Ytd 2021 Production Dewatering - All Site
Ytd 2021 Production Dewatering - All Site
2,250,000
1,750,000
1,250,000
750,000
250,000
Maret
April 23,163 5,255 13,784
Mei 218,559
Juni
July
Agustus
September
Oktober
November
Desember
Bulan
Maret HPU 3285 Star Running 19 Maret 2021
April HPU 3282 Start Running 15 Apr 2021, HPU 3283 Running 19 Apr 2021. HPU 3282 & HPU 3283 Off
Mei HPU 3294 Start Running 23 Mei 2021 (New Unit), HPU 3284 Off Hire 21 Mei 2021.
Juni Standby Sump Surut.
July Standby Low Water Level. HPU 3288 Start Running 28 July 2021
Agustus HPU 3288 Moving to Site Jumbang, HPU 3285 & HPU 3289 Standby Mud Sump.
September Acces Refueling Diblokir Warga (Issue External DH)
Oktober HPU3285, HPU89 & HPU3294 Mud Sump,
November Perhitungan Produksi tgl 1 - 22 November 2021, HPU 3303 Standby Mud Sump, HPU 3300 Breakd
Desember Unit yang ada di JCP dikirim ke Kintap
Production Achivement DH-JMI-KCP
WATERING KCP
800000
700000
600000
500000
400000
300000
200000
100000
0
Agustus September Oktober November Desember Maret
868,393 1,395,949 1,594,009 1,712,844 2,041,385
Fleet Num
HPU 3290
Remarks
Issue
1. HPU 3282 & HPU 3283 Off Hire & Replace New DND 200.
21 Mei 2021.
Mud Sump.
700000
600000
500000
400000
300000
200000
100000
0
Maret April Mei Juni July Agu
Fleet Number HPU 3282 HPU 3283 HPU 3284 HPU 3285 (KSB DND 200)
HPU 3290 (KSB DND 200) HPU 3291 (KSB DND 200) HPU 3294 (KSB DND 200) HPU 3303 (KSB DND 100)
10,839
496,189 276,075 24,037
- 25,643 22,627
212,930 113,035 225,826
250,306 113,760 129,211
424,385 27,614 346,317
521,639 66,861 336,407
333,800 348,684 378,009
567,191 398,115 297,068
HPU 3284 HPU 3285 (KSB DND 200) HPU 3288 (Multiflow CF 28) HPU 3289 (KSB DND 200)
00) HPU 3294 (KSB DND 200) HPU 3303 (KSB DND 100) HPU 3300 (J600DP)
HPU 3303 (KSB DND 100) HPU 3304 (KSB DND 150) HPU 3300 (J600DP)
PIT 9 Ambalat PIT 14 West PIT 14 West
38,403 107,110
126,442 6,334 241,728
164,845 348,838
Oktober November Desember
2,000,000 M3
Total Produksi / m3 Ach
50,400 10%
193,934 26%
1,748,066 87%
231,730 12%
813,171 41%
868,393 43%
1,395,949 70%
1,594,009 80%
1,712,844 86%
2,041,385 102%
10,649,881 M3
Production Achivement DH-JM
JCP Achivement
1,000,000
900,000
800,000
700,000
600,000
500,000
400,000
300,000
200,000
100,000
-
April Mei Juni July Agustus
Fleet Number HPU 3286 (KSB DND 200) Void 2 HPU 3287 (KSB DND 200
Total Produksi / m3 Ach
Remaks
Bulan Issue
April HPU 3288 Start Running 15 April 2021.
Mei Standby Ready issue external (DH & Public)
Juni Standby Ready issue external (DH & Public)
July Standby Low Water Level,CF 28 Breakdown Low Power, Moving to KCP (Temporary KCP Support).
Agustus HPU 3288 Standby Waiting Instruction DH (Alocation Sump), HPU 3286 Dry Sump.
September HPU3286 Standby Instruction DH, HPU3287 Mud Sump, HPU3288 Breakdown FIP Can't Running
Oktober HPU3286 Mud Sump
November Total Produksi tgl 1 - 22 November 2021, HPU 3268 Sump Lumpur, HPU 3287 Standby Waiting Instructio
Desember HPU 3287 & HPU 3276 move to BCP
Production Achivement DH-JMI-JCP
JCP Achivement
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
July Agustus September Oktober November Desember
U 3286 (KSB DND 200) Void 2 HPU 3287 (KSB DND 200) Void 2 HPU 3288 (Multiflow CF 28) Void 11
3 Ach
1,000,000 M3
er
HPU 3288 (Multiflow CF 28) Total Produksi / m3 Ach
Void 11
8,778 838,774 84%
94,552 283,209 28%
28,809 900,953 90%
15,300 617,084 62%
665,185 67%
1,280 450,002 45%
429,535 43%
230,051 23%
295 66,407 7%
149,014 4,481,200 M3
Remaks
Issue
wer, Moving to KCP (Temporary KCP Support).
Sump), HPU 3286 Dry Sump.
mp, HPU3288 Breakdown FIP Can't Running
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
Oktober November Desember
ACP Achivement
600,000
500,000
400,000
300,000
200,000
100,000
-
April Mei Juni July Agustus September
Fleet Number HPU 3299 (KSB DND 200) PIT 4 East HPU 3300 J600DP P
Total Produksi / m3 Ach
Remaks
Bulan Issue
April
Mei
Juni
July
Agustus Start Running 27 Agustus 2021.
September HPU3299 Pompa Kandas, HPU3300 Waiting instal Line HDPE
Oktober HPU 3300 Standby Instruction DH (External Issue)
November Total Produksi Tgl 1 - 22 Nov 2021, Running Well
Desember
ent DH-JMI-ACP
ment
60%
50%
40%
30%
20%
10%
0%
September Oktober November Desember
M3
Ach
0%
0%
0%
0%
6%
53%
33%
49%
27%
M3
PANJANG JUMLAH
NO UNIT KETERANGAN
JALUR PIPA
(Meter) (Batang)
DnD 200 - HPU 3299 408 m 68 Pit 11 ACP
DnD 200 - HPU 3285 780 m 130 Pit 9 Dewi
DnD 100 - HPU 3303 240 m 40 Pit 9 Ambalat
DnD 200 - HPU 3286 Pit 9 AMJ / Waiting Info Engineering DH
DnD 150 - HPU 3304 810 m 135 Pit 9 Sindi
DnD 200 - HPU 3289 288 m 48 Pit 14 West
DnD 200 - HPU 3290 1194 m 199 Pit 14 West
DnD 200 - HPU 3291 396 m 66 Pit 14 West
DnD 200 - HPU 3294 624 m 104 Pit 14 West
J600 DP - HPU 3300 360 m 60 Pit 14 West