Anda di halaman 1dari 3

9.80 3.

83
4.50 1.50 3.00 2.83 0.55
0.20 0.20 0.20 0.20 0.15 0.08

0.60 1.00 Dak Beton tbl. 10cm Lisplank 8/30


+22.60

Ring Balok Ring Balok


15/20 15/20

Kolom 15/20 Pas. Dinding Pas. Dinding


Batu Bata Batu Bata

Pipa GIP Ø2.5" 4.45

0.15 0.15 0.15


2.00 2.00

Plat Beton tbl.12cm


0.30

Dinding Beton
+19.40 +19.40 +19.40 +19.40 Bertulang tbl.15cm
Muka Tanah +19.30 +19.30 Muka Tanah
+19.10 +19.10
Pipa GI 4" Penyangga
0.60

Plat Beton tbl.12cm Kolom 20/40


Pipa Inlet Zone
0.30

+18.80 +18.80
Pasir Urug tbl.10cm
Pondasi
Pipa Inlet dari ABR, Lantai Kerja tbl.5cm Batu Kali
+18.50
PVC Ø6"EDP +20.08 Plat Landasan tbl.20cm
Dinding Beton
Bertulang tbl.20cm +18.05
Aanstamping tbl.20cm
Pasir Urug tbl.10cm +17.85
U-Gutter 0.30 Valve
Pipa Outlet PVC Ø6" +17.65
ke Klorinasi 0.70
3.60

Inlet zone
Dinding Beton
2.50

2.50

0.80
Bertulang tbl.20cm
Dinding Beton
Bertulang tbl.20cm
2.82 +17.05 +17.05
0.15 0.15
Kolom 30/50
3.12
Diffuser Diffuser Sloof 25/40

Pasir Urug tbl.10cm


+16.30 +16.30
Lantai Kerja tbl.5cm
Plat Landasan tbl.20cm
0.50

+15.85

Pasir Urug tbl.10 cm 0.25 1.85 0.25 1.85 0.25


Sloof 30/50 Lantai Kerja tbl.5 cm
Plat Landasan tbl.25 cm 4.45
Sloof 30/50
Pasir Urug tbl.10 cm
Lantai Kerja tbl.5 cm
Plat Landasan tbl.25 cm

0.30 2.90 0.30 2.90 0.30 2.80 0.30

9.80
D:\arifin\2020\09. MINUT\07. MINUT 28112020\WhatsApp Image 2020-12-11 at 15.44.32.jpeg

KEGIATAN

PEMBINAAN MANAJEMEN 1

PEKERJAAN

REVIEW DED IPAL GORONTALO

NAMA GAMBAR

0.08 0.15 0.15 0.15 0.08


0.55 4.08 4.08 0.55

Dak Beton tbl. 10cm


+22.60
0.30

LOKASI TAHUN ANGGARAN

Ring Balok KEC. TELAGA,


Ring Balok
15/20 KAB. GORONTALO 2020
15/20

Pas. Dinding
Kolom 20/20 MENGETAHUI :
Batu Bata

KASI PERENCANAAN AIR LIMBAH DOMSETIK


SELAKU
KETUA TIM TEKNIS
Pas. Dinding
Batu Bata
2.90

RINALDY PRADANA, ST, M.Sc


4.65

NIP.198607112009121001
MENYETUJUI :

PEJABAT PEMBUAT KOMITMEN


Sloof 25/35 KEGIATAN PEMBINAAN MANAJEMEN
+19.40 +19.40 SATKER DIREKTORAT PENGEMBANGAN PLP
Muka Tanah Muka Tanah
0.35

+19.10 +19.10

Pasir Urug tbl.10cm


Pondasi
0.80

Batu Kali Lantai Kerja tbl.5cm


Plat Landasan tbl.20cm
RATIH RIZKI PUSPITA, S.I.P
NIP.198707142010122004
Aanstamping tbl.20cm
0.30

KONSULTAN INDIVIDU
Pasir Urug tbl.10cm
0.30 0.30 AHLI TEKNIK LINGKUNGAN MUHAMMAD SOLEH, ST
0.70 0.70
0.80 0.80 AHLI TEKNIK BANGUNAN GEDUNG ALI IMRON, ST

AHLI KELEMBAGAAN SOSIAL SASMITO JATI UTOMO, S.Sos


8.30
0.15 0.15
8.60 KETERANGAN

POTONGAN A - A
SKALA 1 : 50

SKALA NOMOR LEMBAR

JUMLAH LEMBAR

-
D:\arifin\2020\09. MINUT\07. MINUT 28112020\WhatsApp Image 2020-12-11 at 15.44.32.jpeg

KEGIATAN

PEMBINAAN MANAJEMEN 1

PEKERJAAN

REVIEW DED IPAL GORONTALO

NAMA GAMBAR

8.45

0.15 0.15 0.15


2.00 6.00 LOKASI TAHUN ANGGARAN

KEC. TELAGA,
KAB. GORONTALO 2020
Dinding Beton
Bertulang tbl.15cm
Muka Tanah +19.30 +19.30 Muka Tanah MENGETAHUI :
+19.10 +19.10
KASI PERENCANAAN AIR LIMBAH DOMSETIK
SELAKU
KETUA TIM TEKNIS

1.25
Pipa Inlet
PVC 4"

Pipa PVC 4"


+18.05 +18.05

2.65
RINALDY PRADANA, ST, M.Sc
Pipa Inlet NIP.198607112009121001
PVC 4"
MENYETUJUI :

1.00
PEJABAT PEMBUAT KOMITMEN
KEGIATAN PEMBINAAN MANAJEMEN
+17.05 +17.05 SATKER DIREKTORAT PENGEMBANGAN PLP

0.40
Sloof 25/40
Sloof 25/40
Pasir Urug tbl.10cm
Lantai Kerja tbl.5cm
Plat Landasan tbl.20cm
RATIH RIZKI PUSPITA, S.I.P
NIP.198707142010122004
0.25 1.85 0.25 2.80 0.25 2.80 0.25
8.45 KONSULTAN INDIVIDU
AHLI TEKNIK LINGKUNGAN MUHAMMAD SOLEH, ST
POTONGAN B - B
AHLI TEKNIK BANGUNAN GEDUNG ALI IMRON, ST
SKALA 1 : 50
AHLI KELEMBAGAAN SOSIAL SASMITO JATI UTOMO, S.Sos

KETERANGAN

SKALA NOMOR LEMBAR

JUMLAH LEMBAR

Anda mungkin juga menyukai