Abutmen arah Peura
Galian Tanah Abutmen
V= 1,1*0,5*5,9 3.25 m3 1
40 40
V= (0,5*0,4*17,4) 3.48 m3 Oprit 3
V= (0,5*0,4*16) 3.2 m3 Oprit 4
50 50
80
50
Galian Tanah R 1
100
50
Galian Tanah R 2
100
50
Galian Tanah R 3
JUMLAH A 24.32 m3
SAMPAI DENGAN SAAT INI 24.32 m3
TIMBUNAN
VOLUME = P x B x H
Timbunan
Arah Peura
P = 14.00 M'
B = 7.50 M'
H H = 0.43 M'
V = 44.63 m3 44.63 m3
Arah Dulumai
P = 10.00 M'
B B = 7.50 M'
H = 0.43 M'
V = 31.88 m3 31.88 m3
P P
JUMLAH A 76.50 m3
SAMPAI DENGAN SAAT INI 76.50 m3
2 V = 1,1*0,5*5,9*2 bh 6.49 m3 1
V =((1+0,5)/2)*1,8*5,9*2bh 15.93 m3 2
1
JUMLAH A 22.42 m3
SAMPAI DENGAN SAAT INI 22.42 m3
JUMLAH 15.47 m3
SAMPAI DENGAN SAAT INI 15.47 m3
TULANGAN HORIZONTAL
P. BESI = 12.08 M' 1009.26 Kg
N. BESI = 28 bh
TULANGAN HORIZONTAL
P. BESI = 11.48 M' 959.13 Kg
N. BESI = 28 bh
JUMLAH A 4932.47 Kg
SAMPAI DENGAN SAAT INI 4932.47 Kg
JUMLAH A 95.53 Kg
SAMPAI DENGAN SAAT INI 5,028.00 Kg
ABUTMEN
P = 5.9 M'
MAN H = 1.8 M' 21.24 M2
N = 2 BH
V = 21.24 M2
JUMLAH 24.24 M2
SAMPAI DENGAN SAAT INI 24.24 M2
H H
SIAR OPRIT 2 KIRI ARAH DULUMAI
B P B
P = 14.2 M'
H1 = 2.3 M' 20.59 M2
H2 = 0.6 M'
V = 20.59 M2
T
SIAR OPRIT 4 KANAN ARAH PEURA
T
P = 16 M'
H1 = 1.3 M' 14.40 M2
H H H2 = 0.5 M'
B P B V = 14.4 M2
PENGECATAN PIPA
P = 6 M'
H = 0.1 M'
N = 4 BH
V = 2.4 M2 2.40 M2
PENGECATAN Kerb
P = 5.5 M'
H = 1.12 M'
N = 2 BH
V = 12.32 M2 12.32 M2
JUMLAH A 17.72 M2
SAMPAI DENGAN SAAT INI 17.72 M2