A PEKERJAAN PERSIAPAN 3,883,057.50
B PEKERJAAN TANAH 39,257,251.43
C Err:509 Err:509
D Err:509
Err:509
E Err:509 Err:509
Terbilang : Tiga Ratus Enam Pulu Delapan Juta Tiga Ratus Delapan Puluh Ribu Rupiah
DAFTAR KUANTITAS DAN HARGA
1 2 3
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 581.05 M2
2 pembuatan gudang kerja dan alat 32.00 M2
3 Biaya pemasangan bouplank 94.64 M1
Sub Total I
B PEKERJAAN TANAH
1 Galian tanah pondasi 203.31 M3
2 Timbunan kembali tanah bekas galian + pemadatan 82.83 M3
Sub Total II
C PEKERJAAN PONDASI
1 Pasangan pndasi batu gunung 120.48 M3
1 Anstamping 45.18 M3
2 pasir urug bawah pondasi 22.59 M3
3 pancang ulin 10/10 2m 125.00 titik
1 2 3
F PEKERJAAN DINDING
1 Pasangan bata 849.31 M2
2 Pledteran + aci 1,698.62 M2
Sub Total VI
G PEKERJAAN KOSEN, PINTU & JENDELA
1 Rangka kusen kayu bangkirai 6/10 3.30 M3
2 Daun pintu panel kayu bangkirai ( P1 ) Uk. (1.4 x 2.10) 51.84 M2
3 Daun Ppintu WC ( P2 ) Ukuran ( 70 x 2.10 ) 19.32 Bh
4 Pasangan ventilasi kayu bangkirai 2.94 Bh
5 Pasangan kaca polos 5 mm 26.34 M2
7 Pasangan railing teras pipa stenlis D 1" (teras samping) 14.00 Ls
Sub Total VII
H PEKERJAAN KAP DAN PENUTUP ATAP
1 Pek. Kuda Kuda Jepit Kayu 6/12 4.45 M3
2 Pek. Kaso + Reng Genteng Metal 581.95 M2
3 Pek. Gording 8/12 6.84 M3
4 Pek. Menutup Atap Genteng Metal 581.95 M2
5 Pek. Menutup Bubung Metal 69.52 M1
6 Pek. Menutup Jurai 34.80 M1
7 Pek. Lisplank 2/20 101.52 M1
Sub Total X
K PEKERJAAN CAT - CATAN
1 Pengecatan dinding luar dan dalam dgn cat tembok 1698.62 M2
2 Pengecatan plafon dengan cat tembok 461.09 M2
3 Pengecatan kusen, jalusi daun pintu/jendela dgn cat kilap 169.58 M2
4 Pengecatan list plank dan angin-angin dengan cat kilap 20.30 M2
VOLUME
NO URAIAN PEKERJAAN
1 2 3
Sub Total XI
L PEKERJAAN INSTALASI LISTRIK
A PEKERJAAN INSTALASI
1 Instalasi penerangan Nym 3 x 2.5 mm 190.45 Ttk
2 Instalasi stop kontak Nym 3 x 2.5 mm 75.00 Ttk
3 Box sekring, MCB DLL 1.00 Unit
4 Gronding / pentanahan 1.00 Unit
B ARMATURE LAMPU
1 Lampu fitting Sl 18 Wat 51.00 Ttk
2 Lampu fitting Sl 11 Wat 14.00 Ttk
3 Pasang saklar tunggal 14.00 Bh
4 Pasang saklar ganda 18.00 Bh
5 Pasang stop kontak 16.00 Bh
PENAWAR,
CV. MANUK USAN
PENAWAR,
CV. MANUK USAN
JALIN UDAU
DIREKTUR
HARGA SATUAN JUMLAH HARGA
4 5
1,201,178.00 42,345,968.86
1,201,178.00 2,522,473.80 0
229,928.30 9,656,988.60
270,514.70 30,676,366.98
231,357.75 73,231,668.61
Sub Total V 158,433,466.85
HARGA SATUAN JUMLAH HARGA
4 5
29,566.56 25,111,175.07
33,115.00 56,249,801.30
Sub Total VI 81,360,976.37
5,374,062.50 17,734,406.25
554,800.00 28,760,832.00
554,800.00 10,718,736.00
468,647.50 1,377,823.65
210,205.00 5,536,799.70 22
1,500,000.00 21,000,000.00
Sub Total VII 85,128,597.60
92,193.50 42,509,500.92
32,286.50 19,935,945.16 71.14 43.07 184.76 298.97
143,294.00 66,071,430.46
Sub Total IX 128,516,876.53
291,370.00 8,741,100.00
129,050.00 1,806,700.00
56,905.00 3,641,920.00
35,270.00 3,809,160.00 56 56
39,705.00 4,288,140.00
43,040.00 86,080.00
43,040.00 2,324,160.00
20,635.00 35,051,023.70
12,516.18 5,771,085.44
30,000.00 5,087,400.00
47,529.00 965,028.82
HARGA SATUAN JUMLAH HARGA
4 5
Sub Total XI 46,874,537.95
100,000.00 19,045,000.00 0
100,000.00 7,500,000.00
1,000,000.00 1,000,000.00
350,000.00 350,000.00
75,000.00 3,825,000.00
60,000.00 840,000.00
40,000.00 560,000.00
55,000.00 990,000.00
40,000.00 640,000.00
24,975.00 374,625.00
20,172.00 1,997,028.00 3 60 63
1,852,991.50 1,852,991.50
23,775.75 47,551.50
24,975.00 24,975.00
108,556.50 15,860,104.65
47,269.25 661,769.50
121,612.50 1,702,575.00
724,166.50 10,138,331.00
1,689,454.13 23,652,357.75
1,360,331.00 2,056,820.47
2,000,000.00 4,000,000.00
1,400,000.00 1,400,000.00
Sub Total XIII 63,769,129.37
TOTAL 1,202,401,876.38
PENAWAR,
CV. MANUK USAN
PENAWAR,
CV. MANUK USAN
JALIN UDAU
DIREKTUR
33,000.00 COR SLOOF
2,961,500.00 Cor kolom 20/20
2,768,500.00 Ring balok 15/15
A pekeraan persiapan
pembersihan lahan
gallian dan
urugan
pagar pengaman
mobilisasi dan demobilisasi
B pek. Sipil
pondasi dan
sloof
kolom
dinding
rangka penutup atap
D pekeraan finising
cat
dinding
plafon
lantai
penutup atap
E Pekerajan lain- lain
PEMBERSIHAN LAPANGAN
V=2x(P+L)
P 12
L 13.5
51
REKAPITULASI ANGGARAN BIAYA
TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp)
I PEKERJAAN PERSIAPAN Rp. 3,883,057.50
II PEKERJAAN TANAH Rp. 7,318,768.00
III PEKERJAAN PASANGAN DAN PLESTERAN Rp. 39,257,251.43
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi M2 52.50
2 Pemasangan Bowplank M1 52.50
Sub Total I
II PEKERJAAN TANAH
HARGA SATUAN
TOTAL HARGA (Rp)
(Rp)
16,000.00 840,000.00
57,963.00 3,043,057.50
3,883,057.50
71,000.00 2,236,500.00
253,306.00 4,559,508.00
149,360.00 522,760.00
7,318,768.00
1,221,393.05 29,924,129.73
1,201,178.00 4,204,123.00
73,271.41 5,128,998.70
33,115.00 2,318,050.00
39,257,251.43
DATA BANGUNAN
Panjang Arah Y
PONDASI
22 Meter Dimensi Galian Pondasi 1 0.9
12 Meter Dimensi Pasangan Batu 0.8 0.3
4 Meter Dimensi Aanstamping 1 0.2
4 Meter Dimensi Urugan Pasir 1 0.1
12 Meter Jumlah Titik Pancang 78
3 Meter Jumlah Pasak 78
1.5 Meter Panjang Kalang 5/10 317
22 Meter
80.5 Meter
SLOOF
Lebar Arah X Dimensi Sloof 0.15 0.2
12 Meter Jumlah Tul.Utama Ø12 6 951
12 Meter Panjang Sengkang Ø8 0.54 713.25
2 Meter Panjang Tekukan 0.1 132.0833
4 Meter Bekisting 0.2 158.5
4 Meter
3 Meter Dinding
3 Meter Tinggi Dinding Pas.Bata 4
562
3 Meter Lebar Dinding Pas.Bata 140.5
3 Meter Tinggi Plesteran 4.2 590.1
3 Meter Tebal Plesteran 0.02
3 Meter
2 Meter
12 Meter Kolom 20/20
12 Meter Dimensi Kolom 0.2 0.2
78 Meter Jumlah Tul.Utama 8 4
Panjang Sengkang 0.64 1166.667
Keliling Bangunan Panjang Tekukan 0.1 116.6667
158.5 Meter Bekisting 0.2 140
Balok
Dimensi Balok 0.15 0.2
Jumlah Tul.Utama 6 951
Panjang Sengkang 0.54 713.25
Panjang Tekukan 0.1 132.0833
Bekisting 0.2 158.5
Lantai
El. Lantai -0.2
Urugan Tanah Bawah Lantai 6 12
Urugan Pasir Bawah Lantai 6 12
Beton Lantai 6 12
Spesi 6 12
Penutup Lantai 6 12
Plafond
Dimensi Plafond 22 12
Rangka Plafond 22 12
Elektrikal
Lampu
Kabel
Pipa 1/2"
T 1/2"
Elbow 1/2"
Kotak Hubung Bagi
Stop Kontak
Sakelar
MCB
Sanitasi
Closed
Pipa 4"
Pipa 2"
Elbow 4"
Elbow 2"
Saptictank
31.5
78.4575
31.7
3.5
1.195 0.5975
1.38 0.69
1 0.7
H W
4.755
846.39
285.3 24.5
52.83333 V
31.7
m2
1180.2 m2
23.604 m3
5.6
996.8
466.6667
46.66667
28
0.5184
128.16
38.4
12
4.32
4.755
846.39
285.3
52.83333
31.7
11.52
7.2
7.2
2.88
72
69.12
19.2
19.2
7.68
192
264
264
Gording
10.31
11.97
14.57
17.17
19.77
22.36
96.15
192.3
Kasau
61
Reng
22
Genteng
22.42
35
L
0.31
1.97
4.57
7.17
9.77
12.36
36.15
72.3 264.6 m1 1.323 M3 Sambunga 29 5.8
0.105 3.45695
ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2014
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
A. PEKERJAAN PERSIAPAN SNI 03-2835-2002
A.004 Mengerjakan 1 m' pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti 5/7 0.0120 m³ 1,870,000.00
Paku Biasa 2" - 5" 0.0200 kg 21,650.00
Kayu Papan Meranti (2 x 20 x 400) 0.0070 m³ 1,870,000.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
A.008 Membersihkan 1 m² lapangan dan perataan
Pekerja 0.1000 OH 90,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
B. PEKERJAAN TANAH SNI
B.001 Menggali 1 m³ tanah biasa sedalam 1 meter
Tenaga
Pekerja 0.7500 OH 90,000.00
Mandor 0.0250 OH 140,000.00
Jumlah
B.010 Mengurug kembali 1 m³ galian
Tenaga
Pekerja 0.2500 OH 90,000.00
Mandor 0.0083 OH 140,000.00
Jumlah
B.012 Mengurug 1 m³ pasir urug
Bahan
Pasir Urug 1.2000 m³ 100,800.00
Jumlah (1)
Tenaga
Pekerja 0.3000 OH 90,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
B.014 Mengurug 1 m³ Tanah Timbunan
Bahan
Tanah Timbunan 1.2000 m³ 66,000.00
Jumlah (1)
Tenaga
Pekerja 0.2500 OH 90,000.00
Mandor 0.0250 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
C. PEKERJAAN PONDASI SNI 03-2836
C.003 Memasang 1 m³ pondasi batu belah; campuran 1 PC : 2 PP, Batu Gunung
Bahan
Batu Gunung 1.2000 m³ 392,000.00
Portland Cement (PC) 267.0000 kg 1,820.00
Pasir Pasang (PP) 0.4270 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 1.5000 OH 90,000.00
Tukang Batu 0.6000 OH 110,000.00
Kepala Tukang 0.0600 OH 130,000.00
Mandor 0.0750 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
C.012 Memasang 1 m³ batu kosong (anstamping), Batu Gunung
Bahan
Batu Gunung 1.2000 m³ 392,000.00
Pasir Urug 0.4320 m³ 100,800.00
Jumlah (1)
Tenaga
Pekerja 0.7800 OH 90,000.00
Tukang Batu 0.3900 OH 110,000.00
Kepala Tukang 0.0390 OH 130,000.00
Mandor 0.0390 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
D. PEKERJAAN DINDING SNI 03-2837
D.003 Memasang 1 m² dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP
Bahan
Bata Merah 120.0000 buah 990.00
Portland Cement (PC) 32.9500 kg 1,820.00
Pasir Pasang (PP) 0.0910 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.6000 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0300 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
E. PEKERJAAN PLESTERAN SNI 03-2837
E.010 Memasang 1 m² plesteran 1 PC : 3 PP; tebal 20 mm
Bahan
Portland Cement (PC) 10.3680 kg 1,820.00
Pasir Pasang (PP) 0.0310 m³ 107,150.00
Jumlah (1)
Tenaga
Pekerja 0.2600 OH 90,000.00
Tukang Batu 0.2000 OH 110,000.00
Kepala Tukang 0.0200 OH 130,000.00
Mandor 0.0220 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
E.031 Memasang 1 m² acian
Bahan
Portland Cement (PC) 3.2500 kg 1,820.00
Jumlah (1)
Tenaga
Pekerja 0.1500 OH 90,000.00
Tukang Batu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0100 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F. PEKERJAAN KAYU SNI 03-3434
F.001 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur
F.005 Membuat dan memasang 1 m² daun pintu panel; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ kapur 0.0400 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.006 Membuat dan memasang 1 m² daun pintu panel; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0400 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.007 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur 0.0240 m³ 1,870,000.00
Lem Kayu 0.3000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.2400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.008 Membuat dan memasang 1 m² pintu dan jendela kaca; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0240 m³ 1,870,000.00
Lem Kayu 0.3000 kg 28,000.00
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Jumlah (1)
Tenaga
Pekerja 0.8000 OH 90,000.00
Tukang Kayu 2.4000 OH 110,000.00
Kepala Tukang 0.2400 OH 130,000.00
Mandor 0.0400 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
F.009 Membuat dan memasang 1 m² pintu dan jendela jalusi; Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur 0.0640 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.010 Membuat dan memasang 1 m² pintu dan jendela jalusi; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0640 m³ 1,870,000.00
Lem Kayu 0.5000 kg 28,000.00
Jumlah (1)
Tenaga
Pekerja 1.0000 OH 90,000.00
Tukang Kayu 3.0000 OH 110,000.00
Kepala Tukang 0.3000 OH 130,000.00
Mandor 0.0500 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.013 Membuat dan memasang 1 m² jalusi kusen; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung 0.0600 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.6700 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.014 Membuat dan memasang 1 m² jalusi kusen; Kayu Meranti
Bahan
Papan Kayu Meranti 0.0600 m³ 1,870,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.6700 OH 90,000.00
Tukang Kayu 2.0000 OH 110,000.00
Kepala Tukang 0.2000 OH 130,000.00
Mandor 0.3350 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.017 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 12.0000 OH 110,000.00
Kepala Tukang 1.2000 OH 130,000.00
Mandor 0.2000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.018 Membuat dan memasang 1 m³ konstruksi kuda kuda konvensional; Kayu Meranti
Bahan
Balok Kayu Meranti 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 5.6000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 4.0000 OH 90,000.00
Tukang Kayu 12.0000 OH 110,000.00
Kepala Tukang 1.2000 OH 130,000.00
Mandor 0.2000 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.021 Membuat dan memasang 1 m³ konstruksi gording; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung 1.1000 m³ 1,870,000.00
Besi Strip 5 mm 15.0000 kg 24,600.00
Paku 12 cm 3.0000 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 2.4000 OH 90,000.00
Tukang Kayu 7.2000 OH 110,000.00
Kepala Tukang 0.7200 OH 130,000.00
Mandor 0.1200 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
HARGA SAT
NO KOEF SAT
Rp.
1 2 3 4 5
F.029 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Lembasung/Kapur
Bahan
Kayu Kapur 0.0120 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
F.030 Membuat dan memasang 1 m² rangka atap genteng metal; Kayu Meranti
Bahan
Kayu Meranti 0.0120 m³ 1,870,000.00
Paku 5 cm & 10 cm 0.1500 kg 21,650.00
Jumlah (1)
Tenaga
Pekerja 0.1000 OH 90,000.00
Tukang Kayu 0.1000 OH 110,000.00
Kepala Tukang 0.0100 OH 130,000.00
Mandor 0.0050 OH 140,000.00
Jumlah (2)
Jumlah (1) + (2)
22,440.00
433.00
13,090.00
35,963.00
9,000.00
11,000.00
1,300.00
700.00
22,000.00
57,963.00
9,000.00
7,000.00
16,000.00
SNI
67,500.00
3,500.00
71,000.00
22,500.00
1,166.67
23,666.67
120,960.00
120,960.00
27,000.00
1,400.00
28,400.00
149,360.00
79,200.00
79,200.00
22,500.00
3,500.00
26,000.00
105,200.00
JUMLAH
Rp.
6=(3x5)
SNI 03-2836
470,400.00
485,940.00
45,753.05
1,002,093.05
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,221,393.05
470,400.00
43,545.60
513,945.60
70,200.00
42,900.00
5,070.00
5,460.00
123,630.00
637,575.60
SNI 03-2837
118,800.00
59,969.00
9,750.65
188,519.65
54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
271,319.65
SNI 03-2837
18,869.76
3,321.65
22,191.41
23,400.00
22,000.00
2,600.00
3,080.00
51,080.00
73,271.41
JUMLAH
Rp.
6=(3x5)
5,915.00
5,915.00
13,500.00
11,000.00
1,300.00
1,400.00
27,200.00
33,115.00
SNI 03-3434
74,800.00
14,000.00
88,800.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00
74,800.00
14,000.00
88,800.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00
44,880.00
8,400.00
53,280.00
72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00
44,880.00
8,400.00
JUMLAH
Rp.
6=(3x5)
53,280.00
72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00
JUMLAH
Rp.
6=(3x5)
119,680.00
14,000.00
133,680.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00
119,680.00
14,000.00
133,680.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00
112,200.00
3,247.50
115,447.50
60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50
112,200.00
3,247.50
115,447.50
60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50
2,057,000.00
369,000.00
JUMLAH
Rp.
6=(3x5)
121,240.00
2,547,240.00
360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00
2,057,000.00
369,000.00
121,240.00
2,547,240.00
360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00
2,057,000.00
369,000.00
64,950.00
2,490,950.00
216,000.00
792,000.00
93,600.00
16,800.00
1,118,400.00
3,609,350.00
JUMLAH
Rp.
6=(3x5)
22,440.00
3,247.50
25,687.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
47,687.50
22,440.00
3,247.50
25,687.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
47,687.50
30,481.00
5,412.50
35,893.50
18,000.00
33,000.00
3,900.00
1,400.00
56,300.00
92,193.50
16,082.00
1,299.00
17,381.00
9,000.00
11,000.00
1,300.00
7,000.00
28,300.00
45,681.00
115,500.00
JUMLAH
Rp.
6=(3x5)
162,000.00
4,400.00
520.00
6,020.00
172,940.00
172,940.00
216,175.00
259,410.00
JUMLAH
Rp.
6=(3x5)
77,000.00
77,000.00
162,000.00
4,400.00
520.00
6,020.00
3,366.00
176,306.00
253,306.00
RSNI-T-13
396,760.00
55,718.00
558,250.00
1,010,728.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,201,178.00
611,520.00
57,861.00
500,500.00
1,169,881.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,360,331.00
16,170.00
330.00
16,500.00
630.00
770.00
91.00
56.00
1,547.00
18,047.00
44,550.00
6,495.00
1,060.00
52,105.00
DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN
HARGA
SATUAN
Rp.
NO. URAIAN SATUAN
Zona 1
Tjg.Selor
Tjg.Palas
1 2 3 4
A. UPAH TENAGA :
Tukang
1 Tukang kayu hari 110,000
2 Tukang batu hari 110,000
3 Tukang besi hari 110,000
4 Tukang las hari 110,000
5 Tukang cat hari 110,000
6 Tukang plitur hari 110,000
7 Tukang bor hari 110,000
8 Tukang listrik hari 110,000
9 Tukang pipa ledeng hari 110,000
10 Tukang kapur hari 110,000
11 Tukang gali hari 110,000
Kepala Tukang
12 Kepala tukang kayu hari 130,000
13 Kepala tukang batu hari 130,000
14 Kepala tukang besi hari 130,000
15 Kepala tukang las hari 130,000
16 Kepala tukang cat hari 130,000
17 Kepala tukang plitur hari 130,000
18 Kepala tukang bor hari 130,000
Pekerja
19 Mandor hari 140,000
20 Sopir hari 120,000
21 Kernet / pembantu sopir hari 90,000
22 Mekanik terlatih hari 130,000
Operator
23 Operator tak terlatih hari 85,000
24 Operator terlatih hari 120,000
25 Operator semi terlatih hari 100,000
Buruh
26 Buruh terlatih hari 90,000
27 Buruh semi terlatih hari 85,000
28 Buruh tak terlatih hari 80,000
B. BAHAN:
Kelompok Material Alam :
Tanah
1 Tanah urug m³ 61,875
2 Tanah urug Pilihan m³ 66,000
Pasir dan Tanah
1 Pasir urug m³ 100,800
2 Pasir batu (sirtu) m³ 121,000
3 Pasir pasang / Pasir Beton m³ 107,150
4 Tanah Timbunan m3 82,500
5 Tanah Timbunan Pilihan m3 140,000
Batu
6 Batu gunung m³ 392,000
7 Batu belah 15/20 m³ 431,200
8 Batu kali besar m³ 177,760
9 Batu kali kecil m³ 177,760
10 Kerikil sungai m³ 242,000
11 Batu teraso kg 13,600
12 Batu granito kg 13,600
13 Abu Batu m³ 641,667
Koral Sikat Zak 75,000
Batu Pecah Tangan
14 Batu pecah tangan 2-3 cm (split) m³ 595,833
15 Batu pecah tangan 3-5 cm m³ 595,833
16 Batu pecah tangan 5-7 cm m³ 595,833
Batu Pecah Mesin
17 Batu pecah mesin 0,5-1 cm m³ 641,667
18 Batu pecah mesin 1-2 cm m³ 641,667
19 Batu pecah mesin 2-3 cm m³ 641,667
20 Batu pecah mesin 3-5 cm m³ 641,667
Batu Tempel
21 Batu Tempel (muka segi 6) tebal 10 cm buah
21 Batu Tempel Palimanan Hijau m² 223,850
22 Batu Tempel Palimanan Kuning m² 266,200
23 Batu Tempel (Tidak Beraturan) Kecil m² 199,650
24 Batu Tempel (Tidak Beraturan) Besar m² 199,650
25 Batu Candi Tempel 20/20, 5/20 m² 146,410
Batu Bata
26 Batu bata ukuran 8 x 8 x 16 cm buah 990
27 Batu bata bali buah 1,175
28 Batako buah 2,750
29 Kapur pasang m3 232,925
Kelompok Kayu & Langit-langit
30 Kayu Jati
a. Kayu Jati Klas 2 : Balok 8/15 m³ 14,241,700
b. Kayu Jati Klas 3 : Balok 8/15 m³ 14,241,700
c. Papan kayu jati m³ 14,241,700
31 Kayu Kamper
a. Kayu Kamper : Balok 8/15 m³ 2,090,000
b. Kayu Kamper : 5/7 & 4/6 m³ 2,090,000
c. Kayu Kamper : 3/4 & 3/5 m³ 2,090,000
d. Kayu Kamper : 2/3 m³ 2,090,000
e. Papan kamper m³ 2,090,000
32 Kayu Bangkirai
a. Kayu Bangkirai : Balok 10/10 m³ 2,035,000
b. Kayu Bangkirai : Balok 8/15 m³ 2,090,000
c. Kayu Bangkirai : 5/7 & 4/6 m³ 2,090,000
d. Kayu Bangkirai : 3/4 & 3/5 m³ 2,310,000
e. Kayu Bangkirai : 2/3 m³ 2,310,000
f. Papan bangkirai ( 2 x 20 x 400 ) m³ 2,090,000
g. Papan bangkirai ( 2 x 25 x 400 ) m³ 2,090,000
h Papan bangkirai ( 2 x 30 x 400 ) m³ 2,090,000
33 Kayu Kruing / Lembasung
a. Kayu Kruing : Balok 8/15 m³ 1,870,000
b. Kayu Kruing : 5/7 & 4/6 m³ 1,870,000
c. Kayu Kruing : 3/4 & 3/5 m³ 1,870,000
d. Kayu Kruing : 2/3 m³ 1,870,000
34 Kayu Meranti
a. Kayu Kalimantan ( Meranti ) : Balok 10/10 m³ 1,870,000
b. Kayu Kalimantan ( Meranti ) : Balok 8/15 m³ 1,870,000
c. Kayu Kalimantan ( Meranti ) 5/7 & 4/6 m³ 1,870,000
d. Kayu Kalimantan ( Meranti ) : 3/4 & 3/5 m³ 1,870,000
e. Kayu Kalimantan ( Meranti ) : 2/3 m³ 1,870,000
f. Papan Meranti ( 2 x 20 x 400 ) m³ 1,870,000
g Papan Meranti ( 2 x 25 x 400 ) m³ 1,870,000
35 Kayu Ulin
a Kayu Ulin : 5/10 m³ 3,850,000
b. Kayu Ulin : 10/10 m³ 3,850,000
c. Kayu Ulin : 12/12 m³ 3,850,000
d Kayu Ulin : 15/15 m³ 4,400,000
e. Kayu Ulin : 20/20 m³ 6,050,000
f Papan Ulin ( 2,5 x 20 x 400 ) m³ 3,850,000
g Papan Ulin ( 5 x 20 x 400 ) m³ 4,950,000
h Papan Ulin ( 9 x 25 x 400 ) m³ 4,950,000
i Papan Ulin ( 2,5 x 20 x 200 ) m³ 3,850,000
Kayu Begesting, Perancah, Dolken
36 Kayu Rawa (merah) m³ 990,000
37 Papan Cetak ( kayu rawa ) uk 2 x 20 x 400 m³ 990,000
38 Kayu bakar m³ 49,500
39 Kayu stoot ( bambu ), 5 m btg 5,500
40 Kayu perancah 4m btg 16,000
41 Kayu perancah m³ 1,650,000
42 Dolken Ø 5 kayu rawa (merah) btg 17,600
43 Dolken Ø 12 kayu rawa (merah) btg 33,000
Lain-lain
44 Ijuk kg 31,600
45 Pintu Kayu panil ukuran 80 x 220 cm buah 732,050
Teakwood
46 Teakwood tebal 3 mm lbr 133,100
47 Teakwood tebal 3 mm uk. 90 x 120 cm lbr 93,200
48 Teakwood tebal 4 mm uk. 90 x 210 cm lbr 113,100
49 Teakwood tebal 4 mm uk. 120 x 240 cm lbr 154,400
Multiplek
50 Multipleks 9 mm lbr 154,000
51 Multipleks 12 mm lbr 203,500
Board Pabrikasi
52 Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api) lbr 81,200
53 Gipsum Board lbr 91,200
54 Asbes Datar uk. 100x100 lbr 17,300
55 GRC Board lbr 76,230
56 E t e r n i t m² 20,000
Plywood
57 Plywood 3 mm uk. 90 x 220 cm lbr 60,500
58 Plywood 4 mm lbr 68,200
59 Plywood 9 mm uk. 120 x 240 mm lbr 154,000
List Kayu Profil
60 List Kayu Profil 1/3 m' 13,300
61 List Kayu Profil 1/5 m' 20,000
62 List Kayu Profil 2/4 m' 20,000
List Gipsum m' 30,000
Tepung Gipsum Kg 5,000
63 Triplek 4 mm uk 120 x 240 lbr 73,200
Kelompok Fiber, Besi& Baja
Paku & Baut
64 Paku biasa kg 21,650
65 Paku ulin kg 27,500
66 Paku besi kg 31,100
67 Paku atap metal kg 30,250
68 Paku seng gelombang kg 25,300
69 Baut Ø 1/2 - 45 cm buah 33,000
70 Mur Baut Panjang buah 26,400
71 Mur Baut Pendek buah 24,200
Besi
72 Besi beton polos kg 15,400
73 Besi beton ulir kg 16,500
74 Besi beton U-24 kg 15,400
75 Besi beton U-39 kg 16,720
76 Besi Strip ( tebal 5 mm, lebar 5 cm ) kg 24,600
77 Besi Strip ( tebal 3 mm - 12 m ) lembar 20,000
78 Besi klam U buah 18,700
79 Besi hollow 4 x 4 cm tebal 1.2 mm m' 38,500
80 Kanopi ( Besi Tempa ) m² 1,064,800
Pagar BRC
81 Pagar BRC Galvanis 90 x 240 cm lbr 299,475
82 Pagar BRC Galvanis 120 x 240 cm lbr 366,025
83 Tiang BRC Galvanis panjang 120 cm btg 106,500
84 Tiang BRC Galvanis panjang 150 cm btg 126,400
Pintu
85 Pintu PVC (lengkap; kusen + daun) unit 385,000
86 Rolling Door Besi m² 259,500
87 Folding Door ( 3x2,5 ) m² 2,462,400
88 Rell Pintu Dorong / 5m' Bh 2,298,600
Kawat
89 Kawat duri roll 90,750
90 Kawat duri kg 10,100
91 Kawat harmonika 4 x 4 cm m² 18,700
92 Kawat Ayam m² 17,600
93 Kawat beton (bindrad) kg 22,000
94 Kawat bronjong Q 4 mm kg 34,100
95 Kawat galvanis Q 1 mm kg 70,500
96 Kawat Las kg 33,000
97 Kawat Las Listrik RD 26 kg 29,700
98 Kawat Las Listrik RB 26 kg 154,000
Baja
99 Bondex ( plat beton ) m² 163,600
100 Wiremesh M6 m² 105,500
101 Baja plat lembar 425,900
102 Baja siku L 50.50.4 kg 15,000
103 Baja IWF kg 17,300
104 Pengadaan rangka baja ringan m² 308,000
Kelompok Aluminium
Plat aluminium
121 Aluminium composite panel 3 mm + rangka m² 465,850
122 Aluminium composite panel 4 mm + rangka m² 512,400
123 Aluminium foil m² 50,400
Kusen Aluminium
124 Kusen Almunium 4" Coklat m' 199,650
125 Kusen Almunium 4" Putih m' 146,400
Pintu+Kaca Aluminium
126 Pintu Kaca Rayban Alumunium 4" Putih unit 2,435,700
127 Pintu Kaca Bening Alumunium 4" Putih unit 2,395,800
128 Pintu Kaca Rayban Alumunium 4" Coklat unit 2,701,900
129 Pintu Kaca Bening Alumunium 4" Coklat unit 2,662,000
Jendela+Kaca Aluminium
130 Jendela Kaca Rayban Alumunium 4" Putih Engsel Samping unit 599,000
131 Jendela Kaca Rayban Alumunium 4" Putih Engsel Ayun unit 599,000
132 Jendela Kaca Bening Alumunium 4" Putih Engsel Samping unit 532,400
133 Jendela Kaca Bening Alumunium 4" Putih Engsel Ayun unit 532,400
134 Jendela Kaca Rayban Alumunium 4" Coklat Engsel Samping unit 665,500
135 Jendela Kaca Rayban Alumunium 4" Coklat Engsel Ayun unit 665,500
136 Jendela Kaca Bening Alumunium 4" Coklat Engsel Samping unit 599,000
137 Jendela Kaca Bening Alumunium 4" Coklat Engsel Ayun unit 599,000
138 Jendela Kaca Mati Rayban Alumunium 4" m² 825,200
139 Jendela Kaca Mati Bening Alumunium 4" m² 758,700
Pintu Aluminium
140 Pintu Lipat Varia m² 1,904,700
141 Rolling Door Alumunium m² 1,271,105
142 Pintu Alumunium m² 732,100
143 Pintu almunium unit 1,264,450
Jendela BV Aluminium
144 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 600,350
145 Jendela Casemen standard BV tanpa kaca (A 4,5m' ) Bh 675,400
146 Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss Bh 469,050
147 Jendela Casemen BV tanpa kaca (A 2,8m' )Doff Bh 515,875
Jendela Sliding Aluminium
148 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Gloss Bh 598,950
149 Jendela Sliding ekonomi standard kaca ( A 4,5 m') Doff Bh 469,050
Jalusi Aluminium
150 Louvre( Jalusi ) 7 cm,coklat,merk superex m' 30,050
151 Louvre( Jalusi ) 10 cm,coklat,merk superex m' 60,000
Rangka Plafon & Dinding
152 Plafon spandel,coklat,merk superex m² 431,425
153 Rangka curtain wall,coklat,merk superex m² 337,625
154 Sunscren Alumunium m² 753,975
Lain-lain
155 Sealent Kg 79,860
156 Puzzdith - 100 XR Liter 41,625
Profil Kaca m' 35,000
Kelompok Sanitary
Shower
316 Shower stainless buah 266,200
317 Shower stainless kualitas baik buah 275,000
318 Shower standar/biasa buah 93,500
319 Shower kualitas baik buah 133,100
Kran air
320 Kran air plastik buah 11,000
321 Kran air stainless buah 88,000
Seal Tape bh 3,000
Tangki air fiberglas
322 Tangki air fiberglas Isi : 250 ltr unit 465,850
323 Tangki air fiberglas Isi : 800 ltr unit 1,100,000
324 Tangki air fiberglas Isi : 1100 ltr unit 1,400,000
325 Tangki air fiberglas Isi : 1200 ltr unit 1,600,000
326 Tangki air fiberglas Isi : 2100 ltr unit 2,700,000
327 Tangki air fiberglas Isi : 2200 ltr unit 3,000,000
Tangki air stainless Steel
328 Tangki air stainless steel Isi : 250 ltr unit 998,250
329 Tangki air stainless steel Isi : 800 ltr unit 3,327,500
330 Tangki air stainless steel Isi : 1100 ltr unit 3,826,625
331 Tangki air stainless steel Isi : 1200 ltr unit 3,993,000
332 Tangki air stainless steel Isi : 2100 ltr unit 6,987,750
333 Tangki air stainless steel Isi : 2200 ltr unit 7,320,500
Bak mandi
334 Bak Mandi Fiberglass, volume 120 ltrr (sudut) buah 385,000
335 Bak Mandi Fiberglass, volume 120 ltrr (kotak) buah 385,000
336 Bak Mandi Fiberglass, volume 150 ltrr buah 500,000
Closet
337 Closet duduk buah 137,500
338 Closet duduk monoblock kwalitas prima buah 2,090,000
339 Kloset duduk / Monoblok Warna Putih standard Buah 1,650,000
340 Kloset jongkok Porselin, warna tua Buah 239,775
341 Kloset jongkok Porselin, warna muda Buah 239,775
342 Kloset jongkok Traso dicat Buah 106,480
Lain-lain
343 Urinoir buah 2,462,350
344 Floordrain (saringan buangan air KM/WC) buah 39,930
345 Badkeep Fibreglass buah 552,400
346 Wastafel unit 1,375,000
Bak cuci
347 Bak Cuci Stainless Steel ukuran kecil Buah 203,500
348 Bak Cuci Stainless Steel ( 1,00 x 0,90 ) m² Buah 532,400
349 Bak Cuci Stainless Steel 80 Cm Buah 332,750
Pipa
Kelompok Kelistrikan
Tusuk Kontak (Steker)
358 Tusuk kontak 2 kutup tanpa pembumian/arde buah 6,100
359 Tusuk kontak 2 kutup dengan pembumian/arde buah 12,100
360 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 7,600
361 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 13,600
362 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 6,100
363 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,100
364 Pasang instalasi / titik titik 366,000
Lampu pijar
365 Lampu pijar 5 watt buah 6,100
366 Lampu pijar 10 watt buah 7,600
367 Lampu pijar 25 watt/ 40 watt buah 8,700
368 Lampu pijar 60 watt / 75 watt buah 9,100
369 Lampu pijar 100 watt buah 11,300
370 Lampu softone 100 watt buah 22,700
371 Lampu pijar 150 watt buah 51,400
372 Lampu pijar 200 watt buah 59,000
Lampu TL
373 Lampu TL 10 watt buah 8,000
374 Lampu TL 15 watt buah 10,600
375 Lampu TL 18 watt buah 13,300
376 Lampu TL 36 watt buah 16,000
Lampu SLE
377 Lampu SLE 11 watt buah 70,500
378 Lampu SLE 15 watt buah 73,900
379 Lampu SLE 20 watt buah 79,900
Lampu Slang
380 Lampu Slang 2 jalur (sekualitas sinyoku), 1 roll 100 m roll 1,730,300
381 Lampu Slang 3 jalur (sekualitas sinyoku), 1 roll 100 m roll 2,196,150
Lampu Capsul
382 Lampu Capsul isi 100 pcs 46,600
383 Lampu Capsul isi 140 pcs 66,550
Lampu Anggur
384 Lampu Anggur isi 100 pcs 46,600
385 Lampu Anggur isi 140 pcs 66,550
Lampu Natal
386 Lampu Natal isi 50 pcs 30,000
387 Lampu Natal isi 100 pcs 50,000
Bolam Mercury
388 Bolam Mercury 80 watt buah 195,700
389 Bolam Mercury 125 watt buah 332,750
390 Bolam Mercury 250 watt buah 549,700
391 Bolam Mercury 400 watt buah 858,500
Bolam Halogin
392 Bolam Halogin 500 watt buah 33,000
393 Bolam Halogin 1000 watt buah 44,000
Starter & Travo
394 Starter TL 20/40 watt buah 6,700
395 Travo TL 10 watt buah 29,300
396 Travo TL 20 watt buah 33,000
397 Travo TL 40 watt buah 33,000
Balast Mercury
398 Balast Mercury 80 watt buah 99,825
399 Balast Mercury 125 watt buah 119,800
400 Balast Mercury 250 watt buah 197,000
401 Balast Mercury 400 watt buah 239,600
Fitting
402 Fitting Kecil Lampu 2,5 Watt buah 3,750
403 Fitting Plastik Hitam buah 4,375
404 Fitting Gantung plastik gantung buah 5,000
405 Fitting duduk buah 12,500
Kap Aluminium
406 Kap Alumunium E.27 buah 113,100
407 Kap Alumunium E.40 buah 139,800
Kabel Snoor & NYA
408 Kabel NYA 2,5 sqmm roll 297,000
409 Kabel NYA 1,5 sqmm roll 198,000
410 Kabel NYA 2,5 sqmm m' 4,400
411 Kabel NYA 1,5 sqmm m' 3,300
Kabel NYM
412 Kabel NYM 2 x 1,5 sqmm m1 10,000
413 Kabel NYM 2 x 2,5 sqmm m1 12,500
414 Kabel NYM 2 x 4 sqmm m1 12,500
415 Kabel NYM 3 x 1,5 sqmm m1 12,500
416 Kabel NYM 3 x 2,5 sqmm m1 15,000
417 Kabel NYM 3 x 4 sqmm m1 25,000
Saklar & Stop kontak
418 Skaklar seri OB buah 17,500
419 Skaklar seri IB buah 22,500
420 Skaklar engkel OB buah 22,500
421 Skaklar engkel IB buah 15,000
422 Stop kontak IB buah 22,500
423 Stop kontak OB buah 15,000
Kapasitor
424 Kapasitor 25 F buah 25,000
425 Kapasitor 20 F buah 25,000
426 Kapasitor 12,5 uF buah 25,000
MCB
427 MCB 25 Ampere / 16 Ampere buah 62,500
428 MCB 40 Ampere buah 87,500
429 MCB 6 Ampere buah 56,250
Box
430 Box Kwh Meter 25 x 35 x 20 buah 173,900
431 Box panel 30 x 40 x 20 buah 262,400
432 Box 25 x 25 x 20 buah 143,700
433 Box 20 x 40 x 50 buah 332,800
Timer
434 Timer Delay H3-BA (omron) buah 958,320
Lain-lain
435 Pilot Lamp buah 4,500
436 Kop sekering buah 2,300
437 Isolasi besar buah 7,700
438 Spot + F.MP buah
438 Tang Kombinasi buah 33,000
439 Obeng +/- buah 22,000
440 GZ 30 A buah
440 Multitester buah 378,100
441 Sekering buah 12,900
442 Mata lampu pijar 25 W -75 W buah 7,700
443 Stabilizer 300 A unit 266,200
444 Alat Bantu unit 56,100
Keterangan : Harga Satuan sudah termasuk PPN dan PPh
TAHUN 2014
41 41 41 41 41 42
9,400 10,000 10,600 10,600 11,700 11,700
11,300 12,000 12,700 12,700 14,100 14,100
8,500 9,100 9,600 9,600 10,700 10,700
8,800 9,400 9,900 9,900 11,000 11,000
9,900 10,010 10,120 10,230 10,900 9,900
13,200 13,300 13,500 13,600 14,500 13,200
8,700 9,300 9,300 9,300 10,700 8,000
39,900 40,300 40,800 41,200 43,900 42,350
9,900 10,010 10,120 10,230 10,900 9,900
33,400 33,800 34,100 34,500 36,700 33,400
1 1 1 1 1 4.0509259259
2.1868583162 1 2.8993839836 1 1.2320328542 3.8501026694
2.1868583162 1 2.8993839836 1 1.2320328542 3.8501026694
NO. URAIAN PEKERJAAN RUMUS HITUNGAN VOLUME PEKERJAAN SAT.VOL HITUNGAN VOLUME PEKERJAAN
VT = VA + VB
M3
Aanstampeng 16.2
V = P X L X H M3 90 X 0.9 X 0.2 =
10.8958
V = A X H M3 108.9575 X 0.1 =
V = A X H M3 108.9575 X 0.1 =
5.44788
V = A X H M3 108.9575 X 0.05 =
Pekerjaan lantai keramik V = Abangunan - ( AKM/WC + Ateras ) M2 108.9575 - ( 7.25 + 6.4575 ) = 95.25
Z PEKERJAAN ATAP
Lisplang V = ΣLP M1
Z1 PEKERJAAN SANITAIR
Bak mandi V = n bh
Kloset Duduk V = n bh
Kran air V = n bh
Z2 PEKERJAAN INSTALASI AIR
Air berish
Pipa Ø1/4" M1
Knee 1/4 Ø" bh
Tee1/4 Ø" bh
Tee sokdrat 1/4 Ø" bh
Aksesoris lain ( lem pipa, ampelas ) Ls
Air kotor
Pipa Ø4" M1
Tee sokdrat 4 Ø" bh
Knee 4 Ø" bh
Tee 4 Ø" bh
Pipa Ø2.5" M1
Tee sokdrat 2.5 Ø" bh
Knee 2.5 Ø" bh
Tee 2.5 Ø" bh
Aksesoris lain ( lem pipa, ampelas ) Ls
Septictank dan Rembesan V = n
Penyambungan air bersih dari PAM V = n
Lampu V = n Titik
Panel listrik V = n bh
Pengecatan Lisplafon V = L x P M2
Pengecatan Lisplang V = l x p M2
Pengecatan kusen V = l x k M2
= 1.718496
2.3993
= 0.6808
+ 26.024 ) = 255.554
x 2 = 535.896
95.25
14.688