Anda di halaman 1dari 1

CATATAN

Gypsum Board 12 mm
Karet peredam tebal 1cm

KETERANGAN
Track atas
U-Track 76 mm
Track atas
U-Track 76 mm

Rockwool t. 25mm
40 kg/m3

Stud 74mm dipasang dobel


setiap jarak 600 mm
Stud 74mm
dipasang setiap
Rockwool t. 25mm jarak 600 mm AirNav

40 kg/m3 PERUM LPPNPI

KEGIATAN

Bracing setiap 1200 mm JASA KONSULTASI PERENCANAAN


RENOVASI RUANGAN FASILITAS ATM (ATC SYSTEM)
GEDUNG ATS KANTOR PUSAT
PERUM LPPNPI
Bracing setiap 1200 mm
LOKASI

Jl. Juanda Blok A Karang Anyar Kota Tangerang

2400
Banten

Gypsum Board 12 mm DISETUJUI OLEH :

KETUA TIM PHP

WAHAB

MENGETAHUI :

KEPALA DIVISI UMUM

600 ARI BUDI PRASETYO

600 KONSULTAN PERENCANA

Track Bawah
Track Bawah PT REMON PUTRA
MANDIRI

PT. REMON PUTRA MANDIRI

DETAIL DINDING PEREDAM SUARA DETAIL DINDING PEREDAM SUARA


TWIN FRAME DOUBLE LAYER TIPE 1 (BLOCK WALL) TWIN FRAME DOUBLE LAYER TIPE 2 (R. AC PRESISI) JUDUL GAMBAR

SKALA NTS SKALA NTS


DETAIL DINDING PEREDAM
SUARA TWIN FRAME DOUBLE
LAYER
(BLOCK WALL)
DAN TWIN FRAME
DOUBLE LAYER
RUANG AC PRESISI

DIKELUARKAN UNTUK NO. GAMBAR

AR-33

Anda mungkin juga menyukai