RENCANA DAN REALISASI PENGANGKUTAN CPO DAN PK PKS COT GIREK

Tanggal 18 Maret 2021


I. CPO
RENCANA REALISASI JAM
NO NO SO SISA SO
UNIT NO.POLISI TARA BRUTTO NETTO BERANGKAT
1 BL 8850 AO 10.940 37.530 26.590 1301000960/980 149.040 11'540WIB
2 0 - - - 0 - 16'42 WIB
BL 8143 KR 42.160 42.160 - 1301000485 80.340 15'37 WIB
3
4 1 BL 8857 KU 39.740 39.740 - 1301000485 53.080 16'33 WIB
5 BK 8480 XC - - - 1301000404 49.130 14'36 WIB
6 BL 8766 AL 40.080 40.080 - 1301000404 235.160 15,51 WIB
Jumlah Pengiriman PTP 26.590
1 BL 8538 FB 13.570 44.050 30.480 0 - 14.27 WIB
2 BL 8516 AE 11.560 39.950 28.390 0 - 14.22 WIB
BL 8591 FD 11.190 39.510 28.320 0 - 14.25 WIB
3
4 6 BL 8501 FY 12.400 40.990 28.590 0 - 14.29 WIB
5 BL 8604 AK 11.540 39.930 28.390 0 - 16.26 WIB
6 BH 8297 XU 11.230 39.630 28.400 0 - 16.29 WIB
Jumlah Pengiriman KSO 172.570
TOTAL PENGIRIMAN CPO 199.160
II. INTI
RENCANA REALISASI JAM
NO NO SO SISA SO
UNIT NO.POLISI BRUTTO NETTO BERANGKAT
1 BK 8904 DC 41.300 41.300 - 2301000482 56.430 17'24 WIB
2
3
0 BK 8660 BM
BK 8660 BM
42.440
42.830
42.440
42.830
- 2301000313
- 1301000258
28.890 14,12 WIB
168.800 15,14 WIB
Jumlah Pengiriman PTP -
1 BK 9958 LR 10380 37360 26980 15.56 WIB
2
3
1 BL 8672 AD
BH 8297 XU
43570
39360
43570
39360
0
0
13,59 WIB
17,55 WIB
Jumlah Pengiriman KSO 26.980
TOTAL PENGIRIMAN INTI 26.980 -
keterangan : 1 Truck CPO tidak masuk