KEMENTRIAN KESEHATAN REPUBLIK INDONESIA

JUMLAH : RL4 = 1 UNIT DIREKTORAT JENDERAL TENAGA KESEHATAN


POLITEKNIK KESEHATAN KEMENKES JAYAPURA
RL5 = 1 UNIT

AS BUILT DRAWING
1000

PEKERJAAN

PERENCANAAN PEMBANGUNAN
GEDUNG LABORATORIUM TERPADU
POLTEKKES KEMENKES JAYAPURA
FFL.+9.000
LOKASI KEGIATAN

Poltekkes Kemenkes Jayapura


Jalan Padang Bulan II Hedam
Distrik Heram, Kota Jayapura

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN

RENOLD M. MOFU, SKM., M.Kes.


NIP. 19740301 200003 1 002
2275

MENGETAHUI
DIREKSI TEKNIS
HANDRAIL KAYU

55
L:8 CM T:5.5

100
RANGKA PENGISI RAILLING

20
HOLLOW GALVANISH 20 X 50
T:1.2 MM FIN.CAT
ABNER NAA, ST., M.KP.
NIP. 19730413 200112 1 005

1000

1000

655
DIPERIKSA
KONSULTAN SUPERVISI
PT. ARCI PRATAMA KONSULTAN-
RANGKA UTAMA RAILLING CV. KARYA JOHAR KONSULTAN, KSO
HOLLOW GALVANISH 50 X 50
T:1.2 MM FIN.CAT

20
150
FFL.+6.725

50 900 50 850 50 850 50 1000 50 FHATRA IRJAYAKUSUMA GUNA, ST


3850 Supervision Engineer

TAMPAK DEPAN (RL4) KONTRAKTOR PELAKSANA


Skala 1 : 25

KONTRAKTOR PELAKSANA
PT. PUTRA UTAMA KONSTRUKSI
2030
1980 50
HANDRAIL KAYU
80

80
50

55
L:8 CM T:5.5

100
100 80 100 100 100 100 100 100 80 115 100 100 100 100 100 115 115 100 100 100 100 100 115 70 100 100 100 100 100 100 100 70 RANGKA PENGISI RAILLING

20
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 15 HOLLOW GALVANISH 20 X 50
50 900 50 850 50 850 50 1000 50 T:1.2 MM FIN.CAT
3850 RONAL ROBERT, ST
Project Manager

1000

1000
655
TAMPAK ATAS (RL4) RL4 KETERANGAN :
Skala 1 : 25 RANGKA UTAMA RAILLING
HOLLOW GALVANISH 50 X 50
T:1.2 MM FIN.CAT

20
150
50 940 50 890 50
1980

TAMPAK DEPAN (RL5)


Skala 1 : 25

TANGGAL DIBUAT Oktober 2023


80
50
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 NAMA GAMBAR
20 20 20 20 20 20 20 20 20 20 20 20 20 20 50
Bangunan Utama
50 940 50 940 50
Detail Railing_4
2030
SKALA KODE GAMBAR JUMLAH LBR
TAMPAK ATAS (RL5)
Skala 1 : 25
RL5 1 : 25 AR.A- 808