CT SCAN
RUMAH SAKIT BHAYANGKARA TK II SARTIKA ASIH BANDUNG
Jalan Moch Toha No 369 Bandung
Tahun Anggaran 2022
M.1 M.2 M.3 M.4 M.5 M.6 M.7 M.8 M.9 M.10
F Kegiatan Protokol Pencegahan Penyebaran Corona VIRUS DISEASE 2019 (COVID - 19) :
a Masker dus 3.00 0.019 0.019
c Hand sanitizer liter 3.00 0.027 0.027
V. PEKERJAAN PLAFOND
1 Pas. Rangka Besi Hollow Galvanis 40.40 mm t = 0,5 m2 74.14 2.854 0.951 0.951 0.951
2 Pas. Plafond Gypsum Board 9 mm (CL1) m2 59.47 1.871 0.624 0.624 0.624
3 Pas. Plafond Gyptile JayaBoard 9 mm (CL2) m2 14.67
4 Pas. List Plafond m1 82.50
5 Pengecatan plafond m2 74.14 0.503 0.168 0.168 0.168
BOBOT PROGRES RENCANA 1.093 1.571 7.516 10.707 10.693 11.563 18.297 18.685 17.783 2.092
REKAPITULASI BOBOT PROGRES RENCANA 1.093 2.664 10.180 20.887 31.580 43.142 61.439 80.124 97.908 100.000
BOBOT PROGRES REALISASI 1.043 1.507 5.179 7.421 12.577 37.578 4.729 10.209 15.439
REKAPITULASI BOBOT PROGRES REALISASI 1.043 2.550 7.730 15.151 27.728 65.306 70.035
DEVIASI -0.050 -0.114 -2.451 -5.736 -3.852 22.164 8.596
BOBOT PROGRES RENCANA SEBELUM REVISI 1.043 1.490 5.170 7.432 11.635 12.466 19.433 20.241 18.881 2.209
REKAPITULASI BOBOT PROGRES RENCANA SEBELUM REVISI 1.043 2.533 7.703 15.135 26.770 39.236 58.669 78.910 97.791 100.000
BOBOT PROGRESS REALISASI SEBELUM REVISI 1.043 1.507 5.179 7.421 12.577 37.578
REKAPITULASI BOBOT PROGRES REALISASI SEBELUM REVISI 1.043 2.550 7.730 15.151 27.728 65.306
DEVIASI SEBELUM REVISI 0.000 0.017 0.026 0.016 0.958 26.070
LAMPIRAN ADENDUM KONTRAK PEKERJ
RUMAH SAKIT BHAYANGKARA TK II SARTIKA ASIH BANDUNG
Jalan Moch Toha No 369 Bandung
Tahun Anggaran 2022
NO
A
a
b
c
B
a
b
c
d
C
a
E
a
F
a
c
I.
1
2
3
4
5
6
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
III.
1
2
3
4
5
6
1
2
3
1
1
2
3
4
5
IV.
1
2
V.
1
2
3
4
5
VI.
1
VII.
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
1
2
VIII.
1
LAMPIRAN ADENDUM KONTRAK PEKERJAA
RUMAH SAKIT BHAYANGKARA TK II SARTIKA ASIH BANDUNG
Jalan Moch Toha No 369 Bandung
Tahun Anggaran 2022
URAIAN PEKERJAAN
Personel K3 Konstruksi:
Petugas K3 Konstruksi
Kegiatan Protokol Pencegahan Penyebaran Corona VIRUS DISEASE 2019 (COVID - 19) :
Masker
Hand sanitizer
B. PEKERJAAN RENOVASI RUANG CT-SCAN
PEKERJAAN PERSIAPAN
Pek. Bongkaran Partisi dan kusen
Pek. Bongkaran Keramik Lantai lama
Pek. Bongkaran Plafond lama
Pek. Galian Untuk Lantai Beton t.10 cm
Pek. Galian Cable Tray
Pemberesan Lahan dan Buangan Berangkal
PEKERJAAN DINDING
Sloof SL.1 (0,25x0,40 m3) / LVL. -0.05 Mutu Beton Fc = 19,3 Mpa
Dinding Bata 1pc : 5psr (D2) + Jendela
Plesteran Dinding (D2 + D3) + Jendela
Acian Dinding (D2 + D3) + Jendela
Kolom Praktis 12/12 Mutu beton f’c = 14,52 Mpa
Ring Balok Praktis 12/12 Atas Railing Bata Mutu beton f’c = 14,52 Mpa
Opening Kusen
Pek. Dinding exsisting Lapis Timbal + Rangka Almunium 2x4 dan Gypsumboard 9mm (D1)
Pek. Dinding exsisting Lapis Timbal + Rangka Almunium 2x4 dan Gypsumboard 9mm (D2)
Pek. Dinding exsisting Rangka Alumunium 2x4 cm lapis timbal anti radiasi + multyplek 9mm lapis walpap
Pek. Dinding exsisting Rangka Alumunium 2x4 cm lapis timbal anti radiasi + multyplek 9mm lapis walpap
Pasang Dinding Timbal T. 2mm Ruangan Lama (plafond ruang ct scan)
Pek. Pengecatan Dinding (D3)
Pas. Dinding partisi Gypsumboard + rangka metal, finish dicat dinding (D4) R. Ganti
PEKERJAAN KUSEN
Pintu Type P.1 ( 2 Unit )
Kusen Aluminium 4"
Daun pintu panel WPC
Kaca polos 5 mm
Engsel pintu 4"
Mortise & Cylinder
Lever Handle
PEKERJAAN LANTAI
Pek. Pelat Lantai Beton T,10cm Tul.Wire Mesh M,5(1Lapis) Beton Mutu f’c = 19,3 Mpa (K225)
Pas. Lantai Granito 60x60 cm Polish
PEKERJAAN PLAFOND
Pas. Rangka Besi Hollow Galvanis 40.40 mm t = 0,5
Pas. Plafond Gypsum Board 9 mm (CL1)
Pas. Plafond Gyptile JayaBoard 9 mm (CL2)
Pas. List Plafond
Pengecatan plafond
PEKERJAAN SANITAIR
Wastafle Gantung Lengkap cermin dan tempat Sabun
JADWAL WAKTU PE
SAT VOL BOBOT % BULAN KE - 1
M.1 M.2 M.3 M.4
Axis Title
bh 1.00 0.255
bh 1.00 0.532
m2 1.28 0.010
0.000
0.000
unit 1.00 0.064
m' 8.80 0.398
m2 1.06 0.290
m2 0.60 0.018
ps 2.00 0.057
set 2.00 0.071
m2 74.14 2.854
m2 59.47 1.871
m2 14.67
m1 82.50
m2 74.14 0.503
Ls 1.00 8.402
0.128 0.128
0.266 0.266
0.005 0.005
0.064
0.133 0.133 0.133
0.097 0.097 0.097
0.006 0.006 0.006
0.019 0.019 0.019
0.024 0.024 0.024
0.239 0.239
NO
A
a
b
c
B
a
b
c
d
C
a
E
a
F
a
c
I.
1
2
3
4
5
6
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
III.
1
2
3
4
5
6
1
2
3
1
1
2
3
4
5
IV.
1
2
V.
1
2
3
4
5
VI.
1
VII.
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
1
2
VIII.
1
LAMPIRAN ADENDUM KONTRAK PEKERJAA
RUMAH SAKIT BHAYANGKARA TK II SARTIKA ASIH BANDUNG
Jalan Moch Toha No 369 Bandung
Tahun Anggaran 2022
URAIAN PEKERJAAN
Personel K3 Konstruksi:
Petugas K3 Konstruksi
Kegiatan Protokol Pencegahan Penyebaran Corona VIRUS DISEASE 2019 (COVID - 19) :
Masker
Hand sanitizer
B. PEKERJAAN RENOVASI RUANG CT-SCAN
PEKERJAAN PERSIAPAN
Pek. Bongkaran Partisi dan kusen
Pek. Bongkaran Keramik Lantai lama
Pek. Bongkaran Plafond lama
Pek. Galian Untuk Lantai Beton t.10 cm
Pek. Galian Cable Tray
Pemberesan Lahan dan Buangan Berangkal
PEKERJAAN DINDING
Sloof SL.1 (0,25x0,40 m3) / LVL. -0.05 Mutu Beton Fc = 19,3 Mpa
Dinding Bata 1pc : 5psr (D2) + Jendela
Plesteran Dinding (D2 + D3) + Jendela
Acian Dinding (D2 + D3) + Jendela
Kolom Praktis 12/12 Mutu beton f’c = 14,52 Mpa
Ring Balok Praktis 12/12 Atas Railing Bata Mutu beton f’c = 14,52 Mpa
Opening Kusen
Pek. Dinding exsisting Lapis Timbal + Rangka Almunium 2x4 dan Gypsumboard 9mm (D1)
Pek. Dinding exsisting Lapis Timbal + Rangka Almunium 2x4 dan Gypsumboard 9mm (D2)
Pek. Dinding exsisting Rangka Alumunium 2x4 cm lapis timbal anti radiasi + multyplek 9mm lapis walpap
Pek. Dinding exsisting Rangka Alumunium 2x4 cm lapis timbal anti radiasi + multyplek 9mm lapis walpap
Pasang Dinding Timbal T. 2mm Ruangan Lama (plafond ruang ct scan)
Pek. Pengecatan Dinding (D3)
Pas. Dinding partisi Gypsumboard + rangka metal, finish dicat dinding (D4) R. Ganti
PEKERJAAN KUSEN
Pintu Type P.1 ( 2 Unit )
Kusen Aluminium 4"
Daun pintu panel WPC
Kaca polos 5 mm
Engsel pintu 4"
Mortise & Cylinder
Lever Handle
PEKERJAAN LANTAI
Pek. Pelat Lantai Beton T,10cm Tul.Wire Mesh M,5(1Lapis) Beton Mutu f’c = 19,3 Mpa (K225)
Pas. Lantai Granito 60x60 cm Polish
PEKERJAAN PLAFOND
Pas. Rangka Besi Hollow Galvanis 40.40 mm t = 0,5
Pas. Plafond Gypsum Board 9 mm (CL1)
Pas. Plafond Gyptile JayaBoard 9 mm (CL2)
Pas. List Plafond
Pengecatan plafond
PEKERJAAN SANITAIR
Wastafle Gantung Lengkap cermin dan tempat Sabun
JADWAL WAKTU PE
SAT VOL BOBOT % BULAN KE - 1
M.1 M.2 M.3 M.4
Axis Title
bh 1.00 0.255
bh 1.00 0.532
m2 1.28 0.010
0.000
0.000
unit 1.00 0.064
m' 8.80 0.398
m2 1.06 0.290
m2 0.60 0.018
ps 2.00 0.057
set 2.00 0.071
m2 74.14 2.854
m2 59.47 1.871
m2 14.67
m1 82.50
m2 74.14 0.503
Ls 1.00 8.402
0.128 0.128
0.266 0.266
0.005 0.005
0.064
0.133 0.133 0.133
0.097 0.097 0.097
0.006 0.006 0.006
0.019 0.019 0.019
0.024 0.024 0.024
0.239 0.239