Talang November
Talang November
Talang November
36
PT PILAR MAJU JAYA
JL.raya talangsuko turen
-1 -2 -3
POMPA PERTALITE
NOZZLE NO. 1 8,773,491 8,910,446
NOZZLE NO. 2 13,720,897 13,824,921
NOZZLE NO. 3
NOZZLE NO. 4
TOTAL
Total penyaluran
Penyaluran
(4)=(3-2)
136,955
104,024
-
-