- Exa 1250 - 04
- Loading ob/Regrade Jalan
- Hauler : 5 Unit
- Distance : 1500 m
- Elevasi : :5_0 m
- Dumpingan : IPD
SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diketahui Oleh,
Pit Control Eng. Engineering Dept. Head Product. Dept. Head Product. Sect. Head Pit Control Eng. Engineering Sect. Head
ENGINEERING - PRODUKSI
PT. PRIMA SARANA GEMILANG - PADA IDI PROJECT
2023
SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diketahui Oleh,
Pit Control Eng. Engineering Dept. Head Product. Dept. Head Product. Sect. Head Pit Control Eng. Engineering Sect. Head
ENGINEERING - PRODUKSI
PT. PRIMA SARANA GEMILANG - PADA IDI PROJECT
2023
- Peralihan EX 950 - 06
- Loading ob/Regrade Jalan
- Hauler : 5 Unit
- Distance : 1500 m
- Elevasi : :10 m
- Dumpingan : OPD 80
SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diketahui Oleh,
Pit Control Eng. Engineering Dept. Head Product. Dept. Head Product. Sect. Head Pit Control Eng. Engineering Sect. Head
ENGINEERING - PRODUKSI
PT. PRIMA SARANA GEMILANG - PADA IDI PROJECT
2023
SERAH TERIMA INSTRUKSI PELAKSANAAN PEKERJAAN SERAH TERIMA LAPORAN PELAKSANAAN PEKERJAAN
Dibuat Oleh, Diketahui Oleh, Diterima Oleh, Dilaporkan Oleh, Diketahui Oleh,
Pit Control Eng. Engineering Dept. Head Product. Dept. Head Product. Sect. Head Pit Control Eng. Engineering Sect. Head
ENGINEERING - PRODUKSI
PT. PRIMA SARANA GEMILANG - PADA IDI PROJECT
2023
DISPOSAL
OB
ENGINEERING - PRODUKSI
PT. PRIMA SARANA GEMILANG - PADA IDI PROJECT
2023
Elevasi sump :
1 Blok 28 : -2,461
2 Blok 30 : -2,461
3 Blok 36 : 4.7