Anda di halaman 1dari 4

Estimasi Perjalanan Tujuan Customer & Supplier

PT. Anugerah Daya Industri Komponen Utama


2023

Periode : Oktober s/d Desember

Tarif Tol (Rp.)


Jarak (Km)
No Tujuan Perjalanan (Custumer) Rute Tol One-way Round-trip
One-way Round-trip Gol. I Gol. II Gol. III Gol. I Gol. II Gol. III

Customer
1 PT. Aisin Indonesia 18 36 - - - - - - -
2 PT. Bonecom Tricom 20 40 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
3 PT. Chiyoda Industry Indonesia 17 34 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
4 PT. Fuji Seat Indonesia - Sunter 47 94 CIKARANG UTARA - HALIM - SUNTER 18,000 22,500 22,500 36,000 45,000 45,000 GT. HALIM
5 PT. Fuji Seat Indonesia - KIIC 28 56 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
6 PT. Fuji Seat Indonesia - Surya Cipta 38 76 CIBATU - KARAWANG TIMUR 20,000 30,000 30,000 40,000 60,000 60,000
7 PT. F.Tech Indonesia 29 58 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
8 PT. Hino Motors Manufacturing Indonesia 51 102 CIBATU - KALIHURIP 20,000 30,000 30,000 40,000 60,000 60,000
9 PT. Inkoasku - Pako Group 40 80 CIBATU - KARAWANG TIMUR 20,000 30,000 30,000 40,000 60,000 60,000
10 PT. Inti Pantja Press Industri 33 66 CIKARANG UTARA - BEKASI BARAT 7,000 10,500 10,500 14,000 21,000 21,000
11 PT. Kasai Teck See Indonesia 27 54 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
12 PT. Menara Terus Makmur 3 6 - - - - - - -
13 PT. Matra Roda Piranti 17 34 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
14 PT. Ohkuma Industries Indonesia 19 38 CIBATU - DELTAMAS 12,000 18,000 18,000 24,000 36,000 36,000 FLEXIBLE
15 PT. Ravalia Inti Mandiri 17 34 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
16 PT. Sanoh Indonesia 16 32 - - - - - - -
17 PT. Shinto Kogyo Indonesia 15 30 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
18 PT. Sharp Semiconductor Indonesia 27 54 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
19 PT Shinko Kogyo Indonesia 32 64 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
20 PT. Takahashi Spring Indonesia 6 11 - - - - - - -
21 PT. Takara Sangyo Indonesia 51 102 CIBATU - KALIHURIP 20,000 30,000 30,000 40,000 60,000 60,000
22 PT. Three Star Indonesia 10 20 - - - - - - -
23 PT. Tokai Rubber Indonesia 37 74 CIBATU - KARAWANG TIMUR 20,000 30,000 30,000 40,000 60,000 60,000
24 PT Toyota Boshoku Indonesia, MM2100 14 28 CIKARANG UTARA - CIBITUNG 7,000 10,500 10,500 14,000 21,000 21,000
25 PT Toyota Boshoku Indonesia, Karawang 32 64 CIBATU - KARAWANG BARAT 12,000 18,000 18,000 24,000 36,000 36,000
26 PT. Velasto Indonesia 65 130 CIBATU - KALIHURIP UTAMA - SADANG 28,000 43,000 43,000 56,000 86,000 86,000 GT. KALIHURIP; G

Supplier
27 PT. Elektroplating Superindo 10 20 - - - - - - -
28 PT. Sarana Wira Reksa 9.7 19 - - - - - - -
29 PT. Prima Teknik Trada 20 40 CIBATU - CIBITUNG 12,000 18,000 18,000 24,000 36,000 36,000
30 PT. Multichem Indojasa Arthaprima 6.1 12 - - - - - - -
31 PT. Sankitama 5.3 11 - - - - - - -
32 PT. CGS Indonesia 7.2 14 - - - - - - -
33 PT. Hitotsu Multi Platindo 7.9 16 - - - - - - -
34 PT. Hotmal Jaya Perkasa 20 40 CIBATU - CIBITUNG 12,000 18,000 18,000 24,000 36,000 36,000
35 PT. Isra Presisi Indonesia, Tbk 11 22 - - - - - - -
36 CV. Java Coat Sedulur 22 44 CIBATU - CIBITUNG 12,000 18,000 18,000 24,000 36,000 36,000
37 PT. Maruhide Indonesia 12 24 CIBATU - DELTAMAS 12,000 18,000 18,000 24,000 36,000 36,000 FLEXIBLE
38 CV. Mekar Setia Mandiri 24 48 CIBATU - CIBITUNG 12,000 18,000 18,000 24,000 36,000 36,000
39 CV. Rahardjo Presisi Industri 76 152 CIBATU - JORR - SENTUL 35,000 47,500 47,500 70,000 95,000 95,000
40 PT. Sinar Lestari Abadi Indoraya 8.5 17 - - - - - -
41 CV. Waras Abadi 32 64 CIBATU - BEKASI BARAT 12,000 18,000 18,000 24,000 36,000 36,000
42 PT. Triputra Furintraco 34 68 CIBATU - BEKASI BARAT 12,000 18,000 18,000 24,000 36,000 36,000
43 PT. Senjaya Soode Precision 21 42 CIBATU - CIBITUNG - TELAGA ASIH 17,500 26,000 26,000 35,000 52,000 52,000 GT. TELAGA ASIH
44 PT. Surya Metal Multi Jaya 31 62 CIBATU - KARAWANG TIMUR 20,000 30,000 30,000 40,000 60,000 60,000
45 PT. Parker Metal Treatment Indonesia 13 26 CIBATU - CIBITUNG 12,000 18,000 18,000 24,000 36,000 36,000
46 CV. Indonusa Abadi 39 78 CIBATU - JORR - JATIWARNA 28,000 41,500 41,500 56,000 83,000 83,000
47 PT. Bintang Pratama Wijaya Teknik 31 62 CIBATU - BEKASI BARAT 12,000 18,000 18,000 24,000 36,000 36,000
GT. KALIHURIP; GT. SADANG
GT. TELAGA ASIH

Anda mungkin juga menyukai