Anda di halaman 1dari 1

0.60 20.10 17.10 0.

60
2.60 0.50 17.00 14.00 0.50 2.60

Retaining Wall Psg.Batu Retaining Wall Psg.Batu


0.40
0.30

Frame & Frame & Frame &


1.80
1.00

Paving Block Paving Block


1.80 Paving Block
0.50

El.3+620 El.3+620 El.3+620

Balok Tarik + Balok Tarik + Balok Tarik +


Ba

Ba

Ba

Ba

Ba

Ba

Ba

Ba

Ba

Ba

Ba

Ba
lok

lok

lok

lok

lok

lok

lok

lok

lok

lok

lok
lok
1.95

Plat Playan Plat Playan Plat Playan


Tari

Tari

Tari

Tari

Tari

Tari

Tari

Tari

Tari

Tari

Tari
T
arik
(K.175) (K.175) (K.175)
k (K

k (K

k (K

k (K

k (K

k (K

k (K

k (K

k (K

k (K

k (K
(K.1

.17
.17

.17

.17

.17

.17

.17

.17

.17

.17

.17
El.3+320 El.3+320 El.3+320

75)

5)
5)

5)

5)

5)

5)

5)

5)

5)

5)

5)
El.3+320 El.3+320

Pile Cap PLAN NAMEPLATE HURUF ACP


CCSP, K.175
Tampak Atas, Skala 1 : 125 Sungai
Beton Pengaman
t:0.60m, K.175
Lampu 40W solar panel
tinggi tiang 6.0m

Logo "PUPR" Logo "PT.BUMI KARSA"


ACP, uk.(H: 2.0m t: 0.3m) ACP, t: 0.15m

Huruf "BOLANGO"
ACP, uk.(H: 2.0m t: 0.3m) Huruf "RIVER SIDE" 1.00
2.00
ACP, uk.(H: 1.5m t: 0.3m)
6.00 6.00

PT. BUMI KARSA


A PART OF KALLA DEVELOPVENT & CONTRUCTION

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


D IR EK TO R AT J EN DE RA L S UM B ER D AY A A IR
BALAI BESAR WILAYAH SUNGAI SULAWESI II
SNVT PELAKSANAAN JARINGAN SUMBER AIR SULAWESI II
1.25
PROYEK PENGENDALIAN BANJIR
SUNGAI BOLANGO KOTA GORONTALO
PROYEK INI DI BIAYAI OLEH :

S.B.S.N
(SURAT BERHARGA SYARIAH NEGARA)
TAHUN ANGGARAN 2017 - 2021

El.3+620

2.00 Plakat "SBSN"


Ornamen "Pahangga" Dudukan ACP Marmer (uk.0.6x0.4m)
4bh, H: 3.0m H: 0.75m, K.175

2.60 0.50 17.00 14.00 0.50 2.60


0.60 20.10 1.80 17.10 0.60

2.20 TAMPAK DEPAN NAMEPLATE


0.70 1.00 0.50 1.95
Skala 1 : 125
0.50
0.30

ACP Tebal 3 mm
tinggi 2.0m s.d. 1.5m

Varies Dudukan ACP


Beton K.175

Beton Pengaman
t:0.6m, K.175
0.75
El.+3.620
0.60
0.30 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI / KAB. :
GORONTALO
DIREKTORAT JENDERAL SUMBER DAYA AIR
Retaining Wall BALAI WILAYAH SUNGAI SULAWESI PEKERJAAN
II :
Psg.Batu, TIPE-2 SNVT PELAKSANAAN JARINGAN SUMBER DAYA AIR SULAWESIPENGENDALIAN
II BANJIR SUNGAI BOLANGO
Plat Playan
K.175, t: 0.2m KEGIATAN SUNGAI DAN PANTAI I KOTA GORONTALO
Jl. KH. Notu Badu No.71 Telepon (0435) 882097 Fax Email (0435) 882272 Limboto
KONTRAKTOR PELAKSANA :
Balok Tarik 0 2.5 5m NAMA GAMBAR :
0.60 2.45 K.175, (0.3x0.4m) Skala 1 : 125 AS-BUILT DRAWING

timbunan tanah 0 1.5 3m NAMEPLATE ACP


Skala 1 : 75 NO. GAMBAR : /
TANGGAL : NO.KONTRAK : HK.02.03/SNVT PJSA-SUL.II/K-SP.1/05/2017 SKALA GBR : 1:125 ; 1:75

No. KONSULTAN SUPERVISI :


Tgl. Yang Direvisi Ir.Muh Taslim
Rev. Diperiksa Oleh :
Ir.Dadang Ruhijat
Diperiksa Oleh :
POTONGAN NAMEPLATE 1
Team Leader Kepala Proyek

Tampak Samping, Skala 1 : 75 2


Rahman Haluti, ST A. Putra Bhayangkara,ST
3 KEGIATAN SUNGAI DAN PANTAI I Disetujui Oleh : PPK Sungai dan Pantai I Digambar Oleh :
Drafter
4

Anda mungkin juga menyukai