Anda di halaman 1dari 1

1.60 0.80 3.

20
Parapet Segment
Berikutnya D13-500 3 Tali Air B: 6cm
bentuk Segitiga t : 3cm

1.00
5D13 1

0.03
0.03
0.06
D13-250 2 D13-500 3a
PENULANGAN LANTAI DETAIL TALI AIR PARAPET WALL
Tampak Atas, Skala 1 : 30 Tampak Atas, Skala 1 : 25

0.60
0.30 0.25
0.15 Dowel Bar 4 bh
0.15
D19 L=0.60m
+ PVC Ø1" L=0.30m PVC Waterstop
B: 250mm

1 : 0.2
PVC Waterstop
0.45 B: 250mm Dowel Bar 4bh
D19 L=0.60m
0.30 2.75 1.00 Joint Filler +PVC Ø1" L=0.30m
B: 10mm
Joint Filler
0.45 B: 10mm
Beton K.175
top parapet
D13-500 3
D13-500 3a
angkur 0.45
1 : 0.2

0.40
0.80

D13-250 2 top pilecap DILATASI PARAPET WALL


1.60 0.54 0.46
0.46 Tampak Atas, Skala 1 : 25
1.00
1.00 urugan tanah
0.80
DILATASI PARAPET WALL
0.40
Tampak Samping, Skala 1 : 35
0.10
0.54 0.46 5D13 1 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI / KOTA :
GORONTALO
DIREKTORAT JENDERAL SUMBER DAYA AIR
1.00 BALAI WILAYAH SUNGAI SULAWESI PEKERJAAN
II :
SNVT PELAKSANAAN JARINGAN SUMBER DAYA AIR SULAWESIPENGENDALIAN
II BANJIR SUNGAI BOLANGO
KEGIATAN SUNGAI DAN PANTAI I KOTA GORONTALO
Jl. KH. Notu Badu No.71 Telepon (0435) 882097 Fax Email (0435) 882272 Limboto
KONTRAKTOR PELAKSANA :
NAMA GAMBAR :
AS-BUILT DRAWING
POTONGAN B - B PARAPET WALL utk CCSP
Skala 1 : 30 TANGGAL : NO.KONTRAK : HK.02.03/SNVT PJSA-SUL.II/K-SP.1/05/2017
NO. GAMBAR :
SKALA GBR :
/

1:30 ; 1:25
No. KONSULTAN SUPERVISI :
Tgl. Yang Direvisi Ir.Muh Taslim
Rev. Diperiksa Oleh : Ir.Dadang Ruhijat Dibuat Oleh :
Team Leader Kepala Proyek
1
0 0.6 1.2 m
Skala 1 : 30 2
Rahman Haluti, ST
3 KEGIATAN SUNGAI DAN PANTAI I Disetujui Oleh : PPK Sungai dan Pantai I Digambar Oleh : A.Putra Bhayangkara, ST
Drafter
4

Anda mungkin juga menyukai