HARGA SAT.
NO K. Baru PEKERJAAN SATUAN
PEKERJAAN (Rp)
255 Pipa PVC Maspion ABU dia 1/2" (AW) btg Rp 15,435.00
256 Pipa PVC Maspion ABU dia 2 1/2" (AW) btg Rp 47,460.00
257 Pipa PVC Maspion ABU dia 2" (AW) btg Rp 41,580.00
258 Pipa PVC Maspion ABU dia 3" (AW) btg Rp 59,325.00
259 Pipa PVC Maspion ABU dia 3/4" (AW) btg Rp 19,005.00
260 Pipa PVC Maspion ABU dia 4" (AW) btg Rp 83,055.00
261 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1/2" btg Rp 32,000.00
262 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3/4" btg Rp 39,100.00
263 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1" btg Rp 56,600.00
264 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/4" btg Rp 76,400.00
265 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 1 1/2" btg Rp 99,600.00
266 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2" btg Rp 141,500.00
267 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 2 1/2" btg Rp 182,300.00
268 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 3" btg Rp 277,700.00
269 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 4" btg Rp 429,400.00
270 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 5" btg Rp 562,100.00
271 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 6" btg Rp 844,000.00
272 Pipa PVC Rucika Standar JIS (10 kg/cm2) uk. 8" btg Rp 1,276,400.00
273 Plamir tembok kg Rp 16,590.00
274 Plat Besi Tipis 1 mm kg Rp 10,290.00
275 Plat Strip 2 x 30 mm (6m) btg Rp 29,400.00
276 Plat Strip 3 x 30 mm (6m) btg Rp 39,165.00
277 Ply Wood 18 mm (120 x 240) lbr Rp 262,100.00
278 Plastik Bond Breaker m2 Rp 1,800.00
279 PVC (Sambungan) Ø 1 1/4" bh Rp 5,800.00
280 PVC (Sambungan) Ø 1 3/4" bh Rp 4,725.00
281 PVC (Sambungan) Ø 1" bh Rp 4,650.00
282 PVC (Sambungan) Ø 1/2" bh Rp 2,300.00
283 PVC (Sambungan) Ø 2" bh Rp 7,650.00
284 PVC (Sambungan) Ø 3/4" bh Rp 2,900.00
285 PVC (Sambungan) Ø 1 1/2" bh Rp 6,950.00
286 PVC (Sambungan) Ø 2 1/2" bh Rp 12,810.00
287 PVC (Sambungan) Ø 3" bh Rp 22,575.00
288 PVC (Sambungan) Ø 4" bh Rp 37,250.00
289 Pipa 200 CL Class 2 PC-I Dusaspun (L=2.45 m) btg Rp 218,000.00
290 Pipa 300 CL Class 2 PC-I Dusaspun btg Rp 396,000.00
291 Pipa 400 CL Class 2 PC-I Dusaspun btg Rp 590,000.00
292 Pipa 500 CL Class 2 PC-I Dusaspun btg Rp 89,000.00
293 Pipa 600 CL Class 2 PC-I Dusaspun btg Rp 1,159,000.00
294 Pipa 700 CL Class 2 PC-I Dusaspun btg Rp 1,466,000.00
295 Pipa 800 CL Class 2 PC-I Dusaspun btg Rp 1,811,000.00
296 Pipa 900 CL Class 2 PC-I Dusaspun btg Rp 2,210,000.00
297 Pipa 1000 CL Class 2 PC-I Dusaspun btg Rp 2,625,000.00
298 Pipa 1100 CL Class 2 PC-I Dusaspun btg Rp 3,294,000.00
299 Pipa 1200 CL Class 2 PC-I Dusaspun btg Rp 4,172,000.00
300 Pipa 1300 CL Class 2 PC-I Dusaspun btg Rp 4,753,000.00
301 Pipa 1400 CL Class 2 PC-I Dusaspun btg Rp 5,264,000.00
302 Pipa 1500 CL Class 2 PC-I Dusaspun btg Rp 5,808,000.00
303 Pipa 1600 CL Class 2 PC-I Dusaspun btg Rp 8,412,000.00
304 Pipa 1650 CL Class 2 PC-I Dusaspun btg Rp 6,421,000.00
NO BAHAN / MATERIAL KODE SATUAN HARGA SATUAN KET.
CATATAN :
* OPERATOR YANG SUDAH BIASA DAN TRAMPIL MENGOPERASIKAN JENIS PERALATAN
UNTUK MELAYANI PEKERJAAN BERAT : BULLDOZER, MOTOR GRADER, LOADER WHEEL,
ASPHALT FINISHER, DAN LAIN- LAIN
** OPERATOR YANG MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN YANG AGAK RINGAN :
STEEL WHEELED ROLLER, STAMPER, MACHANICAL RAMMER,
MECHANICAL RAMMER CONCRETE MIXER/MESIN PENGADUK BETON
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 40 X 40 / 1 M'
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 40 X 40 + support M' 1.00 Rp. 433,333.33 Rp. 433,333.33 Rp. 433,333.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.04 D 21 Rp. 31,103.16 Rp. 1,244.13
3 Pas. Bedding Pasir tb. 10 Cm M3 0.05 D 13 Rp. 208,120.00 Rp. 10,406.00
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Rp. 30,400.00 Rp. 30,400.00
5 Pek. Urugan Tanah Sisi U - DitCh M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 56,774.98
7 Pemberesan Lapangan Ls 1.00 Ls Rp. Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 50 X 50 + support M' 1.00 Rp. 643,333.33 Rp. 643,333.33 Rp. 643,333.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19
3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Rp. 45,100.00 Rp. 45,100.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 74,178.24
7 Pemberesan Lapangan Ls 1.00 Ls Rp. Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 60 X 60 + support M' 1.00 Ls Rp. 765,833.33 Rp. 765,833.33 Rp. 765,833.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.08 D 21 Rp. 31,103.16 Rp. 2,488.25
3 Pas. Bedding Pasir tb. 10 Cm M3 0.08 D 13 Rp. 208,120.00 Rp. 16,649.60
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 53,700.00 Rp. 53,700.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.45 D 11 Rp. 10,224.50 Rp. 4,601.03
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.45 D 21 Rp. 31,103.16 Rp. 13,996.42 Rp. 93,435.30
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 80 X 80 + support M' 1.00 Ls Rp. 1,167,083.33 Rp. 1,167,083.33 Rp. 1,167,083.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.10 D 21 Rp. 31,103.16 Rp. 3,110.32
3 Pas. Bedding Pasir tb. 10 Cm M3 0.10 D 13 Rp. 208,120.00 Rp. 20,812.00
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 81,700.00 Rp. 81,700.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.94 D 11 Rp. 10,224.50 Rp. 9,621.25
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.94 D 21 Rp. 31,103.16 Rp. 29,236.97 Rp. 146,480.54
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.
.
DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 100 X 100 / 1 M'
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 100 X 100 + support M' 1.00 Rp. 2,082,458.33 Rp. 2,082,458.33 Rp. 2,082,458.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Galian Tanah M3 2.23 D 01 Rp. 35,337.50 Rp. 78,625.94
3 Pek. Pemadatan Tanah (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01
4 Pas. Bedding Pasir tb. 10 Cm M3 0.32 D 13 Rp. 208,120.00 Rp. 66,598.40
5 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 145,800.00 Rp. 145,800.00
6 Pek. Urugan Tanah Sisi U - Ditch M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40
7 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 40 X 60 + support M' 1.00 Ls Rp. 542,500.00 Rp. 542,500.00 Rp. 542,500.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19
3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 38,000.00 Rp. 38,000.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,259.40
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.71 D 21 Rp. 31,103.16 Rp. 22,083.24 Rp. 83,696.03
Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
JUMLAH TOTAL : Rp. 626,196.03
PEMBULATAN : Rp. 626,197.00
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 50 X 70 + support M' 1.00 Rp. 794,166.67 Rp. 794,166.67 Rp. 794,166.67
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19
3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 47,700.00 Rp. 47,700.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,259.40
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.71 D 21 Rp. 31,103.16 Rp. 22,083.24 Rp. 93,396.03
Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
JUMLAH TOTAL : Rp. 887,562.69
PEMBULATAN : Rp. 887,563.00
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 60 X 70 + support M' 1.00 Ls Rp. 838,333.33 Rp. 838,333.33 Rp. 838,333.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.13 D 21 Rp. 31,103.16 Rp. 4,167.82
3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,888.08
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 50,300.00 Rp. 50,300.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.64 D 11 Rp. 10,224.50 Rp. 6,543.68
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.64 D 21 Rp. 31,103.16 Rp. 19,906.02 Rp. 110,805.61
Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
JUMLAH TOTAL : Rp. 949,138.94
PEMBULATAN : Rp. 949,139.00
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG
U - DITCH PRECAST WITH SPECIAL SUPPORT UK. 60 X 80 / 1 M'
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 60 X 80 + support M' 1.00 Ls Rp. 914,166.67 Rp. 914,166.67 Rp. 914,166.67
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
2 Pek. Pemadatan Tanah (dg alat) M3 0.14 D 21 Rp. 31,103.16 Rp. 4,354.44
3 Pas. Bedding Pasir tb. 10 Cm M3 0.14 D 13 Rp. 208,120.00 Rp. 29,136.80
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 54,900.00 Rp. 54,900.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.78 D 11 Rp. 10,224.50 Rp. 7,975.11
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.78 D 21 Rp. 31,103.16 Rp. 24,260.46 Rp. 122,626.82
Buangan Tanah Sisa Galian M3 0.95 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
JUMLAH TOTAL : Rp. 1,036,793.48
PEMBULATAN : Rp. 1,036,794.00
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 40 X 40 M' 1.00 Rp. 302,500.00 Rp. 302,500.00 Rp. 302,500.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 0.61 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.05 D 21 Rp. 31,103.16 Rp. 1,555.16
3 Pas. Bedding Pasir tb. 10 Cm M3 0.05 D 13 Rp. 208,120.00 Rp. 10,406.00
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 21,200.00 21,200.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.32 D 11 Rp. 10,224.50 Rp. 3,271.84
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 48,386.01
Buangan Tanah Sisa Galian M3 0.61 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.
.
HARGA SATUAN PEMBUATAN SALURAN TYPE U BETON BERTULANG
U - DITCH PRECAST TANPA TUTUP, UK. 50 X 50 / 1 M'
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 50 X 50 M' 1.00 Rp. 450,000.00 Rp. 450,000.00 Rp. 450,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 0.81 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,177.22
3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 14,568.40
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 31,500.00 Rp. 31,500.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.38 D 11 Rp. 10,224.50 Rp. 3,885.31
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.38 D 21 Rp. 31,103.16 Rp. 11,819.20 Rp. 65,950.13
Buangan Tanah Sisa Galian M3 0.81 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Dicth 60 X 60 M' 1.00 Rp. 534,166.67 Rp. 534,166.67 Rp. 534,166.67
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 1.09 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,301.63
3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 15,400.88
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 37,400.00 Rp. 37,400.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.52 D 11 Rp. 10,224.50 Rp. 5,316.74
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.52 D 21 Rp. 31,103.16 Rp. 16,173.64 Rp. 78,592.90
Buangan Tanah Sisa Galian M3 1.09 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 80 X 80 M' 1.00 Ls Rp. 805,000.00 Rp. 805,000.00 Rp. 805,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00
Pek. Galian Tanah M3 1.57 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.10 D 21 Rp. 31,103.16 Rp. 3,110.32
3 Pas. Bedding Pasir tb. 10 Cm M3 0.10 D 13 Rp. 208,120.00 Rp. 20,812.00
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 56,400.00 Rp. 56,400.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.94 D 11 Rp. 10,224.50 Rp. 9,621.25
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.94 D 21 Rp. 31,103.16 Rp. 29,236.97 Rp. 121,680.54
Buangan Tanah Sisa Galian M3 1.57 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 100 X 100 M' 1.00 Rp. 1,377,500.00 Rp. 1,377,500.00 Rp. 1,377,500.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00
2 Pek. Galian Tanah M3 2.23 D 01 Rp. 31,075.00 Rp. 69,141.88
3 Pek. Pemadatan Tanah (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01
4 Pas. Bedding Pasir tb. 10 Cm M3 0.32 D 13 Rp. 208,120.00 Rp. 66,598.40
5 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 96,500.00 Rp. 96,500.00
6 Pek. Urugan Tanah Sisi U - Ditch M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40
7 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79 Rp. 294,286.48
Buangan Tanah Sisa Galian M3 2.23 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.
.
DAFTAR : RENCANA PEMBUATAN SALURAN TYPE U BETON BERTULANG
U - DITCH PRECAST TANPA TUTUP, UK. 40 X 60 / 1 M'
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 40 X 60 M' 1.00 Ls Rp. 380,833.33 Rp. 380,833.33 Rp. 380,833.33
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 0.75 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,866.19
3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,487.20
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 26,700.00 Rp. 26,700.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.71 D 11 Rp. 10,224.50 Rp. 7,249.17
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.32 D 21 Rp. 31,103.16 Rp. 9,953.01 Rp. 60,255.57
Buangan Tanah Sisa Galian M3 0.75 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 50 X 70 M' 1.00 Rp. 556,666.67 Rp. 556,666.67 Rp. 556,666.67
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 0.90 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.12 D 21 Rp. 31,103.16 Rp. 3,732.38
3 Pas. Bedding Pasir tb. 10 Cm M3 0.12 D 13 Rp. 208,120.00 Rp. 25,806.88
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 39,000.00 Rp. 39,000.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.57 D 11 Rp. 10,224.50 Rp. 5,827.97
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.57 D 21 Rp. 31,103.16 Rp. 17,728.80 Rp. 94,096.03
Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. - Rp.
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 60 X 70 M' 1.00 Rp. 587,500.00 Rp. 587,500.00 Rp. 587,500.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 1,500.00 Rp. 1,500.00
Pek. Galian Tanah M3 0.90 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.13 D 21 Rp. 31,103.16 Rp. 4,167.82
3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,888.08
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 41,200.00 Rp. 41,200.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.64 D 11 Rp. 10,224.50 Rp. 6,543.68
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.64 D 21 Rp. 31,103.16 Rp. 19,906.02 Rp. 101,205.61
Buangan Tanah Sisa Galian M3 0.90 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. U - Ditch 60 X 80 M' 1.00 Rp. 640,000.00 Rp. 640,000.00 Rp. 640,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 0.95 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.14 D 21 Rp. 31,103.16 Rp. 4,354.44
3 Pas. Bedding Pasir tb. 10 Cm M3 0.14 D 13 Rp. 208,120.00 Rp. 29,136.80
4 Pek. Penempatan & Penyetelan U - Ditch M' 1.00 Ls Rp. 44,800.00 Rp. 44,800.00
5 Pek. Urugan Tanah Sisi U - Ditch M3 0.78 D 11 Rp. 10,224.50 Rp. 7,975.11
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat) M3 0.78 D 21 Rp. 31,103.16 Rp. 24,260.46 Rp. 112,526.82
Buangan Tanah Sisa Galian M3 0.95 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. Box Culvert 40 X 40 (heavy duty) M' 1.00 Ls Rp. 838,000.00 Rp. 838,000.00 Rp. 838,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 1.18 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.06 D 21 Rp. 31,103.16 Rp. 1,803.98
3 Pas. Bedding Pasir tb. 10 Cm M3 0.06 D 13 Rp. 208,120.00 Rp. 12,070.96
4 Pek. Penempatan & Penyetelan Box Culvert M' 1.00 Ls Rp. 58,700.00 Rp. 58,700.00
5 Pek. Urugan Tanah Sisi Box Culvert M3 0.20 D 11 Rp. 10,224.50 Rp. 2,044.90
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat M3 0.20 D 21 Rp. 31,103.16 Rp. 6,220.63 Rp. 82,840.48
Buangan Tanah Sisa Galian M3 0.98 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. Box Culvert 50 X 50 (heavy duty) M' 1.00 Ls Rp. 964,000.00 Rp. 964,000.00 Rp. 964,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 1.30 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.07 D 21 Rp. 31,103.16 Rp. 2,115.01
3 Pas. Bedding Pasir tb. 10 Cm M3 0.07 D 13 Rp. 208,120.00 Rp. 14,152.16
4 Pek. Penempatan & Penyetelan Box Culvert M' 1.00 Ls Rp. 67,500.00 Rp. 67,500.00
5 Pek. Urugan Tanah Sisi Box Culvert M3 0.40 D 11 Rp. 10,224.50 Rp. 4,089.80
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat M3 0.40 D 21 Rp. 31,103.16 Rp. 12,441.26 Rp. 102,298.24
Buangan Tanah Sisa Galian M3 1.30 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. Box Culvert 60 X 60 (heavy duty) M' 1.00 Ls Rp. 1,265,000.00 Rp. 1,265,000.00 Rp. 1,265,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,000.00 Rp. 2,000.00
Pek. Galian Tanah M3 1.42 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 0.08 D 21 Rp. 31,103.16 Rp. 2,488.25
3 Pas. Bedding Pasir tb. 10 Cm M3 0.08 D 13 Rp. 208,120.00 Rp. 17,065.84
4 Pek. Penempatan & Penyetelan Box Culvert M' 1.00 Ls Rp. 88,600.00 Rp. 88,600.00
5 Pek. Urugan Tanah Sisi Box Culvert M3 0.62 D 11 Rp. 10,224.50 Rp. 6,339.19
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat M3 0.62 D 21 Rp. 31,103.16 Rp. 19,283.96 Rp. 135,777.24
Buangan Tanah Sisa Galian M3 1.42 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. Box Culvert 80 X 80 (heavy duty) M' 1.00 Rp. 2,339,000.00 Rp. 2,339,000.00 Rp. 2,339,000.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00
Pek. Galian Tanah M3 1.70 D 01 Rp. - Rp. -
2 Pek. Pemadatan Tanah (dg alat) M3 1.10 D 21 Rp. 31,103.16 Rp. 34,213.48
3 Pas. Bedding Pasir tb. 10 Cm M3 0.12 D 13 Rp. 208,120.00 Rp. 24,974.40
4 Pek. Penempatan & Penyetelan Box Culvert M' 1.00 Ls Rp. 163,800.00 Rp. 163,800.00
5 Pek. Urugan Tanah Sisi Box Culvert M3 0.61 D 11 Rp. 10,224.50 Rp. 6,267.62
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat M3 0.84 D 21 Rp. 31,103.16 Rp. 26,126.65 Rp. 257,882.15
Buangan Tanah Sisa Galian M3 1.70 D 10 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. - Rp. -
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
A. Supply Material
1 Keb. Box Culvert 100 X 100 (heavy duty) M' 1.00 Ls Rp. 2,854,700.00 Rp. 2,854,700.00 Rp. 2,854,700.00
B. Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja M' 1.00 Ls Rp. 2,500.00 Rp. 2,500.00
Pek. Galian Tanah M3 1.90 D 01 Rp. 31,075.00 Rp. 59,042.50
2 Pek. Pemadatan Tanah (dg alat) M3 1.30 D 21 Rp. 31,103.16 Rp. 40,434.11
3 Pas. Bedding Pasir tb. 10 Cm M3 0.13 D 13 Rp. 208,120.00 Rp. 27,055.60
4 Pek. Penempatan & Penyetelan Box Culvert M' 1.00 Ls Rp. 199,900.00 Rp. 199,900.00
5 Pek. Urugan Tanah Sisi Box Culvert M3 1.20 D 11 Rp. 10,224.50 Rp. 12,269.40
6 Pek. Pemadatan Tanah Sisi Box Culvert (dg alat M3 1.20 D 21 Rp. 31,103.16 Rp. 37,323.79 Rp. 378,525.40
Buangan Tanah Sisa Galian M3 1.90 SNI-T8 Rp. - Rp. -
7 Pemberesan Lapangan Ls 1.00 Ls Rp. 633.62 Rp. 633.62
0.16666667
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
1 Cover Light Duty U - Ditch 40 M' 1.00 Rp. 181,666.67 Rp. 181,666.67
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 14,600.00 Rp. 14,600.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 196,266.67
1 Cover Heavy Duty U - Ditch 40 M' 1.00 Rp. 233,333.33 Rp. 233,333.33
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 18,700.00 Rp. 18,700.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 252,033.33
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
1 Cover Light Duty U - Ditch 50 M' 1.00 Rp. 231,666.67 Rp. 231,666.67
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 18,600.00 Rp. 18,600.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 250,266.67
1 Cover Heavy Duty U - Ditch 50 M' 1.00 Rp. 320,000.00 Rp. 320,000.00
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 25,600.00 Rp. 25,600.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 345,600.00
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
1 Cover Light Duty U - Ditch 60 M' 1.00 Ls Rp. 278,333.33 Rp. 278,333.33
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 22,300.00 Rp. 22,300.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 300,633.33
1 Cover Heavy Duty U - Ditch 60 M' 1.00 Ls Rp. 401,666.67 Rp. 401,666.67
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 32,200.00 Rp. 32,200.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 433,866.67
NO URAIAN PEKERJAAN SAT. VOLUME KODE HARGA SAT. JUMLAH SUB TOTAL
1 Cover Light Duty U - Ditch 80 M' 1.00 Ls Rp. 355,000.00 Rp. 355,000.00
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 24,900.00 Rp. 24,900.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 379,900.00
1 Cover Heavy Duty U - Ditch 80 M' 1.00 Ls Rp. 546,666.67 Rp. 546,666.67
2 Pek. Pengukuran M' - Ls Rp. - Rp. -
3 Pek. Perataan Perletakan M' - Ls Rp. - Rp. -
4 Pemasangan Handling / Unhandling M' 1.00 Ls Rp. 38,300.00 Rp. 38,300.00
5 Perawatan dan Pembersihan M' - Ls Rp. - Rp. - Rp. 584,966.67
1 2 3 4 5 6=(3x5)
Dibulatkan
C 01 1 M3 BONGKARAN BETON BERTULANG
Pekerja 6.6670 oh 40,000.00 266,680.00
Mandor 0.3330 oh 85,000.00 28,305.00
Jumlah 294,985.00
Jasa 10% 29,498.50
Jumlah Total 324,483.50
Dibulatkan 324,484.00
D 01 1 M3 GALIAN TANAH BIASA SEDALAM 1 M
Pekerja 0.7500 oh 40,000.00 30,000.00
Mandor 0.0250 oh 85,000.00 2,125.00
Jumlah 32,125.00
Jasa 10% 3,212.50
Jumlah Total 35,337.50
Dibulatkan 35,338.00
D 02 1 M3 GALIAN TANAH BIASA SEDALAM 2 M
Pekerja 0.9000 oh 40,000.00 36,000.00
Mandor 0.0450 oh 85,000.00 3,825.00
Jumlah 39,825.00
Jasa 10% 3,982.50
Jumlah Total 43,807.50
Dibulatkan 43,808.00
D 03 1 M3 GALIAN TANAH BIASA SEDALAM 3 M
Pekerja 1.0500 oh 40,000.00 42,000.00
Mandor 0.0670 oh 85,000.00 5,695.00
Jumlah 47,695.00
Jasa 10% 4,769.50
Jumlah Total 52,464.50
Dibulatkan 52,465.00
NO URAIAN VOL. SAT. HARGA SAT. JUMLAH
D 13 1 M3 URUGAN PASIR
Pasir urug 1.2000 m3 147,000.00 176,400.00
Pekerja 0.3000 oh 40,000.00 12,000.00
Mandor 0.0100 oh 80,000.00 800.00
Jumlah 189,200.00
Jasa 10% 18,920.00
Jumlah Total 208,120.00
Dibulatkan 208,120.00
SNI-PD5 1 M3 PASANG PONDASI BATU BELAH 1 PC : 4 PS
Batu belah 1.2000 m3 158,000.00 189,600.00
Semen Portland 3.2600 Zak 61,000.00 198,860.00
Pasir pasang 0.5200 m3 189,000.00 98,280.00
Pekerja 1.5000 oh 40,000.00 60,000.00
Tukang Batu Terampil 0.7500 oh 50,000.00 37,500.00
Kepala Tukang 0.0750 oh 55,000.00 4,125.00
Mandor 0.0750 oh 80,000.00 6,000.00
Jumlah 594,365.00
Jasa 10% 59,436.50
Jumlah Total 653,801.50
Dibulatkan 653,802.00
E 11 1 M3 PASANGAN BATU BELAH 1 PC : 4 PS (MENGADUK MORTAR DENGAN CONCRETE MIXER)
Batu belah 10-15 cm 1.1000 m3 158,000.00 173,800.00
Semen Portland 3.2600 zak 61,000.00 198,860.00
Pasir pasang 0.5200 m3 189,000.00 98,280.00
Pekerja 1.5000 oh 40,000.00 60,000.00
Tukang Batu Terampil 0.6000 oh 50,000.00 30,000.00
Kepala Tukang 0.0600 oh 55,000.00 3,300.00
Mandor 0.0750 oh 80,000.00 6,000.00
Operator Concrete Mixer 0.0500 oh 65,000.00 3,250.00
Concrete Mixer 0.25m3 0.3200 jam 38,000.00 12,160.00
Waterpump 50 mm 0.3200 jam 63,000.00 20,160.00
Jumlah 605,810.00
Jasa 10% 60,581.00
Jumlah Total 666,391.00
J 04 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MM
Semen Portland 0.1555 Zak 61,000.00 9,486.72
Pasir pasang 0.0230 m3 189,000.00 4,347.00
Pekerja 0.3000 oh 40,000.00 12,000.00
Tukang Batu Terampil 0.1500 oh 50,000.00 7,500.00
Kepala Tukang 0.0150 oh 55,000.00 825.00
Mandor 0.0150 oh 80,000.00 1,200.00
Jumlah 35,358.72
Jasa 10% 3,535.87
Jumlah Total 38,894.59
Dibulatkan 38,895.00
DAFTAR ANALISA SATUAN PEKERJAAN
TAHUN ANGGARAN 2010
Proses : Anggapan :
1. Pemasok mengirim material 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok
2. Beton diaduk di lokasi pekerjaan 2. Dipakai agregat pecah dan tersaring yang termurah
3. Beton dicor sampai padat 3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari
4. Adukan 1 m3 beton, dibutuhkan : semen : 247 kg/m3 ; Pasir Beton : 869 kg/m3 ;
kerikil (maksimal 3 cm) : 999 kg/m3; Air : 215 lt/m3;
5. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)
1 Pengaduk Beton 250 Lt/6 HP 2.00 3.00 E.251 36.00 38,000.00 1,368,000.00
2 Pump Water 50 mm - 30 m3/Jam 1.00 3.00 E.341 6.00 63,000.00 378,000.00
JUMLAH III Peralatan 1,746,000.00
Total (Rp) 21,387,315.45
BETON NON STRUKTUR Bo
VOLUME : 33.00 satuan m3 Sub. Total Harga Satuan Rp. 648,100.47 Per m3
Jasa 10 % 64,810.05
Total Harga Satuan Rp. 712,910.52 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam BETON STRUKTUR K 225 (SITE MIX) KODE
penyusunan DASK dan (MENGGUNAKAN ALAT PENGADUK BETON 250 LTR) F 08
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Pemasok mengirim material 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok
2. Beton diaduk di lokasi pekerjaan 2. Dipakai agregat pecah dan tersaring yang termurah
3. Beton dicor sampai padat 3. Dicor 11 m3/hari dengan 48 adukan/6 jam/hari
4. Adukan 1 m3 beton, dibutuhkan : semen : 371 kg/m3 ; Pasir Beton : 731 kg/m3 ;
kerikil (maksimal 3 cm) : 1031 kg/m3; Air : 215 lt/m3;
5. Beton non struktur dipakai untuk dasar dan lantai kerja pondasi
6. Sesuai Standar Nasional Indonesia (SNI 7394 :2008)
1 Pengaduk Beton 250 Lt/6 HP 2.00 3.00 E.251 36.00 38,000.00 1,368,000.00
2 Pump Water 50 mm - 30 m3/Jam 1.00 3.00 E.341 6.00 63,000.00 378,000.00
JUMLAH III Peralatan 1,746,000.00
Total (Rp) 25,761,830.10
BETON STRUKTUR K.225
VOLUME : 33.00 satuan m3 Sub. Total Harga Satuan Rp. 780,661.52 Per m3
Jasa 10 % 78,066.15
Total Harga Satuan Rp. 858,727.67 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PASANGAN BATU PADA PARIT KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) K.112
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Galian tambahan ( 0,40 m3 / m' ) 1. Parit yang ada vol. 0,54 m3/m'
2. Buat dasar pasangan batu 2. Ukuran parit bagian dalam tebal rata-rata dinding 20 cm, tebal dasar 25 cm,
3. Buat dinding pasangan batu pada parit ber- lebar dasar 50 cm, lebar atas 90 cm dan kedalaman 60 cm.
batasan dengan jalan untuk mendukung per- 3. 50 % sisa galian dibuang dengan truck bak terbuka, sejauh 1 km.
kerasan jalan dimana perlu. 4. 50 % sisa galian dibuang di sekitar lokasi.
4. Urug kembali dan buang sisa galian. 5. Bahan-bahan dikirim ke tempat pekerjaan oleh pemasok.
6. Hasil produksi 60 m'/Hari
1 Flatbed Truck 3,5 Ton/115 HP 1.00 1.00 E.221 6.00 163,000.00 978,000.00
JUMLAH III Peralatan 978,000.00
Total (Rp) 21,609,500.00
PASANGAN BATU PADA PARIT
VOLUME : 60.00 satuan m' Sub. Total Harga Satuan Rp. 360,158.33 Per m'
Jasa 10 % 36,015.83
Total Harga Satuan Rp. 396,174.17 Per m'
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam GALIAN TANAH UNTUK KONSTRUKSI KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) K.224
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Digali dengan tenaga manusia 1. Menggunakan tenaga manusia (40 m3/hari)
2. Membuang tanah galian sejauh 2. Kapasitas kerja per orang 1,3 m3/hari
30 m dari lubang galian 3. Kedalaman rata-rata galian s/d 3 m
4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
1
JUMLAH III Peralatan
Total (Rp) 1,375,000.00
GALIAN TANAH UNTUK KONSTRUKSI
VOLUME : 40.00 satuan m3 Sub. Total Harga Satuan Rp. 34,375.00 Per m3
Jasa 10 % 3,437.50
Total Harga Satuan Rp. 37,812.50 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENGURUGAN DAN PEMADATAN DGN SIRTU KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) D 14
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Membersihkan struktur dari bahan-bahan 1. Bahan urugan dikirim ke lokasi pekerjaan oleh pemasok
organik. 2. Digunakan kerikil galian/sungai tidak tersaring yang termurah
2. Buruh mengurug bagian belakang struktur. 3. Urugan dipadatkan berlapis tebal 10 cm.
3. Memadatkan dengan tamper dan
mesin gilas bergetar.
1 Roller Vibr. Ped 1 Ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00
2 Tamp Vibr. Plate 4 HP 1.00 10.00 E.088 10.00 38,000.00 380,000.00
JUMLAH III Peralatan 695,000.00
Total (Rp) 4,520,000.00
PENGURUGAN DAN PEMADATAN DGN SIRTU
VOLUME : 15.00 satuan m3 Sub. Total Harga Satuan Rp. 301,333.33 Per m3
Jasa 10 % 30,133.33
Total Harga Satuan Rp. 331,466.67 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) D 15
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Membersihkan struktur dari bahan-Bahan 1. Bahan Urugan dikirim ke lokasi pekerjaan oleh pemasok
organik 2. Digunakan Tanah Pilihan
2. Buruh mengurug bagian belakang struktur 3. Urugan Dipadatkan berlapis tebal 10 cm.
3. Memadatkan dengan tamper dan
mesin gilas bergetar.
1 Roller Vibr. Ped 1 Ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00
2 Tamp Vibr. Plate 4 HP 1.00 10.00 E.088 10.00 38,000.00 380,000.00
JUMLAH III Peralatan 695,000.00
Total (Rp) 2,300,000.00
PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN
VOLUME : 15.00 satuan m3 Sub. Total Harga Satuan Rp. 153,333.33 Per m3
Jasa 10 % 15,333.33
Total Harga Satuan Rp. 168,666.67 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENIMBUNAN BADAN JALAN KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) D 16
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Material dihampar maksimum tebal setiap 1. Menggunakan tenaga manusia (60 m3/Hari)
lapis 20 cm 2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan -
2. Setiap lapis dipadatkan minimum 4 kali sejauh 10 km oleh Pemasok
lintasan dengan mesin gilas roda karet. 3. Harga material tergantung harga di lokasi pekerjaan
4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
Proses : Anggapan :
1. Material dihampar maksimum tebal setiap 1. Menggunakan tenaga manusia (60 m3/hari)
lapis 20 Cm 2. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
2. Setiap lapis dipadatkan minimum 4 kali
lintasan dengan mesin gilas roda karet
Proses : Anggapan :
1. Pembentukan tanah dasar dengan tenaga 1. Menggunakan tenaga orang (8 m x 400 m/hari)
manusia 2. DAMIJA dibersihkan dari semak dan lain-lain
2. Dipadatkan dengan mesin gilas roda baja 3. Lebar dasar jalan 8 m
sampai 100 % MDD (AASHTO T99) 4. Hasil kerja menyiapkan dasar jalan 400 m/Hari
5. Kapasitas kerja 40 m2/orang hari
6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 Alat
Proses : Anggapan :
1. 1.
2. 2.
Proses : Anggapan :
1. Material LPB yang baik dan sesuai ditimbun 1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
sepanjang bahu jalan oleh pemasok 2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan
2. Tenaga terampil mengatur penimbunan 3. Material LPB yang termurah dikirim ke lokasi pekerjaan oleh pemasok
3. Material disebar dengan tenaga manusia 4. Pemasok menimbun material LPB sepanjang bahu jalan
4. Pemadatan dengan mesin gilas bergetar 5. Material disebar dengan tenaga manusia
yang kecil. 6. 96 m3 dihamparkan dan dipadatkan setiap hari
7. Koefisien pemadatan = 1,2
8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
1 Roller Vibr. Ped 1 ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00
JUMLAH III Peralatan 315,000.00
Total (Rp) 10,200,000.00
PEMBENTUKAN BAHU JALAN
VOLUME : 96.00 satuan m3 Sub. Total Harga Satuan Rp. 106,250.00 Per m3
Jasa 10 % 10,625.00
Total Harga Satuan Rp. 116,875.00 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7) KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) D 25
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Material Split yang baik dan sesuai ditimbun 1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
sepanjang bahu jalan oleh pemasok 2. 10 cm timbunan padat, dibutuhkan 1 m' lebar bahu jalan
2. Tenaga terampil mengatur penimbunan 3. Material Split yang termurah dikirim ke lokasi pekerjaan oleh pemasok
3. Material disebar dengan tenaga manusia 4. Pemasok menimbun material Split sepanjang bahu jalan
4. Pemadatan dengan mesin gilas bergetar 5. Material disebar dengan tenaga manusia
yang kecil. 6. 96 m3 dihamparkan dan dipadatkan setiap hari
7. Koefisien pemadatan = 1,2
8. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
1 Roller Vibr. Ped 1 ton 1.00 5.00 E.087 5.00 63,000.00 315,000.00
JUMLAH III Peralatan 315,000.00
Total (Rp) 23,076,000.00
PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7)
VOLUME : 96.00 satuan m3 Sub. Total Harga Satuan Rp. 240,375.00 Per m3
Jasa 10 % 24,037.50
Total Harga Satuan Rp. 264,412.50 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING KODE
penyusunan DPA dan (MENGGUNAKAN ALAT) Q 01
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat (150 m3/detik)
1. Bab Satuan Pekerjaan ini, Spesifikasi Jalan Kota, 2. Material ditimbun disepanjang jalan oleh pemasok
Bina Marga, Maret 1992 3. Dihampar dan dipadatkan sampai tebal padat 15 cm
2. Atau addendum yang berlaku 4. Koefisien pemadatan = 1,3
Proses : Anggapan :
1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (60 m3/detik)
ditimbun disamping jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Jalan disiram air dengan truk air 3. Dihampar dengan tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat 10 cm
3. Pemadatan dalam 2 lapis dengan mesin gilas 4. Koefisien pemadatan = 1,3
baja sampai 100 % MDD 5. Dihampar dan dipadatkan 600 m2/hari
4. Grader membentuk ulang permukaan lama jalan 6. Umur alat bantu rata-rata 1 bulan -
dan menghampar agregat dengan tenaga manusia
5. Perapihan dengan tenaga manusia
1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00
2 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00
JUMLAH III Peralatan 1,194,500.00
Total (Rp) 15,515,500.00
LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI
VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 258,591.67 Per m3
Jasa 10 % 25,859.17
Total Harga Satuan Rp. 284,450.83 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LAPIS PONDASI BAWAH KELAS C AGREGAT KODE
penyusunan DPA dan PECAH TERSARING (MENGGUNAKAN BURUH) Q 03
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (60 m3/det)
ditimbun disamping jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Jalan disiram air dengan truk air 3. Dihampar dan dipadatkan sampai tebal padat 10 cm
3. Pemadatan dengan mesin gilas 4. Koefisien pemadatan 1,3
6 - 8 ton sampai 100 % MDD
1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00
2 Truk Tangki Air 1.00 1.00 E.182 5.00 163,000.00 815,000.00
JUMLAH III Peralatan 1,194,500.00
Total (Rp) 14,350,500.00
LAPIS PONDASI BAWAH KELAS C AGREGAT
VOLUME : 60.00 satuan m3 Sub. Total Harga Satuan Rp. 239,175.00 Per m3
Jasa 10 % 23,917.50
Total Harga Satuan Rp. 263,092.50 Per m3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LAPIS PONDASI ATAS KELAS A AGREGAT KODE
penyusunan DPA dan PECAH TERSARING (MENGGUNAKAN ALAT) Q 04
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Agregat batu pecah tersaring bergradasi 1. Menggunakan alat berat (150 m3/detik)
ditimbun disamping jalan oleh pemasok 2. Material ditimbun di sepanjang jalan oleh pemasok
2. Grader menghampar agregat 3. Dihampar dan dipadatkan sampai tebal padat 10 cm
3. Jalan disiram air dengan truk air 4. Koefisien pemadatan 1,3
4. Pemadatan dengan mesin gilas
6 - 8 ton sampai 100 % MDD
Proses : Anggapan :
1. Permukaan jalan dibersihkan dan kering 1. Menggunakan alat berat (45 m3/hari)
2. Lapis tack/pengikat aspal catback dihampar 2. Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP
@ 0,5 ltr/m2 3. ATB dihampar dan dipadatkan sampai tb. 10 cm
3. ATB dihampar dengan aspal finisher 4. BJ ATB padat 2,25 ton/m3
4. Temperatur ATB 120° C dan 5. Sesuai Spesifikasi BM No. 03/PT/B/1983 & Rev. Spesifikasi Umum Maret 1989 -
tidak kurang dari 100° C Buku 3
5. Perapihan dengan tenaga manusia 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
1 Mesin Gilas 3 Roda 6 - 8 Ton 5.00 1.00 E.080 5.00 75,900.00 379,500.00
2 Roller Pneumatic 8 - 15 ton 5.00 1.00 E.084 5.00 156,000.00 780,000.00
3 Mesin Penyemprot Aspal 1000 ltr 3.00 1.00 E.153 3.00 112,960.66 338,881.98
4 Asphalt Finisher 1820 mm/30 HP 5.00 1.00 E.157 5.00 188,000.00 940,000.00
5 Compressor Air 210 m3/jam 4.00 1.00 E.301 4.00 81,000.00 324,000.00
JUMLAH III Peralatan 2,762,381.98
Total (Rp) 81,094,381.98
PASANGAN LAPIS ATB
VOLUME : 45.00 satuan m3 Sub. Total Harga Satuan Rp. 1,802,097.38 Per M3
Jasa 10 % 180,209.74
Total Harga Satuan Rp. 1,982,307.12 Per M3
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LABUR ASPAL DUA LAPIS (BURDA) KODE
penyusunan DPA dan (MENGGUNAKAN ALAT) Q 06
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Hasil kerja 600 m2/hari
1. Bab Satuan Pekerjaan ini, Spesifikasi Jalan Kota, 2. Agregat ukuran 19 mm dan 9,5 mm tersaring unit pemecah
Bina Marga, Maret 1992 3. Batu ditimbun di lokasi pekerjaan oleh pemasok
2. Atau addendum yang berlaku 4. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan binder
5. Lapis seal/penutup menggunakan aspal catback @ 1,5 kg/m2 dan 1,2 kg/m2
6. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dumptruck penghampar
@ 55 m2/m3 dan 120 m/m3
Proses : Anggapan :
1. Hamparan agregat pokok 3-5 cm 1. Permukaan jalan yang akan dilapis sudah di prime/tack coat
80 kg/m2 (20 m2/m3) 2. Menggunakan tenaga buruh
2. Digilas dan dipadatkan dengan mesin 3. Agregat pecah sesuai ukuran, siap dilokasi
gilas roda baja 6 - 8 ton 4. Tebal padat perkerasan 5 cm
3. Semprotan aspal 2,5 kg/m2 5. Faktor kehilangan agregat = 1.02
4. Hamparkan agregat pengunci 1 - 2 cm
25 kg/m2 (64 m2/m3), digilas & dipadatkan
5. Semprotan aspal 1,5 kg/m2
6. Hamparkan agregat penutup 0,5 - 1 cm
14 kg/m2 (80 m2/m3), digilas & dipadatkan
1 Mesin Gilas 3 Roda 6 - 8 Ton 1.00 3.00 E.080 15.00 75,900.00 1,138,500.00
2 Asp. Sprayer Towed 2.00 3.00 E.154 30.00 38,000.00 1,140,000.00
3 Dump Truck 3,5 Ton - 115 Hp 1.00 3.00 E.211 15.00 163,000.00 2,445,000.00
4 Blower 1.00 3.00 15.00 16,802.57 252,038.55
JUMLAH III Peralatan 4,975,538.55
Total (Rp) 97,987,278.55
LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN
VOLUME : 1,400.00 satuan m2 Sub. Total Harga Satuan Rp. 69,990.91 Per m2
Jasa 10 % 6,999.09
Total Harga Satuan Rp. 76,990.00 Per m2
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LAPIS ASPAL RESAP PELEKAT KODE
penyusunan DPA dan (PRIME COAT) Q 08
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko (siap dilokasi)
1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah
Umum Jalan Kabupaten, Bina Marga berdasarkan berat
Maret 1992 3. Berat jenis minyak tanah 0,86
2. Tingkat Penyemprotan 1 Kg/m2 disemprot 4. Berat jenis aspal 1,03
mempergunakan mesin penyemprot aspal
1 Asp. Sprayer Towed 200 ltr 1.00 1.00 E.154 5.00 38,000.00 190,000.00
2 Blower 1.00 1.00 5.00 16,802.57 84,012.85
JUMLAH III Peralatan 274,012.85
Total (Rp) 13,995,512.85
LAPIS ASPAL RESAP PELEKAT (Prime Coat)
VOLUME : 1,000.00 satuan M2 Sub. Total Harga Satuan Rp. 13,995.51 per M2
Jasa 10 % 1,399.55
Total Harga Satuan Rp. 15,395.06 per M2
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam LAPIS ASPAL PELEKAT KODE
penyusunan DPA dan (TACK COAT) Q 09
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Harga bahan, perangko (siap dilokasi)
1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25 bagian minyak tanah
Umum Jalan Kabupaten, Bina Marga berdasarkan berat
Maret 1992 3. Berat jenis minyak tanah 0,86
2. Tingkat Penyemprotan 0.2 Kg/m2 disemprot 4. Berat jenis aspal 1,03
mempergunakan mesin penyemprot aspal
1 Asp. Sprayer Towed 200 ltr 1.00 1.00 E.154 3.00 38,000.00 114,000.00
2 Compressor 210 m3/jam 1.00 1.00 E.301 1.00 75,900.00 75,900.00
3 Blower 1.00 1.00 3.00 16,802.57 50,407.71
JUMLAH III Peralatan 240,307.71
Total (Rp) 1,933,807.71
LAPIS ASPAL PELEKAT (Tack Coat)
VOLUME : 600.00 Satuan M2 Sub. Total Harga Satuan Rp. 3,223.01 Per M2
Jasa 10 % 322.30
Total Harga Satuan Rp. 3,545.31 Per M2
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON KODE
penyusunan DPA dan (MENGGUNAKAN ALAT) Q 10
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat 1500 m2/hari
1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP
Umum Jalan Kabupaten, Bina Marga 3. Tebal padat rata-rata 3 cm
Maret 1992 4. BJ lataston padat 2,2 t/m3
2. Atau Addendum yang Berlaku 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Proses : Anggapan :
Pekerjaan ini harus dilaksanakan sesuai : 1. Menggunakan alat berat 1500 m2/hari
1. Bab Satuan Pekerjaan ini, Spesifikasi 2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP
Umum Jalan Kabupaten, Bina Marga 3. Tebal padat rata-rata 3 cm
Maret 1992 4. BJ lataston padat 2,2 t/m3
2. Atau Addendum yang Berlaku 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Proses : Anggapan :
1. Pengisian material sampai bin dari spreader 1. Menggunakan alat berat 900 m2/hari
dari pemasok 2. Aspal Concrete (Laston) dikirim kelokasi oleh pemasok dari AMP
2. Material dihampar dengan spreader dan 3. Tebal padat rata-rata 5 cm
dipadatkan dengan mesin gilas baja dan 4. BJ laston padat 2,25 t/m3
mesin gilas pneumatic roda karet 5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
6. Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2
1 Mesin Gilas 3 Roda 6 - 8 ton 1.00 1.00 E.080 5.00 75,900.00 379,500.00
2 Roller Tandem 6 - 10 Ton 1.00 1.00 E.081 5.00 113,000.00 565,000.00
3 Roller Pneumatic 8 - 15 ton 1.00 1.00 E.084 5.00 156,000.00 780,000.00
4 Mesin Penyemprot Aspal 100 ltr 1.00 1.00 E.153 3.00 112,960.66 338,881.98
5 Asphalt Finisher 1820 mm / 301 HP 1.00 1.00 E.157 5.00 188,000.00 940,000.00
6 Compressor Air 210 m3/jam 1.00 1.00 E.301 4.00 81,000.00 324,000.00
JUMLAH III Peralatan 3,327,381.98
Total (Rp) 91,317,381.98
PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC
VOLUME : 900.00 satuan m2 Sub. Total Harga Satuan Rp. 101,463.76 Per m2
Jasa 10 % 10,146.38
Total Harga Satuan Rp. 111,610.13 Per m2
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5 KODE
penyusunan DPA dan (MENGGUNAKAN BURUH) K.705
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Material ditimbun di lokasi pekerjaan 1. Dilakukan utk pekerjaan gorong-gorong, jembatan, dinding penahan tanah,
oleh pemasok dan struktur lainnya yang menggunakan konstruksi pasangan batu
2. Pekerja membawa batu belah ke tempat 2. Material-material dikirim ketempat pekerjaan oleh pemasok
tukang batu bekerja 3. Tidak termasuk galian/timbunan
3. Tukang batu memasang batu pecah dengan 4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari
adukan pasir semen bambu untuk lubang drainase
5. Koefisien lepas batu = 1,2
6. Mortar strain = 50 kg/cm2
Proses : Anggapan :
1. Kelompok tukang kayu memotong dan membuat 1. Kelompok tukang kayu memasang 20 m2 dalam 1 hari kerja
acuan 2. 1/3 material dapat dipakai kembali
2. Kelompok tukang kayu membongkar acuan 3. Pengadaan bahan oleh Pemasok
setelah beton cukup kuat 4. Untuk 1 m3 beton dipakai 2 lbr plywood (120 cm x 240 cm x 1,75 cm)
3. Kelompok tukang kayu membersihkan acuan 5. Kelompok tukang kayu membongkar acuan
untuk dipakai kembali
1
JUMLAH III Peralatan -
Total (Rp) 2,117,000.00
BEKISTING
VOLUME : 20.00 satuan m2 Sub. Total Harga Satuan Rp. 105,850.00 Per m2
Jasa 10 % 10,585.00
Total Harga Satuan Rp. 116,435.00 Per m2
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENULANGAN BETON (BESI ULIR) KODE
penyusunan DPA dan R 14
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan 2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok
2. Perakitan tulangan besi beton dan diikat 3. Penyusutan akibat pemotongan dll dianggap 1 %
dengan kawat baja 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan
5. 0,8 orang/hari memotong 200 kg batang besi beton
6. 1,0 orang/hari membengkok 200 kg batang besi beton
7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton
8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat
1
JUMLAH III Peralatan -
Total (Rp) 3,064,000.00
PENULANGAN BETON
VOLUME : 200.00 satuan kg Sub. Total Harga Satuan Rp. 15,320.00 Per kg
Jasa 10 % 1,532.00
Total Harga Satuan Rp. 16,852.00 Per kg
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENULANGAN BETON (BETON POLOS) KODE
penyusunan DPA dan R 14a
Mengevaluasi Harga Penawaran
Propinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Batang besi beton dipotong sesuai ukuran 1. 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan 2. Besi tulangan dikirim ke tempat pekerjaan oleh pemasok
2. Perakitan tulangan besi beton dan diikat 3. Penyusutan akibat pemotongan dll dianggap 1 %
dengan kawat baja 4. Membengkok dan memasang batang besi beton dilaksanakan dengan tangan
5. 0,8 orang/hari memotong 200 kg batang besi beton
6. 1,0 orang/hari membengkok 200 kg batang besi beton
7. 1,2 orang/hari memasang dan mengikat 200 kg tulangan besi beton
8. Umur alat bantu rata-rata 1 bulan/set @ 3 alat
1
JUMLAH III Peralatan -
Total (Rp) 2,366,500.00
PENULANGAN BETON
VOLUME : 200.00 satuan kg Sub. Total Harga Satuan Rp. 11,832.50 Per kg
Jasa 10 % 1,183.25
Total Harga Satuan Rp. 13,015.75 Per kg
Analisa Harga Satuan ini hanya diperguna ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENGHAMPARAN BETON NON STRUKTUR/RABAT KELAS Bo (READY MIX CONCRETE)
penyusunan DPA dan
Mengevaluasi Harga Penawaran
Provinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
Harga Biaya
No MATERIAL Satuan Kode Total Vol.
(Rp/Unit) (Rp)
Harga Biaya
No. PERALATAN Jumlah Jam Kerja Kode Jam Kerja
(Rp/jam) (Rp)
Sub Total
Rp
615,000.00
Sub Total
(Rp)
29,307,000.00
Sub Total
(Rp)
434,000.00
30,356,000.00
Analisa Harga Satuan ini hanya dipergunakan ANALISA HARGA SATUAN
sebagai dasar/pendekatan dalam PENGHAMPARAN BETON STRUKTUR K 125 (READY MIX CONCRETE) KODE
penyusunan DPA dan F 02
Mengevaluasi Harga Penawaran
Provinsi : Kota : Disiapkan Oleh : Tanggal :
JAWA BARAT DEPOK Dec-99 #REF!
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang
Proses : Anggapan :
1. Pemasok mengirim Ready Mix 1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
2. Beton dihampar di lokasi pekerjaan 2. Beton dipasang untuk bagian struktur pratekan, lantai jembatan, dll
3. Beton digetar sampai padat 3. Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)
4. Acuan dan tulangan besi beton sudah dipasang