Anda di halaman 1dari 50

ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG


2200

600 200 600 200 600

Mengetahui/ Menyetujui :
Kemiringan = ±
10

600

1200
A

900
CHIEF EXECUTIVE OFFICER

750
200
Diperiksa Oleh :

450
OPERASIONAL SCM

150 555 245 600 245 555 150

Border Line 10cm Hitam Border Line 10cm Hitam

Kursi Beton Diperiksa Oleh :


fin cat wartna abu-abu

Meja Beton
FIN. TITANIUM PORLAND DARK GREY
600X600MM

Kursi Beton BALOK RING 10/10 BALOK RING 10/10


fin cat wartna abu-abu TULANGAN 4Ø8 +Ø6-200 TULANGAN 4Ø8 +Ø6-200
PLAT BETON TBL. 7CM
TULANGAN Ø10-200
600
PROJECT MANAGER
Sisi Belakang
Logo Mie Gacoan NOTED :

80
450
PLAT BETON TBL. 7CM PLAT BETON TBL. 7CM
TULANGAN Ø10-200 TULANGAN Ø10-200

900

900
200

670
Border Line 10cm Hitam

450

450

450
ISOMETRI 830
SKALA 1 : 20

550 245 600 250 550


Dibuat/ Digambar Oleh :
570

Sisi Belakang
Logo Mie Gacoan

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL KURSI BETON

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 045 045


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

KITCHEN JL. AH NASUTION METRO-LAMPUNG


+0.20

Mengetahui/ Menyetujui :

LOADING
+0.00

GUTTER GUTTER
-0.30 -0.30

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM
37.5 25.0

Diperiksa Oleh :

PENUTUP SALURAN GUTTER


BESI HOLLOW 40.40 + GRILL PLAT STRIP 3 MM

PROJECT MANAGER
NOTED :

PAS. DINDING
300

220 KERAMIK 30X30 White


GUTTER KERAMIK 30X30 White
-0.10
200

PAS. SPESI 3 CM Dibuat/ Digambar Oleh :


RABATAN BETON 5 CM
URUGAN PASIR 5 CM
SDG
STORE DEVELOPMENT GACOAN
ELBOW PIPA 6 INCH Judul Gambar Skala

DETAIL GUTTER 1 : 10

DETAIL GUTTER
1:10 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 031 031


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

CAT ENAMEL HITAM

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

KERAMIK MOTIF KAYU 60X60

Diperiksa Oleh :

KOLOM PRKATIS 4 BH
PROJECT MANAGER

Ø8-150 NOTED :
Ø8-150
4Ø10
4Ø10

KOLOM DAN BALOK


POSISI DITEPI KURSI

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL MEJA POT 1 : 30

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 048 048


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN
RUNNING GEAR
FINSH. CAT KUNING
Lokasi :
FINSH. CAT HITAM
DETAIL GEMBOK JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

HANDLE BAR
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
DOOR LOCK OPERASIONAL SCM

DETAIL DL

SLOT BESI Diperiksa Oleh :

PROJECT MANAGER
NOTED :
845 845 845 845 845

DETAIL SB

Dibuat/ Digambar Oleh :

POTONGAN A-A DETAIL P1


SDG
STORE DEVELOPMENT GACOAN
1:30
Judul Gambar Skala

DETAIL P1 1 : 30

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 021 021


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG


B
800
B
Mengetahui/ Menyetujui :
70

505
A A

1200
830

505
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
2200

SUNBLAS

2200

2200
A OPERASIONAL SCM

505
830

1000

1000
505
250

LANTAI Diperiksa Oleh :


70
1000

B
B

PROJECT MANAGER
NOTED :

1000 40

744
40 40
800

DETAIL P3 Dibuat/ Digambar Oleh :


1:30

DETAIL P2
SDG
STORE DEVELOPMENT GACOAN
1:30 Judul Gambar Skala

DETAIL P2 1 : 30
DETAIL P3
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 022 022


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :
FINISH BINGKAI HOLLOW WARNA HITAM
FINISH DAUN PINTU HOLLOW WARNA HITAM
PINTU HOLLOW VERTIKAL WARNA HITAM BESI SIKU FIN. CAT HITAM
FINISH BINGKAI HOLLOW WARNA HITAM
HONDA PLAFON / SEJENISNYA

505 790 790 505 2462


BESI DURI CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

640
Diperiksa Oleh :

2780
1500
PROJECT MANAGER
NOTED :
200

640
20
ENGSEL BAJA
JILUMESH
Dibuat/ Digambar Oleh :
PIPA BESI 2" DUCO TAXI
PIPA BESI 2" DENGAN SINTETIK
CAT KUNING

SDG
ENAMEL

STORE DEVELOPMENT GACOAN


Judul Gambar Skala
DETAIL P4 DETAIL P5 DETAIL P6
1:30 1:30 1:30 DETAIL P4, P5 & P6 1 : 30

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 023 023


ARSITEKTURAL DRAWING

Project :

BESI K10 BESI D16 PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

BESI D13
Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

PIPA 8" Diperiksa Oleh :

PROJECT MANAGER
NOTED :

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL PLAT PILONSIGN 1 : 10

DETAIL PLAT PILONSIGN


1:10
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 047 047


ARSITEKTURAL DRAWING
20 20 20 20 20 20 20 20 20
200 200 200 200 200 200 200 200 Project :

PEMBANGUNAN RESTORAN

20
Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

FINISING CUTER 20X20MM

CHIEF EXECUTIVE OFFICER


200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :
1775

PROJECT MANAGER
NOTED :

Dibuat/ Digambar Oleh :

3600
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL RAMP LOADING 1 : 25

DETAIL RAMP LOADING DOCK Kode Gambar Nomor Lembar Jumlah Lembar
SKALA 1 : 25
ARS - 050 050
ARSITEKTURAL DRAWING

Project :
Penggantung plafond hollow 20x40x0,3mm
PEMBANGUNAN RESTORAN

hollow 40x40x0,3mm Lokasi :

JL. AH NASUTION METRO-LAMPUNG


hollow 20x40x0,3mm

Mengetahui/ Menyetujui :
gypsumboard 9mm fin. cat putih
(pemasangan plafond zikzak)
600
120 0
0 120
600 CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM
600
120
0 200 1
0
600 240
Diperiksa Oleh :

0
120

PROJECT MANAGER
NOTED :
0
120

600
0
120 0
120
600
Dibuat/ Digambar Oleh :

0
600
SDG
STORE DEVELOPMENT GACOAN
120 120
Judul Gambar
600 0 Skala

DETAIL RANGKA PLAFON 1 : 15


DETAIL RANGKA PLAFOND
Kode Gambar Nomor Lembar Jumlah Lembar
SKALA 1 : 15
ARS-018 018
ARSITEKTURAL DRAWING

Project :

2056
PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

900
Mengetahui/ Menyetujui :

2000
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

DETAIL R1
1:30

Diperiksa Oleh :

RAILING A 60 PROJECT MANAGER

50 NOTED :
SAMBUNGAN RAILING

RAILING B
35

50
60

RAILING PIPA Ø2"

COVER PLAT

50
25 25

LAS FULL KELILING


50

BASEPLATE 120X120X9MM
+ DYNABOLT 4M6 25
FINISH LANTAI +
ADUKAN SCREED
17
25 Dibuat/ Digambar Oleh :
50
50

50

SDG
60 55
150

COR RABAT BETON


100

STORE DEVELOPMENT GACOAN


120

Judul Gambar Skala

DETAIL R1 & DETAIL 1 : 30


25

DYNABOLT 4M6

BASEPLATE 120X120X9MM
SAMBUNGAN RAILING
120
70

RAILING PIPA Ø2"+


LAS FULL KELILING
DETAIL SAMBUNGAN RAILING
25

1:30 Kode Gambar Nomor Lembar Jumlah Lembar


25 70 25
120 ARS - 024 024
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :
LAMPU LED STRIP

FIN. DINDING CAT WARNA PUTIH


PENEBALAN DINDING FINSH.CAT HITAM
ROSTER uk. 20x20 cm
Finsh. Cat Putih + Mural Vendor
JUMLAH ROSTER 268 pcs

FFL +3.600 CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

15 15
14 14 14
13 13 12 13
12 12 12 12
BALOK RING 11 11 11
10
9 9 9 Diperiksa Oleh :
8
KOLOM PRAKTIS 7
6 6
DINDING BATA RINGAN EXPOSE
FINSH. CAT PUTIH EKSTERIOR
WEATHER SHIELD PROJECT MANAGER
FFL±0.000
NOTED :
FFL -0.400

SLOOF

PONDASI BATU KALI

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL SIGNAGE 1 : 50

Kode Gambar Nomor Lembar Jumlah Lembar


ARS - 044 044
ARSITEKTURAL DRAWING

Project :

Penggantung plafond siku 40x40mm


PEMBANGUNAN RESTORAN
Hollow 40x80x1,2mm
Lokasi :
Hollow SQ 40x40mm + tanaman sintesis merambat 3M
jarak antar hollow 40cm JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

200
0
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

100 200
0 200
200
200
200
200
200 Diperiksa Oleh :
0

100
0
PROJECT MANAGER
NOTED :

200
0

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL PLAFON DINE IN 1 : 25


DETAIL PLAFOND DINE IN Nomor Lembar Jumlah Lembar
Kode Gambar
1:25
ARS-017 017
16 16 16
02 02 02

02

16
02
16
02
OUTDOOR
-0.10

02
16

OUTDOOR
OUTDOOR 01 -0.10
-0.10

16
02
08
08
16
02
01
SEMI OUTDOOR
±0.00

08
08
07
02

08
02
DINE IN
±0.00

02

08
07

02

02
08
02

07

16
02
-0.20

R. CREW
07

07
07

±0.00

08
07
DINE IN
02

±0.00

07
07

13
10

07

13
TOILET PRIA
02

-0.05
10 AREA WUDHU
-0.05
07
02

TOILET WANITA 07

08
07

-0.05
MUSHOLLA
14
11

±0.00
14
02
07

07

11
07

11
JANITOR 07 07
-0.05
02

07 SHOWCASE
FREEZER
14 FREEZER

540 04
07

WORK TABLE (BAR)


07

120X70X85 cm
02

RAK TOING (4 TIERS)


WORK TABLE + CHILLER

180X70X85 cm
WORK TABLE

120X51X155 cm
180X70X85 cm

WORK TABLE
mc 551X05X001
ELBAT KROW

120X70X85 cm
DISPENSER
60X70 cm
+ICE BIN
150X90X121 cm
KOMPOR WOK
07
14

08

DISHWASH
120X70X85 cm
WORK TABLE
WORK TABLE (BAR)

+0.15
SINK 70X70

120X70X85 cm
SINGLE
14
04

cm
14
07

128X75X80 cm
STOVE 2

WORK TABLE + CHILLER WORK TABLE + CHILLER


150X90X121 cm
KOMPOR WOK

180X70X85 cm

40X75X85 cm
GAS FRYER
07

40X75X85 cm

COLD STORAGE GAS FRYER

+0.20
VERTICAL SHELVING

60X60CM
TABLE
WORK
14
180X40X65 cm
180X70X85 cm
WORK TABLE

120X70X85 cm
WORK TABLE
180X70X85 cm
RAK TOING (4 TIERS)
07

120X51X155 cm

16
02
14
04

RAK KITCHEN
07 200X60X240 cm
PANGSIT PANGSIT KERUPUK

180X70X85 cm
WORK TABLE

+0.20
WORK TABLE (TOPING)
GRIDDLE WORK TABLE
WORK TABLE
GRIDDLE 80X70X85 cm

80X70X85 cm

180X70X85 cm
02

07

area parkir bus


DAUN
BAWANG

RAK
GORENG
BAWANG

200X60X240 cm
07

ACIN

08

RAK WORK TABLE WORK TABLE


PANGSIT PANGSIT KERUPUK

200X60X240 cm 100X70X85 cm 100X70X85 cm


WORK TABLE (TOPING)

LORONG
19
WORK TABLE (LEVEL)
07

180X70X85 cm

GUDANG KERING
WORK TABLE (LEVEL)

+0.20
220X70X85 cm
220X70X85 cm

+0.20 DAUN
BAWANG

existing
GORENG
BAWANG

RAK
200X60X240 cm
ACIN
WORK TABLE + CHILLER

RAK
200X60X240 cm
07

180X70X85 cm

40X75X85 cm 40X75X85 cm
NOODLE BOILER NOODLE BOILER
07

40X75X85 cm 40X75X85 cm
14
04

NOODLE BOILER NOODLE BOILER


07

07 RAK 40X70X85 cm 40X70X85 cm


WORK TABLE WORK TABLE
200X60X240 cm
07

R. MANAGER
+0.25 KASIR
+0.25
07

PONDASI GENSET
02

AREA GAS
07

+0.20
07

HEBEL PECOK

AREA PARKIR
-0.20
16
02

19 19 19 19 19
16
02

SYMBOL SPECIFITION SYMBOL SPECIFITION SYMBOL SPECIFITION SYMBOL SPECIFITION

01 FIN. CAT Abu-abu Chinchilla Fur 80951B(2948) (EXTERIOR) 07 FIN. CAT VINILEX 300 (INTERIOR) 13 KERAMIK EX.ROMAN DTUBE BLACK uk.300X600mm 19 CAT KUNING TENNOKOTE

02 FIN. CAT DULUX WEATHERSHIELD (EXTERIOR) 08 FIN. CAT 811B05 MERAH BATA 14 KERAMIK EX.ROMAN DTUBE PUTIH uk.300X600mm

FIN. CAT WELDON 749 (INTERIOR) KERAMIK EX.ROMAN INTERLOCK DCARAVISTA


03 09 FIN. CAT WOODSTAIN WALLNUT / LASUR WALNUT 15 uk.300X600mm

04 FIN. CAT ABU ABU EASY CLEAN/SPOTLESS (INTERIOR) 10 FIN. CAT BLUE TUSCANY 5109 16 FIN. CAT MURAL (BY. SPECIALIST)
NOTE :
05 FIN. BLACK DOFF 9000 (CAT BESI) 11 FIN. CAT LADY PINK 955A 17 CORAL 1-2 SEMUA KOLOM AREA DINE IN SAJA T : 1200MM CAT WELDON 749
SELANJUUTNYA WELDON 747
06 FIN. CAT TAXI YELLOW FT310 12 FIN. CAT CARAMEL 919/ FLALIT KODE 123 18 ARTGRASS MINI
Lokasi :

Project :
RENCANA FINS. DINDING
Kode Gambar

JL. AH NASUTION METRO - LAMPUNG

ARSITEKTURAL DRAWING
10. Sepadan Belakang-Kanan -Kiri

1. Total seat
9. GSB
8. Luasan Semioutdoor
7. Luasan Parkir
6. Luasan Outdoor
5. Luasan bangunan utama

3. Total kapasitas motor


4. Luasan Lahan

2. Total kapasitas parkir mobil


ARS-009

STORE DEVELOPMENT GACOAN

PEMBANGUNAN RESTORAN
OPERASIONAL
Judul Gambar

CHIEF EXECUTIVE OFFICER

Mengetahui/ Menyetujui :
SDG
Dibuat/ Digambar Oleh :

PROJECT MANAGER

Diperiksa Oleh :

Diperiksa Oleh :
Nomor Lembar
009

NOTED :
Jumlah Lembar

SCM
()
()
()
()
()
()
()
()
()
()
1 : 300

Skala
ARSITEKTURAL DRAWING

Project :

LORONG
PEMBANGUNAN RESTORAN

+0.20
Lokasi :

1
1
DRY STORAGE JL. AH NASUTION METRO-LAMPUNG

AREA GAS
P P

COLD STORAGE
+0.20

RAK TOING (4 TIERS)


+0.20

120X51X155 cm
3 Mengetahui/ Menyetujui :

2
P P 4 1
100X50X155 cm
WORK TABLE

R. MANAGER
PRODUKSI AREA

+0.25
5

SHOWCASE
1 4 2 1 3 4 3
3 2 7

120X70X85 cm
WORK TABLE
6 5 WORK TABLE KOMPOR WOK KOMPOR WOK 7 CHIEF EXECUTIVE OFFICER

NOODLE BOILER NOODLE BOILER

NOODLE BOILER NOODLE BOILER


180X70X85 cm

40X75X85 cm

40X75X85 cm
WORK TABLE
40X70X85 cm
WORK TABLE (LEVEL) 150X90X121 cm 150X90X121 cm

FREEZER
220X70X85 cm WORK TABLE VERTICAL SHELVING
GRIDDLE 80X70X85 cm Diperiksa Oleh :
180X40X65 cm 6
OPERASIONAL SCM

WORK TABLE
40X70X85 cm

40X75X85 cm

40X75X85 cm
WORK

40X75X85 cm

40X75X85 cm
SINGLE

GAS FRYER

GAS FRYER
RAK TOING (4 TIERS) STOVE 2 WORK TABLE + CHILLER
GRIDDLE WORK TABLE 120X51X155 cm TABLE SINK 70X70
WORK TABLE (LEVEL) 80X70X85 cm cm 180X70X85 cm
60X60CM 128X75X80 cm
220X70X85 cm

KITCHEN
4

+0.20
NOODLE AREA 6 7 9
KASIR
+0.25

FREEZER
8 9 9 9 9 10 11
DIM SUM AREA
180X70X85 cm 180X70X85 cm
WORK TABLE (TOPING) 180X70X85 cm 180X70X85 cm 120X70X85 cm
WORK TABLE + CHILLER
WORK TABLE (TOPING)
120X70X85 cm WORK TABLE (BAR)
WORK TABLE + CHILLER WORK TABLE + CHILLER
180X70X85 cm

BAWANG
WORK TABLE (BAR)

BAWANG

DAUN
GORENG GORENG

DAUN
ACIN PANGSIT PANGSIT KERUPUK ACIN PANGSIT PANGSIT KERUPUK
BAWANG BAWANG

Diperiksa Oleh :

KETERANGAN GAMBAR :
PROJECT MANAGER
KITCHEN AREA
1 MEJA URAI (2) 8 UNDER COUNTER CHILLER (1) 5 FRYER (2) 7 WALL SHELF (2) 5 WOR TABLE/ MEJA KOTOR (1) NOTED :
Dimensi : 1800 X 700 X 850 mm
PRODUKSI AREA Dimensi : 1800 X 300 X 250 mm Dimensi : 1000 X 700 X 800 mm
Dimensi : 500 x 700 x 850 mm Dimensi : 400 x 750 x 850 mm
2 NOODLE BOILER (4) 9 WORK TABLE ( TOPING ) (2) 6 EXHAUST HOOD (1) 1 WORK TABLE (1) 8 CHILLER (2) DRY STORAGE AREA
Dimensi : 400 X 750 X 850/950 mm Dimensi : 1800 X 700 X 850 mm Dimensi : 2100 X 900 X 500 mm Dimensi : 1800 X 700 X 850 mm Dimensi : 540 X 540 X 1500 mm 1 SOLID RACK 4 TIERS (6)
3 EXHAUST HOOD ISLAND TYPE (1) 7 STOK POT STOVE 2 BURNER (1) 2 DOUBLE OVERSHELF (1) Dimensi : 2000 x 600 x 2400 mm
Dimensi : 1000 X 1800 X 500 mm
DIM SUM AREA Dimensi : 1800 X 300 X 650 mm BACK SINK AREA
Dimensi : 1200 x 750 x 500/1000 mm
4 WORK TABLE (2) 1 FOOD WARMER (1) 8 3 DOUBLE KWALIE RANGE (2) 1 WORK TABLE (1)
COLD STORAGE AREA
WORK TABLE (1)
Dimensi : 2200 X 700 X 850 mm Dimensi : 900 X 750 X 500 mm Dimensi :1200 x 700 x 850 mm Dimensi : 1500 X 900 X 750/1200 mm Dimensi : 1000 X 500 X 1550 mm 1 PALLET (4)
5 GRIDDLE (2) 2 STAND TABLE (1) 9 UNDER COUNTER CHILLER (3) 4 EXHAUST HOOD (1) 2 RAK TRIES 4 TINGKAT (1) Dimensi : 1200 x 1000 x 150 mm
Dimensi : 600 x 750 x 850/950 mm Dimensi : 900 X 750 X 850 mm Dimensi : 1885 X 700 X 850 mm Dimensi : 3000 X 900 X 500mm Dimensi : 1200 X 500 X 1550 mm SERVICE AREA
6 EXHAUST HOOD ISLAND TYPE (1) 3 MEJA WORK TABLE (1) 10 ICE BIN (1) 5 WORK TABLE (1) 3 TRIPLE SINK (3)
1 WORK TABLE OJOL (3)
Dimensi : 800 X 1800 X 500 mm Dimensi : 600 X 600 X 850 mm Dimensi : 600 X 700 X 850 mm Dimensi : 1200 X 700 X 850mm Dimensi : 1800 x 700 x 830/930mm
Dimensi : 1500 x 700 x 850 mm
7 WORK TABLE (2) 4 SINGLE SINK (1) 11 WORK TABLE (1) 6 CHEST FREEZER (2) 4 WALL SHELF (2)
Dimensi : 1800 X 300 X 250 mm 2 WORK TABLE ASSEMBLER (2) Dibuat/ Digambar Oleh :
Dimensi : 800 X 700 X 850 mm Dimensi : 600 X 700 X 850mm Dimensi : 1200 X 700 X 850 mm Dimensi : 1920 X 700 X 800mm Dimensi : 1500 x 700 x 850 mm
3 MEJA CLEAR UP (1)
Dimensi : 1200 x 700 x 850 mm

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

KITCHEN LAYOUTPLAN 1 : 80

Kode Gambar Nomor Lembar Jumlah Lembar

ARS-028 028
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

J4 R. CREW
±0.00 CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :

P2
OPERASIONAL SCM

Diperiksa Oleh :

P5
TOILET PRIA
-0.05 AREA WUDHU
-0.05

TOILET WANITA
P2 PROJECT MANAGER

P5
-0.05
NOTED :
MUSHOLLA
±0.00

JANITOR
-0.05 P2
Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DENAH PENUNJANG 1 : 75
RENC. KUSEN PENUNJANG
1:75 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 020 020


ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO-LAMPUNG
Mengetahui/ Menyetujui :
15000 CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
600
OPERASIONAL SCM
605 130
785
5000 5000
Diperiksa Oleh :

2000
4800
910

PROJECT MANAGER
NOTED :
2000
400
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
PAPAN NAMA 1 : 60
Kode Gambar Nomor Lembar Jumlah Lembar
ARS - 044 046
ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO - LAMPUNG
Mengetahui/ Menyetujui :
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM
CFL.+4.000 CFL.+4.000 CFL.+4.000 CFL.+4.000 CFL.+4.000
01 01 01 01 01
CFL.+5.000 CFL.+5.000 CFL.+5.000
Diperiksa Oleh :
CFL.+4.000 CFL.+4.000
01 01 01
01 01
CFL.+4.000 CFL.+4.000 CFL.+6.000 CFL.+6.000 CFL.+6.000
01 01 01 01 01
CFL.+4.000 CFL.+5.000
CFL.+4.000
01 01
01

KASIR
+0.25
CFL.+4.000 CFL.+4.000
PROJECT MANAGER

02
01 01

02
NOTED :

02

02
CFL.+4.000
01

R. MANAGER
1. Total seat ()

GYPSUMBOARD 9MM FIN. CAT VINILEX 300


+0.25
CFL.+4.000
2. Total kapasitas parkir mobil ()

HOLLOW 40X40MM SQ FIN CAT Ftalit kode 123 +


01
3. Total kapasitas motor ()

TANAMAN SINTESIS IKAT KABEL TIES MEREK 3M


CFL.+4.000
4. Luasan Lahan ()
01 5. Luasan bangunan utama ()

02
6. Luasan Outdoor ()

02

02
7. Luasan Parkir ()
8. Luasan Semioutdoor ()

02
9. GSB ()

02
10. Sepadan Belakang-Kanan -Kiri ()

SPECIFITION
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
RENC. PLAFON DINE IN 1 : 150

SYMBOL

01

02
Kode Gambar Nomor Lembar Jumlah Lembar
ARS-014 014
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

R. CREW CHIEF EXECUTIVE OFFICER


±0.00
Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

TOILET PRIA AREA WUDHU


-0.05
-0.05

TOILET WANITA PROJECT MANAGER


-0.05
NOTED :
MUSHOLLA
±0.00

JANITOR
-0.05

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

RENC. PLAFON PENUNJANG 1 : 75


RENC. PLAFON PENUNJANG
1:75 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 016 016


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO - LAMPUNG

Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM
OUTDOOR
-0.10

Diperiksa Oleh :

OUTDOOR
-0.10
OUTDOOR
-0.10

PROJECT MANAGER
NOTED :
CFL.+4.000
CFL.+4.000

CFL.+4.000 1. Total seat ()


01
CFL.+4.000
01

01
CFL.+4.000
CFL.+4.000
01

CFL.+4.000
2. Total kapasitas parkir mobil ()
01
01
CFL.+4.000

01
3. Total kapasitas motor ()
01

4. Luasan Lahan ()
5. Luasan bangunan utama ()
6. Luasan Outdoor ()
7. Luasan Parkir ()
8. Luasan Semioutdoor ()
9. GSB ()
10. Sepadan Belakang-Kanan -Kiri ()

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
SYMBOL SPECIFITION
Judul Gambar Skala
HOLLOW 40X40MM SQ FIN CAT Ftalit kode 123 +
01 TANAMAN SINTESIS IKAT KABEL TIES MEREK 3M RENC. PLAFON 1 : 150
SEMI OUTDOOR
02 GYPSUMBOARD 9MM FIN. CAT VINILEX 300 Kode Gambar Nomor Lembar Jumlah Lembar

ARS-015 015
ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO - LAMPUNG
Mengetahui/ Menyetujui :
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

L11

L12

L13

L14

L15

L16

L17

L18

L19

L20

D1
Diperiksa Oleh :

L1
L1

L18
L1

L1

L19
PROJECT MANAGER

KASIR
+0.25

L19
NOTED :
1. Total seat ()

L2
L2

L18
2. Total kapasitas parkir mobil ()
3. Total kapasitas motor ()
L1

4. Luasan Lahan ()
5. Luasan bangunan utama ()
6. Luasan Outdoor ()
7. Luasan Parkir ()
8. Luasan Semioutdoor ()

L3
L3
9. GSB ()

L2
10. Sepadan Belakang-Kanan -Kiri ()

L2
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
RENC. POLA LT DINE IN 1 : 150
& KITCHEN

L10
D5

D7
L1

L2

L3

L4

L6

L8

L9
Kode Gambar Nomor Lembar Jumlah Lembar
ARS-011 011
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

R. CREW L1 CHIEF EXECUTIVE OFFICER


±0.00
Diperiksa Oleh :
OPERASIONAL SCM

L1
L6
Diperiksa Oleh :

L11 L15
AREA WUDHU
-0.05
L15

PROJECT MANAGER
NOTED :
MUSHOLLA
L6 ±0.00
L1

L4

JANITOR
-0.05
L6

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

RENC. POLA LT PENUNJANG 1 : 75


RENC. POLA LT PENUNJANG
1:75 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 013 013


JL. SEMINUNG METRO
JL. SEMINUNG METRO

RUMAH EXISTING
TAPAK BANGUNAN RESTO BERADA DI YOSOREJO, KEC.
METRO TIMUR, KOTA METRO, LAMPUNG, JALAN AH,
NASUTION

BANGUNAN RUKO MENGHADAP KE ARAH UTARA, KE ARAH


JALAN AH. NASUTION, KONDISI TANAH BERDIRI BANGUNAN
AKAN DIBANGUN BANGUNAN TOKO DENGAN SEPESIFIKASI :

- LUAS TANAH : 2939 m2


- LUAS DAERAH PERENCANAAN : 1400m2
- LUAS LANTAI DASAR BANGUNAN : 785,440m2
- LUAS SELURUH LANTAI BANGUNAN : 785,440m2
AREA OUTDOOR
AREA OUTDOOR
- JUMLAH LANTAI : 1 LANTAI
- GARIS SEMPADAN BANGUNAN : 14 m
- PERKERASAN HALAMAN : PAVING
BLOCK

15

AREA INDOOR

AREA PARKIR

JL. AH NASUTION METRO JL. AH NASUTION METRO


Lokasi :

Project :
Kode Gambar

JL. AH NASUTION METRO - LAMPUNG

ARSITEKTURAL DRAWING
10. Sepadan Belakang-Kanan -Kiri

1. Total seat
9. GSB
8. Luasan Semioutdoor
7. Luasan Parkir
6. Luasan Outdoor
5. Luasan bangunan utama

3. Total kapasitas motor


4. Luasan Lahan

2. Total kapasitas parkir mobil


STORE DEVELOPMENT GACOAN

PEMBANGUNAN RESTORAN
OPERASIONAL
Judul Gambar

CHIEF EXECUTIVE OFFICER

Mengetahui/ Menyetujui :
SDG
Dibuat/ Digambar Oleh :

PROJECT MANAGER

Diperiksa Oleh :

Diperiksa Oleh :
Nomor Lembar

NOTED :
Jumlah Lembar

SCM
()
()
()
()
()
()
()
()
()
()
Skala
ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO - LAMPUNG
Mengetahui/ Menyetujui :
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

100X70X85 cm 100X70X85 cm
WORK TABLE WORK TABLE
DINE IN
±0.00

DINE IN

Diperiksa Oleh :
±0.00

180X70X85 cm 120X70X85 cm 120X70X85 cm 180X70X85 cm


WORK TABLE WORK TABLE WORK TABLE WORK TABLE

BAWANG
BAWANG

DAUN
DAUN
BAWANG BAWANG
PANGSIT PANGSIT KERUPUK ACIN PANGSIT PANGSIT KERUPUK ACIN 180X70X85 cm
60X70 cm WORK TABLE (BAR) GORENG GORENG
WORK TABLE (BAR) DISPENSER 120X70X85 cm
WORK TABLE + CHILLER WORK TABLE + CHILLER WORK TABLE + CHILLER
+ICE BIN
180X70X85 cm WORK TABLE (TOPING) WORK TABLE (TOPING)
120X70X85 cm 180X70X85 cm
180X70X85 cm 180X70X85 cm

FREEZER

+0.25
KASIR
KITCHEN
+0.20
PROJECT MANAGER

NOODLE BOILER NOODLE BOILER

NOODLE BOILER NOODLE BOILER


40X75X85 cm

40X75X85 cm
220X70X85 cm

GAS FRYER
GAS FRYER

40X75X85 cm

40X75X85 cm

WORK TABLE
40X70X85 cm
180X70X85 cm cm
128X75X80 cm 60X60CM 80X70X85 cm WORK TABLE (LEVEL)
TABLE 120X51X155 cm GRIDDLE WORK TABLE
WORK TABLE + CHILLER SINK 70X70 STOVE 2 RAK TOING (4 TIERS)
SINGLE WORK
NOTED :

WORK TABLE
40X70X85 cm
40X75X85 cm
FREEZER

40X75X85 cm
180X40X65 cm GRIDDLE 80X70X85 cm

120X70X85 cm
WORK TABLE
VERTICAL SHELVING WORK TABLE 220X70X85 cm
150X90X121 cm 150X90X121 cm WORK TABLE (LEVEL)
180X70X85 cm
KOMPOR WOK KOMPOR WOK WORK TABLE

R. MANAGER
+0.25
1. Total seat ()

SHOWCASE

540
2. Total kapasitas parkir mobil ()
ELBAT KROW
3. Total kapasitas motor ()

RAK TOING (4 TIERS)

COLD STORAGE
DISHWASH
mc 551X05X001

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm
120X51X155 cm

+0.15
4. Luasan Lahan ()

GUDANG KERING
RAK

RAK

RAK

RAK

RAK

RAK
+0.20

AREA GAS
5. Luasan bangunan utama ()

+0.20

+0.20
6. Luasan Outdoor ()
7. Luasan Parkir ()
8. Luasan Semioutdoor ()

LORONG
9. GSB ()

+0.20
10. Sepadan Belakang-Kanan -Kiri ()
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
DENAH DINE IN
1 : 150
Kode Gambar Nomor Lembar Jumlah Lembar
ARS-004 004
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

R. CREW CHIEF EXECUTIVE OFFICER


±0.00
Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

TOILET PRIA AREA WUDHU


-0.05
-0.05

TOILET WANITA PROJECT MANAGER


-0.05
NOTED :
MUSHOLLA
±0.00

JANITOR
-0.05

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DENAH PENUNJANG 1 : 75
DENAH PENUNJANG
1:75 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 006 006


B
OUTDOOR
-0.10

OUTDOOR
-0.10
OUTDOOR
-0.10

WELDMESH + VERTICAL GARDEN

NOTASI JUMLAH TOTAL SEAT NOTASI JUMLAH TOTAL SEAT


SEMI OUTDOOR
±0.00

14 BH 56 SEAT 8 BH 32 SEAT
GALAR FULL KAYU MEJA BETON 120X60 CM &
KURSI BETON 1200X400 CM

12 BH 48 SEAT 8 BH 48 SEAT
MEJA FULL KAYU 120 X 60CM &
KURSI FUL KAYU 40 X 40CM MEJA BUNDAR KAYU + PAYUNG Ø 3M
DINE IN
±0.00

7 BH 28 SEAT 1 BH 8 SEAT
MEJA COR BETON POT 140X140CM &
MEJA 80X80CM FULL KAYU & KURSI BAR T 50CM KURSI BETON 120X60 CM

8 BH 32 SEAT 4 BH 8 SEAT
MEJA KAKI BESI 120 x 60CM & MEJA SINGLE JILUMESH 60X60CM &
KURSI KAKI BESI 40 X 40CM KURSI BETON SINGLE 40X40 CM

-0.20

R. CREW
±0.00 10 BH 20 SEAT 10 BH
MEJA FULL KAYU 80 X 60CM & KURSI OJOL/TAKEWAY
KURSI FUL KAYU 40 X 40CM
DINE IN
±0.00

DINE IN = 184 OUTDOOR = 96


TOILET PRIA

PARKIR MOTOR = 190


AREA WUDHU

TOTAL : 280 SEAT


-0.05
-0.05

TOILET WANITA
-0.05
MUSHOLLA
SEPTICTANK
LUAS AREA : 1400 M2
±0.00

JANITOR
-0.05

SHOWCASE
FREEZER FREEZER

540
WORK TABLE (BAR)
120X70X85 cm

SUMUR BOR
RAK TOING (4 TIERS)
WORK TABLE + CHILLER

180X70X85 cm
WORK TABLE

120X51X155 cm
180X70X85 cm

WORK TABLE
mc 551X05X001
ELBAT KROW

120X70X85 cm
DISPENSER
60X70 cm
+ICE BIN
150X90X121 cm
KOMPOR WOK

DISHWASH
120X70X85 cm
WORK TABLE
WORK TABLE (BAR)

+0.15
120X70X85 cm
SINK 70X70
SINGLE

cm
128X75X80 cm
STOVE 2

WORK TABLE + CHILLER WORK TABLE + CHILLER

A A
150X90X121 cm
KOMPOR WOK

180X70X85 cm

40X75X85 cm

TANDON 2000L X 3
GAS FRYER

40X75X85 cm

COLD STORAGE GAS FRYER

+0.20
60X60CM
VERTICAL SHELVING

TABLE
WORK
180X40X65 cm
180X70X85 cm
WORK TABLE

120X70X85 cm
WORK TABLE
180X70X85 cm
RAK TOING (4 TIERS)
120X51X155 cm

RAK KITCHEN
200X60X240 cm
PANGSIT PANGSIT KERUPUK

180X70X85 cm
WORK TABLE

+0.20
WORK TABLE (TOPING)
GRIDDLE WORK TABLE
WORK TABLE

180X70X85 cm
GRIDDLE 80X70X85 cm

80X70X85 cm

area parkir bus


DAUN
BAWANG

RAK
GORENG
BAWANG

200X60X240 cm
ACIN

RAK WORK TABLE WORK TABLE


PANGSIT PANGSIT KERUPUK

200X60X240 cm 100X70X85 cm 100X70X85 cm


WORK TABLE (TOPING)

LORONG
180X70X85 cm
WORK TABLE (LEVEL)

GUDANG KERING
WORK TABLE (LEVEL)

+0.20
WELDMESH + VERTICAL GARDEN
220X70X85 cm
220X70X85 cm

+0.20 DAUN
BAWANG

existing
GORENG
BAWANG

RAK
200X60X240 cm
ACIN
WORK TABLE + CHILLER

RAK
200X60X240 cm
180X70X85 cm

40X75X85 cm 40X75X85 cm
NOODLE BOILER NOODLE BOILER

40X75X85 cm 40X75X85 cm
NOODLE BOILER NOODLE BOILER
150
PONDASI
RAK 40X70X85 cm
WORK TABLE
40X70X85 cm
WORK TABLE
MESIN CS 200X60X240 cm

GENSET ROOM R. MANAGER


FFL -0.200 +0.25 KASIR
+0.25
PONDASI GENSET

IPAL
AREA GAS
+0.20

HEBEL PECOK

AREA PARKIR
-0.20
B

Lokasi :

Project :
ARS-003
Kode Gambar

JL. AH NASUTION METRO - LAMPUNG

ARSITEKTURAL DRAWING
10. Sepadan Belakang-Kanan -Kiri

1. Total seat
9. GSB
8. Luasan Semioutdoor
7. Luasan Parkir
6. Luasan Outdoor
5. Luasan bangunan utama

3. Total kapasitas motor


4. Luasan Lahan

2. Total kapasitas parkir mobil


STORE DEVELOPMENT GACOAN

PEMBANGUNAN RESTORAN
OPERASIONAL
LAYOUT PLAN
Judul Gambar

CHIEF EXECUTIVE OFFICER

Mengetahui/ Menyetujui :
SDG
Dibuat/ Digambar Oleh :

PROJECT MANAGER

Diperiksa Oleh :

Diperiksa Oleh :
Nomor Lembar

NOTED :
003
Jumlah Lembar

SCM
1 : 250

()
()
()
()
()
()
()
()
()
()
Skala
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO - LAMPUNG

Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM
OUTDOOR
-0.10

Diperiksa Oleh :

OUTDOOR
-0.10
OUTDOOR
-0.10

PROJECT MANAGER
NOTED :

1. Total seat ()
SEMI OUTDOOR
±0.00
2. Total kapasitas parkir mobil ()
3. Total kapasitas motor ()
4. Luasan Lahan ()
5. Luasan bangunan utama ()
6. Luasan Outdoor ()
7. Luasan Parkir ()
8. Luasan Semioutdoor ()
9. GSB ()
10. Sepadan Belakang-Kanan -Kiri ()

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DENAH SEMIOUTDOOR 1 : 150


& OUTDOOR
Kode Gambar Nomor Lembar Jumlah Lembar

ARS-005 005
OUTDOOR
-0.10

OUTDOOR
-0.10

OUTDOOR
-0.10

NOTASI JUMLAH TOTAL SEAT NOTASI JUMLAH TOTAL SEAT


SEMI OUTDOOR
±0.00

14 BH 56 SEAT 8 BH 32 SEAT
GALAR FULL KAYU MEJA BETON 120X60 CM &
KURSI BETON 1200X400 CM

12 BH 48 SEAT 8 BH 48 SEAT
MEJA FULL KAYU 120 X 60CM &
KURSI FUL KAYU 40 X 40CM MEJA BUNDAR KAYU + PAYUNG Ø 3M
DINE IN
±0.00

7 BH 28 SEAT 1 BH 8 SEAT
MEJA COR BETON POT 140X140CM &
MEJA 80X80CM FULL KAYU & KURSI BAR T 50CM KURSI BETON 120X60 CM

8 BH 32 SEAT 4 BH 8 SEAT
MEJA KAKI BESI 120 x 60CM & MEJA SINGLE JILUMESH 60X60CM &
KURSI KAKI BESI 40 X 40CM KURSI BETON SINGLE 40X40 CM

-0.20 R. CREW
±0.00
10 BH 20 SEAT 10 BH
MEJA FULL KAYU 80 X 60CM & KURSI OJOL/TAKEWAY
KURSI FUL KAYU 40 X 40CM
DINE IN
±0.00

DINE IN = 184 OUTDOOR = 96


AREA WUDHU
TOILET WANITA -0.05

PARKIR MOTOR = 151


-0.05

TOILET PRIA
-0.05
TOTAL : 280 SEAT
MUSHOLLA
SEPTICTANK
LUAS AREA : 1400 M2
±0.00

JANITOR
-0.05

SHOWCASE SHOWCASE

540
WORK TABLE (BAR)
120X70X85 cm

SUMUR BOR
RAK TOING (4 TIERS)
WORK TABLE + CHILLER

180X70X85 cm
WORK TABLE

120X51X155 cm
180X70X85 cm

WORK TABLE
mc 551X05X001
ELBAT KROW

120X70X85 cm
DISPENSER
60X70 cm
+ICE BIN
150X90X121 cm
KOMPOR WOK

DISHWASH
120X70X85 cm
WORK TABLE
WORK TABLE (BAR)

+0.15
120X70X85 cm
SINK 70X70
SINGLE

cm
128X75X80 cm
STOVE 2

WORK TABLE + CHILLER WORK TABLE + CHILLER


150X90X121 cm
KOMPOR WOK

180X70X85 cm

40X75X85 cm

TANDON 2000L X 3
GAS FRYER

40X75X85 cm

COLD STORAGE GAS FRYER

+0.20
60X60CM
VERTICAL SHELVING

TABLE
WORK
180X40X65 cm
180X70X85 cm
WORK TABLE

120X70X85 cm
WORK TABLE
180X70X85 cm
RAK TOING (4 TIERS)
120X51X155 cm

RAK KITCHEN
200X60X240 cm
PANGSIT PANGSIT KERUPUK

180X70X85 cm
WORK TABLE

+0.20
WORK TABLE (TOPING)
GRIDDLE WORK TABLE
WORK TABLE

180X70X85 cm
GRIDDLE 80X70X85 cm

80X70X85 cm

area parkir bus


DAUN
BAWANG

RAK
GORENG
BAWANG

200X60X240 cm
ACIN

RAK WORK TABLE WORK TABLE


PANGSIT PANGSIT KERUPUK

200X60X240 cm 100X70X85 cm 100X70X85 cm


WORK TABLE (TOPING)

LORONG
180X70X85 cm
WORK TABLE (LEVEL)

GUDANG KERING
WORK TABLE (LEVEL)

+0.20
220X70X85 cm
220X70X85 cm

+0.20 DAUN
BAWANG

existing
GORENG
BAWANG

RAK
200X60X240 cm
ACIN
WORK TABLE + CHILLER

RAK
200X60X240 cm
180X70X85 cm

40X75X85 cm 40X75X85 cm
NOODLE BOILER NOODLE BOILER

40X75X85 cm 40X75X85 cm
NOODLE BOILER NOODLE BOILER

RAK 40X70X85 cm
WORK TABLE
40X70X85 cm
WORK TABLE
200X60X240 cm

R. MANAGER
+0.25 KASIR
+0.25
PONDASI GENSET

IPAL
AREA GAS
+0.20

HEBEL PECOK
Lokasi :

Project :
ARS-002
Kode Gambar

JL. AH NASUTION METRO - LAMPUNG

ARSITEKTURAL DRAWING
10. Sepadan Belakang-Kanan -Kiri

1. Total seat
9. GSB
8. Luasan Semioutdoor
7. Luasan Parkir
6. Luasan Outdoor
5. Luasan bangunan utama

3. Total kapasitas motor


4. Luasan Lahan

2. Total kapasitas parkir mobil


STORE DEVELOPMENT GACOAN

PEMBANGUNAN RESTORAN
OPERASIONAL
Judul Gambar

CHIEF EXECUTIVE OFFICER


SITE PLAN

Mengetahui/ Menyetujui :
SDG
Dibuat/ Digambar Oleh :

PROJECT MANAGER

Diperiksa Oleh :

Diperiksa Oleh :
Nomor Lembar

NOTED :
002
Jumlah Lembar

SCM
1 : 250

()
()
()
()
()
()
()
()
()
()
Skala
KRISBOW BRANKAS
TAHAN API YB300AK ARSITEKTURAL DRAWING
330X420X385 MM

B INFINITY COSTA GREY 600X600MM


Project :

PEMBANGUNAN RESTORAN
150 420 150
Lokasi :

JL. AH NASUTION METRO-LAMPUNG

150
Mengetahui/ Menyetujui :

KRISBOW BRANKAS
330 TAHAN API YB300AK A
330X420X385 mm

385
CHIEF EXECUTIVE OFFICER
150 420 150 Diperiksa Oleh :
OPERASIONAL SCM

DENAH BRANKAS TAMPAK DEPAN


SKALA 1 : 13 SKALA 1 : 13

Diperiksa Oleh :
PAS.BATA
COR BETON
COR BETON
COSTA GREY 600X600MM
COSTA GREY 600X600MM

KRISBOW BRANKAS
TAHAN API YB300AK KRISBOW BRANKAS
330X420X385 MM TAHAN API YB300AK PROJECT MANAGER
330X420X385 MM NOTED :
150

150
535
535

386

385
Dibuat/ Digambar Oleh :

150 420 150 330


SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
DENAH BRANKAS 1 : 13
POTONGAN A-A POTONGAN B-B TAMPAK DEPAN
SKALA 1 : 13 SKALA 1 : 13 POT A-A
POT B-B

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 034 034


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN
400 2000 400

A
Lokasi :
150

JL. AH NASUTION METRO-LAMPUNG

SLOPE 1%
Mengetahui/ Menyetujui :

1300
1125
1275

SLOPE 1% SLOPE 1%

1800
500 1300
150

CHIEF EXECUTIVE OFFICER


350

500
500

Diperiksa Oleh :
150

OPERASIONAL SCM
A

300
400 150 525 800 525 150 400
1850
2150

1300

900
SPANDEK ROOF 3 MM

1000
IRON FLAT BORDES+FRAME
FILL IN COMPACTED SOIL
LEAN CONCRETE T=50 MM COMPACTED SAND T=130 MM
SPECIE+WATERPROOFING LEAN CONCRETE T=50 MM
Diperiksa Oleh :
ROLAG FOUNDATION SPECIE+WATERPROOFING
CERAMIC ASIA TILE 300X300 MM GREY CERAMIC ASIA TILE 300X300 MM GREY

100
FFL - 0.150 FFL - 0.150
FFL - 0.200

50
PROJECT MANAGER
150 350 150 1150 150
1300
NOTED :

STAINLESS STEEL HINGES


STEEL HANDLE
IRON FLAT BORDES+FRAME
CERAMIC ASIA TILE 300X300 MM GREY
SPANDEK ROOF 3 MM
BLACK DOFF
717 717 717

Dibuat/ Digambar Oleh :

SDG
800

STORE DEVELOPMENT GACOAN


Judul Gambar Skala

DENAH DUMPSTER B 1 : 30
SECTION DUMPSTER B
FASAD DUMPSTER B

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 042 042


ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO - LAMPUNG
Mengetahui/ Menyetujui :
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM
P6

J3
J3

100X70X85 cm 100X70X85 cm
WORK TABLE WORK TABLE
DINE IN
±0.00

DINE IN

Diperiksa Oleh :
±0.00

P1
R1
180X70X85 cm 120X70X85 cm 120X70X85 cm 180X70X85 cm
WORK TABLE WORK TABLE WORK TABLE WORK TABLE

BAWANG
BAWANG

DAUN
DAUN
BAWANG BAWANG
PANGSIT PANGSIT KERUPUK ACIN PANGSIT PANGSIT KERUPUK ACIN 180X70X85 cm
60X70 cm WORK TABLE (BAR) GORENG GORENG
WORK TABLE (BAR) DISPENSER 120X70X85 cm
WORK TABLE + CHILLER WORK TABLE + CHILLER WORK TABLE + CHILLER
+ICE BIN
180X70X85 cm WORK TABLE (TOPING) WORK TABLE (TOPING)
120X70X85 cm 180X70X85 cm
180X70X85 cm 180X70X85 cm

FREEZER

+0.25
KASIR
KITCHEN
+0.20

P3
PROJECT MANAGER

NOODLE BOILER NOODLE BOILER

NOODLE BOILER NOODLE BOILER


40X75X85 cm

40X75X85 cm
220X70X85 cm

GAS FRYER
GAS FRYER

40X75X85 cm

40X75X85 cm

WORK TABLE
40X70X85 cm
180X70X85 cm cm
128X75X80 cm 60X60CM 80X70X85 cm WORK TABLE (LEVEL)
TABLE 120X51X155 cm GRIDDLE WORK TABLE
WORK TABLE + CHILLER SINK 70X70 STOVE 2 RAK TOING (4 TIERS)
SINGLE WORK
NOTED :

J1'
WORK TABLE
40X70X85 cm
40X75X85 cm
FREEZER

40X75X85 cm
180X40X65 cm GRIDDLE 80X70X85 cm

120X70X85 cm
WORK TABLE
VERTICAL SHELVING WORK TABLE 220X70X85 cm
150X90X121 cm 150X90X121 cm WORK TABLE (LEVEL)
180X70X85 cm
KOMPOR WOK KOMPOR WOK WORK TABLE

R. MANAGER
+0.25
1. Total seat ()

J1
SHOWCASE

540
2. Total kapasitas parkir mobil ()
ELBAT KROW
3. Total kapasitas motor ()

RAK TOING (4 TIERS)

COLD STORAGE
DISHWASH
mc 551X05X001

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm

200X60X240 cm
120X51X155 cm

+0.15
4. Luasan Lahan ()

GUDANG KERING
RAK

RAK

RAK

RAK

RAK

RAK
+0.20

AREA GAS
5. Luasan bangunan utama ()

+0.20

+0.20
6. Luasan Outdoor ()

P3
P3
7. Luasan Parkir ()
8. Luasan Semioutdoor ()

P4
LORONG
9. GSB ()

P2

+0.20
10. Sepadan Belakang-Kanan -Kiri ()

J2

J2

J2
J2
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
RENC. KUSEN DINE IN 1 : 150
Kode Gambar Nomor Lembar Jumlah Lembar
ARS-019 019
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG


A
5369 Mengetahui/ Menyetujui :

4875

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM
1838

2009
2573
Diperiksa Oleh :

PROJECT MANAGER
NOTED :
2447
2455

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DENAH PANGGUNG 1 : 30

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 038 038


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

A
Mengetahui/ Menyetujui :

R. CREW CHIEF EXECUTIVE OFFICER


±0.00
Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

TOILET PRIA AREA WUDHU


-0.05
-0.05

TOILET WANITA PROJECT MANAGER


-0.05
NOTED :
MUSHOLLA
±0.00

B B
JANITOR
-0.05

Dibuat/ Digambar Oleh :

SDG
A

STORE DEVELOPMENT GACOAN


Judul Gambar Skala

DENAH PENUNJANG 1 : 75
DENAH PENUNJANG
1:75 Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 036 036


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

R. MANAGER Lokasi :

+0.25 KASIR JL. AH NASUTION METRO-LAMPUNG

+0.25
Mengetahui/ Menyetujui :

MEJA MEJA
120X60 cm 120X60 cm

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

FFL +2.95
GYPSUMBOARD 9MM FIN. CAT PUTIH

PROJECT MANAGER
NOTED :

07
600
100

Dibuat/ Digambar Oleh :


1200
1100
955

KASIR
FFL +0.250
SDG
STORE DEVELOPMENT GACOAN

2950 Judul Gambar Skala

DENAH KASIR
TAMPAK A 1 : 35
TAMPAK B
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 032 032


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :
R. MANAGER
JL. AH NASUTION METRO-LAMPUNG
+0.25 KASIR
+0.25 Mengetahui/ Menyetujui :

MEJA MEJA
120X60 cm 120X60 cm

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

+ 2.95
RENCANA PLAFOND PROJECT MANAGER
NOTED :
600

1000
07

Dibuat/ Digambar Oleh :


1200

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DENAH MANAGER
TAMPAK A 1 : 35
TAMPAK B
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 033 033


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

CONCRETE SLAB FIN PLASTER ACI


WATER PROOFING

BESI SIKU 4x4 cm

Diperiksa Oleh :
GAS AREA
A
FFL +0.20

200
PIPA 3' DAPAT DILEPAS

500

300
PROJECT MANAGER
NOTED :

PIPA 3'

PIPA ELBOW 3 '


400 153

SECTION Dibuat/ Digambar Oleh :


1:15

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

R. GAS R. GAS 1 : 15
1:15 SECTION

Kode Gambar Nomor Lembar Jumlah Lembar


ARS - 035 035
ROMAN D'TUBE WHITE 300X600MM ARSITEKTURAL DRAWING
LIST KUNING (EX CAT DUCO FUTULAX GRC BOARD 6MM FIN. FUTULAX TAXI
YELLOW) YELLOW 300MM NAT 20MM Project :
FIN. CAT ABU ABU EASY
CLEAN/SPOTLESS (INTERIOR)
PEMBANGUNAN RESTORAN

Lokasi :

TOP TABLE BETON LEBAR 400MM JL. AH NASUTION METRO-LAMPUNG


FIN GRANIT SUN POWER M66107 60X60
06 06 06

15 Mengetahui/ Menyetujui :
14 14

06

CHIEF EXECUTIVE OFFICER

GRC BOARD 6MM FIN. FUTULAX TAXI Diperiksa Oleh :


YELLOW 300MM NAT 20MM OPERASIONAL SCM
PAPAN MENU (MUTIPLEK + STIKER
CUTTING SESUAI MENU PALEMBANG

Diperiksa Oleh :

PROJECT MANAGER
NOTED :

RAK GUDANG 200X60X240MM

Dibuat/ Digambar Oleh :

SDG
07 07 04

STORE DEVELOPMENT GACOAN

100
14 14
Judul Gambar Skala

GUDANG
FFL +0.20
PRODUKSI
FFL +0.20 FASAD KITCHEN
GUTTER
-0.30
GUTTER
-0.30

FASID KASIR 1 : 75
SECTION
Kode Gambar Nomor Lembar Jumlah Lembar

ARS-029 029
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :
1500
JL. AH NASUTION METRO-LAMPUNG
BOX STRAINER 20X20CM
PIPA PVC D 6"
Mengetahui/ Menyetujui :

220

300
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
PENUTUP SALURAN GUTTER OPERASIONAL SCM
BESI HOLLOW 40.40 + GRILL PLAT STRIP 3 MM
SISI KANAN KIRI PLESTER SPACE 100MM

40 40 40 40
Diperiksa Oleh :

40 40 40 40 40
KERAMIK 30X30 White PENUTUP SALURAN GUTTER
BESI HOLLOW 40.40 + GRILL PLAT STRIP 3 MM

PROJECT MANAGER
NOTED :

PIPA 6 INCH
40

PAS. SPESI 3 CM
RABATAN BETON 5 CM
URUGAN PASIR 5 CM

Dibuat/ Digambar Oleh :

BESI STANLESS ELBOW PIPA 6 INCH


SDG
STORE DEVELOPMENT GACOAN
180

Judul Gambar Skala

PLAT STAINER 2MM


200 DETAIL GUTTER 1 : 10
LUBANG UKURAN 3MM

DETAIL GUTTER
Kode Gambar Nomor Lembar Jumlah Lembar
1:10
ARS - 030 030
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

3D ISOMETRI JL. AH NASUTION METRO-LAMPUNG

BAGIAN DIKIKIS
Mengetahui/ Menyetujui :
600 600 600
250 350 475 125 250 350
5
60 120

17
200

275
DINDING BATA RINGAN EXPOSE FINSH. CAT PUTIH
CHIEF EXECUTIVE OFFICER
475 125 250 350 475 125 EKSTERIOR WEATHER SHIELD
Diperiksa Oleh :
MURAL BY VENDOR MURAL
OPERASIONAL SCM

BALOK RING

Diperiksa Oleh :
KOLOM PRAKTIS

DINDING BATA RINGAN EXPOSE


FINSH. CAT PUTIH EKSTERIOR
2600
2800

WEATHER SHIELD
PROJECT MANAGER
NOTED :

SLOOF
200

PONDASI BATU KALI

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL HEBEL PECOK 1 : 50

Kode Gambar Nomor Lembar Jumlah Lembar


ARS - 041 041
ARSITEKTURAL DRAWING

ONEWAY GLASS 5mm Project :

B
B PEMBANGUNAN RESTORAN

A A Lokasi :
600
JL. AH NASUTION METRO-LAMPUNG

300

300
600 Mengetahui/ Menyetujui :
1000

1000
B

CHIEF EXECUTIVE OFFICER


A A Diperiksa Oleh :
OPERASIONAL SCM

2900
2600
600 Diperiksa Oleh :
1180

1180

PROJECT MANAGER
LANTAI NOTED :

Dibuat/ Digambar Oleh :

600 SDG
STORE DEVELOPMENT GACOAN
DETAIL J1 DETAIL J2 Judul Gambar Skala

1:20 1:20 DETAIL J1 1 : 20


DETAIL J2
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 025 025


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

50
50
Mengetahui/ Menyetujui :

560
50
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

2378
950
50
Diperiksa Oleh :

570
50
50
PROJECT MANAGER
NOTED :

745 745 745 745 745 745 745

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN

DETAIL J3 Judul Gambar Skala

1:20 DETAIL J3 1 : 20

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 026 026


ARSITEKTURAL DRAWING

Project :

DETAIL J4 1 : 20 PEMBANGUNAN RESTORAN

B Lokasi :

JL. AH NASUTION METRO-LAMPUNG


ARS - 022

320
Mengetahui/ Menyetujui :

1200

880
A A CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

2200
480 480
960
Diperiksa Oleh :

1000
B
PROJECT MANAGER
NOTED :
LANTAI

960
480 480

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
DETAIL J4 Judul Gambar Skala

1:20
DETAIL J4 1 : 20

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 027 027


ARSITEKTURAL DRAWING
Meja Beton 60x60 cm
Project :
fin. Top Table Granit 60x60 cm Motif Kayu
Didalam rangka diisi Batu jenis Lava Bulat
1800 Untuk Ornament & Pemberat Meja PEMBANGUNAN RESTORAN
200 SIKU 4X4
400 200 600 200 400

80
Lokasi :

JL. AH NASUTION METRO-LAMPUNG


400 Kursi Beton 40x40 cm
400

600

400
Mengetahui/ Menyetujui :

670
450
100

360
350 CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
TAMPAK ATAS OPERASIONAL SCM
SKALA 1 : 15
TAMPAK DEPAN Border Line 10cm Hitam
SKALA 1 : 15

GRANIT 60x60 MOTIF KAYU


Diperiksa Oleh :

RANGKA BESI HOLLOW 3X3 ORNAMEN


200 EXPANDED METAL JILUMESH

80
BETON TBL 5 CM DI ACI
PROJECT MANAGER
400
NOTED :

670
Rangka Hollow besi 3x3 Omamen
Expanded Metal Jilumesh CAT MOWILEX MIX HITAM
450

PUTIH TEXTURE ACIAN

Border Line 10cm Hitam 350


360
Border Line 10cm Hitam Dibuat/ Digambar Oleh :

PAS. BATA ROLLAG DALAM RANGKA

ISOMETRI
SKALA 1 : 15
DI ISI BATU JENIS LAVA BULAT
UNTUK ORNAMEN DAN PEMBERAT
MEJA
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

POTONGAN DETAIL MEJA JILUMESH 1 : 25


DETAIL MEJA BETON SINGLE SKALA 1 : 25
SKALA 1 : 15

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 049 049


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

L12
L12
L12
JL. AH NASUTION METRO - LAMPUNG

OUTDOOR L12
L12 -0.10
L12
L20 Mengetahui/ Menyetujui :

L15 L20 L20 L20 L20

L12 L12
L20
L15

L10

L11
L15 CHIEF EXECUTIVE OFFICER
L20
L13 L12 Diperiksa Oleh :
L11 L14
OUTDOOR
-0.10 L15
OUTDOOR
-0.10
L8 OPERASIONAL SCM
L11
L10 L11

L1 L1
L2 L2

L11 L14
L12

L14
L1 Diperiksa Oleh :
L2
L11

PROJECT MANAGER
NOTED :

1. Total seat ()
2. Total kapasitas parkir mobil ()
3. Total kapasitas motor ()
4. Luasan Lahan ()
5. Luasan bangunan utama ()
6. Luasan Outdoor ()
7. Luasan Parkir ()
8. Luasan Semioutdoor ()
9. GSB ()
10. Sepadan Belakang-Kanan -Kiri ()
L11
Dibuat/ Digambar Oleh :
L1 L12

L2

L3

L4
L13

L14

L15
SDG
STORE DEVELOPMENT GACOAN
D5 L16
Judul Gambar Skala
L6 L17
RENC. POLA LT
D7 L18
SEMIOUTDOOR 1 : 150
L8 L19

L9 L20
& OUTDOOR
Kode Gambar Nomor Lembar Jumlah Lembar
L10 D1

ARS-012 012
ARSITEKTURAL DRAWING
Project :
PEMBANGUNAN RESTORAN
Lokasi :
JL. AH NASUTION METRO - LAMPUNG
Mengetahui/ Menyetujui :
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

L11

L12

L13

L14

L15

L16

L17

L18

L19

L20

D1
Diperiksa Oleh :
L9

L9

L9

L9
PROJECT MANAGER
NOTED :
1. Total seat ()

L9
2. Total kapasitas parkir mobil ()
3. Total kapasitas motor ()
4. Luasan Lahan ()
5. Luasan bangunan utama ()
6. Luasan Outdoor ()

L9
L9
7. Luasan Parkir ()
8. Luasan Semioutdoor ()

L9
9. GSB ()
10. Sepadan Belakang-Kanan -Kiri ()
Dibuat/ Digambar Oleh :
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala
POLA LANTAI LUAR 1 : 300

L10
D5

D7
L1

L2

L3

L4

L6

L8

L9
Kode Gambar Nomor Lembar Jumlah Lembar
ARS-010 010
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM
3199

Diperiksa Oleh :

TOP OF STAGE W/ ART GRASS SWISS, MINI TYPE


PLASTER RENDER W/ PAINT FINISH (DARK GRAY)
PLASTER RENDER EXPOSE
STRIP LIGHT LED
WARM WHITE
STRIP LIGHT LED
WARM WHITE PROJECT MANAGER
NOTED :
STAGE
FFL + 0.100
125 125
200 200

STEP
FFL - 0.130
400

TOP OF STAGE W/ ART STEP


75

GRASS SWISS, MINI TYPE FFL - 0.130


75

PLASTER RENDER W/ PAINT


FINISH (DARK GRAY)

STRIP LIGHT LED 100


WARM WHITE
125

154 629 171 1798 Dibuat/ Digambar Oleh :


254 2598
20

SDG
2851
75

STORE DEVELOPMENT GACOAN


50
Judul Gambar Skala

POTONGAN PANGGUNG 1 : 25

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 040 040


ARSITEKTURAL DRAWING

Project :

639 4550 874 PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

6072 Mengetahui/ Menyetujui :

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

BESI WELDMESH +
TANAMAN VERTICAL
2300

Diperiksa Oleh :
3825

DINDING FIN. PLESTER + ACI


PROJECT MANAGER
NOTED :

145
700

BATA GEREJA
Dibuat/ Digambar Oleh :

4550
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

DETAIL RUMAH GENSET 1 : 35

DETAIL VERTICAL GARDEN OUTDOOR Kode Gambar Nomor Lembar Jumlah Lembar
SKALA 1: 35
ARS - 052 052
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

STRIP LED LIGHT JL. AH NASUTION METRO-LAMPUNG


MIE GACOAN LOGO
CONCRETE RING BEAM 250X175 MM W/ PAINT FINISH (DARK GREY)
BRICKWALL+PLASTER RENDER W/ WHITE PAINT FINISH & MURAL (BY VENDOR)
WHITE ROSTER 200X200MM
Mengetahui/ Menyetujui :
TOP OF STAGE W/ ART GRASS SWISS, MINI TYPE
PLASTER RENDER W/ PAINT FINISH (DARK GRAY)
PLASTER RENDER EXPOSE

295
5 0
278

930
1074

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

3199
Diperiksa Oleh :

2269
2125

PROJECT MANAGER
NOTED :

130

130
259

5369

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

TAMPAK DEPAN PANGGUNG 1 : 25

Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 039 039


CEROBONG ASAP GENSET ARSITEKTURAL DRAWING

PENUTUP ATAP SPANDEK + Project :

RANGKA HOLLOW 20X40X1,4MM


FIN.CAT HITAM PEMBANGUNAN RESTORAN

Lokasi :

JL. AH NASUTION METRO-LAMPUNG

SISI BELAKANG
Mengetahui/ Menyetujui :

2066
1900
150
PONDASI
MESIN CS
CHIEF EXECUTIVE OFFICER
Diperiksa Oleh :
OPERASIONAL SCM

1581
TAMPAK SAMPING
GENSET ROOM SKALA 1: 35

FFL -0.200
Diperiksa Oleh :

PONDASI GENSET
PENUTUP ATAP SPANDEK +
RANGKA HOLLOW 20X40X1,4MM
FIN.CAT HITAM PROJECT MANAGER
NOTED :

CEROBONG ASAP GENSET

300
DENAH RUMAH GENSET
SKALA 1: 35 COVER JILUMESH

RANGKA BESI HOLLOW 40X60X1,6MM Dibuat/ Digambar Oleh :

2200
FINISHING CAT HITAM

1900
SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

60 1115 1245 1165 745 60 DETAIL RUMAH GENSET 1 : 35

4390

TAMPAK DEPAN Kode Gambar Nomor Lembar Jumlah Lembar


SKALA 1: 35
ARS - 051 051
ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN

Lokasi :

900
JL. AH NASUTION METRO-LAMPUNG

900
1950
250
KRAN WASTAFEL CHROME 21 INC EX ONDA STAINLESS
KERAMIK ROMAN WALL 300X600MM HORIZONTAL
DTUBE TILE BLACK
Mengetahui/ Menyetujui :

200
MEJA WASTAFEL FIN. GRANIT 60X60
COSTA GREY (MUDA)

250

200
1050

1050
800

120
20
600

60

1000
800

800
680
600
CHIEF EXECUTIVE OFFICER

150 300 650 650 300 150 Diperiksa Oleh :


1900
2200 OPERASIONAL SCM

50
150 300
500

Diperiksa Oleh :

PROJECT MANAGER
NOTED :

20
A
150

860
CERMIN 90X220 BEVEL 2 CM
500
300

20
A
50

20 20

2160

150 300 650 650 300 150 2200 Dibuat/ Digambar Oleh :
1900

SDG
2200

STORE DEVELOPMENT GACOAN


Judul Gambar Skala

PLAN WASTAFEL
1 : 30
TAMPAK WASTAFEL
POT WASTAFEL
CERMIN
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 043 043


ARSITEKTURAL DRAWING

Project :

PEMBANGUNAN RESTORAN
+ 3.45 + 3.45 + 3.45 + 3.40
RENCANA PLAFOND RENCANA PLAFOND RENCANA PLAFOND RENCANA PLAFOND

Lokasi :
11 11 10 10

JL. AH NASUTION METRO-LAMPUNG


Kloset Duduk Toto CW 420 J Kloset Duduk Toto CW 420 J
+ TC 505 W + TC 505 W
Urinoir Toto U 57 M
8

13 13
14 14 14
Mengetahui/ Menyetujui :

JANITOR T. WANITA T. PRIA RUANG CREW


FFL-0.05 FFL-0.05 FFL-0.05 FFL+0.00

CHIEF EXECUTIVE OFFICER


Diperiksa Oleh :
OPERASIONAL SCM

Diperiksa Oleh :

PROJECT MANAGER
NOTED :
+ 3.40 + 3.40 + 3.45
RENCANA PLAFOND RENCANA PLAFOND RENCANA PLAFOND

11 11

07 Kloset Jongkok Kloset Duduk Toto CW 420 J


+ TC 505 W

14 14

MUSHOLLA T. WANITA T. WANITA


FFL+0.00 FFL-0.05 FFL-0.05

Dibuat/ Digambar Oleh :

SDG
STORE DEVELOPMENT GACOAN
Judul Gambar Skala

SECTION A 1 : 80
SECTION B
Kode Gambar Nomor Lembar Jumlah Lembar

ARS - 037 037

Anda mungkin juga menyukai