AS BUILT DRAWING
PEKERJAAN
PERENCANAAN PEMBANGUNAN
GEDUNG LABORATORIUM TERPADU
POLTEKKES KEMENKES JAYAPURA
LOKASI KEGIATAN
55
L:8 CM T:5.5
100
RANGKA PENGISI RAILLING
20
MENYETUJUI
HOLLOW GALVANISH 20 X 50 PEJABAT PEMBUAT KOMITMEN
T:1.2 MM FIN.CAT
1000
1000
655
RANGKA UTAMA RAILLING RENOLD M. MOFU, SKM., M.Kes.
HOLLOW GALVANISH 50 X 50 NIP. 19740301 200003 1 002
T:1.2 MM FIN.CAT MENGETAHUI
20
DIREKSI TEKNIS
150
FFL.+6.725
DIPERIKSA
KONSULTAN SUPERVISI
PT. ARCI PRATAMA KONSULTAN-
CV. KARYA JOHAR KONSULTAN, KSO
2225
Supervision Engineer
KONTRAKTOR PELAKSANA
KONTRAKTOR PELAKSANA
PT. PUTRA UTAMA KONSTRUKSI
1000
FFL.+4.500
RONAL ROBERT, ST
50 1050 50 850 50 850 50 850 50 Project Manager
3850 KETERANGAN :
80
100 75 100 100 100 100 100 100 100 115 55 100 100 100 100 100 100 55 55 100 100 100 100 100 100 55 55 100 100 100 100 100 100 55
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 15
50 1050 50 850 50 850 50 850 50
3850
TANGGAL DIBUAT Oktober 2023
TAMPAK ATAS (RL3) RL3 NAMA GAMBAR
Skala 1 : 25
Bangunan Utama
Detail Railing_3
1 : 25 AR.A- 807