No URAIAN PEKERJAAN VOL SAT HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.) BOBOT PEKERJAAN
C MATERIAL
1 Laterite, ketebalan 12 cm (padat) 0,53 m3 Rp 477.360 Rp 252.046 90,7%
SUB TOTAL MATERIAL Rp 252.046 90,7%