Anda di halaman 1dari 1

0

0
300

325

350

375

400

425

450

475

500
0
0
0

0
0

0
0
0
0
0

275
250
000

025

225
050

200
175

Rencana Akhir Pekerjaan


150
125
075

100

STA 0+500
Rencana Awal Pekerjaan
STA 0+000
100
90
80
70
60
50
Rencana Awal Pekerjaan40
STA 0+000 Rencana Akhir Pekerjaan
30 STA 0+500
20 Rencana Rigid
Rencana Rigid
Eksisting Rencana Rigid
Eksisting
10 Eksisting
Datum Elevasi
00.000
Elev. Perkerasan Beton 28.023 26.825 25.945 24.875 23.660 23.114 22.326 22.307 22.300 22.407 22.977 23.525 25.181 22.601 22.067 22.044 21.959 21.054 19.900 18.701 18.401
Semen fc' 20 MPa
Elev. Lapis Fondasi Bawah 23.460 22.126 22.777 21.759 20.854 19.700 18.501 18.201
27.823 26.625 25.745 24.675 22.914 22.107 22.100 22.207 23.325 24.981 22.401 21.867 21.844
Beton Kurus fc' 10 MPa
Elev. Lapis Fondasi
27.723 26.525 25.645 24.575 23.360 22.814 22.126 22.007 22.000 22.107 22.677 23.225 24.881 22.301 21.767 21.744 21.659 20.754 19.600 18.401 18.101
Aggregate Kelas B
Elev. Existing 27.573 26.375 25.498 24.425 23.210 22.664 21.976 21.857 21.850 21.957 22.527 23.075 24.731 22.151 21.617 21.594 21.509 20.604 19.450 18.251 17.951
Station
Long Section

Anda mungkin juga menyukai