KEGIATAN
JA
LA PEKERJAAN
N
LIN PEMBANGUNAN GEDUNG KELAS BARU
TA MAN 2 KUANTAN SINGINGI
S TAHUN ANGGARAN 2020
TA
LU LOKASI
K
KU JL. DATUK GINDO RAJO KEC. PANGEAN
AN KABUPATEN KUANTAN SINGINGI -
TA PROVINSI RIAU
N
-R DIBUAT OLEH
EN
GA
T
RAJO
50.19
K GINDO
107.26
SARIYANTO
Direktur
JL. DATU
DIPERIKSA OLEH
10.00
LAPANGAN OLAH RAGA
9.00
RKB
6.00
MASUK
7.00 40.00 A N D R I, S T
POS Supervision Engineering (SE)
RUANG
RUANG RUANG RUANG
DISETUJUI OLEH
RKB RKB KEPALA
9.00
TU GURU UKS
SEKOLAH
RKB
10.05 10.05
KOPE
3.00
RASI
RUAN
11.00
13.50 HALAMAN UPACARA 13.50
G
PUST
42.79
AKA
YENI ARPINA, SE
NIP. 19810721 201101 2 008
4.00
KANT
3.00 3.00
6.50 9.00 8.50 19.00 3.00 6.00
IN
7.00
CATATAN
LABO
LOKASI
8.00
R
RKB/ AULA RKB/ AULA
KOMP
PENTAS
10.00
RUMAH TOKO
RKB
UTER
2.50
10.00
33.00
9.00
RKB
10.00
28.85
26.72
OKO
AH T
RUM
79.14
SITE EKSISTING
SKALA 1 : 700
01
SHOP DRAWING
KEGIATAN
JA
LA PEKERJAAN
N
LIN PEMBANGUNAN GEDUNG KELAS BARU
TA MAN 2 KUANTAN SINGINGI
S TAHUN ANGGARAN 2020
TA
LU LOKASI
K
KU JL. DATUK GINDO RAJO KEC. PANGEAN
AN KABUPATEN KUANTAN SINGINGI -
TA PROVINSI RIAU
N
-R DIBUAT OLEH
EN
GA
T
RAJO
50.19
K GINDO
107.26
SARIYANTO
Direktur
JL. DATU
DIPERIKSA OLEH
10.00
LAPANGAN OLAH RAGA
9.00
RKB
6.00
MASUK
7.00 40.00 A N D R I, S T
POS Supervision Engineering (SE)
RUANG
RUANG RUANG RUANG
DISETUJUI OLEH
RKB RKB KEPALA
9.00
TU GURU UKS
SEKOLAH
RKB
10.05 10.05
KOPE
3.00
RASI
RUAN
11.00
13.50 HALAMAN UPACARA 13.50
G
PUST
42.79
AKA
YENI ARPINA, SE
33.00 NIP. 19810721 201101 2 008
4.00
KANT
3.00 3.00 R ABAT BETON R ABAT BETON
3.00 6.00
IN
-0.20 -0.20
7.00
CATATAN
LABO
T OILET
-0.02
8.00
R KOMP
R UAN G K ELAS R UAN G K ELAS R UAN G K ELAS
±0.00 ±0.00 ±0.00
10.00 10.00
RUMAH TOKO
UTER
1.30
2.50
SELA SAR SELA SAR SELA SAR
10.00
- 0.05 - 0.05 - 0.05
33.00
9.00
RKB
10.00
28.85
26.72
OKO
AH T
RUM
79.14
SITE PLAN
SKALA 1 : 700
02
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
A
JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
9.00 9.00 3.00 9.00 3.00 PROVINSI RIAU
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 1.15 1.85 1.30
DIBUAT OLEH
-0.40
TOILET
-0.05
4.00 1.33 4.00
SARIYANTO
1.33 Direktur
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
C ±0.00 ±0.00 ±0.00
8.00
NAIK
4.00 4.00
1.30
B
2.20
A N D R I, S T
B Supervision Engineering (SE)
-0.40
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
DENAH LT. 1
SKALA 1 : 150
03
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
A
JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
9.00 9.00 3.00 9.00 3.00 PROVINSI RIAU
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 1.15 1.85 1.20
DIBUAT OLEH
1.20 1.20
TOILET
BORDES 1.75
-0.02
±2.40
2.25 SARIYANTO
1.33 Direktur
TOILET
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
-0.02
C + 4.00 + 4.00 TURUN + 4.00
8.00
B 2.66
A N D R I, S T
B Supervision Engineering (SE)
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
30.00 33.00
DENAH LT. 2
SKALA 1 : 150
04
ATAP BITUMEN ONDULINE TILE 0.3 CM
+ INSULASI RANGKA BAJA BY. STR
ORNAMEN ACP CUTTING LASER 4mm-SILVER ALUMUNIUM COMPOSITE PANEL 4mm-WHITE
SHOP DRAWING
+ RANGKA BESI SIKU + RANGKA BESI SIKU
KEGIATAN
ORNAMEN ACP CUTTING LASER 4mm-SILVER
ALUMUNIUM COMPOSITE PANEL 4mm-GREEN + RANGKA BESI SIKU
+ RANGKA BESI SIKU PENGELOLAAN DAN PEMBINAAN
ALUMUNIUM COMPOSITE PANEL 4mm-GREEN PENDIDIKAN MADRASAH
+ RANGKA BESI SIKU
PEKERJAAN
LOKASI
DIBUAT OLEH
SARIYANTO
Direktur
DIPERIKSA OLEH
TAMPAK DEPAN
SKALA 1 : 150 CV. CIPTA REKAYASA ARSITEKTUR
A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
TAMPAK BELAKANG
TAMPAK DEPAN 1:150
SKALA 1 : 150
TAMPAK BELAKANG 1:150
05
SHOP DRAWING
KEGIATAN
ALUMUNIUM COMPOSITE PANEL 4mm-GREEN
+ RANGKA BESI SIKU
PENGELOLAAN DAN PEMBINAAN
PENDIDIKAN MADRASAH
PEKERJAAN
LOKASI
DIBUAT OLEH
SARIYANTO
Direktur
A N D R I, S T
ATAP BITUMEN ONDULINE TILE 0.3 CM Supervision Engineering (SE)
+ INSULASI RANGKA BAJA BY. STR DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
06
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
A N D R I, S T
PLAFOND GYPSUM 9 MM Supervision Engineering (SE)
+3.40
DISETUJUI OLEH
PLAFOND KALSIBOARD
400 +3.20 PEJABAT PEMBUAT KOMITMEN
0.40 (PPK)
3.10 3.80
2.40
HOMOGENEUS TILE 60x60 CM 1.00
+0.00
±0.00 YENI ARPINA, SE
NIP. 19810721 201101 2 008
-0.40
100 -0.65 CATATAN
-1.00
D C B A
1000
12 57 2022
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
1.20 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.20
+10.50
0.85
+9.65
2.50
1.15
+8.50 CV. MURNI JAYA
0.50 +8.00
LIST PLANK GRC
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
1 2 3 4 5 6 7 8 9
33.00
POTONGAN - B
SKALA 1 : 120
POTONGAN - B 1:120
13
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
33.00
DIBUAT OLEH
1.30 1.30
D
CV. MURNI JAYA
P1 P1 P1 P1 P1 P1 P1 P1 P1
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
P1 P1 P1 P1 P1 P1
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
P1 P1 P1 P1 P1 P1 P1 P1 P1 Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
YENI ARPINA, SE
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9 CATATAN
33.00
14
SHOP DRAWING
KEGIATAN
±0.00 MUKA LANTAI MUKA LANTAI
PILE CAP
50x50x50cm PEKERJAAN
-0.50 5
8 6D16
4D16
TANAH URUG
A
CV. MURNI JAYA
4D16 SPIRAL Ø8-150
BORE PILE
50 35 Ø35 cm
A K-250
50
4D16
65 SARIYANTO
Direktur
8 35 8
50 -1.00
-1.05 5
DETAIL P1 5
A N D R I, S T
Supervision Engineering (SE)
-1.10
SKALA 1 : 10 COR BETON 1:3:5 DISETUJUI OLEH
1475
YENI ARPINA, SE
SPIRAL Ø8-150 NIP. 19810721 201101 2 008
± 14.75
35 6D16
CATATAN
TIANG BORE PILE Ø35 cm K-250
(kedalaman ±15.40 m dari muka tanah)
A
6D16
35
-15.85
10 10 35 10 10 SPIRAL Ø8-200
75
POTONGAN - A DETAIL POT. - A
SKALA 1 : 10 SKALA 1 : 10
DETAIL P1 1 : 10
POT. - A 1 : 10
BETON Fc' = 20,75 Mpa DETAIL POT. A 1 : 10
DETAIL TUL. BREPILE 1 : 10
DET. PEMBESIAN BORE PILE Ø35 cm NO. HAL JML. HAL TAHUN
DETAIL PENULANGAN BALOK SLOOF DETAIL PENULANGAN BALOK DETAIL PENULANGAN RENG BALOK Elv.+ 8.00 PENGELOLAAN DAN PEMBINAAN
PENDIDIKAN MADRASAH
PEKERJAAN
BS 20/40 BL 25/50 RB 15/35
PEMBANGUNAN GEDUNG KELAS BARU
Tumpuan Lapangan Tumpuan Lapangan Tumpuan Lapangan MAN 2 KUANTAN SINGINGI
TAHUN ANGGARAN 2020
LOKASI
3D16 3D16
15 15
20 20 3D16 4D16 SKALA 1 : 10 SKALA 1 : 10
CV. MURNI JAYA
SKALA 1 : 10 SKALA 1 : 10
TUL. ATAS 3 D 13 TUL. ATAS 2 D 13
25 25
TUL. ATAS 3 D 16 TUL. ATAS 3 D 16 TUL. BAWAH 2 D 13 TUL. BAWAH 3 D 13
SKALA 1 : 10 SKALA 1 : 10 TUL. PINGGANG 2 Ø 10 TUL. PINGGANG 2 Ø 10
TUL. BAWAH 3 D 16 TUL. BAWAH 3 D 16
TUL. PINGGANG 2 D 13 TUL. PINGGANG 2 D 13 SENGKANG Ø8 - 100 SENGKANG Ø8 - 140
TUL. ATAS 4 D 16 TUL. ATAS 3 D 16
SENGKANG Ø10 - 120 SENGKANG Ø10 - 150 SARIYANTO
TUL. BAWAH 3 D 16 TUL. BAWAH 4 D 16
TUL. PINGGANG 2 Ø 12 TUL. PINGGANG 2 Ø 12 Direktur
DETAIL PENULANGAN BALOK SLOOF SENGKANG Ø10 - 120 SENGKANG Ø10 - 150 DIPERIKSA OLEH
PRAKTIS BL 20/40 DETAIL PENULANGAN BALOK CV. CIPTA REKAYASA ARSITEKTUR
2Ø12 2Ø12
5D13 3D13 11 11
Ø8-100 Ø8-140 SKALA 1 : 10 SKALA 1 : 10
Ø8-120
30 2Ø10
11 15 15
SKALA 1 : 10 SKALA 1 : 10 SKALA 1 : 10 SKALA 1 : 10
DETAIL TULANGAN -
TUL. ATAS 2Ø10
TUL. ATAS 5 D 13 TUL. ATAS 3 D 13
DIMENSI 30 x 30 cm TUL. BAWAH 2Ø10
TUL. BAWAH 3 D 13 TUL. BAWAH 3 D 13
TUL. POKOK 8 D 13 TUL. PINGGANG -
TUL. PINGGANG 2 Ø 10 TUL. PINGGANG 2 Ø 10
SENGKANG Ø8 - 120 SENGKANG Ø8 - 200
SENGKANG Ø8 - 100 SENGKANG Ø8 - 140
16
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
1.30 1.30
D
CV. MURNI JAYA
1.34
1.33 SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
1.25
10.00 1.80
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
2.75
2.20
B A N D R I, S T
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
YENI ARPINA, SE
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
17
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
1.30 1.30
BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40
D
CV. MURNI JAYA
1.34
BS 15/25
BS 15/25
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
4.00 1.33 4.00
BS 15/25
1.33 SARIYANTO
Direktur
C 8.00
BS 20/40 DIPERIKSA OLEH
1.25
10.00 1.80
CV. CIPTA REKAYASA ARSITEKTUR
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
4.00 BS 15/25 4.00
BS 15/25
2.75
2.20
BS 20/40
BS 20/40
BS 20/40
BS 20/40
BS 20/40
2.00 2.00 2.00
DISETUJUI OLEH
BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40 BS 20/40
A PEJABAT PEMBUAT KOMITMEN
1.30 1.30 (PPK)
YENI ARPINA, SE
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
18
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
KP
D
K1 K1 K1 K1 K1 K1 K1 K1 K1 CV. MURNI JAYA
1.34
KP KP
4.00 1.33 4.00
KP KP
1.33 SARIYANTO
K1 K1 K1 K1 K1 KP K1 Direktur
C 8.00
DIPERIKSA OLEH
10.00 1.80
CV. CIPTA REKAYASA ARSITEKTUR
KP KP
4.00 4.00
2.20
KP
B A N D R I, S T
K1 K1 K1 K1 K1 K1 K1 K1 K1 Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
K1 K1 K1 K1 K1 K1 K1 K1 K1
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
19
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
D
CV. MURNI JAYA
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
20
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
BL 11/15
BL 11/15
4.00 1.33 4.00
BL 11/15
1.33 SARIYANTO
Direktur
C 8.00
BL 11/15 DIPERIKSA OLEH
10.00 1.80
CV. CIPTA REKAYASA ARSITEKTUR
BL 11/15
4.00 4.00
BL 11/15
2.20
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
21
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
D
CV. MURNI JAYA
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
BL 11/15
BL 11/15
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
22
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
BL 25/50
BL 25/50
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
4.00 1.66 4.00
1.17 SARIYANTO
Direktur
C 8.00
BL 25/50 BL 25/50 BL 25/50 BL 25/50 BL 25/50 BL 25/50 BL 25/50 BL 25/50 DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 25/50
BL 25/50
BL 25/50
4.00 4.00
BL 25/50
BL 25/50
Supervision Engineering (SE)
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
BL 20/40
2.00 2.00 2.00
DISETUJUI OLEH
BL 20/40 BL 20/40 BL 20/40 BL 20/40 BL 20/40 BL 20/40 BL 20/40 BL 20/40
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
23
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
D
CV. MURNI JAYA
VOID TANGGA
VOID
4.00 + 4.00 4.00
B A N D R I, S T
METODE METODE METODE METODE Supervision Engineering (SE)
PEMBESIAN PEMBESIAN PEMBESIAN PEMBESIAN
2.00 PLAT 2 ARAH PLAT 2 ARAH 2.00 2.00
Tebal= 12cm Tebal= 12cm
PLAT 2 ARAH
Tebal= 12cm
PLAT 2 ARAH
Tebal= 12cm
DISETUJUI OLEH
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
24
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
KP
D
K1 K1 K1 K1 K1 K1 K1 K1 K1 CV. MURNI JAYA
1.34
KP KP
4.00 1.33 4.00
KP KP
1.33 SARIYANTO
K1 K1 K1 K1 K1 KP K1 Direktur
C 8.00
DIPERIKSA OLEH
1.34
10.00 KP KP CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
2.66
KP
B A N D R I, S T
K1 K1 K1 K1 K1 K1 K1 K1 K1 Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
K1 K1 K1 K1 K1 K1 K1 K1 K1
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
25
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
D
CV. MURNI JAYA
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
BL 11/15
BL 11/15
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
26
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
BL 11/15
BL 11/15
4.00 1.33 4.00
BL 11/15
1.33 SARIYANTO
BL 11/15 Direktur
C 8.00
DIPERIKSA OLEH
1.34
10.00 BL 11/15
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
2.66
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
27
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
D
CV. MURNI JAYA
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
BL 11/15
BL 11/15
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15 BL 11/15
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
28
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
METODE
PEMBESIAN
PLAT 2 ARAH
Tebal= 10cm
BD 15/35
BD 15/35
RB 15/35
RB 15/35
RB 15/35
RB 15/35
4.00 4.00
BD 15/35
2.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
RB 15/35
RB 15/35
RB 15/35
RB 15/35
RB 15/35
RB 15/35
4.00 4.00
RB 15/35
RB 15/35
RB 15/35
RB 15/35
RB 15/35
2.00 2.00 2.00
DISETUJUI OLEH
RB 15/35 RB 15/35 RB 15/35 RB 15/35 RB 15/35 RB 15/35 RB 15/35 RB 15/35
A PEJABAT PEMBUAT KOMITMEN
(PPK)
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
29
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
4.00 4.00
SARIYANTO
Direktur
C 8.00
DIPERIKSA OLEH
10.00
CV. CIPTA REKAYASA ARSITEKTUR
4.00 4.00
B A N D R I, S T
Supervision Engineering (SE)
2.00 2.00 2.00
DISETUJUI OLEH
YENI ARPINA, SE
4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 NIP. 19810721 201101 2 008
1 2 3 4 5 6 7 8 9
CATATAN
33.00
30
800 SHOP DRAWING
175 225 400 KEGIATAN
LANTAI 2
PEKERJAAN
+ 2.60
+ 2.80
+ 3.00
+ 3.20
+ 3.40
+ 3.60
+ 3.80
+ 4.00
PEMBANGUNAN GEDUNG KELAS BARU
130
MAN 2 KUANTAN SINGINGI
TAHUN ANGGARAN 2020
LOKASI
BORDES
+ 2.40
300
25
JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
DIBUAT OLEH
NK
+ 2.20
+ 2.00
+ 1.80
+ 1.60
+ 1.40
+ 1.20
+ 1.00
+ 0.80
+ 0.60
+ 0.40
+ 0.20
130
CV. MURNI JAYA
SARIYANTO
DENAH TANGGA Direktur
DIPERIKSA OLEH
A N D R I, S T
Supervision Engineering (SE)
RELLING STAINLES 2"
DISETUJUI OLEH
5
LT. 2
7
YENI ARPINA, SE
NIP. 19810721 201101 2 008
40 BORDES
BALOK 15/35 ELV. + 2.40
13
400
RELLING STAINLES 2"
HANDRAIL TANGGA
SKALA 1 : 5
240
110 LT. 1
ELV. +0.00 NAMA GAMBAR SKALA
31 57 2022
800 SHOP DRAWING
175 225 400
KEGIATAN
PEKERJAAN
130
MAN 2 KUANTAN SINGINGI
TAHUN ANGGARAN 2020
LOKASI
300
25
JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
DIBUAT OLEH
NK
130
CV. MURNI JAYA
SARIYANTO
Direktur
DENAH TUL. TANGGA
DIPERIKSA OLEH
A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
300
3D16 3D16
YENI ARPINA, SE
2D13 2D13
CATATAN
200
150
BALOK 15/35
3D13
2Ø10
2D13
400
435
240
200
200
3D16 3D16
32 57 2022
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
SARIYANTO
1.33 Direktur
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
C ±0.00 ±0.00 ±0.00
8.00
NAIK
4.00 4.00
2.20
SELASAR
- 0.03 A N D R I, S T
B SELASAR SELASAR SELASAR Supervision Engineering (SE)
- 0.03 - 0.03 - 0.03
DISETUJUI OLEH
2.00 -0.20 -0.40 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
KODE KETERANGAN
33
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
SARIYANTO
1.33 Direktur
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
C + 4.00 + 4.00 + 4.00
8.00
TURUN
4.00 4.00
SELASAR 2.66
+ 3.97
A N D R I, S T
B SELASAR SELASAR SELASAR Supervision Engineering (SE)
+ 3.97 + 3.97 + 3.97
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
KODE KETERANGAN
34
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.30 1.30
VOID
4.00 1.33 4.00
SARIYANTO
1.33 Direktur
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
C ±0.00 ±0.00 ±0.00
8.00
4.00 4.00
2.20
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
KODE KETERANGAN
35
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
SARIYANTO
1.33 Direktur
RUANG KELAS RUANG KELAS RUANG KELAS DIPERIKSA OLEH
C + 4.00 + 4.00 + 4.00
8.00
4.00 4.00
2.66
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
KODE KETERANGAN
36
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
4.00 4.00
SARIYANTO
Direktur
4.00 4.00
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
KODE KETERANGAN
37
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.30 1.30
SARIYANTO
1.33 Direktur
NAIK
4.00 4.00
2.20
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
38
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
SARIYANTO
1.33 Direktur
4.00 4.00
2.66
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
3.00 1.20
1.20
4.00
39
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
MATERIAL FRAME
DOOR PANEL SARIYANTO
Direktur
DIPERIKSA OLEH
ACCESORIES : MASTERKEY + HANDLE, DOOR CLOSER, DOOR STOPER CV. CIPTA REKAYASA ARSITEKTUR
(BY SUPLAYER) HIGH QUALITY
P.2 A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
40
A
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1790
CATATAN
2240
2240
2200
2200
130 290
40 1000 40 POT. A
1080
40 1000 40
1080
DETAIL KUSEN
40
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
A
A
40
40
A
40
40
40
40
40
720
720
800
CV. MURNI JAYA
1000
520
520
520
600
40
40
40
20040
40
1280
1200
1280
1200
40 500 40 40 720 40
580 800 POT. A
2150
2150
2150
SARIYANTO
40
40
Direktur
1550
1550
40 800 40
DIPERIKSA OLEH
880
870
870
POT. A POT. A
A N D R I, S T
Supervision Engineering (SE)
40 800 40
DISETUJUI OLEH
880 40 500 40
580 PEJABAT PEMBUAT KOMITMEN
(PPK)
KUSEN ALUMINIUM 4", WARNA PUTIH SKALA KUSEN ALUMINIUM 4", WARNA PUTIH SKALA KUSEN ALUMINIUM 4", WARNA PUTIH SKALA
TIPE TIPE TIPE
JENDELA KACA T=6mm, RANGKA ALUMINIUM 1 : 40 JENDELA KACA T=6mm 1 : 40 JENDELA PINTU PLAT ALUMINIUM, RANGKA ALUMINIUM 1 : 40
J1 BOUVENLIGHT KACA T=6mm, RANGKA ALUMINIUM JUMLAH V1 BOUVENLIGHT - JUMLAH V2 BOUVENLIGHT - JUMLAH
AKSESORIS ENGSEL CASEMENT, RAMBUNCIS AKSESORIS 12 UNIT AKSESORIS ENGSEL CASEMENT, RAMBUNCIS 1 UNIT YENI ARPINA, SE
48 UNIT
NIP. 19810721 201101 2 008
CATATAN
DETAIL KUSEN
41
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.30 1.30
SARIYANTO
1.33 Direktur
NAIK
4.00 4.00
PANEL - LP 1
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
42
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
TOILET
-0.02
±2.40
SARIYANTO
1.33 Direktur
TOILET
DIPERIKSA OLEH
-0.02
C 8.00
TURUN
4.00 4.00
2.66
PANEL - LP 2
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
43
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.30 1.30
SARIYANTO
1.33 Direktur
4.00 4.00
2.20
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
44
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
SARIYANTO
1.33 Direktur
4.00 4.00
2.66
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
45
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.30 1.30
SARIYANTO
1.33 Direktur
NAIK
4.00 4.00
2.20
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
STOP KONTAK 14 BH
RENCANA STOP 1:150
-
KONTAK LT.1
46
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
1.20 1.20
SARIYANTO
1.33 Direktur
4.00 4.00
2.66
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
STOP KONTAK 14 BH
RENCANA STOP 1:150
-
KONTAK LT.2
47
SHOP DRAWING
KEGIATAN
PEKERJAAN
SEPTICKTANK
PEMBANGUNAN GEDUNG KELAS BARU
9.00 9.00 3.00 9.00 3.00
MAN 2 KUANTAN SINGINGI
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 1.15 1.85 1.30 TAHUN ANGGARAN 2020
LOKASI
RESAPAN
JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
DIBUAT OLEH
1.30 1.30
SARIYANTO
1.33 Direktur
NAIK
4.00 4.00
2.20
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.30 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.30
CATATAN
1 2 3 4 5 6 7 8 9
33.00
AGENDA :
48
SHOP DRAWING
KEGIATAN
PEKERJAAN
DIBUAT OLEH
1.20 1.20
SARIYANTO
1.33 Direktur
4.00 4.00
2.66
A N D R I, S T
B Supervision Engineering (SE)
DISETUJUI OLEH
2.00 2.00 2.00
YENI ARPINA, SE
NIP. 19810721 201101 2 008
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CATATAN
1 2 3 4 5 6 7 8 9
33.00
3.00 1.20
1.20
AGENDA :
2.00
4.00
49
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
138
HOMOGENEUS TILE - UP
A 60 x 60 cm
HOMOGENEUS TILE HOMOGENEUS TILE
60 x 60 cm 60 x 60 cm
SARIYANTO
120
120
Direktur
DIPERIKSA OLEH
C D
15
15
FD
A N D R I, S T
Supervision Engineering (SE)
185 DISETUJUI OLEH
185 185
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
POTONGAN A POTONGAN B
DENAH PARSIAL WC-1 SKALA 1 : 20 SKALA 1 : 20
SKALA 1 : 20
DENAH WC - 1 1:20
POT. A 1:20
POT. B 1:20
50
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
HOMOGENEUS TILE
60 x 60 cm
HOMOGENEUS TILE
SARIYANTO
60 x 60 cm
120
120
Direktur
DIPERIKSA OLEH
FD
A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
138 138
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
POTONGAN C POTONGAN D
SKALA 1 : 20 SKALA 1 : 20
POT. C 1:20
POT. D 1:20
51
SHOP DRAWING
KEGIATAN
PEKERJAAN
A PEMBANGUNAN GEDUNG KELAS BARU
MAN 2 KUANTAN SINGINGI
TAHUN ANGGARAN 2020
LOKASI
BESI RAILLING STAINLESS 1" - JL. DATUK GINDO RAJO KEC. PANGEAN
330 CM KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
141
DIBUAT OLEH
76
99
SARIYANTO
Direktur
7 DIPERIKSA OLEH
HOMOGENEUS TILE - UP
60 x 60 cm
A N D R I, S T
Supervision Engineering (SE)
B DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
185
DENAH WC - 2 1:20
52
SHOP DRAWING
KEGIATAN
PEKERJAAN
LOKASI
DIBUAT OLEH
HOMOGENEUS TILE
60 x 60 cm
120
120
CV. CIPTA REKAYASA ARSITEKTUR
90
FD A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
CATATAN
POTONGAN A POTONGAN B
SKALA 1 : 20 SKALA 1 : 20
POT. A 1:20
POT. B 1:20
53
185 SHOP DRAWING
KEGIATAN
PEKERJAAN
60
LOKASI
DIBUAT OLEH
A N D R I, S T
Supervision Engineering (SE)
DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
CATATAN
10
10
HOMOGENEUS TILE 60 x 60 cm
80
80
54 57 2022
TANAH URUG
PASIR BATA PECAH TANAH URUG
SHOP DRAWING
VENT O 1.5" LAPISAN IJUK PASIR BATA PECAH
PVC O 4" DIBERI LOBANG LAPISAN IJUK
O 10-10
BATU KORAL BATU KORAL KEGIATAN
O 10 O 10-12.5 PECAHAN BATU BATA PECAHAN BATU BATA
O 10-25 O 10-12.5 O 10-10
40 PEKERJAAN
150 PAS 1/2 BATA 1:2
LOKASI
12
5 LANTAI COR 1: 2: 3
PASIR URUG JL. DATUK GINDO RAJO KEC. PANGEAN
13 40 20 40 13 194 13 40 20 30 250 30 KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
DIBUAT OLEH
POTONGAN A - A POTONGAN C - C
SKALA 1 : 40 SKALA 1 : 40
B VENT O 1.5"
CV. MURNI JAYA
O 10-10
20
12
57
C 40
SARIYANTO
Direktur
13
DIPERIKSA OLEH
PVC Ø 4" PVC Ø 4"
200 60
A PVC O 4"
90
CV. CIPTA REKAYASA ARSITEKTUR
90
13 10
LANTAI COR 1: 2: 3
5
57 PASIR URUG
250 20 200 20
A N D R I, S T
20 Supervision Engineering (SE)
B DISETUJUI OLEH
13 40 20 300 20 40 13
PEJABAT PEMBUAT KOMITMEN
(PPK)
446
CATATAN
25
3050
70
25
15
5 15
5
10 13 20 13 10 10 13 30 13 10
POT. SEPTICTANK 1:40
POT. RESAPAN 1:40
POT .SALURAN KELILING POT. BAK KONTROL POT. SALURAN KEL. 1:20
Skala 1:20 Skala 1:20
55
1.20 9.00 9.00 3.00 9.00 1.25 1.75 1.20
SHOP DRAWING
KEGIATAN
LOKASI
Splitzen (Trisula)
C 8.00 JL. DATUK GINDO RAJO KEC. PANGEAN
KABUPATEN KUANTAN SINGINGI -
PROVINSI RIAU
10.00
Kabel BC 70 mm2
DIBUAT OLEH
4.00 4.00
A
1.20 1.20
SARIYANTO
Direktur
DIPERIKSA OLEH
1.20 4.50 4.50 4.50 4.50 3.00 4.50 4.50 3.00 1.20
CV. CIPTA REKAYASA ARSITEKTUR
1 2 3 4 5 6 7 8 9
33.00
DISETUJUI OLEH
±MT
KEDALAMAN 25 METER DARI MUKA TANAH
40
Klem/ Terminal
10
5
10 13 40 13 10
Kabel BC 70 mm2
Kabel BC 70 mm2
Max 2 ohm DENAH INST. 1:150
PENANGKAL PETIR
JA
LA PEKERJAAN
N
LIN PEMBANGUNAN GEDUNG KELAS BARU
TA MAN 2 KUANTAN SINGINGI
S TAHUN ANGGARAN 2020
TA
LU LOKASI
K
KU JL. DATUK GINDO RAJO KEC. PANGEAN
AN KABUPATEN KUANTAN SINGINGI -
TA PROVINSI RIAU
N
-R DIBUAT OLEH
EN
GA
T
RAJO
50.19
K GINDO
107.26
SARIYANTO
Direktur
JL. DATU
DIPERIKSA OLEH
10.00
LAPANGAN OLAH RAGA
9.00
RKB
6.00
MASUK
7.00 40.00 A N D R I, S T
POS Supervision Engineering (SE)
RUANG
RUANG RUANG RUANG
DISETUJUI OLEH
RKB RKB KEPALA
9.00
TU GURU UKS
SEKOLAH
RKB
10.05 10.05
KOPE
3.00
RASI
RUAN
11.00
13.50 HALAMAN UPACARA 13.50
G
PUST
LOKASI TURAP 42.79
AKA
300 300 300 300 300 300 300 300 300 300 300 300 300 300 YENI ARPINA, SE
4200 NIP. 19810721 201101 2 008
4.00
KANT
3.00 2.00 6.00
IN
300 300 300
CATATAN
LABO
300 300 300
8.00
R
3.00
KOMP
1200
10.00
RUMAH TOKO
300 300
UTER
2.50
300 2100 300
10.00
R ABAT BETON
-0.20
300
9.00
7.00 300
RKB
300
10.00
28.85
26.72
OKO
AH T
RUM
79.14
PEKERJAAN
20/25
BESI 2∅10 BESI 2∅10
25
25
MAN 2 KUANTAN SINGINGI
BESI 2∅10 BESI 2∅10 TAHUN ANGGARAN 2020
LOKASI
DIBUAT OLEH
POT. S1 POT. S2
25
25
BESI 2∅12 BESI 2∅12
POT. K1 POT. K1
BESI ∅8 - 15 cm BESI ∅8 - 15 cm
PINGGANG
A N D R I, S T
Supervision Engineering (SE)
BESI 2∅10 BESI 2∅10
20
20
DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
POT. RB1 POT. RB2
CATATAN
15/20
BESI 2∅10 BESI 2∅10
20
20
15 15
57.b
SHOP DRAWING
KEGIATAN
PEKERJAAN
20
20
PIPA PVC 1,5" LOKASI
70
70
DIBUAT OLEH
BALOK PINGGANG 15/20
BALOK PINGGANG 15/20
25
TANAH URUG TANAH URUG
20
205
20
205
KAYU CEROCOK Ø 12-15 cm
5 TITIK PAS. BATU BATA 1 BATU
C B
PIPA PVC 1,5" CV. MURNI JAYA
70
70
KOLOM 20/25
Ø10-150 MM
20 SLOOF 20/25
SLOOF 20/25
A
80
25
20
SARIYANTO
25
25
Ø10-150 MM
Direktur
MUKA TANAH MUKA TANAH
TANAH URUG DIPERIKSA OLEH
MUKA TANAH
20 20
CV. CIPTA REKAYASA ARSITEKTUR
65
65
65
80 TANAH URUG
TANAH URUG
PONDASI TAPAK
100
100
100
PONDASI TAPAK
PONDASI TAPAK Ø10-150MM 80x80 CM Ø10-150MM 80x80 CM
80x80 CM
DETAIL PONDASI
25
25
25
25
SKALA 1 : 20 A N D R I, S T
55
Supervision Engineering (SE)
55
55
DISETUJUI OLEH
YENI ARPINA, SE
NIP. 19810721 201101 2 008
25 25 25 25 25 25
CATATAN
5 30 20 30 5
5 25 30 25 5 5 25 30 25 5
80
80 80
DETAIL POT. A
SKALA 1 : 20
DETAIL POT. B DETAIL POT. C
SKALA 1 : 20 SKALA 1 : 20
57.c