Anda di halaman 1dari 1

PROJECT : PALEMBANG CITY SEWERAGE PROJECT

PAKET : PEMBANGUNAN JARINGAN IPAL KOTA PALEMBANG PAKET B2B


BULAN : OKTOBER
TAHUN : 2023

ROOSTER / JADWAL KERJA OKTOBER

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
NO NAMA JABATAN
Mgg Sen Sel Rab Kam Jum Sab Mgg Sen Sel Rab Kam Jum Sab Mgg Sen Sel Rab Kam Jum Sab Mgg Sen Sel Rab Kam Jum Sab Mgg Sen

1 M. AGUS SARJONO Sr L R R R R C L L P P P P P P L P P P P P P L P P P P P P L P

2 SUPRIYANTO INSPECTOR L M M M P P P L M M M M M M L P P P M M M L M M M P P P L M

3 HARIS SANUSI INSPECTOR L P P P M M M L M M M P P P L M M M M M M L P P P M M M L M

4 REDDY SYAPUTRA INSPECTOR L M M M M M M L C C C C C L L P P P M M M L M M M P P P L M

5 BENI SUBRATA INSPECTOR L M M M M M M L P P P M M M L M M M P P P L M M M M M M L P

6 INDAH QS L P P P P P L L P P P P P L L P P P P P L L P P P P P L L P

7 USMAN QC L P P P P P P L P P P P P P L P P P P P P L P P P P P P L P

8 ELSA DOC. CONTROL L P P P P P P L P P P P P P L P P P P P P L P P P P P P L P

DI BUAT OLEH DI SETUJUI OLEH

MOHAMMAD AGUS SARJONO RONALD VAN de KUILEN

Sr. Pipe Line Inspector Team Leader

KETERANGAN NOTE :
P HARI KERJA

M SHIFT MALAM
L LIBUR
C CUTI
R REPLACEMENT