144,000 160,000
i. Kaca Ray Ben 10 mm M2 225,000 250,000
j. Kaca One Ray (cermin) 3 mm M2 148,500 165,000
k. Kaca One Ray (cermin) 5 mm M2 157,500 175,000
l. Kaca Rasa 5 mm M2 198,000 220,000
m. Kaca Krepyak/ Nako Lembar 27,000 30,000
n. Glass Block Buah 22,500 25,000
29 BAHAN PAKU :
a. Paku Reng/Usuk Kg 15,300 17,000
b. Paku Triplek Kg 18,000 20,000
c. Paku Seng/Payung Kg 22,500 25,000
d. Paku Asbes Kg 23,400 26,000
e. Paku Keling 3/4", 5/8", 7/8" Kg 18,000 20,000
f. Paku Sekrup Kg 33,750 37,500
30 BAHAN LAIN-LAIN :
a. Kertas Gosok besi Lembar 4,500 5,000
b. Kertas Gosok kayu Lembar 4,500 5,000
c. Kertas Gosok tembok Lembar 3,600 4,000
d. Kereta dorong/ Gerobak Buah 360,000 400,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
18
N BAHAN
IK TAHUN 2017
H / KOTA
HARGA SATUAN
KET
TERTINGGI
5 6
220,000
264,000
308,000
214,500
77,000
242,000
121,000
137,500
88,000
242,000
253,000
357,500
360,250
363,000
412,500
418,000
423,500
264,000
253,000
231,000
825
578
8,800
148,500
126,500
77,000
935
7,150
4,400
8,250
16,500
63,250
68,750
66,000
85,250
71,500
82,500
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
19
HARGA SATUAN
KET
TERTINGGI
5 6
88,000
104,500
82,500
93,500
99,000
115,500
104,500
132,000
143,000
154,000
115,500
154,000
3,850
5,500
4,950
6,600
5,225
6,050
7,150
8,250
6,325
7,150
7,150
8,250
8,800
10,450
10,450
11,550
71,500
90,750
88,000
104,500
82,500
101,750
99,000
115,500
14,300
28,600
41,250
52,250
60,500
71,500
50,400
57,750
99,750
10,500
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
20
HARGA SATUAN
KET
TERTINGGI
5 6
13,650
3,850
10,450
11,000
11,550
11,550
27,500
95,700
11,550
11,550
2,255,000
2,090,000
3,300,000
38,500
38,500
38,500
3,850,000
15,950
19,800
44,000
49,500
88,000
330,000
165,000
38,500
357,500
550,000
11,550
12,650
14,300
17,600
22,000
24,750
275,000
313,500
396,000
1,397,000
330,000
10,450
14,850
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
21
HARGA SATUAN
KET
TERTINGGI
5 6
8,415
10,725
19,250
29,150
36,850
52,800
75,900
160,600
2,750
3,850
4,950
6,600
8,250
10,450
16,500
22,000
49,500
93,500
27,500
55,000
99,000
104,500
258,500
319,000
385,000
59,015
85,879
147,510
181,441
288,254
29,029
1,842,500
643,500
566,500
291,500
198,000
1,218,690
457,710
291,500
192,280
880,000
748,000
275,000
231,000
187,000
132,000
132,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
22
HARGA SATUAN
KET
TERTINGGI
5 6
121,000
111,100
346,500
291,500
126,500
976,690
627,220
319,770
252,230
182,270
1,056,220
704,000
357,500
269,500
195,690
3,850,000
2,310,000
979,000
792,000
517,000
159,500
473,000
319,000
165,000
121,000
115,500
55,000
36,300
29,700
18,700
13,200
11,000
8,800
7,700
5,500
176,000
4,950,000
16,632,000
9,240,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
23
HARGA SATUAN
KET
TERTINGGI
5 6
16,500,000
3,465,000
50,820,000
9,240,000
257,400,000
227,040,000
13,200,000
7,150,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
24
HARGA SATUAN
KET
TERTINGGI
5 6
4,620,000
9,900,000
5,500,000
9,240,000
17,600,000
12,100,000
14,300,000
13,200,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
25
HARGA SATUAN
KET
TERTINGGI
5 6
9,790,000
30,800,000
2,392,500
20,900
27,500
38,500
58,300
82,500
104,500
121,000
44,000
55,000
16,500
44,000
44,000
264,000
363,000
478,500
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
26
HARGA SATUAN
KET
TERTINGGI
5 6
484,000
583,000
594,000
99,000
121,000
82,500
104,500
126,500
143,000
170,500
198,000
60,500
77,000
99,000
132,000
154,000
176,000
742,500
786,500
830,500
874,500
918,500
962,500
1,006,500
1,050,500
495,000
385,000
456,500
528,000
588,500
671,000
753,500
709,500
792,000
874,500
1,039,500
1,133,000
1,226,500
1,413,500
1,595,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
27
HARGA SATUAN
KET
TERTINGGI
5 6
1,716,000
1,837,000
2,211,000
2,420,000
3,932,500
4,317,500
4,488,000
4,664,000
4,840,000
6,671,500
6,908,000
7,150,000
7,788,000
8,024,500
8,261,000
176,000
148,500
297,000
363,000
429,000
495,000
561,000
638,000
715,000
682,000
759,000
836,000
891,000
979,000
1,056,000
1,540,000
1,716,000
1,760,000
1,870,000
2,200,000
2,722,500
2,431,000
2,772,000
2,365,000
2,860,000
4,642,000
4,840,000
104,500
170,500
253,000
319,000
412,500
1,155,000
165,000
176,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
28
HARGA SATUAN
KET
TERTINGGI
5 6
220,000
264,000
313,500
209,000
374,000
484,000
253,000
385,000
412,500
632,500
797,500
918,500
814,000
1,012,000
1,210,000
1,732,500
1,925,000
2,310,000
412,500
484,000
550,000
616,000
698,500
792,000
742,500
825,000
907,500
951,500
1,067,000
1,155,000
1,760,000
1,870,000
1,980,000
2,420,000
2,860,000
2,585,000
3,135,000
2,942,500
4,565,000
4,950,000
198,000
275,000
363,000
423,500
550,000
825,000
990,000
1,265,000
2,585,000
242,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
29
HARGA SATUAN
KET
TERTINGGI
5 6
291,500
412,500
429,000
462,000
495,000
715,000
605,000
918,500
1,375,000
1,622,500
2,502,500
2,695,000
3,245,000
3,300,000
4,180,000
8,690,000
9,625,000
1,593,900
1,882,650
2,454,375
2,818,200
3,003,000
3,361,050
6,641,250
6,901,125
1,432,200
2,292,675
2,899,050
1,848,000
2,945,250
4,215,750
5,093,550
5,815,425
610,500
720,500
836,000
957,000
1,089,000
1,215,500
1,155,000
1,281,500
1,413,500
1,644,500
1,793,000
1,941,500
2,090,000
2,244,000
2,530,000
2,717,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
30
HARGA SATUAN
KET
TERTINGGI
5 6
2,865,500
3,041,500
3,201,000
3,234,000
3,393,500
3,553,000
3,630,000
6,534,000
7,172,000
7,452,500
7,606,500
12,947,000
418,000
588,500
825,000
1,122,000
1,474,000
2,359,500
2,986,500
5,252,500
5,995,000
10,835,000
13,722,500
435,600
632,500
918,500
1,144,000
3,707,000
5,775,000
8,387,500
2,118,600
1,589,500
1,303,500
1,215,500
1,094,500
15,878,500
14,979,800
11,286,000
6,534,000
4,851,000
6,336,000
5,742,000
4,950,000
242,000
198,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
31
HARGA SATUAN
KET
TERTINGGI
5 6
187,000
132,000
49,500
52,800
57,200
63,800
49,500
55,000
63,250
68,750
57,200
63,800
82,500
93,500
104,500
132,000
165,000
192,500
27,500
242,000
231,000
357,500
148,500
660,000
1,320,000
550,000
385,000
275,000
22,000
16,500
275,000
137,500
275,000
38,500
38,500
44,000
49,500
55,000
82,500
275,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
32
HARGA SATUAN
KET
TERTINGGI
5 6
55,000
2,750
3,300
5,225
6,600
5,500
16,500
12,100
14,300
3,025
12,100
16,500
18,150
82,500
106,700
129,250
49,500
60,500
82,500
99,000
23,100
19,800
61,050
66,000
68,750
66,000
71,500
55,000
66,000
82,500
30,250
44,000
14,025,000
13,640,000
14,575,000
7,975,000
6,847,500
5,959,800
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
33
HARGA SATUAN
KET
TERTINGGI
5 6
7,150,000
4,950,000
8,286,850
8,048,150
8,710,350
5,817,350
8,742,250
8,225,250
9,416,000
7,472,850
3,575,000
220,000
115,500
23,100
66,000
66,000
77,000
132,000
187,000
236,500
110,000
126,500
115,500
126,500
110,000
99,000
104,500
550,000
8,360
7,480
1,443,750
1,337,600
1,320,000
12,100
10,450
1,375,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
34
HARGA SATUAN
KET
TERTINGGI
5 6
22,000
104,500
60,500
60,500
148,500
55,000
33,000
25,300
66,000
7.500 -
11,000
15.000
77,000
13,750
8,800 Mengikuti
harga dari
7,205 pemerintah
8,030
49,500
30,800
24,200
16,500
93,500
104,500
165,000
253,000
385,000
104,500
115,500
176,000
275,000
181,500
192,500
242,000
33,000
27,500
104,500
71,500
99,000
121,000
55,000
22,000
16,500
13,750
44,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
35
HARGA SATUAN
KET
TERTINGGI
5 6
27,500
22,000
30,250
99,000
16,500
18,700
22,000
27,500
28,600
22,000
41,250
5,500
5,500
4,400
440,000
_____________________________________________________________________________________________________________
Standar Harga Satuan Bahan Semester I 2017 Wilayah Kota
36
Plat
STROUS O 20 cm
Panjang = 7.96178344 m1
T.pokok = 49.50 kg
0.012 0.888 49.50
Begel = 26.32 kg 26.32
0.008 0.395 75.8161905
Total 1m3 = 75.8161905 kg
BAWAH
BERAT BESI PER-M³ BETON Total (kg)
Nama jml. Tul. begisting
Ø besi kg besi Jml. Pjg. Pjg. berat
No dimensi beton(m) Kg besi
Balok/Kolom (m) pls / m1 (bh) Begel Btg/m3 Besi/m3 berat
SLOOF
Begel 0.0080 0.39 0.150 223 33.333 124.880 49.295 13.33
1 0.15 0.2 0.0120 0.89 4 33.333 133.333 118.423 167.718
SL 15/20
0.0120 0.89 0 33.333 - -
Begel 0.0080 0.39 0.150 371 55.556 148.400 58.580 255.951 16.67
2 0.12 0.15 0.0120 0.89 4 55.556 222.222 197.371
SL 12/15
0.0120 0.89 0 55.556 - -
Begel 0.0060 0.22 0.150 223 33.333 124.880 27.729 205.363 13.33
3 0.15 0.2 0.0120 0.89 6 33.333 200.000 177.634
SL 15/20
0.0120 0.89 0 33.333 - -
Begel 0.0080 0.39 0.150 149 22.222 113.240 44.701 163.124 13.33
3 0.15 0.3 0.0120 0.89 6 22.222 133.333 118.423
SL 15/30
0.0120 0.89 0 22.222 - -
Begel 0.0080 0.39 0.150 167 25.000 110.220 43.509 176.734 10.00
4 0.2 0.2 0.0120 0.89 6 25.000 150.000 133.226
SL 20/30
0.0120 0.89 0 25.000 - -
KOLOM
Begel 0.0100 0.62 0.100 41 4.000 76.260 47.036 173.354 8.00
1 0.5 0.5 0.0160 1.58 20 4.000 80.000 126.318
K1 30/30
0.0160 1.58 0 4.000 - -
Begel 0.0080 0.39 0.150 167 25.000 110.220 43.509 176.734 10.00
2 0.2 0.2 0.0120 0.89 6 25.000 150.000 133.226
K2 20/20
0.0120 0.89 0 25.000 - -
Begel 0.0080 0.39 0.150 64 9.524 74.240 29.306 80.058 6.67
3 0.3 0.35 0.0120 0.89 6 9.524 57.143 50.753
K2 30/30
0.0120 0.89 0 9.524 - -
Begel 0.0080 0.39 0.150 96 14.286 92.160 36.380 137.885 15.71
3 0.2 0.35 0.0120 0.89 8 14.286 114.286 101.505
K2 15/30
0.0120 0.89 0 14.286 - -
Begel 0.0080 0.39 0.150 297 44.444 136.620 53.930 211.827 13.33
3 0.15 0.15 0.0120 0.89 4 44.444 177.778 157.897
Kp 15/15
0.0120 0.89 0 44.444 - -
Begel 0.0060 0.22 0.150 297 44.444 136.620 30.335 188.233 13.33
4 0.15 0.15 0.0120 0.89 4 44.444 177.778 157.897
Kp 15/15
0.0120 0.89 0 44.444 - -
Begel 0.0080 0.39 0.150 42 6.250 61.320 24.206 68.614 10.00
4 0.4 0.4 0.0120 0.89 8 6.250 50.000 44.409
Kp 15/15
0.0120 0.89 0 6.250 - -
BALOK
Begel 0.0080 0.39 0.150 371 55.556 148.400 58.580 255.951 16.67
1 0.12 0.15 0.0120 0.89 4 55.556 222.222 197.371
BLT1 12/15
0.0120 0.89 0 55.556 - -
Begel 0.0080 0.39 0.150 178 26.667 117.480 46.374 141.113 13.33
2 0.15 0.25 0.0120 0.89 4 26.667 106.667 94.738
BLT2 15/20
0.0120 0.89 0 26.667 - -
Begel 0.0080 0.39 0.150 223 33.333 124.880 49.295 167.718 13.33
3 0.15 0.2 0.0120 0.89 4 33.333 133.333 118.423
BLV1 15/20
0.0120 0.89 0 33.333 - -
BERAT BESI PER-M³ BETON Total (kg)
Nama jml. Tul. begisting
Ø besi kg besi Jml. Pjg. Pjg. berat
No Begel dimensi beton(m) 0.0080 pls / 0.39 0.150 Begel
149 22.222 113.240 Kg 44.701
besi 163.124 16.67
(m) m1 Btg/m3 Besi/m3
### 0.15 0.3 0.0120 0.89 6 22.222 133.333 118.423
B4 15/30
0.0120 0.89 0 22.222 - -
Begel 0.0060 0.22 0.150 149 22.222 113.240 25.144 143.567 16.67
### 0.15 0.3 0.0120 0.89 6 22.222 133.333 118.423
B4 15/30
0.0120 0.89 0 22.222 - -
Begel 0.0100 0.62 0.200 101 20.000 76.760 47.344 47.344 14.00
### 0.2 0.25 0.0160 1.58 4 20.000 80.000 126.318 126.318
B5 20/25
0.0130 1.04 0 20.000 - -
Begel 0.0100 0.62 0.200 134 26.667 88.440 54.549 54.549 17.33
### 0.15 0.25 0.0160 1.58 4 26.667 106.667 168.424 168.424
B6 15/25
0.0130 1.04 0 26.667 - -
%
1.51%
2.51%
2.26%
1.51%
1.70%
1.61%
1.70%
0.65%
1.29%
2.01%
2.01%
0.57%
2.51%
1.21%
1.51%
%
1.51%
1.51%
1.61%
2.15%
DAFTAR HARGA SATUAN BAHAN DAN UPAH
III KAYU
1 Begisting Kayu Meranti (MC) m3 Rp 3,500,000.00
IV CAT / MINYAK
1 Minyak Begisting liter Rp 25,000.00
V PAKU
1 Paku Reng / Usuk kg Rp 18,000.00
PEKERJAAN URUGAN
PEKERJAAN PASANGAN
Pekerjaan : PEMBANGUNAN JPD (PAVINGISASI) Dimensi Jalan Paving (m) Dimensi Jalan Rabat (m)
Biaya : ……………….. - Panjang = 159.00 - Panjang = 0.00
Sumber Dana : ……………….. - Lebar = 3.00 - Lebar = 4.00
Desa : …………………..
Kecamatan : DUKUN
Kabupaten : GRESIK
PEKERJAAN PAVING
Kepala
2 Urug Pasir / m3 3.34 m3 Juru Ukur Mandor Tukang Pekerja Pasir Urug
Tukang
Koef. 0.300 1.200
Harga Satuan Rp 110,000.00 Rp 180,000.00
Jumlah volume 1.00 4.01
Pembulatan volume 1.00 4.01
Satuan volume Hok m3
Harga Total Rp 110,187.00 Rp 721,224.00
PPN 10%
PPh 1,5%
PPh 2%
Kepala
3 Urug Sirtu / m3 30.05 m3 Juru Ukur Mandor Tukang Pekerja Sirtu
Tukang
Koef. 0.250 1.200
Harga Satuan Rp 110,000.00 Rp 180,000.00
Jumlah volume 7.51 36.06
Pembulatan volume 7.51 36.06
Satuan volume Hok m3
Harga Total Rp 826,402.50 Rp 6,491,016.00
PPN 10%
PPh 1,5%
NO PEKERJAAN VOL SAT TENAGA MATERIAL ALAT
PPh 2%
IV BOP
TOTAL
PEMBULATAN
TERBILANG ENAM PULUH DUA JUTA ENAM RATUS SEMBILAN PULUH EMPAT RIBU DUA RATUS RUPIAH
Diperiksa, Dibuat,
Koordinator PTPKD Panitia Pelaksana Desa
Ketua
Disahkan,
Penguasa Pengelolaan Keuangan Desa
Kepala Desa
CANA ANGGARAN BIAYA (RAB)
JUMLAH
Rp 354,487.32
Rp -
Rp -
Rp -
Rp 831,411.00
Rp -
Rp -
Rp -
Rp 7,317,418.50
Rp -
Rp -
JUMLAH
Rp -
Rp 8,079,783.75
Rp 503,354.25
Rp -
Rp -
Rp 5,607,930.00
Rp 275,547.00
Rp -
Rp -
JUMLAH
Rp -
Rp -
Rp -
Rp -
Rp 68,795,990.15
Rp 2,605,599.52
Rp -
Rp -
Rp 9,408,030.00
Rp 557,613.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
JUMLAH
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 8,079,783.75
JUMLAH
Rp 503,354.25
Rp -
Rp -
Rp 5,607,930.00
Rp 275,547.00
Rp -
Rp -
Rp 1,100,000.00
Rp 119,903,779.49
………………..
IBU DUA RATUS RUPIAH
BACK UP VOLUME
PEKERJAAN : PEMBANGUNAN JPD (PAVINGISASI)
DESA : …………………..
KECAMATAN : DUKUN
KABUPATEN : GRESIK
SUMBER DANA : ………………..
DIMENSI
NO URAIAN phi VOLUME SAT
P L T Jlh Luas
1 2 3 4 5 6 7 8 9 10 11
A PEKERJAAN URUGAN
1 Pek. Galian Tanah Biasa (Kanstine) 159.00 0.15 0.12 2.00 5.72 m3
2 Pek. Urugan Pasir Bawwah Kanstine 159.00 0.15 0.07 2.00 3.34 m3
B PEKERJAAN PASANGAN
1 Pek. Pasang Paving Stone 159.00 2.70 429.30 m2
Dikurangi Luas Uskup = 44.26 44.26 m2
385.05 m2
DIMENSI
NO URAIAN phi VOLUME SAT
P L T Jlh Luas
1 2 3 4 5 6 7 8 9 10 11
PROGRAM :
KEGIATAN :
PEKERJAAN : PEMBANGUNAN JPD (PAVINGISASI)
DESA : …………………..
KECAMATAN : DUKUN
KABUPATEN : GRESIK
SUMBER DANA : ………………..
JUMLAH Rp 85,875,925.97
Diperiksa, Dibuat,
Koordinator PTPKD Panitia Pelaksana Desa
........................................... ...........................................
Ketua
Disahkan,,
Penguasa Pengelolaan Keuangan Desa
...........................................
Kepala Desa