Anda di halaman 1dari 14

T2

BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Tanah Biasa/Galian Batu

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

1. 00 + 000 - - - - -

50 -

2. 00 + 050 - - - - -

50 -

3. 00 + 100 - - - - -

50 -

La
4. 00 + 150 - - - - -
T1
Lb
50 -

5. 00 + 200 - - - - -

SUB TOTAL VOLUME GALIAN TANAH - T1 Lb


T1
T1
T1 Lb
Lb
Lb
SUB TOTAL VOLUME GALIAN BATU -
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Tanah Biasa/Galian Batu

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

12 00 + 215 - - - - - T1

Lb
35 -
La

13 00 + 250 - - - - -
T1 T2

Lb
24 -
La

14. 00 + 274 - - - - -
T1 T2

Lb
26 -

T1
15 00 + 300 - - - - -
Lb
20 -

T1
16. 00 + 320 - - - - -
Lb

30 -

T1
17. 00 + 350 - - - - -
Lb
50 -
T1

18. 00 + 400 - - - - -
Lb

50 -
T1
19. 00 + 450 - - - - -
Lb

50 -

20. 00 + 500 - - - - -

50 -
T1

21. 00 + 550 - - - - -
Lb

50 -

22. 00 + 600 - - - - -

SUB TOTAL VOLUME GALIAN TANAH -


SUB TOTAL VOLUME GALIAN BATU -
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
0 Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Tanah Biasa/Galian Batu

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

22 00 + 691 - 6.00 4.00 - 12.00 T1

Lb
9 216.00
La

23 00 + 700 10.00 8.00 4.00 4.00 36.00 T1 T2

Lb
27 1,093.50
La

24 00 + 727 10.00 8.00 5.00 5.00 45.00 T1 T2

Lb
23 931.50
La

25 00 + 750 10.00 8.00 4.00 4.00 36.00 T1 T2

Lb
10 390.00
La

26 00 + 760 8.00 6.00 6.00 6.00 42.00 T1 T2

Lb
40 1,680.00
La

27 00 + 800 8.00 6.00 6.00 6.00 42.00 T1 T2

Lb
50 2,100.00
La

28 00 + 850 8.00 6.00 6.00 6.00 42.00 T1 T2

Lb

4m

garis jalan eksisting


garis jalan realisasi lapangan

9m

18 m

5,5 m

6m

SUB TOTAL VOLUME GALIAN TANAH 3,780.00


SUB TOTAL VOLUME GALIAN BATU 2,631.00
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
0 Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
T2

BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Tanah Biasa/Galian Batu

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

32 01 + 050 - 3.00 15.00 - 22.50 T1

Lb
50 887.50

T1
33 01 + 100 - 2.00 13.00 - 13.00

Lb
50 775.00

34 01 + 150 - 3.00 12.00 - 18.00

50 887.50

35 01 + 200 - 3.50 10.00 - 17.50

50 812.50

36 01 + 250 - 3.00 10.00 - 15.00 T1

Lb
35 525.00

T1
37 01 + 285 - 3.00 10.00 - 15.00
Lb

T1

Lb

SUB TOTAL VOLUME GALIAN TANAH 3,887.50 Lb T1


Lb
LbLb T1
T1
T1

Disetujui : Diajukan Oleh :


Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
0 Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Penyiapan Badan Jalan


6.20 s/d 7 .0 m

Item Pekerjaan : Penyiapan Badan Jalan

LEBAR LEBAR VOLUME


No. STA PANJANG (M) KETERANGAN
(M) RATA-RATA (M2)

a b c d e f g
1. 00 + 000 6.20
22 6.10 134.20
2. 00 + 022 6.00
28 6.50 182.00
3. 00 + 050 7.00
50 7.00 350.00
4. 00 + 100 7.00
50 7.25 362.50
5. 00 + 150 7.50
50 7.25 362.50
6. 00 + 200 7.00
50 7.00 350.00
7. 00 + 250 7.00

SUB TOTAL VOLUME 1,741.20

Disetujui : Diajukan Oleh :


Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Penyiapan Badan Jalan

7.0 s/d 10.0 m

Item Pekerjaan : Penyiapan Badan Jalan

PANJANG LEBAR LEBAR VOLUME


No. STA KETERANGAN
(M) (M) RATA-RATA (M2)

a b c d e f g
8. 00 + 300 8.00
50 8.50 425.00
9. 00 + 350 9.00
50 8.50 425.00
10. 00 + 400 8.00
50 8.40 420.00
11. 00 + 450 8.80
50 9.40 470.00
12. 00 + 500 10.00
50 9.50 475.00
13. 00 + 550 9.00
50 9.00 450.00
14. 00 + 600 9.00
50 8.50 425.00
15. 00 + 650 8.00
50 7.65 382.50
16. 00 + 700 7.30

SUB TOTAL VOLUME 3,472.50

Disetujui : Diajukan Oleh :


Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Penyiapan Badan Jalan


6.80 s.d 8.70 m

Item Pekerjaan : Penyiapan Badan Jalan

PANJANG LEBAR LEBAR VOLUME


No. STA KETERANGAN
(M) (M) RATA-RATA (M2)

a b c d e f g
17. 00 + 750 7.50
50 7.15 357.50
18. 00 + 800 6.80
50 7.10 355.00
19. 00 + 850 7.40
50 7.35 367.50
20. 00 + 900 7.30
50 7.65 382.50
21. 00 + 950 8.00
50 7.80 390.00
22. 01 + 000 7.60
50 7.80 390.00
23. 01 + 050 8.00
50 8.35 417.50
24. 01 + 100 8.70

SUB TOTAL VOLUME 2,660.00


TOTAL VOLUME 7,873.70
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Penyiapan Badan Jalan


7.0 s/d 9.50 m

Item Pekerjaan : Penyiapan Badan Jalan

PANJANG LEBAR LEBAR VOLUME


No. STA KETERANGAN
(M) (M) RATA-RATA (M2)

a b c d e f g
25. 01 + 150 8.40
50 8.30 415.00
26. 01 + 200 8.20
50 8.25 412.50
27. 01 + 250 8.30
35 8.65 302.75
28. 01 + 285 9.00

SUB TOTAL VOLUME 1,130.25


TOTAL VOLUME 9,003.95
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
22,712.50
63,522.85 Total Vol Penyiapan
Total Volume penyiapan ;

63,522.85

63,522.85
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Material Pilihan T = 15 - 30 cm
5.0 m s.d 6.50 m

Item Pekerjaan : Material Pilihan Setempat Ruas Dolong - Tutung

SISI DIMENSI LUAS VOLUME


No. STA PANJAN (M) KETERANGAN
(Ki/Ka) M2 (M3)
T1 T2 L
a b c d e f g h i j
1. 00 + 000 (Ki/Ka) 0.20 0.20 5.00 1.00
22 19.25
2. 00 + 022 (Ki/Ka) 0.15 0.15 5.00 0.75
28 25.62
3. 00 + 050 (Ki/Ka) 0.18 0.18 6.00 1.08
50 68.25
4. 00 + 100 (Ki/Ka) 0.30 0.25 6.00 1.65
50 76.69
5. 00 + 150 (Ki/Ka) 0.20 0.25 6.30 1.42
50 78.19
6. 00 + 200 (Ki/Ka) 0.27 0.30 6.00 1.71
50 72.75
7. 00 + 250 (Ki/Ka) 0.20 0.20 6.00 1.20
50 67.50
8. 00 + 300 (Ki/Ka) 0.20 0.30 6.00 1.50
50 74.88
9. 00 + 350 (Ki/Ka) 0.23 0.23 6.50 1.50
50 72.81
10. 00 + 400 (Ki/Ka) 0.20 0.25 6.30 1.42
50 83.54
11. 00 + 450 (Ki/Ka) 0.26 0.26 7.40 1.92
50 98.05
12. 00 + 500 (Ki/Ka) 0.26 0.28 7.40 2.00
50 88.14
13. 00 + 550 (Ki/Ka) 0.22 0.25 6.50 1.53
50 71.19
14. 00 + 600 (Ki/Ka) 0.22 0.22 6.00 1.32
50 75.50
15. 00 + 650 (Ki/Ka) 0.20 0.30 6.80 1.70

SUB TOTAL VOLUME 972.35

Disetujui : Diajukan Oleh :


Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)

Material Pilihan T = 15 - 30 cm
6,0 m s.d 6.80 m

Item Pekerjaan : Material Pilihan Setempat Ruas Dolong - Tutung

SISI DIMENSI LUAS VOLUME


No. STA PANJAN (M) KETERANGAN
(Ki/Ka) M2 (M3)
T1 T2 L
a b c d e f g h i j
16. 00 + 650 (Ki/Ka) 0.20 0.30 6.80 1.70
50 88.13
17. 00 + 700 (Ki/Ka) 0.20 0.30 7.30 1.83
50 74.30
18. 00 + 750 (Ki/Ka) 0.20 0.17 6.20 1.15
50 58.68
19. 00 + 800 (Ki/Ka) 0.25 0.15 6.00 1.20
50 57.13
20. 00 + 850 (Ki/Ka) 0.20 0.15 6.20 1.09
50 53.37
21. 00 + 900 (Ki/Ka) 0.20 0.15 6.00 1.05
50 55.70
22. 00 + 950 (Ki/Ka) 0.22 0.16 6.20 1.18
50 57.95
23. 01 + 000 (Ki/Ka) 0.20 0.18 6.00 1.14
50 55.73
24. 01 + 050 (Ki/Ka) 0.18 0.15 6.60 1.09
50 76.73
25. 01 + 100 (Ki/Ka) 0.30 0.30 6.60 1.98
50 91.50
26. 01 + 150 (Ki/Ka) 0.28 0.28 6.00 1.68
50 77.75
27. 01 + 200 (Ki/Ka) 0.22 0.22 6.50 1.43
50 88.25
28. 01 + 250 (Ki/Ka) 0.20 0.50 6.00 2.10
35 148.75
29. 01 + 285 (Ki/Ka) 0.15 0.15 6.50 6.40

SUB TOTAL VOLUME 983.95


TOTAL VOLUME 1,956.30
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Untuk Selokan Drainase & Saluran Air

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

1. 00 + 000 - - - - -

50 -

2. 00 + 050 - - - - -

50 -

3. 00 + 100 - - - - -

50 12.50

La
4. 00 + 150 1.00 1.00 1.00 - 0.50
T1
Lb
50 26.25

5. 00 + 200 1.20 1.00 1.00 - 0.55

SUB TOTAL VOLUME GALIAN SALURAN 38.75 T T L


T1T1 T1LbL Lb
11 bb
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Untuk Selokan Drainase & Saluran Air

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

12 00 + 250 1.00 1.00 1.00 - 0.50

La
50 26.25 T1
Lb

13 00 + 300 1.20 1.00 1.00 - 0.55

50 30.63 La
T1
Lb
14. 00 + 350 1.50 1.20 1.00 - 0.68

La
50 31.88 T1
Lb

15 00 + 400 1.30 1.10 1.00 - 0.60

50 29.38 La
T1
Lb
16. 00 + 450 1.30 1.00 1.00 - 0.58

50 36.25 La
T1
Lb
17. 00 + 500 2.00 1.50 1.00 - 0.88

50 35.63 La
T1
Lb
18. 00 + 550 1.20 1.00 1.00 - 0.55

La
50 36.25 T1
Lb
19. 00 + 600 2.00 1.60 1.00 - 0.90

La
50 36.25 T1
Lb

20. 00 + 650 1.20 1.00 1.00 - 0.55


La
50 13.75 T1
Lb

21. 00 + 700 - - - - -

50 -

22. 00 + 750 - - - - -

SUB TOTAL VOLUME GALIAN SALURAN 276.25

Disetujui : Diajukan Oleh :


Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
0 Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector
BACK UP DATA
Pekerjaan : Peningkatan Jalan Dolong - Tutung (Rigid Pavement)
Item Pekerjaan : Galian Untuk Selokan Drainase & Saluran Air

DIMENSI LUAS VOLUME


No. STA SKETSA
(M2) (M3)
P La Lb T1 T2
a b d e f g h i j k

22 00 + 800 - - - - -

50 -

23 00 + 850 - - - - -

50 -

24 00 + 900 - - - - -

50 -

25 00 + 950 - - - - -

50 -

26 01 + 000 - - - - -

50 -

27 01 + 050 - - - - -

50 15.63

28 01 + 100 1.40 1.10 1.00 - 0.63


La
T1
50 33.13
Lb

29 01 + 150 1.60 1.20 1.00 - 0.70

La
50 31.87
T1
Lb
30 01 + 200 1.30 1.00 1.00 - 0.58

La
50 30.00 T1
Lb

31 01 + 250 1.40 1.10 1.00 - 0.63

La
35 20.56 T1
Lb

32 01 + 285 1.20 1.00 1.00 - 0.55

SUB TOTAL VOLUME GALIAN SALURAN 131.19


SUB TOTAL VOLUME GALIAN SALURAN DRAINASE 446.19
Disetujui : Diajukan Oleh :
Pengawas Lapangan CV. TIGA SAUDARA BERKARYA
FAZLUR RAHMAN, ST SULAIMAN, ST
Pelaksana

NUR ALFIAT, ST Diperiksa Oleh :


CV. CLAPEYRON
SULAEMAN R, ST
Inspector

Anda mungkin juga menyukai