Anda di halaman 1dari 2

No.

: 1982/QUO/TST/12/2023
Project : Loading Test Bearing Pad Jembatan Jakarta, 27 Desember 2023
Location : Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur
Kepada : Bpk. Andar - FSP CHR100 Tabang

Hal : Penawaran Harga Loading Test Pada Bearing Pad 7 Jembatan di Kabupaten Kutai Kartanegara

Dengan Hormat,
Sehubungan dengan adanya kebutuhan pengujian loading test pada bearing pad 7 Jembatan di Kabupaten Kutai Kartanegara, berikut kami
sampaikan penawaran harga untuk pekerjaan tersebut dengan detail sebagai berikut:

Price Total
No. Scope of Works Unit Quantity
(Rp.) (Rp.)
1. PEKERJAAN PERSIAPAN
1.1 Mob-Demobilization Jakarta - Kutai Kartanegara PP ls 1.00 56,000,000 56,000,000
(Transport, Tools, Accomodation, Meal & Personel)
1 Site Coordinator (Total 5 Orang)
3 Instrument Engineer + 2 Engineer Support)
1.2 Material Cost (cabel, Moounting support) ls 7.00 3,000,000 21,000,000
1.3 Platform, Scaffolding, Perahu/Sampan/Boat, Tangga, Akses ls 1.00 By Customer By Customer
Supporting Facilities

1.4 Software Monitoring TMR Soft ls 7.00 25,000,000 175,000,000

SUBTOTAL 1 252,000,000

2. PEKERJAAN SURVEY DAN PENGUJIAN JEMBATAN

2.1 Jembatan Pleo 2 abutment, total girder : 14 line

2.1.1 Engineers (5 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.1.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.1.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 56.00 2,700,000 151,200,000

2.2 Jembatan Belayan (2 abutment, total girder : 14 line)

2.2.1 Engineers (5 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.2.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.2.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 56.00 2,700,000 151,200,000

2.3 Jembatan Guang (2 abutment & 2 pier, total girder : 14 line)

2.3.1 Engineers (5 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.3.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 4,000,000 4,000,000

2.3.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 168.00 3,500,000 588,000,000

2.4 Jembatan Muyo (2 abutment, total girder : 13 line)

2.4.1 Engineers (6 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.4.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.4.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 52.00 2,700,000 140,400,000
2.5 Jembatan Berambai 2 abutment, total girder : 14 line

2.5.1 Engineers (6 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.5.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.5.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 56.00 2,700,000 151,200,000

2.6 Jembatan Melepat (2 abutment, total girder : 14 line)

2.6.1 Engineers (6 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.6.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.6.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 56.00 2,700,000 151,200,000

2.7 Jembatan Abit (2 abutment, total girder : 9 line)

2.7.1 Engineers (6 Orang team personil) man/day 5.00 1,500,000 7,500,000

2.7.2 Visual Survey (Documentation & Identification) Using Camera ls 1.00 2,000,000 2,000,000

2.7.3 STATIC LOADING TEST PADA BEARING PAD

Pemasangan LVDT (Pengecekan Displacement Bearing Pad Arah X dan Y) titik 36.00 2,700,000 97,200,000

Alat Bantu, Scaffolding, Steger, Tangga, Platform ls 1.00 By Customer By Customer

Beban Truck dan Isi ls 1.00 By Customer By Customer

2.8 Loading Test Report by Certified Engineering ls 1.00 30,000,000 30,000,000

SUBTOTAL 2 1,528,900,000

3. LAIN-LAIN

3.1 Dokumen Hard Copy dan Soft Copy (Laporan A4, Drawing A3) ls 7.00 250,000 1,750,000

3.2 Meeting dan Presentasi (Maks. 2x) di Jakarta Termasuk ONLINE ls 1.00 1,000,000 1,000,000

Note : Apabila meeting di Site, tiket dan akomodasi by Owner

SUBTOTAL 3 2,750,000

Total 1 sd 3 1,783,650,000

PPn11% 196,201,500

Grand Total Rp 1,979,851,500.00

Term & Condition


Exclude Permit & Security Testing and Analysis Conducted By Certified Engineer
Exclude TAX PPn and PPh Testing Tools Updated and Calibrated

Person In Charge
1 Team Leader, S2 Teknik Sipil Struktur,
SKA Ahli Madya Teknik Jembatan, Pengalaman > 10 Tahun di Audit Jembatan
1 Structure Engineer, S2 Teknik Sipil Struktur, SKK Ahli Madya Teknik Jembatan, Pengalaman > 5 Tahun di Audit Jembatan
1 Structure Engineer, S1 Teknik Sipil Struktur, SKK Ahli Utama Teknik Jembatan, Pengalaman > 7 Tahun di Audit Jembatan
1 Estimator, S1 Teknik Sipil Struktur, Pengalaman > 5 Tahun di Audit Jembatan
1 Site Coordinator, S1 Teknik Sipil Struktur, Pengalaman > 5 Tahun di Audit Jembatan
1 Drafter, S1 Teknik Sipil
3 Instrument Engineer, Pengalaman > 3 Tahun di Audit Jembatan

Payment

Part 1 : 50% Down Payment


Part 2 : 30% Payment After Investigation & Site Survey
Part 3 : 20% Full Payment After Completion

Hormat Kami,