TIME SCHEDULE

Kegiatan : PEMBANGUNAN PINTU AIR DAN NORMALISASI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
Pelaksana : CV. PAGI PETANG
No. Kontrak : P.342/DPU/SDA/600.1.4.1/7/2023
Tanggal Kontrak : 24 Juli 2023
Nilai Kontrak : 1,221,543,853.00 bulan1 bulan 2 bulan 3 bulan 4
Waktu Pelaksanaan : 90 ( Sembilan Puluh ) Hari Kalender
PROGRESS
Lokasi : KEC. SAMBOJA prestasi
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct
31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct
No. Uraian Pekerjaan Kode Analisa Volume bobot
1 2 3 4 5 6 7 8 9 10 11 12 13

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi LA.1 1.00 7.15% 1.37% 1.30% 0.90% 0.90% 0.90% 0.90% 87%
-demob 6.27%
-pemasangan papan kegiatan 0.06%
-sewa barak 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) - 1.00 1.20% 0.09% 0.09% 0.09% 0.09% 0.09% 0.09% 46%

II. PEKERJAAN NORMALISASI


I. Pekerjaan Normalisasi
1 Galian Tanah Berlumpur di Sungai TM.04.a.5.a 526.47 2.52% 0%
- tenaga 34453.50 1.81%
- peralatan sewa long-arm 13437.41 0.71%

III. PEKERJAAN PINTU AIR


I. Pekerjaan Tanah
1 Pasang 1 m' Profil Melintang Galian Tanah T.02.b.1) 49 0.23% 0.08% 0.08% 0.08% 100%
tenaga 20870 0.10%
bahan 26150 0.13%
peralatan 400 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m T.06.a.2) 633.65 7.25% 3.62% 3.62% 100%
3 1 m3 Urugan Kembali Tanah Biasa T.14.a 316.83 1.77% 0%

II. Pekerjaan Pintu Air


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. T.15.a.11) 85.07 3.61% 0.90% 0.90% 0.90% 75%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m P.05 75.89 6.19% 4.85% 0.67% 0.33% 0.00% 95%
tenaga 263750 2.00%
material batu 552000 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) B.02.b 13.49 1.86% 0.93% 0.93% 100%
tenaga 259835 0.35%
bahan 1116865 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) B.08.b 85.07 13.40% 2.24% 0.44% 2.24% 37%
tenaga 259835 2.21%
bahan 1315894 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) B.15.a 85.07 0.73% 0%
tenaga 42375 0.36%
peralatan concrete 43988 0.37%
6 Untuk pembesian polos B.17.a 2290.37 4.02% 0.86% 0.00% 0.00% 0.00% 0.11% 24%
tenaga 2506 0.57%
bahan 15075 3.45%
7 Untuk pembesian Deformasi B.17.b 4131.11 8.85% 2.10% 0.00% 0.00% 0.00% 24%
tenaga 6199 2.56%
bahan 15225 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. B.25.b 79.15 1.51% 0%
tenaga 63300 0.50%
bahan 127660 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). B.27.a 79.15 0.05% 0%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm P.07.a 932 11.77% 10.71% 0.53% 0.53% 100%
tenaga 17060 1.59%
bahan 78750 7.34%
peralatan 30500 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm D.01.a 310 0.68% 0.57% 0.11% 100%
tenaga 6780 0.21%
bahan 15160 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) - 6 15.27% 7.63% 50%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. T.15.a.11) 17.82 0.76% 0%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) B.08.b 17.82 2.81% 0%
tenaga 259835 0.46%
bahan 1315894 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) B.15.a 17.82 0.15% 0%
tenaga 42375 0.08%
peralatan concrete 43988 0.08%
4 Untuk pembesian polos B.17.a 984.51 1.73% 0%
tenaga 2506 0.25%
bahan 15075 1.48%
5 Untuk pembesian Deformasi B.17.b 1666.32 3.57% 0%
tenaga 6199 1.03%
bahan 15225 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. B.25.b 60.40 1.15%
tenaga 63300 0.38%
bahan 127660 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). B.27.a 60.40 0.04% 0%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm P.07.a 48.27 0.61% 0%
tenaga 17060 0.08%
bahan 78750 0.38%
peralatan 30500 0.15%
9 1 m' Pipa Drainase PVC 2" - 5.03 0.02% 0%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) B.02.b 1.51 0.21% 0%
tenaga 259835 0.04%
bahan 1116865 0.17%
IV. PEKERJAAN PEMBONGKARAN
1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting - 1.00 0.45% 0%
2 Pembongkaran Pintu Air Lama - 1.00 0.45% 0%

100%
RENCANA MINGGUAN ADD-01 (%) 0.64% 0.73% 2.70% 4.68% 6.64% 10.23% 12.47% 13.76% 13.49% 13.37% 10.44% 8.20% 2.64%

RENCANA KOMULATIF ADD-01 (%) 0.64% 1.37% 4.07% 8.75% 15.39% 25.63% 38.10% 51.86% 65.35% 78.72% 89.16% 97.36% 100.00%

REALISASI MINGGUAN ADD-01 (%) 1.46% 0.00% 0.00% 0.00% 0.00% 13.62% 19.91% 9.95% 3.59% 4.24%

REALISASI KOMULATIF ADD-01 (%) 1.46% 1.46% 1.46% 1.46% 1.46% 15.08% 34.98% 44.94% 48.53% 52.77%

DEVIASI (%) 0.82% 0.09% -2.61% -7.29% -13.93% -10.55% -3.11% -6.92% -16.82% -25.95%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

44.78%

Purwaningsih, ST Abdi Saputra Samid


Site Engineer Pelaksana
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU PERTAMA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 24 - 31 juli 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan JULI

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% - 1.46% 1.46%

II PEKERJAAN NORMALISASI 2.52% - - -

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% - - -
Pekerjaan Pintu Air 67.93% - - -
Pekerjaan Turap 11.04% - - -

IV PEKERJAAN PEMBONGKARAN 0.91% - - -

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU -
BOBOT PEKERJAAN MINGGU INI 1.46%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 0.64%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN 0.82%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU PERTAMA
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 24 - 31 juli 2023
Bulan JULI

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% 0.19 1.37%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% 0.08 0.09%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% 0.00% - 0.00%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% 0.00% - 0.00%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% 0.00% - 0.00%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% 0.00% - 0.00%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% 0.00% - 0.00%

1,100,489,714.32 0% 1.46% 1.46%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 0%

BOBOT PEKERJAAN MINGGU INI 1,100,489,957.66 1.46%

REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA BULAN PERTAMA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 25 Juli - 31 juli
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan JULI

KONTRAK REALISASI BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% - 1.46% 1.46%

II PEKERJAAN NORMALISASI 2.52% - - -

III PEKERJAAN PINTU AIR -


Pekerjaan Tanah 9.25% - -
Pekerjaan Pintu Air 67.93% - -
Pekerjaan Turap 11.04% - -

IV PEKERJAAN PEMBONGKARAN 0.91% - - -

JUMLAH BOBOT 100%


JUMLAH BOBOT BULAN LALU -
BOBOT PEKERJAAN BULAN INI 1.46%
REALISASI KOMULATIF BOBOT PEKERJAAN BULAN INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN BULAN INI 0.64%
PEKERJAAN BULAN INI MENGALAMI KEMAJUAN/KETERLAMBATAN 0.82%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI PEK
PROGRAM : PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NO
LOKASI : KECAMATAN SAMBOJA KABUPATEN
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN

No. Uraian Pekerjaan Volume Satuan

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls
-demob
-pemasangan papan kegiatan
-sewa barak
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls
JUMLAH TOTAL PEKERJAAN PERSIAPAN
II. PEKERJAAN NORMALISASI
I. Pekerjaan Normalisasi
1 Galian Tanah Berlumpur di Sungai 903.75 m3
- tenaga 34453.50
- peralatan sewa long-arm 13437.41
JUMLAH TOTAL PEKERJAAN NORMALISASI
III. PEKERJAAN PINTU AIR
I. Pekerjaan Tanah
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m
tenaga 20870
bahan 26150
peralatan 400
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3
JUMLAH TOTAL Pekerjaan Tanah
II. Pekerjaan Pintu Air
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3
tenaga 263750
material batu 552000
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3
tenaga 259835
bahan 1116865
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3
tenaga 259835
bahan 1315893.5
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3
tenaga 42375
peralatan concrete 43987.72
6 Untuk pembesian polos 2,290.37 Kg
tenaga 2,506.00
bahan 15,075.00
7 Untuk pembesian Deformasi 4,131.11 Kg
tenaga 6,198.50
bahan 15,225.00
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2
tenaga 63300
bahan 127660
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m
tenaga 17060
bahan 78750
peralatan 30500
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh
tenaga 6780
bahan 15160
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh
JUMLAH TOTAL Pekerjaan Pintu Air
III. Pekerjaan Turap
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 22 m3
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 22 m3
tenaga 259835
bahan 1315893.5
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 22 m3
tenaga 42375
peralatan concrete 43987.72
4 Untuk pembesian polos 421.93 Kg
tenaga 2,506.00
bahan 15,075.00
5 Untuk pembesian Deformasi 1,044.41 Kg
tenaga 6,198.50
bahan 15,225.00
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 56 m2
tenaga 63300
bahan 127660
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 56 m2
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 20 m
tenaga 17060
bahan 78750
peralatan 30500
9 1 m' Pipa Drainase PVC 2" 10 m
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 2 m
tenaga 259835
bahan 1116865
JUMLAH TOTAL Pekerjaan Turap
IV. PEKERJAAN PEMBONGKARAN
1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls
2 Pembongkaran Pintu Air Lama 1 Ls
JUMLAH TOTAL PEKERJAAN PEMBONGKARAN

Diperiksa Oleh :
Konsultan Supervisi
CV. ISAM STUDIO KONSULTAN

Purwaningsih, ST
Site Engineer
REALISASI PEKERJAAN BULANAN
ENGELOLAAN SUMBER DAYA AIR (SDA)
EMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
ECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
.342/DPU/SDA/600.1.4.1/7/2023
4 JULI 2023
0 HARI KALENDER
PBD KAB. KUTAI KARTANEGARA
CV. PAGI PETANG
CV. ISAM STUDIO KONSULTAN

s/d Bulan lalu Bulan ini


Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot

78,700,000.00 78,700,000.00 7.15% - - 0.19 1.37%


69,000,000.00
700,000.00
9,000,000.00
13,152,307.77 13,152,307.77 1.20% - - 0.077 0.09%
91,852,307.77
-
-
52,680.00 47,609,552.38 4.33% - - - -
34,251,087.40
13,358,465.88
47,609,552.38
-
-
52,162.00 2,555,938.00 0.23% - - - -
1,124,893.00
1,409,485.00
21,560.00
125,853.75 79,747,228.69 7.25% - - - -
61,528.50 19,494,074.65 1.77% - - - -
101,797,241.34
-
466,374.15 39,674,448.94 3.61% - - - -
897,325.00 68,097,994.25 6.19% - - - -
22,017,586.25
46,080,408.00
1,514,370.00 20,428,851.30 1.86% - - - -
3,855,691.57
16,573,159.74
1,733,301.37 147,451,947.58 13.40% - - - -
24,314,579.79
123,137,367.92
94,998.99 8,081,564.29 0.73% - - - -
3,965,325.37
4,116,238.87
19,339.10 44,293,694.47 4.02% - - - -
6,313,633.94
37,980,060.53
23,565.85 97,353,118.59 8.85% - - - -
28,167,353.87
69,185,764.73
210,056.00 16,625,932.40 1.51% - - - -
5,511,214.50
11,114,717.90
7,458.00 590,300.70 0.05% - - - -
138,941.00 129,493,012.00 11.77% - - - -
17,489,912.00
80,734,500.00
31,268,600.00
24,134.00 7,481,540.00 0.68% - - - -
2,311,980.00
5,169,560.00
28,000,000.00 168,000,000.00 15.27% - - - -
747,572,404.52

466,374.15 10,260,231.30 0.93% - - - -


1,733,301.37 38,132,630.15 3.47% - - - -
6,288,007.00
31,844,623.18
94,998.99 2,089,977.84 0.19% - - - -
1,025,475.00
1,064,502.82
19,339.10 8,159,746.46 0.74% - - - -
1,163,092.24
6,996,654.23
23,565.85 24,612,409.40 2.24% - - - -
7,121,152.92
17,491,256.48
210,056.00 11,763,136.00 1.07% - - - -
3,899,280.00
7,863,856.00
7,458.00 417,648.00 0.04% - - - -
138,941.00 2,778,820.00 0.25% - - - -
375,320.00
1,732,500.00
671,000.00
41,511.25 415,112.50 0.04% - - - -
1,514,370.00 3,028,740.00 0.28% - - - -
571,637.00
2,457,103.00
101,658,451.65
-
5,000,000.00 5,000,000.00 0.45% - - - -
5,000,000.00 5,000,000.00 0.45% - - - -
10,000,000.00
1,100,489,957.66 100% 0.00% 1.46%

Dibuat Oleh :
Kontraktor Pelaksana
CV. PAGI PETANG

Zulkipli Fahrijal
Direktur
ATAN SAMBOJA

BULAN PERTAMA
PERIODE 25 Juli - 31 juli
Bulan JULI

s/d Bulan ini


Volume Bobot

0.19 0.01

0.077 0.09%

- -

- -

- -
- -

- -
- -
- -

- -

- -

- -

- -

- -

- -
- -

- -

- -

- -
- -

- -

- -

- -

- -
- -
- -

- -
- -

- -
- -

1.46%

ktor Pelaksana
AGI PETANG
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KEDUA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 1 - 7 Agustus 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan AGUSTUS

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 0.00% 1.46%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 0.00% 0.00%
Pekerjaan Pintu Air 67.93% 0.00% 0.00% 0.00%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 1.46%
BOBOT PEKERJAAN MINGGU INI 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.37%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN 0.09%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KEDUA
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 1 - 7 Agustus 2023
Bulan AGUSTUS

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% - 0.00% 0.19 1.37%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% - 0.00% 0.08 0.09%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.00% 0.00% - 0.00%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% - 0.00% 0.00% - 0.00%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% - 0.00% 0.00% - 0.00%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% - 0.00% 0.00% - 0.00%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00% - 0.00%

1,100,489,714.32 1.46% 0.00% 1.46%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 1.46%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KETIGA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 8 - 14 Agustus 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan AGUSTUS

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 0.00% 1.46%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 0.00% 0.00%
Pekerjaan Pintu Air 67.93% 0.00% 0.00% 0.00%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 1.46%
BOBOT PEKERJAAN MINGGU INI 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 4.07%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -2.61%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KETIGA
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 8 - 14 Agustus 2023
Bulan AGUSTUS

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% 0.00% 0.19 1.37%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% 0.00% 0.08 0.09%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.00% 0.00% - 0.00%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% - 0.00% 0.00% - 0.00%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% - 0.00% 0.00% - 0.00%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% - 0.00% 0.00% - 0.00%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00% - 0.00%

1,100,489,714.32 1.46% 0.00% 1.46%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 1.46%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE EMPAT
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 15 - 21 Agustus 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan AGUSTUS

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 0.00% 1.46%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 0.00% 0.00%
Pekerjaan Pintu Air 67.93% 0.00% 0.00% 0.00%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 1.46%
BOBOT PEKERJAAN MINGGU INI 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 8.75%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -7.29%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE EMPAT
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 15 - 21 Agustus 2023
Bulan AGUSTUS

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% - 0.00% 0.19 1.37%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% - 0.00% 0.08 0.09%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.00% - 0.00% - 0.00%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% - 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% - 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% - 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% - 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% - 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% - 0.00% - 0.00% - 0.00%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% - 0.00% - 0.00% - 0.00%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% - 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 1.46% 0.00% 1.46%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 1.46%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE LIMA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 22 - 28 Agustus 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan AGUSTUS

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 0.00% 1.46%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 0.00% 0.00%
Pekerjaan Pintu Air 67.93% 0.00% 0.00% 0.00%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 1.46%
BOBOT PEKERJAAN MINGGU INI 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 15.39%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -13.93%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE LIMA
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 22 - 28 Agustus 2023
Bulan AGUSTUS

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% - 0.00% 0.19 1.37%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% - 0.00% 0.08 0.09%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.00% - 0.00% - 0.00%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% - 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% - 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% - 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% - 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% - 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% - 0.00% - 0.00% - 0.00%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% - 0.00% - 0.00% - 0.00%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% - 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 1.46% 0.00% 1.46%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 1.46%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 1.46%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA BULAN KEDUA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 1 - 28 Agustus 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan AGUSTUS

KONTRAK REALISASI BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 0.00% 1.46%

II PEKERJAAN NORMALISASI 2.52% 0.00% - -

III PEKERJAAN PINTU AIR -


Pekerjaan Tanah 9.25% 0.00% -
Pekerjaan Pintu Air 67.93% 0.00% -
Pekerjaan Turap 11.04% 0.00% -

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% - -

JUMLAH BOBOT 100%


JUMLAH BOBOT BULAN LALU 1.46%
BOBOT PEKERJAAN BULAN INI 0.00%
REALISASI KOMULATIF BOBOT PEKERJAAN BULAN INI 1.46%
RENCANA KOMULATIF BOBOT PEKERJAAN BULAN INI 15.39%
PEKERJAAN BULAN INI MENGALAMI KEMAJUAN/KETERLAMBATAN -13.93%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI PEK
PROGRAM : PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NO
LOKASI : KECAMATAN SAMBOJA KABUPATEN
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN

No. Uraian Pekerjaan Volume Satuan

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls
-demob
-pemasangan papan kegiatan
-sewa barak
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls
JUMLAH TOTAL PEKERJAAN PERSIAPAN
II. PEKERJAAN NORMALISASI
I. Pekerjaan Normalisasi
1 Galian Tanah Berlumpur di Sungai 903.75 m3
- tenaga 34453.50
- peralatan sewa long-arm 13437.41
JUMLAH TOTAL PEKERJAAN NORMALISASI
III. PEKERJAAN PINTU AIR
I. Pekerjaan Tanah
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m
tenaga 20870
bahan 26150
peralatan 400
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3
JUMLAH TOTAL Pekerjaan Tanah
II. Pekerjaan Pintu Air
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3
tenaga 263750
material batu 552000
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3
tenaga 259835
bahan 1116865
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3
tenaga 259835
bahan 1315893.5
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3
tenaga 42375
peralatan concrete 43987.72
6 Untuk pembesian polos 2,290.37 Kg
tenaga 2,506.00
bahan 15,075.00
7 Untuk pembesian Deformasi 4,131.11 Kg
tenaga 6,198.50
bahan 15,225.00
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2
tenaga 63300
bahan 127660
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m
tenaga 17060
bahan 78750
peralatan 30500
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh
tenaga 6780
bahan 15160
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh
JUMLAH TOTAL Pekerjaan Pintu Air
III. Pekerjaan Turap
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 22 m3
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 22 m3
tenaga 259835
bahan 1315893.5
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 22 m3
tenaga 42375
peralatan concrete 43987.72
4 Untuk pembesian polos 421.93 Kg
tenaga 2,506.00
bahan 15,075.00
5 Untuk pembesian Deformasi 1,044.41 Kg
tenaga 6,198.50
bahan 15,225.00
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 56 m2
tenaga 63300
bahan 127660
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 56 m2
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 20 m
tenaga 17060
bahan 78750
peralatan 30500
9 1 m' Pipa Drainase PVC 2" 10 m
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 2 m
tenaga 259835
bahan 1116865
JUMLAH TOTAL Pekerjaan Turap
IV. PEKERJAAN PEMBONGKARAN
1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls
2 Pembongkaran Pintu Air Lama 1 Ls
JUMLAH TOTAL PEKERJAAN PEMBONGKARAN

Diperiksa Oleh :
Konsultan Supervisi
CV. ISAM STUDIO KONSULTAN

Purwaningsih, ST
Site Engineer
REALISASI PEKERJAAN BULANAN
ENGELOLAAN SUMBER DAYA AIR (SDA)
EMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
ECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
.342/DPU/SDA/600.1.4.1/7/2023
4 JULI 2023
0 HARI KALENDER
PBD KAB. KUTAI KARTANEGARA
CV. PAGI PETANG
CV. ISAM STUDIO KONSULTAN

s/d Bulan lalu Bulan ini


Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot

78,700,000.00 78,700,000.00 7.15% 0.19 1.37% 0 0.00%


69,000,000.00
700,000.00
9,000,000.00
13,152,307.77 13,152,307.77 1.20% 0.08 0.09% 0 0.00%
91,852,307.77
-
-
52,680.00 47,609,552.38 4.33% - - 0 0.00%
34,251,087.40
13,358,465.88
47,609,552.38
-
-
52,162.00 2,555,938.00 0.23% - - 0 0.00%
1,124,893.00
1,409,485.00
21,560.00
125,853.75 79,747,228.69 7.25% - - 0 0.00%
61,528.50 19,494,074.65 1.77% - - 0 0.00%
101,797,241.34
-
466,374.15 39,674,448.94 3.61% - - 0 0.00%
897,325.00 68,097,994.25 6.19% - - 0 0.00%
22,017,586.25
46,080,408.00
1,514,370.00 20,428,851.30 1.86% - - 0 0.00%
3,855,691.57
16,573,159.74
1,733,301.37 147,451,947.58 13.40% - - 0 0.00%
24,314,579.79
123,137,367.92
94,998.99 8,081,564.29 0.73% - - 0 0.00%
3,965,325.37
4,116,238.87
19,339.10 44,293,694.47 4.02% - - 0 0.00%
6,313,633.94
37,980,060.53
23,565.85 97,353,118.59 8.85% - - 0 0.00%
28,167,353.87
69,185,764.73
210,056.00 16,625,932.40 1.51% - - 0 0.00%
5,511,214.50
11,114,717.90
7,458.00 590,300.70 0.05% - - 0 0.00%
138,941.00 129,493,012.00 11.77% - - 0 0.00%
17,489,912.00
80,734,500.00
31,268,600.00
24,134.00 7,481,540.00 0.68% - - 0 0.00%
2,311,980.00
5,169,560.00
28,000,000.00 168,000,000.00 15.27% - - 0 0.00%
747,572,404.52

466,374.15 10,260,231.30 0.93% - - 0 0.00%


1,733,301.37 38,132,630.15 3.47% - - 0 0.00%
6,288,007.00
31,844,623.18
94,998.99 2,089,977.84 0.19% - - 0 0.00%
1,025,475.00
1,064,502.82
19,339.10 8,159,746.46 0.74% - - 0 0.00%
1,163,092.24
6,996,654.23
23,565.85 24,612,409.40 2.24% - - 0 0.00%
7,121,152.92
17,491,256.48
210,056.00 11,763,136.00 1.07% - - 0 0.00%
3,899,280.00
7,863,856.00
7,458.00 417,648.00 0.04% - - 0 0.00%
138,941.00 2,778,820.00 0.25% - - 0 0.00%
375,320.00
1,732,500.00
671,000.00
41,511.25 415,112.50 0.04% - - 0 0.00%
1,514,370.00 3,028,740.00 0.28% - - 0 0.00%
571,637.00
2,457,103.00
101,658,451.65
-
5,000,000.00 5,000,000.00 0.45% - - 0 0.00%
5,000,000.00 5,000,000.00 0.45% - - 0 0.00%
10,000,000.00
1,100,489,957.66 100% 1.46% 0.00%

Dibuat Oleh :
Kontraktor Pelaksana
CV. PAGI PETANG

Zulkipli Fahrijal
Direktur
ATAN SAMBOJA

BULAN KEDUA
PERIODE 1 - 28 Agustus 2023
Bulan AGUSTUS

s/d Bulan ini


Volume Bobot

0.19 1.37%

0.077 0.09%

- -

- -

- -
- -

- -
- -
- -

- -

- -

- -

- -

- -

- -
- -

- -

- -

- -
- -

- -

- -

- -

- -
- -
- -

- -
- -

- -
- -

1.46%

ktor Pelaksana
AGI PETANG
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE ENAM
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 29-4 Sept 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan SEPTEMBER

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 1.40% 2.86%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 0.08% 0.08%
Pekerjaan Pintu Air 67.93% 0.00% 12.14% 12.14%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 1.46%
BOBOT PEKERJAAN MINGGU INI 13.62%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 15.08%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 25.63%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -10.55%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE ENAM
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 29-4 Sept 2023
Bulan SEPTEMBER

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.19 1.37% 0.18 1.30% 0.37 2.67%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.08 0.09% 0.08 0.09% 0.15 0.18%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.00% - 0.08% - 0.08%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% - 0.00% - 0.00%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% - 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% - 0.00% - 0.00%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% - 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% - 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% - 0.00% 490.98 0.86% 490.98 0.86%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% - 0.00% 848.08 10.71% 848.08 10.71%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% - 0.00% 262.10 0.57% 262.10 0.57%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% - 0.00% - 0.00%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 1.46% 13.62% 15.08%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 1.46%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 13.62%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 15.08%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE TUJUH
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 5-11 Sept 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan SEPTEMBER

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 2.86% 0.99% 3.84%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.08% 3.70% 3.78%
Pekerjaan Pintu Air 67.93% 12.14% 15.22% 27.36%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 15.08%
BOBOT PEKERJAAN MINGGU INI 19.91%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 34.98%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 38.10%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -3.11%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE TUJUH
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 5-11 Sept 2023
Bulan SEPTEMBER

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.37 2.67% 0.13 0.90% 0.50 3.57%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.15 0.18% 0.08 0.09% 0.23 0.28%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% - 0.08% 16.33 0.08% 16.33 0.15%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% - 0.00% 316.83 3.62% 316.83 3.62%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% - 0.00% - 0.00%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% - 0.00% 59.53 4.85% 59.53 4.85%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% - 0.00% - 0.00%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% - 0.00% - 0.00%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% 490.98 0.86% - 0.00% 490.98 0.86%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% - 0.00% 978.62 2.10% 978.62 2.10%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% 848.08 10.71% 41.96 0.53% 890.04 11.24%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% 262.10 0.57% 47.90 0.11% 310.00 0.68%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% - 0.00% 3.00 7.63% 3.00 7.63%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 15.08% 19.91% 34.98%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 15.08%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 19.91%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 34.98%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE DELAPAN
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 12-18 Sept 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan SEPTEMBER

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 3.84% 0.99% 4.83%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 3.78% 3.70% 7.48%
Pekerjaan Pintu Air 67.93% 27.36% 5.26% 32.63%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 34.98%
BOBOT PEKERJAAN MINGGU INI 9.95%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 44.94%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 51.86%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -6.92%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE DELAPAN
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 12-18 Sept 2023
Bulan SEPTEMBER

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.50 3.57% 0.13 0.90% 0.62 4.46%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.23 0.28% 0.08 0.09% 0.31 0.37%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% 16.33 0.15% 16.33 0.08% 32.67 0.23%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% 316.83 3.62% 316.83 3.62% 633.65 7.25%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% - 0.00% 21.27 0.90% 21.27 0.90%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% 59.53 4.85% 8.18 0.67% 67.71 5.52%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% - 0.00% 6.75 0.93% 6.75 0.93%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% - 0.00% 14.21 2.24% 14.21 2.24%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% 490.98 0.86% - 0.00% 490.98 0.86%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% 978.62 2.10% - 0.00% 978.62 2.10%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% 890.04 11.24% 41.96 0.53% 932.00 11.77%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% 310.00 0.68% - 0.00% 310.00 0.68%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% 3.00 7.63% - 0.00% 3.00 7.63%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 34.98% 9.95% 44.94%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 34.98%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 9.95%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 44.94%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE SEMBILAN
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 19-25 Sept 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan SEPTEMBER

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 4.83% 0.99% 5.82%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 7.48% 0.00% 7.48%
Pekerjaan Pintu Air 67.93% 32.63% 2.60% 35.23%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 44.94%
BOBOT PEKERJAAN MINGGU INI 3.59%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 48.53%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 65.35%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -16.82%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE SEMBILAN
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 19-25 Sept 2023
Bulan SEPTEMBER

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.62 4.46% 0.13 0.90% 0.75 5.36%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.31 0.37% 0.08 0.09% 0.38 0.46%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% 32.67 0.23% - 0.00% 32.67 0.23%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% 633.65 7.25% - 0.00% 633.65 7.25%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% 21.27 0.90% 21.27 0.90% 42.54 1.80%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% 67.71 5.52% 4.09 0.33% 71.80 5.85%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% 6.75 0.93% 6.75 0.93% 13.49 1.86%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% 14.21 2.24% 2.81 0.44% 17.01 2.68%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% 490.98 0.86% - 0.00% 490.98 0.86%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% 978.62 2.10% - 0.00% 978.62 2.10%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% 932.00 11.77% - 0.00% 932.00 11.77%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% 310.00 0.68% - 0.00% 310.00 0.68%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% 3.00 7.63% - 0.00% 3.00 7.63%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 44.94% 3.59% 48.53%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 44.94%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 3.59%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 48.53%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur
REALISASI PEKERJAAN BULANAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NOR
LOKASI : KECAMATAN SAMBOJA KABUPATEN
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN

No. Uraian Pekerjaan Volume Satuan

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls
JUMLAH TOTAL PEKERJAAN PERSIAPAN
II. PEKERJAAN NORMALISASI
I. Pekerjaan Normalisasi
1 Galian Tanah Berlumpur di Sungai 903.75 m3
JUMLAH TOTAL PEKERJAAN NORMALISASI
III. PEKERJAAN PINTU AIR
I. Pekerjaan Tanah
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3
JUMLAH TOTAL Pekerjaan Tanah
II. Pekerjaan Pintu Air
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3
6 Untuk pembesian polos 2,290.37 Kg
7 Untuk pembesian Deformasi 4,131.11 Kg
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh
JUMLAH TOTAL Pekerjaan Pintu Air
III. Pekerjaan Turap
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 22 m3
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 22 m3
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 22 m3
4 Untuk pembesian polos 421.93 Kg
5 Untuk pembesian Deformasi 1,044.41 Kg
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 56 m2
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 56 m2
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 20 m
9 1 m' Pipa Drainase PVC 2" 10 m
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 2 m
JUMLAH TOTAL Pekerjaan Turap
IV. PEKERJAAN PEMBONGKARAN
1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls
2 Pembongkaran Pintu Air Lama 1 Ls
JUMLAH TOTAL PEKERJAAN PEMBONGKARAN

A JUMLAH TOTAL
B PPN = 11% X A
C TOTAL HARGA (termasuk ppn11%) = A + B
D MATERIAL ON SITE
E JUMLAH SERTIFIKASI BULANAN SAMPAI DENGAN SAAT INI = C
F JUMLAH SERTIFIKASI BULANAN SAMPAI DENGAN BULAN LALU
G JUMLAH KOTOR SERTIFIKASI BULANAN SAAT INI = E - F
H POTONGAN POTONGAN
1. JAMINAN PEMELIHARAAN (5% x G)
2. PENGEMBALIAN UANG MUKA
3. LAIN-LAIN
I JUMLAH POTONGAN - POTONGAN = ( 1 + 2 + 3)
J JUMLAH BERSIH SERTIFIKASI BULANAN BULAN LALU
K JUMLAH BERSIH SERTIFIKASI BULANANAN SAAT INI = G - I
L JUMLAH BESIH SERTIFIKASI SAMPAI DENGAN BULAN INI = J + K

Diperiksa Oleh :
Konsultan Supervisi
CV. ISAM STUDIO KONSULTAN
Purwaningsih, ST
Site Engineer
ERJAAN BULANAN
ENGELOLAAN SUMBER DAYA AIR (SDA)
EMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
ECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
.342/DPU/SDA/600.1.4.1/7/2023
4 JULI 2023
0 HARI KALENDER
PBD KAB. KUTAI KARTANEGARA BULAN
CV. PAGI PETANG PERIODE
CV. ISAM STUDIO KONSULTAN Bulan

kontrak awal Prestasi Pekerjaan


Harga Satuan
Jumlah harga bobot Jumlah harga

78,700,000.00 78,700,000.00 7.15% 58,985,727.33


13,152,307.77 13,152,307.77 1.20% 5,058,581.03
91,852,307.77
-
-
52,680.00 47,609,552.38 4.33% -
47,609,552.38
-
-
52,162.00 2,555,938.00 0.23% 2,555,938.57
125,853.75 79,747,228.69 7.25% 79,747,246.32
61,528.50 19,494,074.65 1.77% -
101,797,241.34
-
466,374.15 39,674,448.94 3.61% 19,837,228.86
897,325.00 68,097,994.25 6.19% 64,428,410.79
1,514,370.00 20,428,851.30 1.86% 20,428,855.82
1,733,301.37 147,451,947.58 13.40% 29,490,396.06
94,998.99 8,081,564.29 0.73% -
19,339.10 44,293,694.47 4.02% 9,495,017.23
23,565.85 97,353,118.59 8.85% 23,061,926.67
210,056.00 16,625,932.40 1.51% -
7,458.00 590,300.70 0.05% -
138,941.00 129,493,012.00 11.77% 129,493,040.63
24,134.00 7,481,540.00 0.68% 7,481,541.65
28,000,000.00 168,000,000.00 15.27% 84,000,018.57
747,572,404.52
466,374.15 10,260,231.30 0.93% -
1,733,301.37 38,132,630.15 3.47% -
94,998.99 2,089,977.84 0.19% -
19,339.10 8,159,746.46 0.74% -
23,565.85 24,612,409.40 2.24% -
210,056.00 11,763,136.00 1.07% -
7,458.00 417,648.00 0.04% -
138,941.00 2,778,820.00 0.25% -
41,511.25 415,112.50 0.04% -
1,514,370.00 3,028,740.00 0.28% -
101,658,451.65
-
5,000,000.00 5,000,000.00 0.45% -
5,000,000.00 5,000,000.00 0.45% -
10,000,000.00

1,100,489,957.66 100% 534,063,929.54


121,053,895.34 58,747,032.25
1,221,543,853.00 592,810,961.79

C 592,810,961.79
U -
592,810,961.79

29,640,548.09
162,184,222.50

191,824,770.59

400,986,191.20
K 400,986,191.20
ANG KECAMATAN SAMBOJA

KETIGA
29 agust-25 Sept 2023
SEPTEMBER

Prestasi Pekerjaan
bobot

5.36%
0.46%

0.00%

0.23%
7.25%
0.00%

1.80%
5.85%
1.86%
2.68%
0.00%
0.86%
2.10%
0.00%
0.00%
11.77%
0.68%
7.63%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%

48.53%
REKAPITULASI
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA BULAN KETIGA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 29 agust-25 Sept 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan SEPTEMBER

KONTRAK REALISASI BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 1.46% 4.36% 5.82%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 0.00% 7.48% 7.48%
Pekerjaan Pintu Air 67.93% 0.00% 35.23% 35.23%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT BULAN LALU 1.46%
BOBOT PEKERJAAN BULAN INI 47.07%
REALISASI KOMULATIF BOBOT PEKERJAAN BULAN INI 48.53%
RENCANA KOMULATIF BOBOT PEKERJAAN BULAN INI 65.35%
PEKERJAAN BULAN INI MENGALAMI KEMAJUAN/KETERLAMBATAN -16.82%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI PEK
PROGRAM : PENGELOLAAN SUMBER DAYA AIR
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NO
LOKASI : KECAMATAN SAMBOJA KABUPATEN
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN

No. Uraian Pekerjaan Volume Satuan

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls
-demob
-pemasangan papan kegiatan
-sewa barak
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls
JUMLAH TOTAL PEKERJAAN PERSIAPAN
II. PEKERJAAN NORMALISASI
I. Pekerjaan Normalisasi
1 Galian Tanah Berlumpur di Sungai 903.75 m3
- tenaga 34453.50
- peralatan sewa long-arm 13437.41
JUMLAH TOTAL PEKERJAAN NORMALISASI
III. PEKERJAAN PINTU AIR
I. Pekerjaan Tanah
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m
tenaga 20870
bahan 26150
peralatan 400
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3
JUMLAH TOTAL Pekerjaan Tanah
II. Pekerjaan Pintu Air
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3
tenaga 263750
material batu 552000
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3
tenaga 259835
bahan 1116865
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3
tenaga 259835
bahan 1315893.5
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3
tenaga 42375
peralatan concrete 43987.72
6 Untuk pembesian polos 2,290.37 Kg
tenaga 2,506.00
bahan 15,075.00
7 Untuk pembesian Deformasi 4,131.11 Kg
tenaga 6,198.50
bahan 15,225.00
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2
tenaga 63300
bahan 127660
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m
tenaga 17060
bahan 78750
peralatan 30500
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh
tenaga 6780
bahan 15160
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh
JUMLAH TOTAL Pekerjaan Pintu Air
III. Pekerjaan Turap
1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 22 m3
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 22 m3
tenaga 259835
bahan 1315893.5
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 22 m3
tenaga 42375
peralatan concrete 43987.72
4 Untuk pembesian polos 421.93 Kg
tenaga 2,506.00
bahan 15,075.00
5 Untuk pembesian Deformasi 1,044.41 Kg
tenaga 6,198.50
bahan 15,225.00
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 56 m2
tenaga 63300
bahan 127660
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 56 m2
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 20 m
tenaga 17060
bahan 78750
peralatan 30500
9 1 m' Pipa Drainase PVC 2" 10 m
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 2 m
tenaga 259835
bahan 1116865
JUMLAH TOTAL Pekerjaan Turap
IV. PEKERJAAN PEMBONGKARAN
1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls
2 Pembongkaran Pintu Air Lama 1 Ls
JUMLAH TOTAL PEKERJAAN PEMBONGKARAN

Diperiksa Oleh :
Konsultan Supervisi
CV. ISAM STUDIO KONSULTAN

Purwaningsih, ST
Site Engineer
REALISASI PEKERJAAN BULANAN
ENGELOLAAN SUMBER DAYA AIR (SDA)
EMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
ECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
.342/DPU/SDA/600.1.4.1/7/2023
4 JULI 2023
0 HARI KALENDER
PBD KAB. KUTAI KARTANEGARA
CV. PAGI PETANG
CV. ISAM STUDIO KONSULTAN

s/d Bulan lalu Bulan ini


Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot

78,700,000.00 78,700,000.00 7.15% 0.19 1.37% 0.56 3.99%


69,000,000.00
700,000.00
9,000,000.00
13,152,307.77 13,152,307.77 1.20% 0.08 0.09% 0.31 0.37%
91,852,307.77
-
-
52,680.00 47,609,552.38 4.33% - 0.00% 0.00 0.00%
34,251,087.40
13,358,465.88
47,609,552.38
-
-
52,162.00 2,555,938.00 0.23% - 0.00% 32.67 0.23%
1,124,893.00
1,409,485.00
21,560.00
125,853.75 79,747,228.69 7.25% - 0.00% 633.65 7.25%
61,528.50 19,494,074.65 1.77% - 0.00% 0.00 0.00%
101,797,241.34
-
466,374.15 39,674,448.94 3.61% - 0.00% 42.54 1.80%
897,325.00 68,097,994.25 6.19% - 0.00% 71.80 5.85%
22,017,586.25
46,080,408.00
1,514,370.00 20,428,851.30 1.86% - 0.00% 13.49 1.86%
3,855,691.57
16,573,159.74
1,733,301.37 147,451,947.58 13.40% - 0.00% 17.01 2.68%
24,314,579.79
123,137,367.92
94,998.99 8,081,564.29 0.73% - 0.00% 0.00 0.00%
3,965,325.37
4,116,238.87
19,339.10 44,293,694.47 4.02% - 0.00% 490.98 0.86%
6,313,633.94
37,980,060.53
23,565.85 97,353,118.59 8.85% - 0.00% 978.62 2.10%
28,167,353.87
69,185,764.73
210,056.00 16,625,932.40 1.51% - 0.00% 0.00 0.00%
5,511,214.50
11,114,717.90
7,458.00 590,300.70 0.05% - 0.00% 0.00 0.00%
138,941.00 129,493,012.00 11.77% - 0.00% 932.00 11.77%
17,489,912.00
80,734,500.00
31,268,600.00
24,134.00 7,481,540.00 0.68% - 0.00% 310.00 0.68%
2,311,980.00
5,169,560.00
28,000,000.00 168,000,000.00 15.27% - 0.00% 3.00 7.63%
747,572,404.52

466,374.15 10,260,231.30 0.93% - 0.00% 0.00 0.00%


1,733,301.37 38,132,630.15 3.47% - 0.00% 0.00 0.00%
6,288,007.00
31,844,623.18
94,998.99 2,089,977.84 0.19% - 0.00% 0.00 0.00%
1,025,475.00
1,064,502.82
19,339.10 8,159,746.46 0.74% - 0.00% 0.00 0.00%
1,163,092.24
6,996,654.23
23,565.85 24,612,409.40 2.24% - 0.00% 0.00 0.00%
7,121,152.92
17,491,256.48
210,056.00 11,763,136.00 1.07% - 0.00% 0.00 0.00%
3,899,280.00
7,863,856.00
7,458.00 417,648.00 0.04% - 0.00% 0.00 0.00%
138,941.00 2,778,820.00 0.25% - 0.00% 0.00 0.00%
375,320.00
1,732,500.00
671,000.00
41,511.25 415,112.50 0.04% - 0.00% 0.00 0.00%
1,514,370.00 3,028,740.00 0.28% - 0.00% 0.00 0.00%
571,637.00
2,457,103.00
101,658,451.65
-
5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00 0.00%
5,000,000.00 5,000,000.00 0.45% - 0.00% 0.00 0.00%
10,000,000.00
1,100,489,957.66 100% 1.46% 47.07%

Dibuat Oleh :
Kontraktor Pelaksana
CV. PAGI PETANG

Zulkipli Fahrijal
Direktur
ATAN SAMBOJA

BULAN KETIGA
PERIODE 29 agust-25 Sept 2023
Bulan SEPTEMBER

s/d Bulan ini


Volume Bobot

0.75 5.36%

0.38 0.46%

- 0.00%

32.67 0.23%

633.65 7.25%
- 0.00%

42.54 1.80%
71.80 5.85%
13.49 1.86%

17.01 2.68%

- 0.00%

490.98 0.86%

978.62 2.10%

- 0.00%

- 0.00%
932.00 11.77%

310.00 0.68%

3.00 7.63%

- 0.00%
- 0.00%

- 0.00%

- 0.00%

- 0.00%

- 0.00%
- 0.00%
- 0.00%

- 0.00%
- 0.00%

- 0.00%
- 0.00%

48.53%

ktor Pelaksana
AGI PETANG
REKAPITULASI - MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA MINGGU KE SEPULUH
KONTRAKTOR PELAKSANA : CV. PAGI PETANG Tanggal 26-2 Oktober 2023
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN Bulan OKTOBER

KONTRAK REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI
NO URAIAN BOBOT BOBOT BOBOT BOBOT
% (%) (%) (%)

I PEKERJAAN PERSIAPAN 8.35% 5.82% 0.99% 6.81%

II PEKERJAAN NORMALISASI 2.52% 0.00% 0.00% 0.00%

III PEKERJAAN PINTU AIR


Pekerjaan Tanah 9.25% 7.48% 0.00% 7.48%
Pekerjaan Pintu Air 67.93% 35.23% 3.25% 38.49%
Pekerjaan Turap 11.04% 0.00% 0.00% 0.00%

IV PEKERJAAN PEMBONGKARAN 0.91% 0.00% 0.00% 0.00%

JUMLAH BOBOT 100%


JUMLAH BOBOT MINGGU LALU 48.53%
BOBOT PEKERJAAN MINGGU INI 4.24%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 52.77%
RENCANA KOMULATIF BOBOT PEKERJAAN MINGGU INI 78.72%
PEKERJAAN MINGGU INI MENGALAMI KEMAJUAN/KETERLAMBATAN -25.95%

Mengetahui, Diperiksa Oleh Dibuat Oleh


Dinas Pekerjaan Umum Konsultan Pengawas Kontraktor Pelaksana
Pejabat Pembuat Komitmen ( PPK ) CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

H. Agus Sofian Martin, SP Purwaningsih, ST Zulkipli Fahrijal


NIP 19760918 200112 1 005 Site Engineer Direktur
REALISASI KEMAJUAN PEKERJAAN MINGGUAN
PROGRAM : PENGELOLAAN SUMBER DAYA AIR (SDA)
PEKERJAAN : PEMBANGUNAN PINTU AIR DAN NORMALISASI SUNGAI DI HANDIL BARU DAN MUARA SEMBILANG KECAMATAN SAMBOJA
LOKASI : KECAMATAN SAMBOJA KABUPATEN KUTAI KARTANAGARA
NOMOR KONTRAK : P.342/DPU/SDA/600.1.4.1/7/2023
TANGGAL KONTRAK : 24 JULI 2023
WAKTU PELAKSANAAN : 90 HARI KALENDER
SUMBER DANA : APBD KAB. KUTAI KARTANEGARA
KONTRAKTOR PELAKSANA : CV. PAGI PETANG MINGGU KE SEPULUH
KONSULTAN PENGAWAS : CV. ISAM STUDIO KONSULTAN PERIODE 26-2 Oktober 2023
Bulan OKTOBER

s/d Minggu lalu Minggu ini s/d Minggu ini


No. Uraian Pekerjaan Volume Satuan Harga Satuan Jumlah harga bobot
Volume Bobot Volume Bobot Volume Bobot

I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1 Ls 78,700,000.00 78,700,000.00 7.15% 0.75 5.36% 0.13 0.90% 0.87 6.26%
-demob 69,000,000.00 6.27%
-pemasangan papan kegiatan 700,000.00 0.06%
-sewa barak 9,000,000.00 0.82%
2 Sistem Manajemen dan Keselamatan Konstruksi (SMKK) 1 Ls 13,152,307.77 13,152,307.77 1.20% 0.38 0.46% 0.08 0.09% 0.46 0.55%
-
II. PEKERJAAN NORMALISASI -
I. Pekerjaan Normalisasi -
1 Galian Tanah Berlumpur di Sungai 526.47 m3 52,680.00 27,734,439.60 2.52% - 0.00% - 0.00% - 0.00%
- tenaga 34453.50 19,952,607.56 1.81%
- peralatan sewa long-arm 13437.41 7,781,832.57 0.71%

III. PEKERJAAN PINTU AIR -


I. Pekerjaan Tanah -
1 Pasang 1 m' Profil Melintang Galian Tanah 49 m 52,162.00 2,555,938.00 0.23% 32.67 0.23% - 0.00% 32.67 0.23%
tenaga 20870 1,124,893.00 0.10%
bahan 26150 1,409,485.00 0.13%
peralatan 400 21,560.00 0.00%
2 1 m3 Galian Tanah Biasa sedalam > 1 m s.d 2 m 633.65 m3 125,853.75 79,747,228.69 7.25% 633.65 7.25% - 0.00% 633.65 7.25%
3 1 m3 Urugan Kembali Tanah Biasa 316.83 m3 61,528.50 19,494,074.65 1.77% - 0.00% - 0.00% - 0.00%

II. Pekerjaan Pintu Air -


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 85.07 m3 466,374.15 39,674,448.94 3.61% 42.54 1.80% 21.27 0.90% 63.80 2.70%
2 1 m3 Pasangan Batu Kosong yang teratur dan padat - sedikit rongga beda tinggi >0 sd 1 m 75.89 m3 897,325.00 68,097,994.25 6.19% 71.80 5.85% - 0.00% 71.80 5.85%
tenaga 263750 22,017,586.25 2.00%
material batu 552000 46,080,408.00 4.19%
3 1 m3 beton mutu fc' = 7,4 Mpa (K100) 13.49 m3 1,514,370.00 20,428,851.30 1.86% 13.49 1.86% - 0.00% 13.49 1.86%
tenaga 259835 3,855,691.57 0.35%
bahan 1116865 16,573,159.74 1.51%
4 1 m3 beton mutu fc' = 21,7 Mpa (K250) 85.07 m3 1,733,301.37 147,451,947.58 13.40% 17.01 2.68% 14.21 2.24% 31.22 4.92%
tenaga 259835 24,314,579.79 2.21%
bahan 1315893.5 123,137,367.92 11.19%
5 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 85.07 m3 94,998.99 8,081,564.29 0.73% - 0.00% - 0.00% - 0.00%
tenaga 42375 3,965,325.37 0.36%
peralatan concrete 43987.72 4,116,238.87 0.37%
6 Untuk pembesian polos 2,290.37 Kg 19,339.10 44,293,694.47 4.02% 490.98 0.86% 65.29 0.11% 556.27 0.98%
tenaga 2,506.00 6,313,633.94 0.57%
bahan 15,075.00 37,980,060.53 3.45%
7 Untuk pembesian Deformasi 4,131.11 Kg 23,565.85 97,353,118.59 8.85% 978.62 2.10% - 0.00% 978.62 2.10%
tenaga 6,198.50 28,167,353.87 2.56%
bahan 15,225.00 69,185,764.73 6.29%
8 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 79.15 m2 210,056.00 16,625,932.40 1.51% - 0.00% - 0.00% - 0.00%
tenaga 63300 5,511,214.50 0.50%
bahan 127660 11,114,717.90 1.01%
9 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 79.15 m2 7,458.00 590,300.70 0.05% - 0.00% - 0.00% - 0.00%
10 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 932 m 138,941.00 129,493,012.00 11.77% 932.00 11.77% - 0.00% 932.00 11.77%
tenaga 17060 17,489,912.00 1.59%
bahan 78750 80,734,500.00 7.34%
peralatan 30500 31,268,600.00 2.84%
11 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm 310 Bh 24,134.00 7,481,540.00 0.68% 310.00 0.68% - 0.00% 310.00 0.68%
tenaga 6780 2,311,980.00 0.21%
bahan 15160 5,169,560.00 0.47%
12 Pintu Klep Fiber (1,2 x 1,4 m) 6 Bh 28,000,000.00 168,000,000.00 15.27% 3.00 7.63% - 0.00% 3.00 7.63%

III. Pekerjaan Turap


1 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 600 m s/d 700 m. 17.82 m3 466,374.15 8,309,765.82 0.76% - 0.00% - 0.00% - 0.00%
2 1 m3 beton mutu fc' = 21,7 Mpa (K250) 17.82 m3 1,733,301.37 30,883,633.83 2.81% - 0.00% - 0.00% - 0.00%
tenaga 259835 5,092,659.62 0.46%
bahan 1315893.5 25,790,974.24 2.34%
3 1 m3 Pemadatan beton pada saat mengecor (Concrete Vibrator) 17.82 m3 94,998.99 1,692,673.96 0.15% - 0.00% - 0.00% - 0.00%
tenaga 42375 830,532.65 0.08%
peralatan concrete 43987.72 862,141.30 0.08%
4 Untuk pembesian polos 984.50796 Kg 19,339.10 19,039,497.80 1.73% - 0.00% - 0.00% - 0.00%
tenaga 2,506.00 2,713,894.63 0.25%
bahan 15,075.00 16,325,603.17 1.48%
5 Untuk pembesian Deformasi 1,666.32 Kg 23,565.85 39,268,273.30 3.57% - 0.00% - 0.00% - 0.00%
tenaga 6,198.50 11,361,560.53 1.03%
bahan 15,225.00 27,906,712.77 2.54%
6 1 m2 Bekesting dinding beton biasa dengan multiplek 12 mm. 60.399355 m2 210,056.00 12,687,246.84 1.15% - 0.00% - 0.00% - 0.00%
tenaga 63300 4,205,607.06 0.38%
bahan 127660 8,481,639.78 0.77%
7 1 m2 bongkar bekesting cara biasa (membersihkan dan membereskan puing-puing). 60.399355 m2 7,458.00 450,458.39 0.04% - 0.00% - 0.00% - 0.00%
8 Per-m' penetrasi Cerucuk Kayu 10 x 10 cm 48.266236 m 138,941.00 6,706,159.16 0.61% - 0.00% - 0.00% - 0.00%
tenaga 17060 905,764.19 0.08%
bahan 78750 4,181,062.73 0.38%
peralatan 30500 1,619,332.23 0.15%
9 1 m' Pipa Drainase PVC 2" 5.0332796 m 41,511.25 208,937.73 0.02% - 0.00% - 0.00% - 0.00%
10 1 m3 beton mutu fc' = 7,4 Mpa (K100) 1.5099839 m 1,514,370.00 2,286,674.27 0.21% - 0.00% - 0.00% - 0.00%
tenaga 259835 431,581.32 0.04%
bahan 1116865 1,855,092.94 0.17%

IV. PEKERJAAN PEMBONGKARAN -


1 Mengangkut Hasil Pembongkaran Pintu Air Eksisting 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%
2 Pembongkaran Pintu Air Lama 1 Ls 5,000,000.00 5,000,000.00 0.45% - 0.00% - 0.00% - 0.00%

1,100,489,714.32 48.53% 4.24% 52.77%

TOTAL BOBOT 100.00%

JUMLAH BOBOT MINGGU LALU 48.53%


BOBOT PEKERJAAN MINGGU INI 110048995766.05% 4.24%
REALISASI KOMULATIF BOBOT PEKERJAAN MINGGU INI 52.77%

Diperiksa Oleh : Dibuat Oleh :


Konsultan Supervisi Kontraktor Pelaksana
CV. ISAM STUDIO KONSULTAN CV. PAGI PETANG

Purwaningsih, ST Zulkipli Fahrijal


Site Engineer Direktur