Anda di halaman 1dari 1

LAPORAN PEMAKAIAN SOLAR DAN OLI

KMP. PERMATA LESTARI 3


PT. ATOSIM LAMPUNG PELAYARAN PERIODE APRIL 2024
JAM KERJA SOLAR OLI MEDITTRAN SAE-40 OLI TURALIK 52
TANGGAL TRIP SALDO PEMAKAIAN SALDO SALDO SALDO SALDO SALDO KETERANGAN
ME.1 ME.2 AE. 1 AE. 2 ISI ISI global stok pakai ISI global stok pakai
AWAL OPERASI LABUH/ AKHIR AWAL AKHIR AWAL AKHIR
1-Apr-24 0 0,0 0,0 12 4.536 0 144 4.392 2.963 3493 20 2.963 580 800 0 580 off ( skkp mati )
2-Apr-24 6 5,1 5,1 24 4.392 740 170 3.482 2.963 3493 20 2.963 580 800 0 580 kapal nyisip
3-Apr-24 0 0,0 0,0 12 3.482 0 144 3.338 2.963 3493 20 2.963 580 800 0 580 off perawatan
4-Apr-24 9 7,7 7,7 24 3.338 5.000 1.085 111 7.142 2.963 3493 20 5 2.958 580 800 0 580 operasi reguler
5-Apr-24 7 6,0 6,0 24 7.142 5.000 835 150 11.157 2.958 200 3493 220 2.958 580 800 0 580 operasi reguler
6-Apr-24 9 7,7 7,7 24 11.157 1.085 111 9.961 2.958 3493 220 2.958 580 800 0 580 operasi reguler
7-Apr-24 9 7,7 7,7 24 9.961 1.065 111 8.785 2.958 3493 220 2.958 580 800 0 580 operasi reguler
8-Apr-24 8 6,8 6,8 24 8.785 970 131 7.685 2.958 3493 220 2.958 580 800 0 580 operasi reguler

Total 48 40,8 40,8 72 96 10000 5780 1.071,360 200 5 0 0

Bengkalis, APRIL 2024


Menyetujui,

Juan Setyadi
kkm kmp. Permata Lestari 3

Anda mungkin juga menyukai