Anda di halaman 1dari 1

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL BINA MARGA


BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI JAWA TIMUR
PPK 4.5 PROVINSI JAWA TIMUR

RINGKASAN KEMAJUAN PEKERJAAN (EXECUTIVE SUMMARY)


Status Laporan Minggu Ke 10 Periode : 30 Oktober s/d 05 November 2023
PAKET PENINGKATAN JALAN BANJARWATI – PETIIN ( LAMONGAN )
DATA UMUM PEKERJAAN LAPORAN KEMAJUAN PEKERJAAN PERMASALAHAN, SOLUSI DAN TINDAK LANJUT
Propinsi : JAWA TIMUR RENCANA MINGGU INI 45,805 % LEMBAR PENGESAHAN
Nama Satuan Kerja : PELAKSANAAN JALAN NASIONAL WILAYAH IV REALISASI MINGGU INI 59,106 % No. PERMASALAHAN SOLUSI DAN TINDAK LANJUT KETERANGAN
PROPINSI JAWA TIMUR DEVIASI 13,301 %
Nama PPK : YUDI DWI PRASETYO, ST,MT. Bobot s.d Minggu Minggu s.d Minggu DIPERIKSA OLEH
No DIVISI PEKERJAAN
PPK 4.5 PROVINSI JAWA TIMUR (% ) Lalu Ini Ini KONSULTAN SUPERVISI
Nama Kontraktor : PT. TRIJAYA CIPTA MAKMUR I DIVISI 1. UMUM
PT. DAKSINAPATI KARSA KONSULTINDO KSO PT.
Nomor Kontrak : HK 02 01-Bb.8.9/4.5/3506 II DIVISI 2. DRAINASE EKSAPINDOMATRA DAN PT. GARIS PUTIH SEJAJAR
Tanggal Kontrak : 23 Agustus 2023 2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup)
2,826 1,934 0,755 2,689
Nomor Addendum 1 : HK 02 01-Bb.8.9/4.5/3506-ADD01 III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Tanggal SPMK : 20 Oktober 2023 3.1.(1) Galian Biasa 0,558 0,199 0,022 0,221
Nilai Kontrak : 20.908.263.000 3.1.(9) Galian Perkerasan berbutir 0,276 0,144 0,024 0,167
Tanggal SPMK : 23 Agustus 2023 3.1.(10). Galian Perkerasan Beton 0,727 1,153 1,153
Masa Pelaksanaan : 131 (Seratus Tiga Puluh Satu) Hari Kalender IV DIVISI 4. PEKERJAAN PREVENTIF
Tanggal PHO : 31 Desember 2023 V DIVISI 5. PERKERASAN BERBUTIR Ir. YULIUS BUDI KUSDARYONO
Masa Pemeliharaan : 365 (Tiga Ratus Enam Puluh Lima) Hari Kalender 5.1.(1) Lapis Pondasi Agregat Kelas A 8,445 4,631 0,516 5,147 Team Leader
MONITORING KEUANGAN
Nama Manager Pelaksanaan: EKO EDI BUDIARTO, ST 5.1.(3a) Lapis Pondasi Agregat Kelas S 1,114
Konsultan Pengawas : PT. DAKSINAPATI KARSA KONSULTINDO KSO VI DIVISI 6. PERKERASAN ASPAL - NILAI TERKONTRAK REALISASI SISA DANA DIBUAT OLEH :
PT. ESKAPINDOMATRA DAN PT. GARIS PUTIH SEJAJAR 6.1(1) Lapis Resap Pengikat - Aspal Cair/Emulsi 3,123 0,317 0,075 0,392 Rp 20.908.263.000,00 10.390.377.600,00 10.517.885.400,00 PENYEDIA
Nama Supervision Enginer : Ir. YULIUS BUDI KUSDARYONO 6.1(2a) Lapis Perekat - Aspal Cair/Emulsi 1,068 1,302 1,302 PT. TRIJAYA CIPTA MAKMUR
6.3(5a) Laston Lapis Aus (AC-WC) 41,323 18,894 18,894
6.3(6a) Laston Lapis Antara (AC-BC) 40,286 22,804 6,338 29,141
S-CURVE PROGRES
VII DIVISI 7. STRUKTUR
VIII DIVISI 8. REHABILITASI JEMBATAN 23-Aug-23 4-Sep-23 11-Sep-23 18-Sep-23 25-Sep-23 2-Oct-23 9-Oct-23 16-Oct-23 23-Oct-23 30-Oct-23 6-Nov-23 13-Nov-23 20-Nov-23 27-Nov-23 4-Dec-23 11-Dec-23 18-Dec-23 25-Dec-23
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
9.2.(1) Marka Jalan Termoplastik 0,254 3-Sep-23 10-Sep-23 17-Sep-23 24-Sep-23 1-Oct-23 8-Oct-23 15-Oct-23 22-Oct-23 29-Oct-23 5-Nov-23 12-Nov-23 19-Nov-23 26-Nov-23 3-Dec-23 10-Dec-23 17-Dec-23 24-Dec-23 31-Dec-23
X DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA
TOTAL 100,00 51,377 7,730 59,106 1,4115 1,4115 99,651
92,324 100,000
DATA TEKNIS REKAMAN PEMBAYARAN
0,1859 0,1859 0,1859 85,125 EKO EDI BUDIARTO, ST
Panjang Penanganan Jalan : 7.420 KM No NILAI % Keterangan 0,0919 0,0919 0,0919 77,926 General Superitedent
URAIAN
1 UM Rp 4.181.652.600,00 20,0% 0,0021 0,0021 0,0041 0,4127 0,4127 70,727
2 MC - 01 Rp 6.208.725.000,00 39,6% 63,750 DISETUJUI OLEH
3 MC-02 59,106
55,362
4 MC - 03 0,0102 0,0102 0,0205 1,0237 1,2285 2,0475 2,0475 2,0475 51,377 Pelaksanaan Jalan Nasional Wil. IV Provinsi Jawa Timur
5 MC - 04 48,556 49,891 0,2226 0,2226 0,2226 0,2226 0,2226 Pejabat Pembuat Komitmen 4.5
45,805
6 MC - RETENSI 40,124 37,659 Provinsi Jawa Timur
0,0052 0,0052 0,0052 0,0052 1,0331 1,0331 1,0331
0,0970 0,0970 0,0970 0,0970 0,0970 0,0970 0,0970 0,0970 0,0970 0,0970 0,0970
24,728 28,481 6,8797 6,8797 6,8797 6,8797 6,8797 6,8797
8,0485 8,0485 8,0485 8,0485 8,0485
12,124
1,101 6,028 17,255
0,126 2,663 3,698
0,025 0,054 1,774
0,012
0,1268 0,1268
TOTAL Rp 10.390.377.600,00 59,6% 0,012 0,012 0,030 1,719 1,924 2,330 11,226 11,226 9,179 8,145 9,557 8,388 6,977 7,199 7,199 7,199 7,326 0,349
0,012 0,025 0,054 1,774 3,698 6,028 17,255 28,481 37,659 45,805 55,362 63,750 70,727 77,926 85,125 92,324 99,651 100,000 YUDI DWI PRASETYO, ST,MT.
0,126 0,974 1,562 9,461 12,604 15,396 8,432 1,335 1,486 7,730 NIP. 19750108 200912 1 001
0,126 1,101 2,663 12,124 24,728 40,124 48,556 49,891 51,377 59,106